CN201242570Y - 非接触式高压核相器 - Google Patents
非接触式高压核相器 Download PDFInfo
- Publication number
- CN201242570Y CN201242570Y CNU2008200299475U CN200820029947U CN201242570Y CN 201242570 Y CN201242570 Y CN 201242570Y CN U2008200299475 U CNU2008200299475 U CN U2008200299475U CN 200820029947 U CN200820029947 U CN 200820029947U CN 201242570 Y CN201242570 Y CN 201242570Y
- Authority
- CN
- China
- Prior art keywords
- phase
- slave
- contact type
- high voltage
- type high
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
本实用新型涉及一种高压线路相序校准核定技术。由主机和从机两个组件构成,主、从机均有非接触式电压传感器、无线通信模块、GPS模块和相位测量电路。本实用新型克服了传统相位核定装置存在的缺点,具有安全、可靠、效率高、操作简便等优点。
Description
技术领域 本实用新型涉及一种高压线路相序校准核定技术。
背景技术 每当新发电厂并网前、新变电站投产前、输变电工程扩建改造后或主设备大修后,常常需要在竣工投运现场进行核相试验,即需要校核待并网的两线路中的对应相是否同相——相序校准核定。传统相位核定的方法有直接核定法和间接核定法:
直接核定法:在运行电压下,使用二根电阻值相同的高绝缘、高阻值的核相棒直接接触待核定的二相高压线,将被测高压降压后引入核相装置,读取连接两个核相棒的微安表电流数值,根据广义交流电桥的原理,从而判断出待测的二根高压线是否同相。这种方法主要存在两个弊端:1)核相时,人与电网通过核相器形成电气连接,安全隐患极大;2)核相时,两相线路通过核相器连接,有相间短路的危险。
间接核定法:在现场不具备直接核相条件时,利用连接在两个高压导线上的同型号的电压互感器,通过电压互感器二次侧进行间接核定。这种方法,需要多次调整***一次接线,多次操作输变电设备,不仅麻烦,而且易出差错;另外,电压互感器与***电容可能发生铁磁谐振,引起过电压而损坏设备,造成人身与***事故;另外,采用该方法,需要多个部门配合,工作流程长,效率低。
实用新型内容 本实用新型的目的在于,解决传统核相方法和装置存在的不足,设计一种安全、可靠、效率高、操作简便的新型核相器——非接触式高压核相器。
本实用新型是这样实现的:主要由主机和从机两个组件构成,主、从机均有非接触式电压传感器、无线通信模块、GPS模块和相位测量电路。非接触式电压传感器在高压线路的电磁场下感应产生电压差,结合GPS模块的时间基准,提供被测高压线路的初相位信号;无线通信模块,用于主、从机之间的射频无线通信;相位测量电路,进行两被测高压线路的相位差测量,得出是否同相的判断。
使用本实用新型核相时,操作人员不必接触被测高压线路,只需在两条被测高压线路的正下方,分别手持主机、从机。当主机和从机的无线通信建立之后,首先将采集的高压线路电压信号进行处理,经过调制后再发送给对方。主、从机各自将接收到的对方发来的电网电压信号解调后,与本机采集到的电网电压信号进行实时比较,即可测出其相位差值。按照核相判定准则,相位差值小于10°为同相,相位差值大于30°为不同相。
本实用新型克服了传统相位核定装置存在的缺点,更加安全、可靠、效率高、操作简便。
附图说明
附图1.本实用新型的工作状态示意图;
附图2.单机的电路原理方框图;
附图3.相位测量的计算原理图。
具体实施方式 下面结合附图叙述一个本实用新型的实施例
图1显示了本实施例的工作状态。图中,A、B、C和A’、B’、C’分别表示两条被测高压线路——线路I和线路II各自的三相;两个操作人员位于两条被测之高压线路I和线路II的正下方,分别手持主机、从机,以获得被测线路的同频电压信号。
图2显示电路结构原理。主机、从机均含由非接触电压传感器1、无线通信模块2、GPS模块3和相位测量电路4构成。
其中,非接触式电压传感器1是一个特制的铜质平板金属体,用来感应高压导线上的电压。在感应电极上产生微弱的和被测高压线路同频同相的电压信号,主机得到线路I的电压信号,从机得到线路II的电压信号,并送入各自的相位测量电路进行处理。
从机的无线通信模块2将经过处理的线路II的电压信号发送给主机,主机的无线通信模块2接收该信号。
GPS模块3提供相位测量的时间基准。
从机的相位测量电路4获得的线路II的工频正弦波电压信号,按信号的过零点转换成同样频率的方波,处理后通过无线通信模块2发送给主机。主机的相位测量电路4处理主机获得的线路I的电压信号,并将接收到的、经过处理的从机的同时刻电压信号进行比较,得到二者的相位差。按照核相判定准则,相位差值小于10°为同相,相位差值大于30°为不同相。
图3系以图形方式表示的相位差计算原理。
由于相位实际是一个时域量,因此同频率的2个方波信号I、II,其相位差等于II的上升沿(或下降沿)时间减去I的上升沿(或下降沿)的时间差Δt,除以该频率信号的周期T,再乘以360度,相位差的计算公式为:
在相位差的计算中,I、II两路信号必须有同一个参考时基。在高压核相时,从机获得的信号需要调制后通过无线方式传送给主机,必然存在时间的延迟,因此可以在主机和从机上各配置一各GPS,利用GPS的标准秒脉冲来为主、从机提供统一的参考时基。
Claims (2)
1.非接触式高压核相器,其特征在于:由主机和从机两个组件构成,主、从机均有非接触式电压传感器(1)、无线通信模块(2)、GPS模块(3)和相位测量电路(4),非接触式电压传感器(1)在高压线路的电磁场下感应产生电压差,结合GPS模块(3)的时间基准,提供被测高压线路的初相位信号;无线通信模块(2)用于主、从机之间的射频无线通信;相位测量电路(4)进行两被测高压线路的相位差测量,得出是否同相的判断。
2.根据权利要求1所述非接触式高压核相器,其特征在于:所说的非接触式电压传感器(1)是一个铜质平板金属体。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200299475U CN201242570Y (zh) | 2008-08-14 | 2008-08-14 | 非接触式高压核相器 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200299475U CN201242570Y (zh) | 2008-08-14 | 2008-08-14 | 非接触式高压核相器 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201242570Y true CN201242570Y (zh) | 2009-05-20 |
Family
ID=40715861
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200299475U Expired - Fee Related CN201242570Y (zh) | 2008-08-14 | 2008-08-14 | 非接触式高压核相器 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201242570Y (zh) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101893662A (zh) * | 2010-07-23 | 2010-11-24 | 江苏省电力公司常州供电公司 | 数字变电站的核相方法 |
CN102577058A (zh) * | 2009-08-10 | 2012-07-11 | 艾默生环境优化技术有限公司 | 用于功率因数校正频率跟踪和参考产生的***和方法 |
CN103063934A (zh) * | 2012-12-31 | 2013-04-24 | 国家电网公司 | 一种三相电压鉴相方法 |
CN103604992A (zh) * | 2013-11-28 | 2014-02-26 | 国家电网公司 | 变电站二次回路无线核相带负荷校保护的方法及*** |
US9088232B2 (en) | 2009-08-10 | 2015-07-21 | Emerson Climate Technologies, Inc. | Power factor correction with variable bus voltage |
CN104880615A (zh) * | 2015-05-19 | 2015-09-02 | 苏州市华安普电力工程有限公司 | 一种高压核相器 |
US9154061B2 (en) | 2009-08-10 | 2015-10-06 | Emerson Climate Technologies, Inc. | Controller and method for transitioning between control angles |
US9240749B2 (en) | 2012-08-10 | 2016-01-19 | Emerson Climate Technologies, Inc. | Motor drive control using pulse-width modulation pulse skipping |
CN105785143A (zh) * | 2016-04-22 | 2016-07-20 | 国家电网公司 | 一种低压线路在线核相装置及其核相方法 |
US9634593B2 (en) | 2012-04-26 | 2017-04-25 | Emerson Climate Technologies, Inc. | System and method for permanent magnet motor control |
CN110275072A (zh) * | 2019-07-23 | 2019-09-24 | 国网湖南省电力有限公司 | 低压三相负荷不平衡台区的相线检测装置及其检测方法 |
CN110333399A (zh) * | 2019-08-21 | 2019-10-15 | 广东电网有限责任公司 | 一种配网低压用户负荷查相方法 |
-
2008
- 2008-08-14 CN CNU2008200299475U patent/CN201242570Y/zh not_active Expired - Fee Related
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9705433B2 (en) | 2009-08-10 | 2017-07-11 | Emerson Climate Technologies, Inc. | Controller and method for transitioning between control angles |
US9564846B2 (en) | 2009-08-10 | 2017-02-07 | Emerson Climate Technologies, Inc. | Power factor correction with variable bus voltage |
US9912263B2 (en) | 2009-08-10 | 2018-03-06 | Emerson Climate Technologies, Inc. | Controller and method for transitioning between control angles |
US9154061B2 (en) | 2009-08-10 | 2015-10-06 | Emerson Climate Technologies, Inc. | Controller and method for transitioning between control angles |
CN102577058B (zh) * | 2009-08-10 | 2015-09-02 | 艾默生环境优化技术有限公司 | 用于功率因数校正频率跟踪和参考产生的***和方法 |
US9088232B2 (en) | 2009-08-10 | 2015-07-21 | Emerson Climate Technologies, Inc. | Power factor correction with variable bus voltage |
CN102577058A (zh) * | 2009-08-10 | 2012-07-11 | 艾默生环境优化技术有限公司 | 用于功率因数校正频率跟踪和参考产生的***和方法 |
CN101893662B (zh) * | 2010-07-23 | 2013-08-07 | 江苏省电力公司常州供电公司 | 数字变电站的核相方法 |
CN101893662A (zh) * | 2010-07-23 | 2010-11-24 | 江苏省电力公司常州供电公司 | 数字变电站的核相方法 |
US9991834B2 (en) | 2012-04-26 | 2018-06-05 | Emerson Climate Technologies, Inc. | System and method for permanent magnet motor control |
US10075116B2 (en) | 2012-04-26 | 2018-09-11 | Emerson Climate Technologies, Inc. | System and method for permanent magnet motor control |
US9634593B2 (en) | 2012-04-26 | 2017-04-25 | Emerson Climate Technologies, Inc. | System and method for permanent magnet motor control |
US9853588B2 (en) | 2012-08-10 | 2017-12-26 | Emerson Climate Technologies, Inc. | Motor drive control using pulse-width modulation pulse skipping |
US9240749B2 (en) | 2012-08-10 | 2016-01-19 | Emerson Climate Technologies, Inc. | Motor drive control using pulse-width modulation pulse skipping |
CN103063934A (zh) * | 2012-12-31 | 2013-04-24 | 国家电网公司 | 一种三相电压鉴相方法 |
CN103063934B (zh) * | 2012-12-31 | 2017-02-08 | 国家电网公司 | 一种三相电压鉴相方法 |
CN103604992A (zh) * | 2013-11-28 | 2014-02-26 | 国家电网公司 | 变电站二次回路无线核相带负荷校保护的方法及*** |
CN103604992B (zh) * | 2013-11-28 | 2015-11-04 | 国家电网公司 | 变电站二次回路无线核相带负荷校保护的方法及*** |
CN104880615A (zh) * | 2015-05-19 | 2015-09-02 | 苏州市华安普电力工程有限公司 | 一种高压核相器 |
CN105785143A (zh) * | 2016-04-22 | 2016-07-20 | 国家电网公司 | 一种低压线路在线核相装置及其核相方法 |
CN110275072A (zh) * | 2019-07-23 | 2019-09-24 | 国网湖南省电力有限公司 | 低压三相负荷不平衡台区的相线检测装置及其检测方法 |
CN110333399B (zh) * | 2019-08-21 | 2021-05-11 | 广东电网有限责任公司 | 一种配网低压用户负荷查相方法 |
CN110333399A (zh) * | 2019-08-21 | 2019-10-15 | 广东电网有限责任公司 | 一种配网低压用户负荷查相方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201242570Y (zh) | 非接触式高压核相器 | |
CN101339212A (zh) | 非接触式高压核相器 | |
CN102680798B (zh) | 杆塔接地电阻在线测量方法与装置 | |
CN201707380U (zh) | 一种基于gps同步的便携式moa带电检测装置 | |
CN102129018A (zh) | 一种高压容性设备绝缘在线监测方法 | |
CN103543378B (zh) | 台片关系检测方法 | |
CN201402287Y (zh) | 一种电压互感器二次回路压降检测装置 | |
CN102262171A (zh) | 一种基于gps同步的moa带电检测*** | |
CN202230195U (zh) | 智能变电站光纤式电能表带负荷检测装置 | |
CN105929284A (zh) | 带电测量氧化锌避雷器的无线测试仪及检测方法 | |
CN206411250U (zh) | 一种直流电子式电流互感器数字化实时校验装置 | |
CN104407240A (zh) | 三绕组变压器损耗在线检测***及损耗计算方法 | |
CN106353610A (zh) | 具有基站服务功能的核相仪及核相方法 | |
CN106093582A (zh) | 一种基于gps同步的线路参数双端测试***及方法 | |
JP5485344B2 (ja) | 監視装置、監視システム | |
CN102866378B (zh) | 一种电压或电流互感器在线测试装置及方法 | |
CN203164360U (zh) | 一种变电设备绝缘在线监测*** | |
CN207232291U (zh) | 一种电力变压器损耗的带电检测*** | |
CN107589330B (zh) | 一种电力变压器损耗的带电检测***及方法 | |
CN205749680U (zh) | 一种基于gps同步的线路参数双端测试*** | |
CN103439616A (zh) | 一种变损精确测量装置 | |
CN206038784U (zh) | 带电测量氧化锌避雷器的无线测试仪 | |
CN206756941U (zh) | 高压交流线路三相相序无线测量装置 | |
CN203250019U (zh) | 一种750kV变电站互感器现场无线校验仪 | |
CN204633468U (zh) | 一种多模方式的台区用户识别装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090520 Termination date: 20130814 |