CN201232163Y - Relief sand jack - Google Patents

Relief sand jack Download PDF

Info

Publication number
CN201232163Y
CN201232163Y CNU2008200263187U CN200820026318U CN201232163Y CN 201232163 Y CN201232163 Y CN 201232163Y CN U2008200263187 U CNU2008200263187 U CN U2008200263187U CN 200820026318 U CN200820026318 U CN 200820026318U CN 201232163 Y CN201232163 Y CN 201232163Y
Authority
CN
China
Prior art keywords
sandbox
sand
load
sand box
upper center
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200263187U
Other languages
Chinese (zh)
Inventor
刘文解
孙延琳
覃继华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 10 Engineering Group Co Ltd
Original Assignee
China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 10 Engineering Group Co Ltd filed Critical China Railway No 10 Engineering Group Co Ltd
Priority to CNU2008200263187U priority Critical patent/CN201232163Y/en
Application granted granted Critical
Publication of CN201232163Y publication Critical patent/CN201232163Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Catching Or Destruction (AREA)

Abstract

The utility model discloses an unloading sand box and in particular relates to an unloading casting box used for bearing heavy objects. The unloading sand box comprises an upper center for bearing loads and a sand box which is arranged below the upper center and is sheathed with the upper center, and a water-proof sealing ring is arranged at the sheathing position of the upper center and the sand box; wherein, dry standard sands or medium coarse sands are filled in the sand box, a sand outlet and a plug screw matched with the sand outlet are opened at the side surface of the lower part of the sand box. The unloading sand box has few equipment, low cost, convenient operation and stable load bearing, and is energy saving and environmental protective.

Description

A kind of off-load sandbox
(1) technical field
The utility model relates to a kind of off-load sandbox, specifically relates to a kind of off-load sandbox that put on big weight top that is used to carry.
(2) background technology
Along with Chinese economic development, highway, these bigger engineerings of railway are also more and more, and highway, the railway beam that falls adopts large-tonnage jack that it is carried usually at present, waiting construction to finish, and the jack off-load is reclaimed.But because large-tonnage jack itself is heavier, volume ratio is bigger, large-tonnage jack also will be equipped with special high-pressure oil pump, hydraulic oil pipeline and fixture thereof in addition, and its underpart also will be provided with backing plate, with the base fixed that guarantees its installation, smooth, cause that the large-tonnage jack difficulty is set in the building site is bigger; In addition, large-scale jack acquisition expenses costliness.Mainly by hydraulic lifting, its oil feed line node is many for large-tonnage jack, and leakage point is more relatively, and use jack often to need to carry weight one month or the longer time in this occasion, along with the leakage of hydraulic oil, jack pushing tow height descends to some extent, causes construction error easily.And the used hydraulic pump of this system itself needs to consume certain chemical fuel, can cause the basic demand of certain pollution and the national energy-saving and emission-reduction of being advocated at present to disagree to environment.
(3) summary of the invention
The utility model causes site requirements height, space requirement big at present use jack as the load equipment of highway, construction of railways decline beam, and cost height, the defective that maintenance cost is high, provide that a kind of device therefor is few, cost is low, be convenient to operation, to hold lotus stable, and the off-load sandbox of energy-conserving and environment-protective.
For achieving the above object, the technical solution adopted in the utility model is:
The utility model off-load sandbox, comprise the last top heart that is used for bearing load and be positioned at below it sandbox with its socket, both are provided with waterproof grommet by socket place, are filled with dry standard sand or medium coarse sand in its cheek, the plug screw that side, its underpart has sand outlet and is mated.
Above-mentioned off-load sandbox, the described upward top heart and sandbox are hollow cylinder, hold in the heart on last top and the sandbox lower end is respectively arranged with cross sectional area seat of honour tube sealing mouth and following tube sealing mouth greater than both.
Above-mentioned off-load sandbox, the described top interior portion that goes up is filled with concrete.
The utility model off-load sandbox comprises the two large divisions, be respectively the top heart and sandbox, the last top heart directly is used for load-bearing, be filled with sand in the sandbox, last top heart load passes to sandbox by sand, in case after the sand compacting, under the stable situation of load, volume can not change basically, so the utility model is very suitable for the load-bearing to longer load of time, and its stability very heavy very good more than based on hydraulic principle, and sand itself is mobile relatively poor, sealing neither can produce leakage a little, and it is very good again to hold lotus stability.And it does not need the hydraulic means that adds yet, can not produce additional leakage point, thereby when saving cost, has significantly reduced the equipment use amount, has reduced the regular maintenance expense yet.In daily use, need not safeguard that operation is simple more than hydraulic system to it.Because with respect to original hydraulic jacking device, the utility model has been saved hydraulic power system, has reduced the consumption of fossil fuel, meet the basic demand of country to energy-saving and emission-reduction.Subparticle has the characteristic of fluid, in the drain charge process, and can be as the slow leakage of fluid.But this solid particle can not be intake, and not so can lump and loses flowability, so the utility model is provided with waterproof seal ring at the last top heart and sandbox junction, has prevented that water from entering sandbox, keeps internal standard sand or medium coarse sand to be in dry state.
(4) description of drawings
Fig. 1 be the concrete real-time mode of the utility model structural representation.
Among the figure: 1, seal at the seat of honour, 2, go up the top heart, 3, concrete, 4, waterproof seal ring, 5, sand, 6, sandbox, 7, sand outlet, 8, plug screw, 9, following seal.
(5) specific embodiment
Specify structural principle of the present utility model below in conjunction with Figure of description:
With reference to explanation accompanying drawing 1, this specific embodiment off-load sandbox, comprise the last top heart 2 that is used for bearing load and be positioned at below it sandbox 6 with its socket, both socket places are provided with waterproof grommet 4, be filled with dry standard sand 5 in its cheek, side, its underpart has sand outlet 7 and is mated plug screw 8.All adopt spiral steel pipe for the sandbox and the last top heart, the intensity height, selection range is wide, is convenient to the sealing of junction.For selecting for use of standard sand, must guarantee that it is in dry state, can not have caking.In addition, if select for use the top heart and sandbox volume bigger, when highly higher, medium coarse sand can meet the demands fully, and if to go up the top heart relative with the sandbox volume less, and height is hour, just needs to have selected mobile better standard sand.
For adopting this hollow cylinder of spiral steel pipe, its upper and lower is not enough to bearing load, and hold in the heart on the top and the sandbox lower end is respectively arranged with cross sectional area seat of honour tube sealing mouth 1 and following tube sealing mouth 9 greater than both so go up.And in order to make the top heart obtain load stability and the requirement of strength of himself, its inside is filled with concrete 3.

Claims (3)

1. off-load sandbox, it is characterized in that: comprise the last top heart (2) that is used for bearing load and be positioned at below it sandbox (6) with its socket, both socket places are provided with waterproof grommet (4), be filled with dry standard sand or medium coarse sand (5) in its cheek, side, its underpart has sand outlet (7) and is mated plug screw (8).
2. off-load sandbox according to claim 1, it is characterized in that: the described upward top heart (2) and sandbox (6) are hollow cylinder, and last top is held in the heart and the sandbox lower end is respectively arranged with seat of honour tube sealing mouth (1) and following the tube sealing mouth (9) of cross sectional area greater than both.
3. off-load sandbox according to claim 2 is characterized in that: the described top heart (2) inside of going up is filled with concrete (3).
CNU2008200263187U 2008-07-25 2008-07-25 Relief sand jack Expired - Fee Related CN201232163Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200263187U CN201232163Y (en) 2008-07-25 2008-07-25 Relief sand jack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200263187U CN201232163Y (en) 2008-07-25 2008-07-25 Relief sand jack

Publications (1)

Publication Number Publication Date
CN201232163Y true CN201232163Y (en) 2009-05-06

Family

ID=40618537

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200263187U Expired - Fee Related CN201232163Y (en) 2008-07-25 2008-07-25 Relief sand jack

Country Status (1)

Country Link
CN (1) CN201232163Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102966044A (en) * 2012-12-05 2013-03-13 山东省路桥集团有限公司 Load-bearing lifting frame equipment
CN106583670A (en) * 2017-01-25 2017-04-26 广东峰华卓立科技股份有限公司 Telescopiform sand box for sand mold three dimensional printer and working method thereof
CN109112967A (en) * 2018-09-12 2019-01-01 长安大学 Tower beam thrust attachment device and self-anchored suspension bridge quickly build construction method
CN111305071A (en) * 2019-11-25 2020-06-19 上海宝冶市政工程有限公司 Flushing type sand box and sand unloading method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102966044A (en) * 2012-12-05 2013-03-13 山东省路桥集团有限公司 Load-bearing lifting frame equipment
CN102966044B (en) * 2012-12-05 2015-07-01 山东省路桥集团有限公司 Load-bearing lifting frame equipment
CN106583670A (en) * 2017-01-25 2017-04-26 广东峰华卓立科技股份有限公司 Telescopiform sand box for sand mold three dimensional printer and working method thereof
CN106583670B (en) * 2017-01-25 2018-08-10 广东峰华卓立科技股份有限公司 A kind of the telescopiform sandbox and its working method of sand mold three-dimensional printer
CN109112967A (en) * 2018-09-12 2019-01-01 长安大学 Tower beam thrust attachment device and self-anchored suspension bridge quickly build construction method
CN109112967B (en) * 2018-09-12 2023-07-25 长安大学 Tower beam thrust connection device and quick construction method for self-anchored suspension bridge
CN111305071A (en) * 2019-11-25 2020-06-19 上海宝冶市政工程有限公司 Flushing type sand box and sand unloading method thereof

Similar Documents

Publication Publication Date Title
CN201232163Y (en) Relief sand jack
CN201850498U (en) Steel trestle in water
CN201089696Y (en) Spar boom of explosion-proof suspension crane
CN204383429U (en) A kind of hydraulic pressure aerating superimposed trailer
CN201610978U (en) Pipe rack convenient for installing and repairing multilayer pipeline
CN201144395Y (en) Steel structure sand box temporary support for continuous bridge
CN101736751A (en) Connecting structure between wind measurement tower and pile foundation of offshore wind power station
CN202082490U (en) Reverse push bench
CN201850539U (en) Large-well variable-cross-section restricted-orifice surge chamber for water supply system of hydropower station
CN215921949U (en) Hydraulic pressure trades electricity locking mechanism arrangement structure
CN202814805U (en) Concrete pipe inner water pressure vertical type detection device
CN107781173B (en) Self-propelled ship-mounted pump station
CN211576177U (en) Scalable non-contact sensor installation device
CN205168829U (en) Can extend deck jack -up platform
CN212177133U (en) Combine and dig external dust remover of machine
CA2982135A1 (en) World's first krishna's syringe method sea hydropower plants to produce large scale hydropower for the production of large scale synthetic fuel (synthetic gasoline) or hydrogen gas for ships, aircrafts, or cars (vehicles)
CN204938050U (en) A kind of vertical refuse compression station durable and convenient for installation and maintenance
CN204895790U (en) Ship body connected device
CN202736674U (en) Low-voltage high-current outlet device for power transformer
CN203403445U (en) Steel sleeve used for plugging basement tube well
CN206117286U (en) Power supply system's vertical lift stereo garage is synthesized with solar energy power supply and commercial power
CN208088266U (en) There is the simple wellhead structure of support
CN202610824U (en) Non transition section single pile type offshore blower fan foundation structure
CN201817199U (en) Automatic leveling device for semisubmersible barge crane platform
CN102108723A (en) Water supply system for building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090506

Termination date: 20130725