CN201228553Y - Tunnel durable lining structure at active fault section - Google Patents

Tunnel durable lining structure at active fault section Download PDF

Info

Publication number
CN201228553Y
CN201228553Y CNU2008200300449U CN200820030044U CN201228553Y CN 201228553 Y CN201228553 Y CN 201228553Y CN U2008200300449 U CNU2008200300449 U CN U2008200300449U CN 200820030044 U CN200820030044 U CN 200820030044U CN 201228553 Y CN201228553 Y CN 201228553Y
Authority
CN
China
Prior art keywords
tunnel
lining structure
active fault
section
permanent lining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200300449U
Other languages
Chinese (zh)
Inventor
刘培硕
梁文灏
李国良
刘赪
张剑
杨国柱
张旭珍
贾元霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CNU2008200300449U priority Critical patent/CN201228553Y/en
Application granted granted Critical
Publication of CN201228553Y publication Critical patent/CN201228553Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model belongs to the field of a lining structure for rail tunnels and relates to a permanent lining structure for tunnels in an active fault section. In past railway location, a basic principle of railway location for the active fault section is that the active fault section is kept off as far as possible, and if the active fault is not kept off, only the general engineering (lower roadbeds or culverts) of railway passes through the active fault section in the form of a large angel and a short distance so as to reduce construction of tunnel in the active fault section; therefore, the permanent lining structure is specially important when the tunnels are constructed in the active fault section in tunnel engineering. The permanent lining structure adopts the form of a circular section structure with high quake-proof capacity; deformed continuous seams which vertically partitions the tunnels are separately formed in the permanent lining structure, so as to form a structure system which eliminates deformation and releases seismic energy section by section. Due to high quake-proof capacity, the permanent lining structure forms a reparable structure through twice structure forms after the tunnel is partially damaged by earthquake, so as to ensure rapid repair, thereby reducing the damage to the tunnel engineering as much as possible when the fault moves due to the earthquake.

Description

Tunnel, activity tomography location permanent lining, secondary lining structure
Technical field
The utility model belongs to railway tunnel lining structure field, relates to tunnel, activity tomography location permanent lining, secondary lining structure.
Background technology
Said activity tomography generally was meant since the Recent Epoch (about 10,000 years) on the engineering, and movable tomography once took place.When passing through, infer that from its occurrence frequency in the phase, differential settlement, craze and transfiguration and bad break might take place for it at engineering safety, can directly influence the normal use of engineering when serious, even cause disaster when setting on active fault or with engineering.Therefore, in railway route selection in the past, when meeting with the activity tomography, basic route selection principle is firmly to pass round can pass round the time, must wide-angle in the time of can not passing round, short distance passes through with common engineering (low roadbed or culvert), and it is less to pass through example with construction of tunnel.So build construction of tunnel at the activity tomography, the permanent lining, secondary lining structure is with regard to particular importance.
Summary of the invention
The purpose of this utility model is to provide a kind of tunnel, activity tomography location permanent lining, secondary lining structure with safe and reliable, advanced technology and economic and reliable.
For achieving the above object, the technical solution adopted in the utility model is:
Tunnel, activity tomography location permanent lining, secondary lining structure, its special character is: described permanent lining, secondary lining structure adopts the high circular cross section form of structure of shock resistance; The distortion straight joint that the tunnel is vertically carried out piecemeal is set in the permanent lining, secondary lining structure at interval, forms the structural system that segmentation absorbs distortion and discharges seismic energy.
Above-mentioned permanent lining, secondary lining structure adopts double-deck steel concrete, but is formed on the maintaining structure after the earthquake local failure, guarantees quick reparation.
Above-mentioned tunnel cross-section apply fill concrete layer and groove at the bottom of the tunnel, reinforcement concrete structure layer also is set outside reinforced concrete floor.
The utility model is with respect to prior art, and its advantage is as follows:
Can cause the permanent lining, secondary lining structural deterioration to peripheral rock kneading extruding when 1, considering faulting, select the high circular cross section form of structure of shock resistance;
2, at interval the distortion straight joint is set, the tunnel is vertically divided soon, form the structural system that segmentation absorbs distortion and discharges seismic energy;
3, the permanent lining, secondary lining structure adopts and applies for twice, but is formed on the maintaining structure after the earthquake local failure, guarantees quick reparation.
4, consider the activity tomography in quite long period, still have distortion slowly, therefore, in tunnel structure, estimated total deformation, reserve in level, vertical direction by 100 year useful life period.
Description of drawings
Fig. 1 is a three-dimensional structure diagram of the present utility model;
Fig. 2 is an assembling schematic diagram of the present utility model.
The specific embodiment
Referring to Fig. 1, Fig. 2, existing liner structure is an elliptical section form of structure, tunnel cross-section size and technical standard are directly related, therefore should get technical standard in conjunction with actual engineering determines cross dimensions, then according to engineering pass through the technical data of activity tomography, determine the level of Tunnel Design lifetime, vertically add up displacement, thereby determine the pre-allowance of distortion.
Permanent lining, secondary lining structure of the present utility model adopts the high circular cross section form of structure of shock resistance; The distortion straight joint that the tunnel is vertically carried out piecemeal is set in the permanent lining, secondary lining structure at interval, forms the structural system that segmentation absorbs distortion and discharges seismic energy.
Referring to Fig. 2, its permanent lining, secondary lining structure adopts double- deck steel concrete 1,2, but is formed on the maintaining structure after the earthquake local failure, guarantees quick reparation.
After the tunnel cross-section excavation is shaped, apply reinforced concrete floor 1 earlier, lagging behind suitably applies reinforced concrete floor 2 after the distance, and reinforced concrete floor 2 adopts the perfusion of circular shuttering chassis pumping of concrete; After this apply fill concrete layer 3 and groove 4 at the bottom of the tunnel successively, reinforcement concrete structure layer 5 also is set outside reinforced concrete floor 2.
Consider the activity tomography in quite long period, still have distortion slowly, therefore, in tunnel structure, estimated total deformation, reserve in level, vertical direction by 100 year useful life period.

Claims (3)

1, tunnel, activity tomography location permanent lining, secondary lining structure is characterized in that: described permanent lining, secondary lining structure adopts the high circular cross section form of structure of shock resistance; The distortion straight joint that the tunnel is vertically carried out piecemeal is set in the permanent lining, secondary lining structure at interval.
2, tunnel, activity tomography location according to claim 1 permanent lining, secondary lining structure, it is characterized in that: described permanent lining, secondary lining structure adopts double-deck steel concrete (1,2).
3, tunnel, activity tomography location according to claim 1 permanent lining, secondary lining structure, it is characterized in that: described tunnel cross-section apply fill concrete layer (3) and groove (4) at the bottom of the tunnel, reinforcement concrete structure layer (5) also is set outside reinforced concrete floor (2).
CNU2008200300449U 2008-08-22 2008-08-22 Tunnel durable lining structure at active fault section Expired - Fee Related CN201228553Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200300449U CN201228553Y (en) 2008-08-22 2008-08-22 Tunnel durable lining structure at active fault section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200300449U CN201228553Y (en) 2008-08-22 2008-08-22 Tunnel durable lining structure at active fault section

Publications (1)

Publication Number Publication Date
CN201228553Y true CN201228553Y (en) 2009-04-29

Family

ID=40633505

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200300449U Expired - Fee Related CN201228553Y (en) 2008-08-22 2008-08-22 Tunnel durable lining structure at active fault section

Country Status (1)

Country Link
CN (1) CN201228553Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103527212A (en) * 2013-11-06 2014-01-22 西南交通大学 Fiber concrete secondary lining tunnel earthquake resisting and absorbing construction method
CN104018846A (en) * 2014-05-26 2014-09-03 中国水电顾问集团贵阳勘测设计研究院有限公司 Hydraulic tunnel structure spanning large-scale active fault zone
CN103485796B (en) * 2013-10-18 2015-06-17 四川省交通运输厅公路规划勘察设计研究院 Tunnel supporting structure across active fault
CN110805453A (en) * 2019-10-18 2020-02-18 国网四川省电力公司成都供电公司 Tunnel engineering extrusion type two-lining concrete pouring device and two-lining construction method
CN110804919A (en) * 2019-11-19 2020-02-18 兰州交通大学 Novel roadbed structure for crossing active fault

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485796B (en) * 2013-10-18 2015-06-17 四川省交通运输厅公路规划勘察设计研究院 Tunnel supporting structure across active fault
CN103527212A (en) * 2013-11-06 2014-01-22 西南交通大学 Fiber concrete secondary lining tunnel earthquake resisting and absorbing construction method
CN103527212B (en) * 2013-11-06 2015-11-25 西南交通大学 A kind of fibrous concrete secondary lining tunnel shock resisting building method
CN104018846A (en) * 2014-05-26 2014-09-03 中国水电顾问集团贵阳勘测设计研究院有限公司 Hydraulic tunnel structure spanning large-scale active fault zone
CN104018846B (en) * 2014-05-26 2016-04-13 中国水电顾问集团贵阳勘测设计研究院有限公司 A kind of hydraulic tunnel structure of crossing over large-scale activity fault zone
CN110805453A (en) * 2019-10-18 2020-02-18 国网四川省电力公司成都供电公司 Tunnel engineering extrusion type two-lining concrete pouring device and two-lining construction method
CN110804919A (en) * 2019-11-19 2020-02-18 兰州交通大学 Novel roadbed structure for crossing active fault

Similar Documents

Publication Publication Date Title
CN201228553Y (en) Tunnel durable lining structure at active fault section
CN102094649B (en) Method for constructing underground space by shield-shallow buried covered excavation composite method
CN103362073B (en) A kind of Framed underpass bridge method
CN105821961B (en) A kind of tee girder column connected node
CN109989768B (en) Lining structure suitable for tunnel crossing active fault and construction method thereof
CN101294447B (en) Buildings pile underpinning method
CN101886374B (en) Groove bottom-reinforced fully lined debris flow drainage groove and construction method thereof
CN105003272A (en) Reversed construction method for expanding and excavating stations on sectional shield tunnel foundations of subways
CN202644376U (en) Dumbbell type steel tube concrete structure of non-filling abdominal cavity stiffening batten plate
CN103924795A (en) Existing building moving underground space structure and construction method
CN206816265U (en) A kind of air channel arch combined retaining structure
CN109406759B (en) Assembled multifunctional geotechnical engineering test model box
CN103742155B (en) A kind of long-span segment method for dismounting
CN103290851A (en) Prestressed steel support used for controlling internal and external differential displacement of foundation pit enclosure wall and construction method
CN204876196U (en) Prefabricated assembled is from restoring to throne shear wall structure
CN113833491A (en) Tunnel lining support and tunnel penetrating through active fault fracture zone
CN113356880A (en) Anti-fault structure crossing active fault tunnel
CN209854704U (en) Structure system for municipal bridge and bridge pile to serve as fender post of subway station
CN208777759U (en) A kind of building reconstruction bracing means
CN208816132U (en) Collapsible loess combination land pebble stratum tunneling air duct connects the ventilating shaft of shield tunnel
CN207277368U (en) The anti-collapse rock-fall assembled spring energy dissipating bed course safeguard structure in canopy cave cave top
CN217267494U (en) Structural system integrating inner support and vertical vibration reduction of foundation pit
CN213805406U (en) Supporting system for transfer nodes of urban rail transit transfer station
CN105839791B (en) A kind of supporting bilateral plate node of overhanging cover board
CN210396760U (en) Assembled supporting system for diversion tunnel construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090429

Termination date: 20170822

CF01 Termination of patent right due to non-payment of annual fee