Prior art keywords
reaction frame
supported box
self
utility
simply supported
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU200820084786XU
Other languages
Chinese (zh)
Inventor
肖新华
张吉春
林凤国
代亚雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Original Assignee
China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 13th Bureau Group Co Ltd filed Critical China Railway 13th Bureau Group Co Ltd
Priority to CNU200820084786XU priority Critical patent/CN201193999Y/en
Application granted granted Critical
Publication of CN201193999Y publication Critical patent/CN201193999Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model relates to a prestressed concrete simply supported box girder static test self balancing counterforce frame device, which comprises a conterforce frame made up by jointing eight or seven girder components, end anchor sockets disposed on both ends of the counterforce frame; a counterforce frame supporter disposed under the counterforce frame, several distributing beams disposed on the counterforce frame, and force transmitting rods passing through the end anchor sockets. The above structure in the utility model utilizes the existing eight or seven girder components and achieves the advantages of money saving, simple in jointing and little deformation in test course.

Description

Prestressed concrete simple supported box beam static test self-equilibrating reaction frame device
Technical field
The utility model relates to a kind of railroad bridge verifying attachment, especially relates to a kind of prestressed concrete simple supported box beam static test self-equilibrating reaction frame device.
Background technology
The large-tonnage Railway Prestressed Concrete static test of case beam simply has dual mode at present: a kind of is beam body and reaction frame and unified integral body of accessory structure formation thereof, and the deadweight of beam body and reaction frame is only born on its basis, is called self-equilibrating reaction frame system; Another kind of do not reach into a unified integral body for the beam body with reaction frame and accessory structure thereof, the load that loads in the process of the test is also born in basic deadweight of not only bearing beam body and reaction frame, is called outer balance reaction frame system.These two kinds of balanced systems all have application in present beam body static test, more extensive but the former uses, the latter because to the basis requirement than higher so use less.The common way of self-equilibrating reaction frame is by the higher patented product of designing unit's specialized designs price.And the reaction frame that my unit designs voluntarily adopts eight or the seven beam assembly units member composition of more auxiliary special processing again, its characteristics can be utilized at present existing eight or seven beams (other rod member also can), saving fund, and have assembly unit simple, characteristics such as the distortion that produces in the process of the test is little.
The utility model content
The utility model mainly is to solve above-mentioned technical matters, can effectively utilize existing eight or seven beams thereby provide a kind of, economizes on the use of funds, and assembly unit is simple, the little prestressed concrete simple supported box beam static test self-equilibrating reaction frame device of distortion in the process of the test.
Above-mentioned technical matters of the present utility model is mainly solved by following technical proposals: include reaction frame, described reaction frame has eight or seven beams to be spliced, be provided with the termination anchoring part at the two ends of described reaction frame, below described reaction frame, be provided with the reaction frame support, on described reaction frame, be provided with some distribution crossbeams, on the anchoring part of described termination, have transmission rod to pass through.
In the utility model, form main part of the present utility model by existing eight or seven beams.Described transmission rod links together by termination anchoring part and the fining twisted steel that is embedded in the cushion cap, constitutes a self-balancing system.Described distribution crossbeam becomes the stress point that loads lifting jack in loading procedure, and the reaction frame support plays the interim supporting role of reaction frame when Liang Shangwei loads.
As preferably, described reaction frame is made up of some rod members, gusset plate and coupling bolt, and described transmission rod is made by fining twisted steel.
In the reaction frame structure, rod member can be divided into resistance to compression beam, tension beam and support bar, and the connection between them then realizes by gusset plate and coupling bolt.
In the utility model, reaction frame utilizes eight or seven beams to form, and makes the utlity model has effectively to utilize existing eight or seven beams, economizes on the use of funds, and assembly unit is simple, the little advantage of distortion in the process of the test.
Description of drawings
Accompanying drawing 1 is the utility model front view;
Accompanying drawing 2 is the utility model side views;
Embodiment
Below by embodiment, and in conjunction with the accompanying drawings, the technical solution of the utility model is described in further detail.
Embodiment 1: as Fig. 1, shown in Figure 2, the utility model mainly includes reaction frame 1, described reaction frame 1 has eight or seven beams to be spliced, be provided with termination anchoring part 2 at the two ends of described reaction frame 1, on each described termination anchoring part 2, be provided with six screws, below described reaction frame 1, be provided with reaction frame support 3, on described reaction frame 1, be provided with some distribution crossbeams 4, on described termination anchoring part 2, have transmission rod 5 to pass through.Reaction frame support 3 is placed on the case beam 6.
Described reaction frame 1 is made up of rod member, gusset plate and coupling bolt, and described rod member can be divided into resistance to compression beam, tension beam and support bar, and the connection between them then realizes by gusset plate and coupling bolt.Described transmission rod 5 is made by fining twisted steel, by the screw on the termination anchoring part 2, is connected with fining twisted steel in being embedded in cushion cap, constitutes a self-balancing system.Described distribution crossbeam 4 is the stress point that loads lifting jack in loading procedure, and reaction frame support 3 plays the interim supporting role of reaction frame 1 when not loading.

Claims (3)

1. prestressed concrete simple supported box beam static test self-equilibrating reaction frame device, include reaction frame, it is characterized in that described reaction frame (1) has eight or seven beams to be spliced, be provided with termination anchoring part (2) at the two ends of described reaction frame (1), be provided with reaction frame support (3) in the below of described reaction frame (1), on described reaction frame (1), be provided with some distribution crossbeams (4), on described termination anchoring part (2), have transmission rod (5) to pass through.
2. prestressed concrete simple supported box beam static test self-equilibrating reaction frame device according to claim 1 is characterized in that described reaction frame (1) is made up of some rod members, gusset plate and coupling bolt.
3. prestressed concrete simple supported box beam static test self-equilibrating reaction frame device according to claim 1 is characterized in that described transmission rod (5) made by fining twisted steel.
CNU200820084786XU 2008-03-31 2008-03-31 Self-balancing reaction frame apparatus for pre-stressed concrete simply supported box girder static load experiment Expired - Lifetime CN201193999Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820084786XU CN201193999Y (en) 2008-03-31 2008-03-31 Self-balancing reaction frame apparatus for pre-stressed concrete simply supported box girder static load experiment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820084786XU CN201193999Y (en) 2008-03-31 2008-03-31 Self-balancing reaction frame apparatus for pre-stressed concrete simply supported box girder static load experiment

Publications (1)

Publication Number Publication Date
CN201193999Y true CN201193999Y (en) 2009-02-11

Family

ID=40393533

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820084786XU Expired - Lifetime CN201193999Y (en) 2008-03-31 2008-03-31 Self-balancing reaction frame apparatus for pre-stressed concrete simply supported box girder static load experiment

Country Status (1)

Country Link
CN (1) CN201193999Y (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101986128A (en) * 2010-07-07 2011-03-16 华侨大学 Multi-functional self-balancing loading reaction frame
CN102162774A (en) * 2010-12-28 2011-08-24 北京中铁房山桥梁有限公司 Steel-structure distribution-girder-type double-track whole opening box girder static load test device and construction method thereof
CN102175475A (en) * 2011-02-16 2011-09-07 山东大学 Kiloton modular combined adjustable self-reaction table frame device
CN105158064A (en) * 2015-09-30 2015-12-16 三峡大学 Counterforce loading frame for multifunctional self-balancing type continuous beam test
CN107340185A (en) * 2017-06-22 2017-11-10 北京华横新技术开发公司 A kind of bridge static loading test pre-stressed steel pipe concrete self-balancing type static test bed
CN110146246A (en) * 2019-06-03 2019-08-20 中铁大桥局集团有限公司 A kind of impact test test platform and test device and lifting buffer test method
CN110926952A (en) * 2019-12-13 2020-03-27 哈尔滨工程大学 Ship real-scale composite superstructure testing device and method
CN113495031A (en) * 2020-03-20 2021-10-12 建研科技股份有限公司 Assembled self-balancing loading device suitable for structural performance inspection

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101986128A (en) * 2010-07-07 2011-03-16 华侨大学 Multi-functional self-balancing loading reaction frame
CN102162774A (en) * 2010-12-28 2011-08-24 北京中铁房山桥梁有限公司 Steel-structure distribution-girder-type double-track whole opening box girder static load test device and construction method thereof
CN102175475A (en) * 2011-02-16 2011-09-07 山东大学 Kiloton modular combined adjustable self-reaction table frame device
CN105158064A (en) * 2015-09-30 2015-12-16 三峡大学 Counterforce loading frame for multifunctional self-balancing type continuous beam test
CN107340185A (en) * 2017-06-22 2017-11-10 北京华横新技术开发公司 A kind of bridge static loading test pre-stressed steel pipe concrete self-balancing type static test bed
CN110146246A (en) * 2019-06-03 2019-08-20 中铁大桥局集团有限公司 A kind of impact test test platform and test device and lifting buffer test method
CN110146246B (en) * 2019-06-03 2020-12-29 中铁大桥局集团有限公司 Impact test platform, test device and hoisting buffer test method
CN110926952A (en) * 2019-12-13 2020-03-27 哈尔滨工程大学 Ship real-scale composite superstructure testing device and method
CN113495031A (en) * 2020-03-20 2021-10-12 建研科技股份有限公司 Assembled self-balancing loading device suitable for structural performance inspection

Similar Documents

Publication Publication Date Title
CN201193999Y (en) Self-balancing reaction frame apparatus for pre-stressed concrete simply supported box girder static load experiment
CN101830392A (en) Special lifting tool for steel containment vessel of nuclear power station and lifting method
CN200979506Y (en) A self-balance static load testing device for a double-track whole-span box girder of a passenger dedicated line
CN202380398U (en) Novel main cable anchoring system of suspension bridge and unit pieces of novel main cable anchoring system
CN201788094U (en) Counter-force supporting leg type railway bridge static loading test stand
CN201835224U (en) Anti-beam falling device for bridge
CN201402216Y (en) Device for testing fatigue of connecting piece of railway wagon
CN103303772A (en) Ultra-long wall attaching device of construction lift
CN105836164A (en) Interstage adaptive structure of spacecraft
CN201110804Y (en) Multifunctional experimental bench
CN203855282U (en) Car frame structure of elevator
CN202466651U (en) Loading device for axial force test of prestressed pipe pile
CN102267671B (en) Crane arm
CN106610343A (en) A pier counterforce closing force system self-balance-type railway cast-in-situ beam static load test apparatus
CN206693060U (en) A kind of hoisting device for the lifting of suspension bridge saddle bearing plate
CN204778234U (en) Elevator host computer load -bearing device
CN202644401U (en) Omnipotent prestress stretch-draw connecting structure for finish-rolling screw-thread steel
CN202728340U (en) Installing and supporting mechanism of vehicle
CN201307081Y (en) Half box type static load test device
CN208857713U (en) A kind of No. zero block standardization bracket of continuous beam
CN209513477U (en) A kind of rod piece compression test loading mechanism
CN202090655U (en) Inserting plate for joint connection of steel tube tower, steel tube tower and joint thereof
CN203319445U (en) Super-long wall attaching device of construction elevator
CN108168858B (en) Main support beam fatigue test device that subtracts
CN201678344U (en) Layout structure of elevator tractor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: China Railway 13th Bureau Group 1st Engineering Co., Ltd.

Assignor: China Railway 13th Bureau Group Co., Ltd.

Contract record no.: 2010210000134

Denomination of utility model: Self-balancing reaction frame apparatus for pre-stressed concrete simply supported box girder static load experiment

Granted publication date: 20090211

License type: Exclusive License

Record date: 20100824

ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY 13TH BUREAU GROUP 1ST ENGINEERING CO

Free format text: FORMER OWNER: CHINA RAILWAY 13TH BUREAU GROUP CO., LTD.

Effective date: 20110422

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 130033 NO. 2138, LINGDONG ROAD, ERDAO DISTRICT, CHANGCHUN CITY, JILIN PROVINCE TO: 116000 NO. 9, SHAYUE STREET, SHAHEKOU DISTRICT, DALIAN CITY, LIAONING PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110422

Address after: 116000 No. 9 Sha Yue Street, Shahekou District, Liaoning, Dalian

Patentee after: China Railway 13th Bureau Group 1st Engineering Co., Ltd.

Address before: 130033 No. 2138 East Ling Road, two district, Jilin, Changchun

Patentee before: China Railway 13th Bureau Group Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20090211