CN201189699Y - PCCP mortar protection layer synchronous slicking device - Google Patents

PCCP mortar protection layer synchronous slicking device Download PDF

Info

Publication number
CN201189699Y
CN201189699Y CNU200820005595XU CN200820005595U CN201189699Y CN 201189699 Y CN201189699 Y CN 201189699Y CN U200820005595X U CNU200820005595X U CN U200820005595XU CN 200820005595 U CN200820005595 U CN 200820005595U CN 201189699 Y CN201189699 Y CN 201189699Y
Authority
CN
China
Prior art keywords
scraper
pccp
mortar
scraping device
tubing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU200820005595XU
Other languages
Chinese (zh)
Inventor
高正庶
顾晓蒙
刘江宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Hanjian Heshan Pipeline Co., Ltd.
Original Assignee
BEIJING HANJIAN CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING HANJIAN CONSTRUCTION GROUP Co Ltd filed Critical BEIJING HANJIAN CONSTRUCTION GROUP Co Ltd
Priority to CNU200820005595XU priority Critical patent/CN201189699Y/en
Application granted granted Critical
Publication of CN201189699Y publication Critical patent/CN201189699Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a scraping device for the PCCP (Prestressed Concrete Cylinder Pipe) production field. The scraping device consists of a radiation dolly (1), a cylinder (3), a spring (4), a scraper assembly (5) and a vertical shaft (6), wherein the radiation dolly (1) is connected with a bracket (8) of the scraping device by the vertical shaft (6); the bracket (8) of the scraping device is connected with the spring (4) and the cylinder (3); a tracking wheel (7) is connected to one end of the bracket (8) of the scraping device; the bracket (8) of the scraping device is connected with one end of the tracking wheel (7) and the scraper assembly (5); the scraper assembly (5) consists of a scraper (9), a scraper (10) and a scraper (11) which are arranged in parallel; and the scale of the working faces of three scrapers is 3 to 2 to 6. When a mortar protective layer of a first layer of steel wire is sprayed in the production of a PCCP material, the scraping device carries out synchronous scraping to the surface of the mortar protective layer; the surface planeness after scraping can meet the requirement of secondary winding; and the distributing evenness of the steel wire in secondary winding meets the standard specification.

Description

The PCCP mortar cover is wipeed device synchronously off
Technical field
The utility model relates to a kind of strickling device, is used for PCCP (Prestressed Concrete Cylinder Pipe Prestressed concrete cylinder pipe) production field.Bilayer need be carried out when twining thread in senior engineer's pressure pipe, strickling operation can be when roller is penetrated the mortar cover of ground floor compressor wire, finished synchronously, so that carry out the winding of second layer compressor wire to mortar.
Background technology
The PCCP tubing that major diameter, senior engineer are pressed, need the tube core outer wall twine two-layer compressor wire just can reach bear in the intensity of pressure.Every layer of steel wire will spray one deck mortar cover after twining and finishing, and dry mortar is ejected into pipe outer surface by mortar coater with the speed of 37 meter per seconds, and PCCP tubing at the uniform velocity rotates in the time of injection, finishes the production process of mortar cover.
Mortar cover surface irregularity after the injection, cause carry out secondary when twining thread the steel wire spacing uniformity do not reach technical standard (unevenness≤3 millimeter).For this reason, need corresponding synchronous to wipe device off, so as before mortar hardening with its strickling.
Summary of the invention
The purpose of this utility model is to design a kind of PCCP tubing mortar cover and wipes device synchronously off; make in the PCCP tubing production process when the mortar cover of ground floor steel wire sprays; the mortar cover surface is wipeed off synchronously, guarantee the thickness deviation (12 ± 2 millimeters) within critical field of mortar cover.Surface smoothness after the strickling can satisfy the needs (unevenness≤3 millimeter) that secondary twines silk, makes steel wire when twining for the second time thread uniformity of arranging meet standard code.
The dry mortar that sprays is carried out in the surperficial strickling process, installed three on the scraper assembly of the present utility model, when PCCP tubing rotation carrying out mortar cover roller is penetrated, finish the strickling work on mortar cover surface synchronously the different scraper of width.
The ovality deviation that PCCP tubing self exists during the rotation of PCCP tubing, has influence on the relative position of scraper and PCCP outer pipe wall, and simultaneously, the placement deviation of PCCP tubing axis and rotating disk axis can make PCCP tubing produce random shaking phenomenon when rotated.The variation of outer wall position was followed the tracks of synchronously when the utility model had adopted tracking wheel that scraper is rotated according to PCCP tubing, guaranteed the thickness deviation (12 ± 2 millimeters) within critical field of mortar cover.
Shown in accompanying drawing 1 and accompanying drawing 2, the utility model is penetrated dolly (1) by roller, cylinder (3), spring (4), scraper assembly (5), vertical shaft (6) constitutes, its central roll is penetrated dolly (1) and is linked to each other with strickling appliance stand (8) by vertical shaft (6), wipe off on the appliance stand (8) and be connected to spring (4) and cylinder (3), tracking wheel (7) is connected an end of wipeing appliance stand (8) off, an end of wipeing appliance stand (8) connection tracking wheel (7) off also is connected to scraper assembly (5), scraper assembly (5) is by the scraper that is arranged side by side (9), scraper (10), scraper (11) constitutes, and above-mentioned three should remain the face width ratio of scraper 3: 2: 6.
Shown in accompanying drawing 1 and accompanying drawing 2; the technical scheme that the utility model solves the strickling problem is: wipe appliance stand (8) off and penetrate on the dolly (1) by the roller that vertical shaft (6) is installed in pulp shooting machine; whole strickling appliance stand (8) can center on vertical shaft (6) and rotate; utilize cylinder (3) realize to wipe the contact of appliance stand (8) and PCCP tube surfaces tubing mortar cover (2) off or separate; strickling appliance stand (8) is followed roller and is penetrated dolly (1) rising synchronously; the rate of climb 250 mm/min; 10 rev/mins of PCCP tubing rotary speeies, 25 millimeters of the strickling width that PCCP tubing whenever rotates a circle.The operating position of scraper assembly (5) can accomplish that at 150 millimeters places, mortar spray beam bottom tubing mortar cover (2) sprays the back and wipeed off synchronously.Use three scraper (9), scraper (10), scraper (11) be installed on the same scraper assembly (5), 50 millimeters of scraper centre-to-centre spacing, 15 millimeters of first scraper (9) effective face width degree, the PCCP tubing scraper (9) that rotates a circle rises 25 millimeters, actual effect is to wipe unnecessary mortar off 15 millimeters in per 25 millimeters width, promptly wipe 3/5 off, avoid once all stricklings can cause the local fall in flakes phenomenon of tubing mortar cover (2); 10 millimeters of second scraper (10) effective face width degree, the unnecessary mortar that first scraper (9) is not wiped off is wiped off, the tubing mortar cover (2) that second scraper (10) is wiped off has not been rough surface, but the strip of 10 mm wides, its width is 2/5 of an overall width, therefore also can not cause the fall in flakes of tubing mortar cover (2); The 3rd 30 millimeters of scraper (11) effective face width degree; during its scraping; PCCP tubing mortar cover (2) is wipeed off substantially; because the alignment error of scraper and the wearing and tearing of scraper working face; the linking vestige that preceding two cuttves are wipeed off can be left in basic surface of wipeing off; the 3rd is the effect of scraper (11) to utilize the working face of broad will be connected vestige to eliminate, and the surface smoothness that guarantees tubing mortar cover (2) reaches technical standard and requires (unevenness≤3 millimeter).
The compressor wire that tracking wheel (7) has twined with the PCCP pipe outer surface is as following the tracks of benchmark, and tracking wheel (7) is installed in 200 millimeters places on the mortar spray beam, is splashed on the datum level accuracy that influence is followed the tracks of when avoiding mortar to spray.Compressor wire twines spacing between the 15-25 millimeter, the width of tracking wheel (7) is 120 millimeters, in whole courses of injection, keeps tracking wheel (7) and pushes down five steel wires, make the axial tread and the PCCP pipe outer surface keeping parallelism of tracking wheel (7), can guarantee to follow the tracks of accurately.
Carrying out bilayer at needs twines in the PCCP tubing of silk; the required thickness of ground floor mortar cover is (12 ± 2 millimeters); during adjustment tracking wheel (7) is pressed on the Steel Wire Surface; adjust the working face of scraper assembly (5) and the spacing of PCCP pipe outer surface tubing mortar cover (2), its actual requirement with tubing mortar cover (2) thickness is conformed to.
In the mortar course of injection, rotation along with PCCP tubing, the relative movement orbit of scraper of the present utility model and PCCP pipe outer surface, except that spiral rises, also there is random fluctuation campaign, is in the state of being close to the PCCP pipe outer surface always, adorn a compression spring (4) in the back of wipeing device frame (8) off for making tracking wheel (7) along the PCCP pipe outer surface, by its tension force tracking wheel (7) is adjacent to along the outer surface that PCCP tubing rises and falls always with steel wire, can makes and follow the tracks of accurately.
The beneficial effects of the utility model are: the utility model makes in the PCCP tubing production process when the mortar cover of ground floor steel wire sprays; the mortar cover surface is wipeed off synchronously; guarantee the thickness deviation (12 ± 2 millimeters) within critical field of mortar cover, solved the strickling problem of mortar cover.Surface smoothness after the strickling can satisfy the needs (unevenness≤3 millimeter) that secondary twines silk, makes steel wire when twining for the second time thread uniformity of arranging meet standard code.
Description of drawings
Accompanying drawing 1 is a structural representation of the present utility model, penetrates dolly (1), cylinder (3), spring (4), scraper assembly (5), vertical shaft (6) formation by roller.
Accompanying drawing 2 is that vertical shaft PCCP tubing of the present utility model is wipeed assembly axis survey schematic diagram off, wherein wipeing appliance stand (8) off is coupling with vertical shaft (6), tracking wheel (7) is connected an end of wipeing appliance stand (8) off, and an end of wipeing appliance stand (8) connection tracking wheel (7) off also is connected to scraper (9), scraper (10), scraper (11).
The specific embodiment
The utility model is applicable to the mortar outer surface strickling of the PCCP tubing of DN1800-DN4000; utilize tracking wheel (7) to guarantee that the thickness of tubing mortar cover (2) is even relatively; with three of scraper assembly (5) scraper made the fall in flakes that can not cause tubing mortar cover (2) in the strickling process; according to different PCCP pipe diameters; pair roller is penetrated the speed of dolly (1) rising and is done corresponding adjustment; the PCCP pipe diameter is more little; the rate of climb is fast more; the also corresponding increase of the face width of scraper assembly (5); three of scraper assembly (5) should remain the face width ratio of scraper 3: 2: 6, guaranteed the best effect of wipeing off.
When the utility model is wipeed application off at DN4000 tubing, the scraper assembly three scraper effective face width degree according to 3: 2: 6 ratio, be respectively 15mm, 10mm, 30mm, scraper assembly (5) centre-to-centre spacing 50mm, scraper assembly (5) is 150mm below spraying the mortar bundle, and tracking wheel (7) width 120mm is installed in 200mm position above the mortar spray beam, through trying out of 10,000 tubing, effect satisfies specification requirement (12 ± 2 millimeters).
At PCCP tubing production field, need carry out the PCCP tubing that secondary twines silk and occupy certain ratio, the strickling effect after the ground floor mortar cover sprays directly influences the quality that the second layer twines silk, and the utility model has solved the strickling problem of mortar cover.

Claims (1)

1. a PCCP mortar cover is wipeed device synchronously off; it is characterized in that: described strickling device is penetrated dolly (1) by roller; cylinder (3); spring (4); scraper assembly (5); vertical shaft (6) constitutes; its central roll is penetrated dolly (1) and is linked to each other with strickling appliance stand (8) by vertical shaft (6); wipe off on the appliance stand (8) and be connected to spring (4) and cylinder (3); tracking wheel (7) is connected an end of wipeing appliance stand (8) off; an end of wipeing appliance stand (8) connection tracking wheel (7) off also is connected to scraper assembly (5); scraper assembly (5) is by the scraper that is arranged side by side (9); scraper (10); scraper (11) constitutes, and above-mentioned three should remain the face width ratio of scraper 3: 2: 6.
CNU200820005595XU 2008-03-07 2008-03-07 PCCP mortar protection layer synchronous slicking device Expired - Lifetime CN201189699Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820005595XU CN201189699Y (en) 2008-03-07 2008-03-07 PCCP mortar protection layer synchronous slicking device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820005595XU CN201189699Y (en) 2008-03-07 2008-03-07 PCCP mortar protection layer synchronous slicking device

Publications (1)

Publication Number Publication Date
CN201189699Y true CN201189699Y (en) 2009-02-04

Family

ID=40333854

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820005595XU Expired - Lifetime CN201189699Y (en) 2008-03-07 2008-03-07 PCCP mortar protection layer synchronous slicking device

Country Status (1)

Country Link
CN (1) CN201189699Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013003956A1 (en) 2011-07-04 2013-01-10 Shawcor Ltd. Vibrating finishing plate technology
CN102909782A (en) * 2012-10-17 2013-02-06 上海中技桩业股份有限公司 Feeding device for U-shaped pre-stress concrete pile plank and control method
CN108789794A (en) * 2018-05-31 2018-11-13 新疆国统管道股份有限公司 PCCP spraying systems and its application

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013003956A1 (en) 2011-07-04 2013-01-10 Shawcor Ltd. Vibrating finishing plate technology
CN102909782A (en) * 2012-10-17 2013-02-06 上海中技桩业股份有限公司 Feeding device for U-shaped pre-stress concrete pile plank and control method
CN102909782B (en) * 2012-10-17 2014-12-17 上海中技桩业股份有限公司 Control method for feeding device for U-shaped pre-stress concrete pile plank
CN108789794A (en) * 2018-05-31 2018-11-13 新疆国统管道股份有限公司 PCCP spraying systems and its application
CN108789794B (en) * 2018-05-31 2024-02-27 新疆国统管道股份有限公司 PCCP (prestressed concrete cylinder pipe) guniting system and application thereof

Similar Documents

Publication Publication Date Title
CN201189699Y (en) PCCP mortar protection layer synchronous slicking device
FI71794B (en) FOERFARANDE OCH ANLAEGGNING FOER AOSTADKOMMANDE AV EN NOETNINGSBESTAENDNING YTBELAEGGNING PAO ETT TUNT METALLISKT BANMATERIAL FOERETRAEDESVIS AVSETT FOER FRAMSTAELLNING AV SCHABRAR RAKLAR OCH LIKNANDE
CN106890749A (en) Coating unit for spraying petroleum casing pipe
CN206716293U (en) Petroleum casing pipe inside and outside wall spraying feeding system
CN108162198A (en) A kind of dust-protection type groover that can easily be accommodated
CN104960084A (en) Encased concrete nodular cast iron pipe manufacturing device
CN202081344U (en) Film transfer surface sizing machine
CN107881693B (en) Short-flow sanding machine with centripetal type grinding rollers arranged in arc shape
CN112501945A (en) A spray starch mobile device for production of paper tube body paper
CN103949492B (en) Multi-functional ring oxygen coating presstressed reinforcing steel production line
CN206604821U (en) A kind of steel band for producing steel band reinforced spiral ripple pipe is oriented to cleaning device
CN202644198U (en) Calender roller cooling dedusting device
CN111822542B (en) Device and method for reducing longitudinal and transverse slippage of steel strip in stretching, leveling and uncoiling processes
CN103480807B (en) A kind of spraying method of horizontal centrifugal roller cold mould
CN106827126A (en) A kind of rubber-coated mechanism of the continuous cold press of solid wooden compound floor
CN202705800U (en) Measuring humidifier
CN203270294U (en) Novel slasher beam creel
CN203093054U (en) Spray-coating and winding forming device of steel pipeline corrosion-proof heat-insulating layer
CN215667779U (en) Anti-adhesion long-acting slow-release fertilizer coating device
CN110344129B (en) Polymer coating mechanism for electrostatic spinning nanofiber
CN210146555U (en) Palm fiber cleaning device for mattress production
CN105032639A (en) Low-pressure sprayer for movable sprinkling irrigation
CN214078481U (en) Semi-circular arc cooling device for rod and wire rod roller
CN203807872U (en) Steel strand single wire spraying center wire tensioning device
CN216107974U (en) Engineering construction road surface curing means

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Beijing Hanjian Heshan Pipeline Co., Ltd.

Assignor: Beijing Hanjian Construction Group Co., Ltd.

Contract record no.: 2010110000090

Denomination of utility model: PCCP mortar protection layer synchronous slicking device

Granted publication date: 20090204

License type: Exclusive License

Record date: 20100726

ASS Succession or assignment of patent right

Owner name: BEIJING HANJIAN HESHAN PIPELINE CO., LTD.

Free format text: FORMER OWNER: BEIJING HANJIAN CONSTRUCTION GROUP

Effective date: 20130419

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100073 HAIDIAN, BEIJING TO: 102423 FANGSHAN, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20130419

Address after: 102423 Beijing city Fangshan District Hancunhe town Hancunhe village nature Metro commercial building block C No. 3 NGA

Patentee after: Beijing Hanjian Heshan Pipeline Co., Ltd.

Address before: 100073, 6, Wu Jia Road, West Third Ring Road, Haidian District, Beijing

Patentee before: Beijing Hanjian Construction Group Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20090204

CX01 Expiry of patent term