CN201158786Y - Ground rail installation apparatus - Google Patents

Ground rail installation apparatus Download PDF

Info

Publication number
CN201158786Y
CN201158786Y CNU2008200653737U CN200820065373U CN201158786Y CN 201158786 Y CN201158786 Y CN 201158786Y CN U2008200653737 U CNU2008200653737 U CN U2008200653737U CN 200820065373 U CN200820065373 U CN 200820065373U CN 201158786 Y CN201158786 Y CN 201158786Y
Authority
CN
China
Prior art keywords
bolt
pressing plate
base plate
anchor screw
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200653737U
Other languages
Chinese (zh)
Inventor
廖广昌
白洁
苏书明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
WUHAN YEJIAN FIELD ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN YEJIAN FIELD ENGINEERING Co Ltd filed Critical WUHAN YEJIAN FIELD ENGINEERING Co Ltd
Priority to CNU2008200653737U priority Critical patent/CN201158786Y/en
Application granted granted Critical
Publication of CN201158786Y publication Critical patent/CN201158786Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The utility model relates to a ground surface rail installation device, which comprises a first anchor screw (1), a mounting plate (3), a first clamp nut (4), a first rail pressure plate (5), a second rail pressure plate (7), a second clamp nut (8), a second anchor screw (10), a first pressure plate fixing bolt (11) and a second pressure plate fixing bolt (12), wherein the lower portions of the first anchor screw (1) and the second anchor screw (10) are buried in a ground work (13), and the upper ends of the first anchor screw (1) and the second anchor screw (10) are respectively and correspondingly threaded through a first anchor screw hole and a second anchor screw hole on the mounting plate (3). The utility model is characterized in that a first adjusting nut (2) and a second adjusting nut (9) are respectively screwed on the first anchor screw (1) and the second anchor screw (10) on the lower portion of the mounting plate (3). Compared with the prior art, the utility model has the advantages of fast construction speed and low production cost.

Description

The ground rail erecting device
Technical field
The utility model relates to a kind of ground rail erecting device.
Background technology
Metallurgy high furnace, coke oven etc., the transportation material need be installed ground rail.The ground rail mounting method is: bury stone bolt underground at basic upper edge track laying route earlier, two stone bolt outsides on the single track line are placed respectively and are adjusted backing plate, base plate is installed is shelved on (two stone bolt pass two anchor (bolt) holes installing on the base plate respectively) on the both sides adjustment backing plate, the absolute altitude and the levelness of regulating the installation base plate by the height of adjusting backing plate; Base plate grouting cast down is installed, between installation base plate and basis, forms grout blanket; Lay track on the installation base plate, track is by track pressing plate stationary positioned.This mounting method is to add to adjust backing plate and transfer its levelness and absolute altitude below sole-plate, and shortcoming is: 1, speed of application is slow, and it is big to adjust difficulty, more than 2, use backing plate, and the cost height.
Summary of the invention
The purpose of this utility model is to provide the ground rail that a kind of speed of application is fast, cost is low erecting device.
To achieve these goals, the technical solution of the utility model is: the ground rail erecting device, it comprises first stone bolt, base plate, first clamp nut, the first track pressing plate, the second track pressing plate, second clamp nut, second stone bolt, the first pressing plate set bolt, the second pressing plate set bolt is installed, base plate is installed is provided with first anchor (bolt) hole, second anchor (bolt) hole, the first pressing plate fixed bolt hole, the second pressing plate fixed bolt hole, the bottom of first stone bolt, second stone bolt is embedded in the basis; Corresponding respectively first anchor (bolt) hole, second anchor (bolt) hole of installing on the base plate that pass in the upper end of first stone bolt, second stone bolt, first stone bolt of installation base plate top, the upper end of second stone bolt correspondence respectively are rotary with first clamp nut, second clamp nut; The first track pressing plate is passed the first pressing plate fixed bolt hole of installing on the base plate fixedlys connected with the installation base plate by the first pressing plate set bolt, and the second track pressing plate is passed the second pressing plate fixed bolt hole of installing on the base plate fixedlys connected with the installation base plate by the second pressing plate set bolt; It is characterized in that: correspondence is installed on first stone bolt, second stone bolt of floor below respectively is rotary with first and adjusts nut, second and adjust nut.
The beneficial effects of the utility model are: correspondence has screwed on first and has adjusted nut, the second adjustment nut respectively on first stone bolt, second stone bolt.Do not need when mounted to use and adjust backing plate, adjust absolute altitude and the levelness that nut is adjusted track, after adjustment is finished its disposable being in the milk is finished but adjust nut, second by first.
Compared with prior art, have the advantages that speed of application is fast, cost is low.The utility model is applicable to the base surface track construction.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the vertical view of Fig. 1;
Among the figure: 1-first stone bolt, 2-first adjusts nut, and 3-installs base plate, 4-first clamp nut, the 5-first track pressing plate, 6-track, the 7-second track pressing plate, 8-second clamp nut, 9-second adjusts nut, 10-second stone bolt, the 11-first pressing plate set bolt, the 12-second pressing plate set bolt, the 13-basis.
The specific embodiment
As shown in Figure 1 and Figure 2, the ground rail erecting device, it comprises first stone bolt 1, the first adjustment nut 2, base plate 3, first clamp nut 4, the first track pressing plate 5, the second track pressing plate 7, second clamp nut 8, the second adjustment nut 9, second stone bolt 10, the first pressing plate set bolt 11, the second pressing plate set bolt 12 is installed, base plate 3 is installed is provided with first anchor (bolt) hole, second anchor (bolt) hole, the first pressing plate fixed bolt hole, the second pressing plate fixed bolt hole, the bottom of first stone bolt 1, second stone bolt 10 is embedded in the basis 13; Corresponding respectively first anchor (bolt) hole, second anchor (bolt) hole of installing on the base plate 3 that pass in the upper end of first stone bolt 1, second stone bolt 10, first stone bolt 1 of installation base plate 3 tops, the upper end of second stone bolt 10 correspondence respectively are rotary with first clamp nut 4, second clamp nut 8; The first track pressing plate 5 is passed the first pressing plate fixed bolt hole of installing on the base plate 3 (screwing on nut) fixedlys connected with installation base plate 3 by the first pressing plate set bolt 11, and the second track pressing plate 7 is passed the second pressing plate fixed bolt hole of installing on the base plate 3 (screwing on nut) fixedlys connected with installation base plate 3 by the second pressing plate set bolt 12; Correspondence is installed on first stone bolt 1, second stone bolt 10 of base plate 3 belows respectively to be rotary with first and to adjust nut 2, second and adjust nut 9.

Claims (1)

1. ground rail erecting device, it comprises first stone bolt (1), base plate (3), first clamp nut (4), the first track pressing plate (5), the second track pressing plate (7), second clamp nut (8), second stone bolt (10), the first pressing plate set bolt (11), the second pressing plate set bolt (12) is installed, base plate (3) is installed is provided with first anchor (bolt) hole, second anchor (bolt) hole, the first pressing plate fixed bolt hole, the second pressing plate fixed bolt hole, the bottom of first stone bolt (1), second stone bolt (10) is embedded in the basis (13); First anchor (bolt) hole, second anchor (bolt) hole of installing on the base plate (3) passed in the upper end of first stone bolt (1), second stone bolt (10) correspondence respectively, and first stone bolt (1) of installation base plate (3) top, the upper end of second stone bolt (10) correspondence respectively are rotary with first clamp nut (4), second clamp nut (8); The first track pressing plate (5) is passed the first pressing plate fixed bolt hole of installing on the base plate (3) fixedlys connected with installation base plate (3) by the first pressing plate set bolt (11), and the second track pressing plate (7) is passed the second pressing plate fixed bolt hole of installing on the base plate (3) fixedlys connected with installation base plate (3) by the second pressing plate set bolt (12); It is characterized in that: correspondence is installed on first stone bolt (1), second stone bolt (10) of base plate (3) below respectively is rotary with first and adjusts nut (2), second and adjust nut (9).
CNU2008200653737U 2008-01-21 2008-01-21 Ground rail installation apparatus Expired - Fee Related CN201158786Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200653737U CN201158786Y (en) 2008-01-21 2008-01-21 Ground rail installation apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200653737U CN201158786Y (en) 2008-01-21 2008-01-21 Ground rail installation apparatus

Publications (1)

Publication Number Publication Date
CN201158786Y true CN201158786Y (en) 2008-12-03

Family

ID=40109376

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200653737U Expired - Fee Related CN201158786Y (en) 2008-01-21 2008-01-21 Ground rail installation apparatus

Country Status (1)

Country Link
CN (1) CN201158786Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108252321A (en) * 2018-01-26 2018-07-06 中国冶集团有限公司 A kind of equipment rail integral installation method
CN114369976A (en) * 2021-12-23 2022-04-19 中国华冶科工集团有限公司 Method for laying ground track supported at intervals

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108252321A (en) * 2018-01-26 2018-07-06 中国冶集团有限公司 A kind of equipment rail integral installation method
CN108252321B (en) * 2018-01-26 2020-01-24 中国一冶集团有限公司 Integral installation method for equipment rail
CN114369976A (en) * 2021-12-23 2022-04-19 中国华冶科工集团有限公司 Method for laying ground track supported at intervals
CN114369976B (en) * 2021-12-23 2023-08-22 中国华冶科工集团有限公司 Method for laying ground rail with interval support

Similar Documents

Publication Publication Date Title
CN201520928U (en) Adjustable track seat of large-stroke precise track
CN204847453U (en) Integral type height -adjustable prevents subsiding track fixing system
CN204004792U (en) For piping fixing structure part
KR200399203Y1 (en) Appratus for fixing tracks of maglev train
CN202164809U (en) Adjustable support of climbing type scaffold
CN108252321B (en) Integral installation method for equipment rail
CN201158786Y (en) Ground rail installation apparatus
CN202124387U (en) Guide rail bracket for elevator car
CN207021947U (en) A kind of new energy solar panels mounting bracket
CN201495471U (en) Asphalt cleaning device for roll surface of road roller
CN103046671B (en) Fixing system of glass panel structure supported at two ends
CN201738200U (en) Ballastless track slab-paving retainer
CN201520584U (en) Outer cover plate device
CN107653756B (en) A kind of city rail U-type groove plate-type ballastless railway roadbed track plates bearing adjuster and its application method
CN205383395U (en) Base angle -adjustment means
CN203099228U (en) Anchor bolt leveling structure
CN202131816U (en) Fixing device of communication tower
CN201144374Y (en) Vertical adjusting apparatus for railroad switch
CN203781657U (en) Ground track fixing device
CN208474639U (en) A kind of jacking construction guide rail
CN201144372Y (en) L type temporary fixing rack
CN203097198U (en) Improved Z-shaped fastener and anchoring element
CN203071426U (en) Power distribution cabinet convenient for rapid leveling
CN202831323U (en) Rear-mounted slot-type embedded part
CN201217779Y (en) U-beam temporary support for aerial track

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA FIRST METALLURGICAL CONSTRUCTION GROUP CORPO

Free format text: FORMER OWNER: WUHAN YEJIAN FIELD ENGINEERING CO., LTD.

Effective date: 20101213

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20101213

Address after: 430081 Wuhan Industrial Zone, Qingshan District, Hubei, No. 3

Patentee after: China First Metallurgical Group Co., Ltd.

Address before: 430081 Wuhan Industrial Zone, Qingshan District, Hubei, No. 3

Patentee before: Wuhan Yejian Field Engineering Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081203

Termination date: 20150121

EXPY Termination of patent right or utility model