CN201152692Y - Circulation fluidized smoke dust removing apparatus - Google Patents

Circulation fluidized smoke dust removing apparatus Download PDF

Info

Publication number
CN201152692Y
CN201152692Y CNU200720201664XU CN200720201664U CN201152692Y CN 201152692 Y CN201152692 Y CN 201152692Y CN U200720201664X U CNU200720201664X U CN U200720201664XU CN 200720201664 U CN200720201664 U CN 200720201664U CN 201152692 Y CN201152692 Y CN 201152692Y
Authority
CN
China
Prior art keywords
pipeline
electrostatic precipitator
connects
air lift
mud pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200720201664XU
Other languages
Chinese (zh)
Inventor
金刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CNU200720201664XU priority Critical patent/CN201152692Y/en
Application granted granted Critical
Publication of CN201152692Y publication Critical patent/CN201152692Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Cyclones (AREA)

Abstract

The utility model discloses a circulating fluidized smoke dust-collection device which comprises a venturi dryer (2) and a Cottrell precipitator (4), wherein, the upper end of the venturi dryer (2) is connected with the upper part of the Cottrell precipitator (4) through a pipeline; the lower end of the Cottrell precipitator (4) is connected with an airlift pump (5); the airlift pump (5) is connected with the upper part of a swell cabin (7) through an air-phase transmission pipeline; the bottom end and the upper end of the swell cabin (7) are connected with a circulating fluidized-bed roasting-furnace system (8) through pipelines; the upper end of the circulating fluidized-bed roasting-furnace system (8) is connected with the lower end of the venturi dryer (2); a whirl-wind dust collector (3) is arranged between the venturi dryer (2) and the Cottrell precipitator (4). The dust-collection device has high dust-collection efficiency and low energy consumption, is economical and easy to be implemented, not only reduces the energy consumption of the dust-collection device, but also improves the influence of the dust concentration in the discharged smoke on the surrounding environment.

Description

A kind of ciculation fluidized fume dust remover
Technical field
The utility model relates to a kind of fume dust remover, specifically relates to the fume dust remover in a kind of alumina producing
Background technology
In alumina producing, the recirculating fluidized bed roaster is one of a kind of industrial equipment that the typical case who obtains the product aluminium oxide after the high-temperature roasting of wet hydrogen alumina material is used, one of characteristics of this roasting system are exactly that the high-temperature flue gas that roasting master stove comes out is sloughed attached water with the wet hydrogen alumina material that enters after venturi drier 2 is mixed preheating, enter then in the electrostatic precipitator 4 solid material is collected, adopt gas-phase transport in expansion storehouse 7 with air lift mud pump 5, send into again and carry out roasting in the roasting master stove and obtain product.But this kind flue gas ash removal flow process is owing to only adopted 4 one dust collection devices of electrostatic precipitator, so the ability of gathering dust of its electrostatic precipitator 4 is bigger, and the complete machine electrical power is bigger, the energy consumption height.Because all material all enters in the electrostatic precipitator 4, so dustiness is higher in the discharged flue gas, influential to environment, loss of material is more relatively.And through electrostatic precipitator 4 collected whole materials again by air lift mud pump 5 gas-phase transport to expansion storehouse 7, and the power of air lift mud pump 5 provides by high pressure positive blower 6, so the load of high pressure positive blower 6 is higher, energy consumption is also higher.
Summary of the invention
Problem to be solved in the utility model provides a kind of ciculation fluidized fume dust remover, and its dust-collecting efficiency height, energy consumption is low and economic, easy enforcement, has both reduced the energy consumption of cleaner, has improved in the fume emission dust concentration again to the influence of surrounding environment.
In order to address the above problem, the utility model provides a kind of ciculation fluidized fume dust remover, it comprises feed bin 1, venturi drier 2, electrostatic precipitator 4, feed bin 1 connects venturi drier 2, the upper end of venturi drier 2 connects the top of electrostatic precipitator 4 by pipeline, the lower end of electrostatic precipitator 4 connects air lift mud pump 5 through pipeline, air lift mud pump 5 links to each other with high pressure positive blower 6, air lift mud pump 5 connects 7 tops, expansion storehouse through the gas-phase transport pipeline, 7 bottoms, expansion storehouse are connected recirculating fluidized bed roaster system 8 with the upper end by pipeline, and the upper end of recirculating fluidized bed roaster system 8 connects the lower end of venturi drier 2 again by pipeline.Between venturi drier 2 and electrostatic precipitator 4 by cyclone dust collectors 3, the import of cyclone dust collectors 3 links to each other through the upper end of pipeline with venturi drier 2, the upper end outlet of cyclone dust collectors 3 links to each other with electrostatic precipitator 4 through pipeline, and the lower end of cyclone dust collectors 3 exports on the gas-phase transport pipeline that is connected between air lift mud pump 5 and the expansion storehouse 7.
Electrostatic precipitator 4 is provided with flue gas discharge opening.
Compared with prior art, the utility model is by increasing one-level cyclone dust collectors 3, make the load that gathers dust that enters electrostatic dust collection equipment significantly reduce, thereby specification of equipment, complete machine electrical power and the energy consumption of electrostatic precipitator 4 have been reduced, saved investment and operating cost, and made the exhaust gas dust concentration of discharging atmosphere much smaller than discharging standards.After adopting device for modifying of the present utility model, significantly reduce from electrostatic precipitator 4 collected materials, the feasible load of the air lift mud pump 5 of this material of carrying reduces, and provides the ability and the power of motor of the high pressure positive blower 6 of power also can correspondingly to reduce, thereby has reduced energy consumption.In addition, the cyclone dust collectors 3 of increase are without any need for extra power, and only the flow velocity by flue gas itself can carry out dedusting, and the drag losses of cyclone dust collectors is less, can ignore in the line loss of flue gas.
Description of drawings
Fig. 1 is an installation drawing of the present utility model.
Accompanying drawing acceptance of the bid note is respectively: 1-feed bin, 2-venturi drier, 3-cyclone dust collectors, 4-electrostatic precipitator, 5-air lift mud pump, 6-high pressure positive blower, 7-expansion storehouse, 8-recirculating fluidized bed roaster system.
The specific embodiment
Embodiment: feed bin 1 connects venturi drier 2, the upper end of venturi drier 2 connects the top of electrostatic precipitator 4 by pipeline, electrostatic precipitator 4 is provided with flue gas discharge opening, the lower end of electrostatic precipitator 4 connects air lift mud pump 5 through pipeline, air lift mud pump 5 links to each other with high pressure positive blower 6, air lift mud pump 5 connects 7 tops, expansion storehouse through the gas-phase transport pipeline, 7 bottoms, expansion storehouse are connected recirculating fluidized bed roaster system 8 with the upper end by pipeline, and the upper end of recirculating fluidized bed roaster system 8 connects the lower end of venturi drier 2 again by pipeline.Between venturi drier 2 and electrostatic precipitator 4 by cyclone dust collectors 3, the import of cyclone dust collectors 3 links to each other through the upper end of pipeline with venturi drier 2, the upper end outlet of cyclone dust collectors 3 links to each other with electrostatic precipitator 4 through pipeline, and the lower end of cyclone dust collectors 3 exports on the gas-phase transport pipeline that is connected between air lift mud pump 5 and the expansion storehouse 7.
Workflow of the present utility model is as follows:
The high-temperature flue gas that comes out from recirculating fluidized bed roaster 8 enters the venturi drier 2, carry out the first order the cyclone dust collectors 3 and gather dust with entering after wet hydrogen alumina material from feed bin 1 mixes, solid material more than 92% is collected the back from cyclone dust collectors 3 bottom discharges, enters from the gas-phase transport Guan Zhongjing expansion storehouse 7 that air lift mud pump 5 comes out again and returns roaster.The remainder solid material is taken out of the laggard further dedusting the electrostatic precipitator 4 of going into by flue gas from the top of cyclone dust collectors 3, fume emission is to atmosphere after the dedusting, electrostatic precipitator 4 collected materials enter in the air lift mud pump 5, the high-pressure blast gas-phase transport of coming out by high pressure positive blower 6, deliver in the expansion storehouse 7 after the material that comes out with cyclone dust collectors 3 bottoms converges again, enter the roasting kiln roasting at last.

Claims (3)

1. ciculation fluidized fume dust remover, it comprises feed bin (1), venturi drier (2), electrostatic precipitator (4), feed bin (1) connects venturi drier (2), the upper end of venturi drier (2) connects the top of electrostatic precipitator (4) by pipeline, the lower end of electrostatic precipitator (4) connects air lift mud pump (5) through pipeline, air lift mud pump (5) links to each other with high pressure positive blower (6), air lift mud pump (5) connects top, expansion storehouse (7) through the gas-phase transport pipeline, bottom, expansion storehouse (7) is connected recirculating fluidized bed roaster system (8) with the upper end by pipeline, the upper end of recirculating fluidized bed roaster system (8) connects the lower end of venturi drier (2) again by pipeline, it is characterized in that: between venturi drier (2) and electrostatic precipitator (4), cyclone dust collectors (3) are arranged, the import of cyclone dust collectors (3) links to each other through the upper end of pipeline with venturi drier (2), and the upper end outlet of cyclone dust collectors (3) links to each other with electrostatic precipitator (4) through pipeline.
2. ciculation fluidized fume dust remover according to claim 1 is characterized in that: the lower end of cyclone dust collectors (3) exports on the gas-phase transport pipeline that is connected between air lift mud pump (5) and expansion storehouse (7).
3. ciculation fluidized fume dust remover according to claim 1 is characterized in that: electrostatic precipitator (4) is provided with flue gas discharge opening.
CNU200720201664XU 2007-12-17 2007-12-17 Circulation fluidized smoke dust removing apparatus Expired - Fee Related CN201152692Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200720201664XU CN201152692Y (en) 2007-12-17 2007-12-17 Circulation fluidized smoke dust removing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200720201664XU CN201152692Y (en) 2007-12-17 2007-12-17 Circulation fluidized smoke dust removing apparatus

Publications (1)

Publication Number Publication Date
CN201152692Y true CN201152692Y (en) 2008-11-19

Family

ID=40128371

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200720201664XU Expired - Fee Related CN201152692Y (en) 2007-12-17 2007-12-17 Circulation fluidized smoke dust removing apparatus

Country Status (1)

Country Link
CN (1) CN201152692Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102369409A (en) * 2009-04-02 2012-03-07 哈奇有限公司 Dust collection system for calcine transfer container
CN102815536A (en) * 2012-08-30 2012-12-12 山东华建仓储装备科技有限公司 Pneumatic lifting system and usage thereof
CN103496726A (en) * 2013-08-30 2014-01-08 鞠复勇 Gas suspension calciner for alumina and process

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102369409A (en) * 2009-04-02 2012-03-07 哈奇有限公司 Dust collection system for calcine transfer container
CN102369409B (en) * 2009-04-02 2014-04-02 哈奇有限公司 Dust collection system for calcine transfer container
CN102815536A (en) * 2012-08-30 2012-12-12 山东华建仓储装备科技有限公司 Pneumatic lifting system and usage thereof
CN102815536B (en) * 2012-08-30 2015-04-08 山东华建仓储装备科技有限公司 Pneumatic lifting system and usage thereof
CN103496726A (en) * 2013-08-30 2014-01-08 鞠复勇 Gas suspension calciner for alumina and process
CN103496726B (en) * 2013-08-30 2016-05-18 鞠复勇 A kind of aluminum oxide gaseous state suspending calcining stove and technique

Similar Documents

Publication Publication Date Title
CN204601912U (en) A kind of intelligent waste gas dust-removal device
CN101983942B (en) Drying and quality improvement apparatus for slime and sludge and technology thereof
CN201152692Y (en) Circulation fluidized smoke dust removing apparatus
CN201709305U (en) Energy-saving grain drying equipment
CN101385934A (en) Dust collection method of lime kiln gas in combinative alkali production and special device thereof
CN104548842A (en) Cyclone diffusion type smoke prevention and dust control device and smoke prevention and dust control method
CN209174114U (en) Using the two fans system of roller mill
CN201873599U (en) Drying and upgrading device for coal slim and sludge
CN203222597U (en) Coal gas dust control device of rotary furnace
CN104874457B (en) Efficient circulating fluid bed milling equipment
CN102311135A (en) Method for ash returning utilizing electrical dust collection
CN108033286A (en) A kind of grain dust pelletizing system
CN109701323A (en) The axis stream Combined dust removal system and method for the high ash-laden gas of high temperature
CN205095589U (en) Wet -type dust collector
CN2272331Y (en) Multi-tube type dust trap
CN210410020U (en) Dust removal and dust fall device
CN100395500C (en) Tech. for drying rubber assistant
CN210171077U (en) Water film dust remover
CN102774656A (en) Furfural production process system for conveying raw materials in closed mode
CN209226857U (en) A kind of energy-efficient natural gas perlite bloating plant
CN201852413U (en) Microwave drying system with dedusting and recovery device
CN206094047U (en) Coal slurry fluidized bed boiler system
CN202909595U (en) Dirt collection device integrating gravity dust removal and cyclone dust removal
CN201537597U (en) Combined type dry coal preparation apparatus
CN201632326U (en) One-segment multi-pipe and single-chamber three-electric field combined dust remover

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER NAME: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

CP03 Change of name, title or address

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081119

Termination date: 20141217

EXPY Termination of patent right or utility model