CN201151953Y - Pre-buried joint - Google Patents

Pre-buried joint Download PDF

Info

Publication number
CN201151953Y
CN201151953Y CNU2007203107542U CN200720310754U CN201151953Y CN 201151953 Y CN201151953 Y CN 201151953Y CN U2007203107542 U CNU2007203107542 U CN U2007203107542U CN 200720310754 U CN200720310754 U CN 200720310754U CN 201151953 Y CN201151953 Y CN 201151953Y
Authority
CN
China
Prior art keywords
external screw
link plate
built
base
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007203107542U
Other languages
Chinese (zh)
Inventor
严建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007203107542U priority Critical patent/CN201151953Y/en
Application granted granted Critical
Publication of CN201151953Y publication Critical patent/CN201151953Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses an embedded joint which consists of a connecting body and a hang plate and a pedestal, which are arranged at the connecting body. The connecting body is a columnar structure, the upper end is an external screw column, and the lower end is an internal screw column. The middle of the hanging plate is provided with a downwards extending structure, and two sides of the hanging plate are provided with fixing holes. The bottom surface of the pedestal is a flat structure, the upper surface of which is vertically provided with a hollow central column. The lower end of the connecting body is fixed in the central column. The external screw column at the upper end is connected with the internal screw of the extending structure on the hanging plate by screws. The upper end of the external screw column is connected with a floor installation part. The embedded joint solves the problems of the prior art of the great construction difficulty of ceiling and floor, low installation intensity and influence on safeness. At the same time, the embedded joint can be used for ceiling the ceiling and also can be used for installing wood floor, has multiple purposes, simple structure and low cost and is worthwhile for popularization.

Description

Built-in joint
Technical field
The utility model belongs to building field, and particularly a kind of Gong later stage finishing that is embedded in the floor lifts ceiling or lifting light fixture and the built-in joint of usefulness such as wood flooring is installed.
Background technology
Usually, people buy new house before moving in, and all will fit up the house.During house decoration, general ceiling and floor two fitting-out works that are absolutely necessary.For ceiling, generally be to adopt the hanging belt method, in the ceiling punching expansion bolt is installed earlier, then decorative panel is hung in the above; And for solid wood class floor, then need keel nails on the cement floor, again with flooring nail at top of keel, this is current at present job practices.But these two kinds of methods all have tangible deficiency, the one, be on the ceiling punching or its difficulty of construction of nailing on the cement floor is all very big, and the intensity of installing also can't guarantee, the 2nd, these two kinds of methods all can be destroyed the concrete structure of building, cause structural strength to descend, influence safety.Especially on the cement floor, nail, be easy to the concrete floor face nailing is worn and cause security incident.The day for announcing is that the notice of authorization CN200971565Y on November 7th, 2007 discloses a kind of ceiling lifting built-in fitting, adopted the main body of column structure to be provided with an eyelet that can supply ceiling to lift towards next end, eyelet is provided with internal thread, the open and flat one-tenth position-arresting disk structure in upper end, the position-arresting disk area offers the form of structure of a hole for nailing at least greater than stylolitic part on the position-arresting disk.But the built-in fitting of this form has only been considered the lifting of ceiling, does not consider the installation on floor, and function ratio is more single, and in fact, the ceiling of resident family lifting downstairs can be used same concrete embedded with the floor installation of resident family upstairs.
The utility model content
The utility model is big for ceiling, the floor finiss difficulty of construction that solves prior art and exist, and installation strength is low, the problem of influence safety and provide construction simple and convenient, intensity height, safe and reliable built-in joint.
Another purpose of the present utility model is can lift ceiling for the problem that solves the function singleness that prior art exists both provides, and the built-in joint of wood flooring can be installed again.
The utility model is to reach the concrete technical scheme that above-mentioned technical purpose adopts to be: built-in joint is by connector and be arranged on link plate on the connector, base is formed, connector is a cylindrical structural, the upper end is the external screw thread post, the lower end is an internal threaded column, be provided with downward extended structure in the middle of the link plate, be provided with and the suitable internal thread of external screw thread post in the extended structure, both sides are provided with fixing hole, the bottom surface of base is a slabbed construction, vertically be provided with the central post of hollow above the slabbed construction, the lower end of connector is fixed in the central post, and the external screw thread post of upper end and the internal thread on the link plate are spirally connected, and the upper end of external screw thread post exceeds link plate.Connector is designed to all attachable up and down structure, the internal threaded column of lower end can be hung ceiling, the external screw thread post of upper end can connect the floor installed part when needed, the problem that interim punching is produced when both having solved finishing, also reached the purpose of dual-use material, simplify the construction formality, saved cost.Link plate is used for fixing connector, and the effect one of base is the position of restriction connector, guarantees the verticality of connector, reaches the purpose of convenient construction, and the 2nd, foreign material such as cement enter internal threaded column, the protection internal thread in the time of also can preventing to construct.The fixing hole of link plate both sides can be fixed on built-in joint on the appropriate location of construction formwork easily.
In the place on needs installation floor, the upper end of external screw thread post connects the floor installed part.Like this, lifting ceiling and twice pre-buried process that the floor is installed, just can be in construction disposable finishing, simplified work progress, saved cost.
As preferably, the bilateral symmetry of central post is provided with the side column of hollow, and the fixing hole of the position of side column and link plate both sides is suitable.The effect of side column is a link plate fixedly the time, provides suitable support to link plate.
As preferably, the plastic construction that base is integrated, the side column on the base is higher than central post.The base of plastic construction is easy to manufacture, and cost is low and can not get rusty in concrete, and the life-span is long.
Built-in joint in use, connector and link plate, base are fixed on the construction formwork by nail, the slabbed construction of base is close to and is connected construction formwork.The effect of nail has two, and the one, during construction built-in joint is fixed on the appropriate location of construction formwork, prevent that built-in joint from moving, the 2nd, when the lifting ceiling, can prevent when screwing in screw that built-in joint from rotating.
The beneficial effects of the utility model are: ceiling, floor construction difficulty that it has solved the prior art existence effectively are big, and installation strength is low, the problem of influence safety.Simultaneously, the utility model both can lift ceiling, again wood flooring can be installed, and one-object-many-purposes and simple in structure is with low cost, is worth of widely use.
Description of drawings
Below in conjunction with accompanying drawing the specific embodiment of the present utility model is further described.
Fig. 1 is a kind of structure sectional view of the utility model built-in joint.
Fig. 2 is a kind of structure sectional view of the utility model built-in joint link plate.
Fig. 3 is the vertical view of accompanying drawing 2.
Fig. 4 is a kind of structure sectional view of the utility model built-in joint base.
Fig. 5 is the vertical view of accompanying drawing 4.
Fig. 6 is the another kind of structure sectional view of the utility model built-in joint.
Among the figure: 1. connector, 2. link plate, 3. base, 4. floor installed part, 5. nail, 6. construction formwork, 11. external screw thread posts, 12. internal threaded columns, 21. extended structures, 22. fixing holes, 31. slabbed constructions, 32. central posts, 33. side columns.
The specific embodiment
Embodiment 1
In embodiment 1 as shown in Figure 1, built-in joint is made up of connector 1 and the link plate 2, the base 3 that are arranged on the connector 1, connector 1 is a cylindrical structural, the upper end is an external screw thread post 11, the lower end is an internal threaded column 12, be provided with downward extended structures 21 in the middle of the link plate 2, the internal thread suitable with external screw thread post 11 is set in the extended structure 21, both sides are provided with fixing hole 22 (seeing Fig. 2 Fig. 3).The plastic construction that base 3 is integrated, the bottom surface is a slabbed construction 31, vertically be provided with the central post 32 of hollow above the slabbed construction 31, the lower end of connector 1 is fixed in the central post 32, the bilateral symmetry of central post 32 is provided with the side column 33 of hollow, side column 33 is higher than central post 32, the fixing hole 22 suitable (seeing Fig. 4 Fig. 5) of the position of side column 33 and link plate 2 both sides.The external screw thread post 11 of connector 1 upper end is spirally connected with the internal thread on the link plate 2, and the upper end of external screw thread post 11 exceeds link plate 2.
Embodiment 1 does not consider the installation on floor, during construction, earlier built-in joint is placed in the appropriate location of construction formwork 6, nail 5 is passed the fixing hole 22 of link plate 2 both sides and the hollow structure of base 3 side columns 33, the slabbed construction 31 of base 3 is close to and is connected construction formwork 6, connector 1 and link plate 2, base 3 are fixed on the construction formwork 6 by nail 5, just can carry out concrete cast.
Embodiment 2
Embodiment 2 adopts the upper end of external screw thread posts 11 to connect the structure of floor installed part 4, and floor installed part 4 is a plastic construction, the bottom surface be provided with one with the suitable screw (see figure 6) of the external screw thread post 11 of connector 1 upper end, all the other are identical with embodiment 1.
Embodiment 2 is when considering the ceiling of resident family's lifting downstairs, also considered the installation question on the floor of resident family upstairs, during construction, earlier built-in joint is placed in the appropriate location of construction formwork 6, nail 5 is passed the fixing hole 22 of link plate 2 both sides and the hollow structure of base 3 side columns 33, the slabbed construction 31 of base 3 is close to and is connected construction formwork 6, connector 1 and link plate 2, base 3 is fixed on the construction formwork 6 by nail 5, floor installed part 4 is loaded onto in the position that exceeds link plate 2, the upper end of threaded column 11 outside again, the top of noting the floor installed part is concordant with ground, subsequently just can carry out concrete cast.

Claims (5)

1. built-in joint, by connector and be arranged on link plate on the connector, base is formed, it is characterized in that: described connector (1) is a cylindrical structural, the upper end is external screw thread post (11), the lower end is internal threaded column (12), be provided with downward extended structure (21) in the middle of the link plate (2), be provided with and the suitable internal thread of external screw thread post (11) in the extended structure (21), both sides are provided with fixing hole (22), the bottom surface of base (3) is slabbed construction (31), vertically be provided with the central post (32) of hollow above the slabbed construction (31), the lower end of connector (1) is fixed in the central post (32), the external screw thread post (11) of upper end and the internal thread on the link plate (2) are spirally connected, and the upper end of external screw thread post (11) exceeds link plate (2).
2. built-in joint according to claim 1 is characterized in that the upper end of described external screw thread post (11) connects floor installed part (4).
3. built-in joint according to claim 1 is characterized in that the bilateral symmetry of described central post (32) is provided with the side column (33) of hollow, and the fixing hole (22) of the position of side column (33) and link plate (2) both sides is suitable.
4. built-in joint according to claim 1 is characterized in that the integrated plastic construction of described base (3), and the side column (33) on the base (3) is higher than central post (32).
5. according to claim 1 or 2 or 3 or 4 described built-in joints, when it is characterized in that described built-in joint uses, connector (1) and link plate (2), base (3) are fixed on the construction formwork (6) by nail (5), and the slabbed construction (31) of base (3) is close to and is connected construction formwork (6).
CNU2007203107542U 2007-12-17 2007-12-17 Pre-buried joint Expired - Fee Related CN201151953Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007203107542U CN201151953Y (en) 2007-12-17 2007-12-17 Pre-buried joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007203107542U CN201151953Y (en) 2007-12-17 2007-12-17 Pre-buried joint

Publications (1)

Publication Number Publication Date
CN201151953Y true CN201151953Y (en) 2008-11-19

Family

ID=40127632

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007203107542U Expired - Fee Related CN201151953Y (en) 2007-12-17 2007-12-17 Pre-buried joint

Country Status (1)

Country Link
CN (1) CN201151953Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110206797A (en) * 2019-03-20 2019-09-06 山东电力设备有限公司 Reactor clamp device in place and its installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110206797A (en) * 2019-03-20 2019-09-06 山东电力设备有限公司 Reactor clamp device in place and its installation method

Similar Documents

Publication Publication Date Title
CN106400966A (en) Assembly method of prefabricated integral assemble type portable house
CN206428956U (en) Driven hanging basket and its fixing device
CN201649604U (en) I-steel overhanging type scaffold for floor corner construction
CN201151953Y (en) Pre-buried joint
CN202441045U (en) Rail-type electric attached lifting scaffold
CN207553613U (en) A kind of structure of hoisting prefabricated Side fascia
WO2017041518A1 (en) Pillar base of aluminum alloy house
KR200443024Y1 (en) Stanchion for stairs
CN206205151U (en) A kind of prefabricated integral assembling formula movable plank house
AU2021102633A4 (en) Method for carrying objects by girder crane lifting device arranged in light well
CN214696641U (en) Ground overhead leveling structure
CN201381629Y (en) Light scaffold
CN201714005U (en) Precast concrete stair
CN210032102U (en) Support for mounting external hanging piece of building
CN205348816U (en) Face limit protector and pole setting thereof
CN107313597A (en) Modularization ready-package discharging platform for assembled architecture
CN211200968U (en) Stair railing rod connector
CN220587883U (en) Multifunctional stool convenient for ascending operation
CN206554262U (en) A kind of dismantled and assembled suspension type housing of environment-friendly and energy-efficient
CN220725585U (en) Light FRP plate reinforced prefabricated staircase
CN221053148U (en) Reinforced structure that scaffold frame used
CN216516980U (en) Outer wall ALC board simply promotes device of taking one's place
CN212656248U (en) Caisson prefabricated plate mount
CN211421371U (en) Assembled balcony of prefabricated floor
CN219509023U (en) Assembled stair

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081119

Termination date: 20100118