Prior art keywords
pipe arrangement
pipe
standpipe
support
prefabricated combination
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007203105439U
Other languages
English (en)
Inventor
王亮
戴运华
徐建忠
钟保华
张永红
尹奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Third Engineering Division
China Construction Third Bureau Group Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Third Engineering Division filed Critical First Construction Co Ltd of China Construction Third Engineering Division
Priority to CNU2007203105439U priority Critical patent/CN201141483Y/zh
Application granted granted Critical
Publication of CN201141483Y publication Critical patent/CN201141483Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

本实用新型公开了一种预制组合立管,立管单体内设有多根配管(1),配管(1)与配管支架(2)制作装配为一体,各配管(1)之间间距均匀,配管(1)设有配管防晃件(8),二者通过防晃件连接孔(9)相连,配管(1)上端设有导板(10)和吊耳(11)。本实用新型设计结构合理,加快了施工进度,降低了危险性。预制立管安装完成后进行管井和楼板一次性浇注,管井与楼板为一体,减少了安全隐患和漏水隐患。

Description

一种预制组合立管
技术领域:
本实用新型一种预制组合立管涉及建筑施工,特别涉及一种建筑集中配管的预制组合立管。
背景技术:
高层建筑的主要管井中密集地布置着输送各种介质的立管,而这些立管就好比是整个建筑的大动脉。如何提高管井立管的施工速度及功效,降低管井作业的安全风险、保证立管的施工质量,如何缩短施工现场垂直运输机械的占用时间及狭窄场地的快速转运等,始终是困扰着机电安装工程的几个难题。
若按常规施工方法,面临工效、安全和垂直运输几大难题,针对上述问题,提出预制组合立管的***理论,并经过详尽设计计算,达到实际应用的标准。
发明内容:
本实用新型的目的是设计一种高层建筑集中配管的预制加工、组合与装配的立管。
本实用新型技术方案是这样实现的:一种预先在工厂内制作装配、可进行整体安装的预制组合立管,其特征是单体长约10-12m,单体有多根配管,配管与配管支架制作装配为一体,各配管之间间距均匀、布置美观。
安装时每一根立管按图纸位置固定在管架上,从而使管道与管架之间,
架与管架之间,管道与管道之间形成一个相对稳定的整体(节)。当钢结构施工到相应楼层时,利用塔吊把每节预制组合立管吊装到管井中,最后准确就位,这样相当于施工一次吊装了一个管井2~3层的所有立管,最后进行节与节之间的对接。
本实用新型的有益效果是:
设计结构合理,使集中配管成为标准化产品,在工厂加工装配,可实现工厂化流水式作业,大大提高预制组合立管的制作装配质量,加快了施工进度,降低了成本。现场施工减少了吊装次数与现场组对焊接次数,降低了危险性。与常规施工比较,具有组合化施工以提高功效、现场施工简便、质量可靠、安全可控、产品精度高、管井封堵安全、防水可靠几个特点,预制立管安装完成后进行管井和楼板一次性浇注,管井与楼板为一体,减少了安全隐患和漏水隐患。
附图说明:
图1平面结构图
图2剖面结构图
图3-1防振活动支架示意图
图3-2防振固定支架示意图
图4-1非防振活动支架示意图
图4-2非防振固定支架示意图
图5安装平面示意图
图6安装立面示意图
具体实施方式:
下面结合具体图例对本实用新型作进一步说明。
参造图1、图2、图5和图6一种预先在工厂内制作装配、可进行整体安装的预制组合立管,其特征是单体长约10-12m,单体有多根配管1,配管1与配管支架2制作装配为一体,各配管1之间间距均匀;每节单体有多根管径大小不一的配管1;配管1与支架2制作装配为一体;管架2为方形,并有方形封板;方形管架侧面有多个间距一致的圆形钻孔3;距配管1两端500mm处各设一个临时支撑件4;每根配管1均预设套管5,套管5设支撑金属件4,套管5与管架2之间设金属固定件6;配管1与管架2之间的金属固定件6两侧各有2个圆形钻孔;配管1设有防晃件8;配管1上端设有导板10和吊耳11,距配管1下端500mm处设一个临时支撑件16。
另,防晃支架8用来防止配管1在安装过程及运行过程中的晃动;可动管架2可适度调整安装垂直距离;连接板12用来连接管架与主体结构;临时支撑件16在吊装过程中进行临时固定;每根配管上端的4个导板10用来进行另一节预制组合立管的连接。
参照图5,配管设有4个导板,反映配管与钢梁之间的连接,用来进行预制组合立管与钢梁的连接,根据实际情况可采用焊接或其他方式连接。
参造图6,为本实用新型安装完成后平面示意,管架2与主体结构的连接通过预留的焊接;一节预制组合立管可完成2-3层的集中配管,省时、省力,操作安全,质量可靠。
本实用新型涉及的部件均采用型钢或钢管焊接而成,工厂化加工、装配,机械化程度高,替代了传统现场手工作业的种种缺陷,管井与楼板一次浇注成型,有效减少了安全隐患和漏水隐患,提高了工效及操作可靠度。
本图例中提及的各部件造型为最佳结构造型,如采用其他相似造型,及有类似结构但只是安装方位或方向上的改变均属本实用新型保护范围。
实施例2
参造图3,为本实用新型的所用管架2的一种,为防振型。防振活动支架为竖向可适度位移,由防晃支架8、防振件13、防振橡胶14、可动管架2组成。防振固定支架为固定型,不能进行垂直或水平方向的位移,由固定部15、防振橡胶14、可动管架2组成。
实施例3
参造图4,为本实用新型的所用管架2的一种,为非防振型。非防振活动支架为竖向可适度位移,由防晃支架8、可动管架2组成。非防振固定支架为固定型,不能进行垂直或水平方向的位移,由固定部15、可动管架组成。

Claims (9)

1、一种预制组合立管,其特征是单体内设有多根配管(1),配管(1)与配管支架(2)制作装配为一体,各配管(1)之间间距均匀。
2、根据权利要求1所述的预制组合立管,其特征是,所述配管(1)的管径大小不一。
3、根据权利要求1所述的预制组合立管,其特征是配管支架(2)为方形,并有方形封板。
4、根据权利要求1或2所述预制组合立管,其特征是所述配管1两端各设一个临时支撑件(4)。
5、根据权利要求1或3所述的预制组合立管,其特征是配管支架(2)侧面有多个间距一致的圆形钻孔(3)。
6、根据权利要求1、2或4所述的预制组合立管,其特征是每根配管(1)均预设套管(5),套管(5)与管架(2)之间有金属固定件(6)。
7、根据权利要求1-6之一所述的预制组合立管,其特征是配管(1)与管架(2)之间的金属固定件(6)两侧各有(2)个圆形钻孔。
8、根据权利要求1、2、4、6或7所述的预制组合立管,其特征是配管(1)设有配管防晃件(8),二者通过防晃件连接孔(9)相连。
9、根据权利要求1、2、4、6、7或8所述的预制组合立管,其特征是在配管(1)上端设有导板(10)和吊耳(11)。
CNU2007203105439U 2007-12-13 2007-12-13 一种预制组合立管 Expired - Fee Related CN201141483Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007203105439U CN201141483Y (zh) 2007-12-13 2007-12-13 一种预制组合立管

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007203105439U CN201141483Y (zh) 2007-12-13 2007-12-13 一种预制组合立管

Publications (1)

Publication Number Publication Date
CN201141483Y true CN201141483Y (zh) 2008-10-29

Family

ID=40069194

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007203105439U Expired - Fee Related CN201141483Y (zh) 2007-12-13 2007-12-13 一种预制组合立管

Country Status (1)

Country Link
CN (1) CN201141483Y (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603504A (zh) * 2013-11-26 2014-02-26 中建二局第三建筑工程有限公司 超高层建筑机电大口径立管随主体进度吊装施工的方法
CN104060948A (zh) * 2014-06-05 2014-09-24 宝鸡石油机械有限责任公司 海洋立管、辅管支架的组焊方法
CN104149065A (zh) * 2014-07-24 2014-11-19 苏州众捷汽车零部件有限公司 联接立管用预装配零件

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603504A (zh) * 2013-11-26 2014-02-26 中建二局第三建筑工程有限公司 超高层建筑机电大口径立管随主体进度吊装施工的方法
CN104060948A (zh) * 2014-06-05 2014-09-24 宝鸡石油机械有限责任公司 海洋立管、辅管支架的组焊方法
CN104060948B (zh) * 2014-06-05 2016-01-20 宝鸡石油机械有限责任公司 海洋立管、辅管支架的组焊方法
CN104149065A (zh) * 2014-07-24 2014-11-19 苏州众捷汽车零部件有限公司 联接立管用预装配零件
CN104149065B (zh) * 2014-07-24 2016-06-08 苏州众捷汽车零部件有限公司 联接立管用预装配零件

Similar Documents

Publication Publication Date Title
CN204524692U (zh) 精度控制工装
CN201141483Y (zh) 一种预制组合立管
CN102518300B (zh) 预埋锥形承载接头式钢结构支座及其施工方法
CN203361354U (zh) 一种梁柱节点连接装置
CN203199913U (zh) 一种装拆式起吊桁架
CN101177933B (zh) 桥梁拱肋吊运及支撑支架一体化施工方法及装置
CN104314009A (zh) 大节段提升机构及使用方法
CN107097062A (zh) 一种堆取料机回转交叉轴承的更换方法
CN104233961A (zh) 一种悬浇桥梁0号块的支承三角托架
CN204728217U (zh) 钢箱梁节段拼装定位板装置
CN103806530B (zh) 一种异形悬挑钢结构及其施工方法
CN203429556U (zh) 一种索鞍快速安装、定位***
CN103334584B (zh) 一种滑模***的模板调节***
CN204504600U (zh) 用于自升平台桩腿焊接的辅助平台及其支撑装置
CN201873949U (zh) 桥梁预应力张拉台车
CN204676905U (zh) 核电cb20模块整体拼装运输平台
CN203755167U (zh) 塔楼天桥v形钢管架的辅助安装装置
CN201128882Y (zh) 桥梁拱肋吊运及支撑支架一体化施工装置
CN204823671U (zh) 节点灌浆卡箍水下安装辅助机构
CN110820518B (zh) 一种钢拱桥吊杆加工及吊装方法
CN205205664U (zh) 混凝土塔柱连接结构
CN203867164U (zh) 一种带有定位钢管的悬挑型脚手架结构
CN113336144A (zh) 一种便于水轮发电机组大型球阀拆装以及水平搬运的装置
CN108423120B (zh) 一种抗扭箱单元的建造方法
CN201850762U (zh) 一种用于横梁支模架的梁底支撑架

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: THE FIRST CONSTRUCTION ENGINEERING COMPANY OF CHI

Free format text: FORMER OWNER: THE FIRST CONSTRUCTION ENGINEERING COMPANY OF CHINA CONSTRUCTION NO.3 BUREAU

Effective date: 20081010

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20081010

Address after: No. 1, Soochow Road, Dongxihu District, Hubei, Wuhan Province, China: 430040

Co-patentee after: China Construction three Bureau Construction Engineering Co., Ltd.

Patentee after: China Construction three bureau first construction project limited liability company

Address before: No. 1, Soochow Road, Dongxihu District, Hubei, Wuhan Province, China: 430040

Patentee before: The First Construction Engineering Company of China Construction No.3 Bureau

CU03 Correction of utility model patent gazette

Correction item: Co-patentee

Correct: China Construction Third Engineering Bureau Co., Ltd.

False: China Construction three Bureau Construction Engineering Co., Ltd.

Number: 47

Page: 799

Volume: 24

ERR Gazette correction

Free format text: CORRECT: COMMON ¬ PATENTEE; FROM: CHINA CONSTRUCTION THIRD ENGINEERING BUREAU CORP., LTD. TO: CHINA CONSTRUCTION THIRD ENGINEERING BUREAU CONSTRUCTION ENGINEERING CO., LTD.,

C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Huang Gang

Inventor after: Wang Liang

Inventor after: Dai Yunhua

Inventor after: Xu Jianzhong

Inventor after: Zhong Baohua

Inventor after: Zhang Yonghong

Inventor after: Yin Kui

Inventor before: Wang Liang

Inventor before: Dai Yunhua

Inventor before: Xu Jianzhong

Inventor before: Zhong Baohua

Inventor before: Zhang Yonghong

Inventor before: Yin Kui

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG LIANG DAI YUNHUA XU JIANZHONG ZHONG BAOHUA ZHANG YONGHONG YIN KUI TO: HUANG GANG WANG LIANG DAI YUNHUA XU JIANZHONG ZHONG BAOHUA ZHANG YONGHONG YIN KUI

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081029

Termination date: 20161213