CN201141483Y - 一种预制组合立管 - Google Patents
一种预制组合立管 Download PDFInfo
- Publication number
- CN201141483Y CN201141483Y CNU2007203105439U CN200720310543U CN201141483Y CN 201141483 Y CN201141483 Y CN 201141483Y CN U2007203105439 U CNU2007203105439 U CN U2007203105439U CN 200720310543 U CN200720310543 U CN 200720310543U CN 201141483 Y CN201141483 Y CN 201141483Y
- Authority
- CN
- China
- Prior art keywords
- pipe arrangement
- pipe
- standpipe
- support
- prefabricated combination
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007203105439U CN201141483Y (zh) | 2007-12-13 | 2007-12-13 | 一种预制组合立管 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007203105439U CN201141483Y (zh) | 2007-12-13 | 2007-12-13 | 一种预制组合立管 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201141483Y true CN201141483Y (zh) | 2008-10-29 |
Family
ID=40069194
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007203105439U Expired - Fee Related CN201141483Y (zh) | 2007-12-13 | 2007-12-13 | 一种预制组合立管 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201141483Y (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103603504A (zh) * | 2013-11-26 | 2014-02-26 | 中建二局第三建筑工程有限公司 | 超高层建筑机电大口径立管随主体进度吊装施工的方法 |
CN104060948A (zh) * | 2014-06-05 | 2014-09-24 | 宝鸡石油机械有限责任公司 | 海洋立管、辅管支架的组焊方法 |
CN104149065A (zh) * | 2014-07-24 | 2014-11-19 | 苏州众捷汽车零部件有限公司 | 联接立管用预装配零件 |
-
2007
- 2007-12-13 CN CNU2007203105439U patent/CN201141483Y/zh not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103603504A (zh) * | 2013-11-26 | 2014-02-26 | 中建二局第三建筑工程有限公司 | 超高层建筑机电大口径立管随主体进度吊装施工的方法 |
CN104060948A (zh) * | 2014-06-05 | 2014-09-24 | 宝鸡石油机械有限责任公司 | 海洋立管、辅管支架的组焊方法 |
CN104060948B (zh) * | 2014-06-05 | 2016-01-20 | 宝鸡石油机械有限责任公司 | 海洋立管、辅管支架的组焊方法 |
CN104149065A (zh) * | 2014-07-24 | 2014-11-19 | 苏州众捷汽车零部件有限公司 | 联接立管用预装配零件 |
CN104149065B (zh) * | 2014-07-24 | 2016-06-08 | 苏州众捷汽车零部件有限公司 | 联接立管用预装配零件 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204524692U (zh) | 精度控制工装 | |
CN201141483Y (zh) | 一种预制组合立管 | |
CN102518300B (zh) | 预埋锥形承载接头式钢结构支座及其施工方法 | |
CN203361354U (zh) | 一种梁柱节点连接装置 | |
CN203199913U (zh) | 一种装拆式起吊桁架 | |
CN101177933B (zh) | 桥梁拱肋吊运及支撑支架一体化施工方法及装置 | |
CN104314009A (zh) | 大节段提升机构及使用方法 | |
CN107097062A (zh) | 一种堆取料机回转交叉轴承的更换方法 | |
CN104233961A (zh) | 一种悬浇桥梁0号块的支承三角托架 | |
CN204728217U (zh) | 钢箱梁节段拼装定位板装置 | |
CN103806530B (zh) | 一种异形悬挑钢结构及其施工方法 | |
CN203429556U (zh) | 一种索鞍快速安装、定位*** | |
CN103334584B (zh) | 一种滑模***的模板调节*** | |
CN204504600U (zh) | 用于自升平台桩腿焊接的辅助平台及其支撑装置 | |
CN201873949U (zh) | 桥梁预应力张拉台车 | |
CN204676905U (zh) | 核电cb20模块整体拼装运输平台 | |
CN203755167U (zh) | 塔楼天桥v形钢管架的辅助安装装置 | |
CN201128882Y (zh) | 桥梁拱肋吊运及支撑支架一体化施工装置 | |
CN204823671U (zh) | 节点灌浆卡箍水下安装辅助机构 | |
CN110820518B (zh) | 一种钢拱桥吊杆加工及吊装方法 | |
CN205205664U (zh) | 混凝土塔柱连接结构 | |
CN203867164U (zh) | 一种带有定位钢管的悬挑型脚手架结构 | |
CN113336144A (zh) | 一种便于水轮发电机组大型球阀拆装以及水平搬运的装置 | |
CN108423120B (zh) | 一种抗扭箱单元的建造方法 | |
CN201850762U (zh) | 一种用于横梁支模架的梁底支撑架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: THE FIRST CONSTRUCTION ENGINEERING COMPANY OF CHI Free format text: FORMER OWNER: THE FIRST CONSTRUCTION ENGINEERING COMPANY OF CHINA CONSTRUCTION NO.3 BUREAU Effective date: 20081010 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20081010 Address after: No. 1, Soochow Road, Dongxihu District, Hubei, Wuhan Province, China: 430040 Co-patentee after: China Construction three Bureau Construction Engineering Co., Ltd. Patentee after: China Construction three bureau first construction project limited liability company Address before: No. 1, Soochow Road, Dongxihu District, Hubei, Wuhan Province, China: 430040 Patentee before: The First Construction Engineering Company of China Construction No.3 Bureau |
|
CU03 | Correction of utility model patent gazette |
Correction item: Co-patentee Correct: China Construction Third Engineering Bureau Co., Ltd. False: China Construction three Bureau Construction Engineering Co., Ltd. Number: 47 Page: 799 Volume: 24 |
|
ERR | Gazette correction |
Free format text: CORRECT: COMMON ¬ PATENTEE; FROM: CHINA CONSTRUCTION THIRD ENGINEERING BUREAU CORP., LTD. TO: CHINA CONSTRUCTION THIRD ENGINEERING BUREAU CONSTRUCTION ENGINEERING CO., LTD., |
|
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Huang Gang Inventor after: Wang Liang Inventor after: Dai Yunhua Inventor after: Xu Jianzhong Inventor after: Zhong Baohua Inventor after: Zhang Yonghong Inventor after: Yin Kui Inventor before: Wang Liang Inventor before: Dai Yunhua Inventor before: Xu Jianzhong Inventor before: Zhong Baohua Inventor before: Zhang Yonghong Inventor before: Yin Kui |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: WANG LIANG DAI YUNHUA XU JIANZHONG ZHONG BAOHUA ZHANG YONGHONG YIN KUI TO: HUANG GANG WANG LIANG DAI YUNHUA XU JIANZHONG ZHONG BAOHUA ZHANG YONGHONG YIN KUI |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20081029 Termination date: 20161213 |