CN201132738Y - Acoustical barrier column tool car - Google Patents
Acoustical barrier column tool car Download PDFInfo
- Publication number
- CN201132738Y CN201132738Y CNU200720076026XU CN200720076026U CN201132738Y CN 201132738 Y CN201132738 Y CN 201132738Y CN U200720076026X U CNU200720076026X U CN U200720076026XU CN 200720076026 U CN200720076026 U CN 200720076026U CN 201132738 Y CN201132738 Y CN 201132738Y
- Authority
- CN
- China
- Prior art keywords
- suspension rod
- sound barrier
- shipping platform
- hoisting mechanism
- hook
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The utility model discloses a sound barrier upright post installation vehicle which comprise a transportation platform, a running mechanism, a rotary suspender, a hoisting mechanism and a crane sling, wherein, the running mechanism is arranged at the lower part of the transportation platform; the rotary suspender comprises a main suspender and a suspension arm transversely and fixedly arranged at the upper end of the main suspender, the lower end of the main suspender is fixedly provided with a rotary board, the main suspender is connected with the transportation platform by the rotary board, and the distal end part of the suspension arm and the top of the main suspender are respectively provided with a pulley; a lifting bracket is arranged on the rotary board, and the hoisting mechanism is arranged at the upper end of the lifting bracket; the crane sling comprises a cable wire and a hook, the cable wire passes through the pulley to be connected with the hoisting mechanism, and the hook is connected at the front end of the cable wire. The sound barrier upright post installation vehicle has the advantages of simple structure, agile operation, and convenient use, etc., and can safely perform the transportation and lifting of the sound barrier upright posts.
Description
Technical field
The utility model relates to a kind of sound barrier column car is installed, particularly a kind of sound barrier column erecting device about lifting sound barrier steel column on light rail bridge floor side wall along the line.
Background technology
The noise that produces in the time of stoping the light rail train operation that is provided with of sound barrier spreads, and makes noise effectively absorption, isolated in the sound barrier section of setting.Therefore in the noise-sensitive zone sound barrier is set, the control noise radiation is the effective measures of environmental protection.
The execution conditions that sound barrier is installed are: installation exercise carries out after the track installation and in the time period before the contact system installation; The storage of material and midget plant and vertical transport are all interior AT STATION to be implemented; When needing to install on the circuit by transport trolley from storage medium, equipment platform AT STATION be transported to the place of erection.
Install to proofread and correct on the pre-embedded bolt that vertically is inserted in side shelves wall (H=1.5m) top after sound barrier needs earlier the column of L=3.0m, Q=780kN to be sling and fix, then the absorbing screen body is fixed between the column.It is the critical process that sound barrier is installed that its central post is installed.
Column when lifting bridge floor terrain clearance all>10m, ground all is again main vital communication lines, vehicle and pedestrian are seething.The construction operation difficulty is very big, causes column to fall from bridge floor in case misoperation occurs, and its consequence is hardly imaginable.
The orthodox method of column lifting: the one, adopt the track traffic special purpose crane on the track that bridge floor has been laid, to travel, to finish the column lifting operation.But this method lease expenses height, cost are big.The 2nd, adopt T101 type (10t) car hosit on ground along line direction berth successively, to finish the column lifting operation.But this method is that lease expenses height, cost are big equally, influence ground-surface traffic, and some ground region can't sail at all for car hosit into.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of simple in structure, flexible operation, easy to use and can realize safely and reliably that the transportation of sound barrier column and the sound barrier column of lifting purpose install car, to overcome the above-mentioned defective that prior art exists.
The technical scheme of the utility model technical solution problem is as follows:
A kind of sound barrier column is installed car, it is characterized in that, comprises shipping platform, traveling gear, rotation suspension rod, hoisting mechanism and hoisting hook rigging; Described traveling gear is arranged on the shipping platform bottom; Described rotation suspension rod comprises that main suspension rod and crosswise fixed are arranged on the arm of main suspension rod upper end, and described main suspension rod lower end is fixed with rotor plate, is rotationally connected by rotor plate and shipping platform, and described arm distal portion and main suspension rod top are respectively equipped with pulley; Also be provided with the elevator support on the described rotor plate, described hoisting mechanism is arranged on elevator support upper end; Described hoisting hook rigging comprises steel rope and suspension hook, and described steel wire penetrating pulley links to each other with hoisting mechanism, and described suspension hook is connected the steel rope front end.
The utility model is to use like this: the sound barrier column is deposited on the shipping platform, shelves batten between sound barrier column and shipping platform in order to anti-skidding, colligation firmly back is pushed into the place of erection with manpower.When carrying out the lifting task, with the bolt chucking, carry out the lifting task by rotation suspension rod, hoisting mechanism, hoisting hook rigging then between wheel in the traveling gear and rail.The column installation procedure is as follows:
When installing, car will be installed earlier carry out the column that is stacked on the shipping platform being tied up with nylon sling, be hung on the suspension hook, and rotate hoisting mechanism column is sling to the place of erection.Revolution rotation suspension rod puts down column and makes the column lower end bolt hole be inserted in pre-embedded bolt to the installation site, and just tight nut unclamps nylon sling.Adjust column squareness and levelness with parallels, eventually tight bolt is finished installation.
The utlity model has simple in structure, flexible operation, advantage such as easy to use, and can transportation of security implementation sound barrier column and lifting.Adopting the utility model can be a kind ofly can guarantee safety, cost-cutting, not influence under the operating environment of ground communications and be convenient to the workmen implements the sound barrier column on light rail bridge floor along the line installation.
Description of drawings
Fig. 1 is the utility model facade structures scheme drawing;
Fig. 2 is the hoisting mechanism structural representation.
The specific embodiment
Further specify the utility model below in conjunction with accompanying drawing.
As shown in Figure 1, the utility model sound barrier column is installed car, comprises shipping platform 1, traveling gear 2, rotation suspension rod 3, hoisting mechanism 4 and hoisting hook rigging 5; Described traveling gear 2 is arranged on shipping platform 1 bottom; Described rotation suspension rod 3 comprises that main suspension rod 301 and crosswise fixed are arranged on the arm 302 of main suspension rod 301 upper ends, described main suspension rod 301 lower ends are fixed with rotor plate 303, be rotationally connected by rotor plate 303 and shipping platform 1, described arm 302 distal portion 304 and main suspension rod 301 tops are respectively equipped with pulley 305, and the pulley place is provided with the baffle plate that anti-steel rope skids off. Also be provided with elevator support 306 on the described rotor plate 303, described hoisting mechanism 4 is arranged on elevator support 306 upper ends; Described hoisting hook rigging 5 comprises steel rope 501 and suspension hook 502, and described steel rope 501 passes pulley 305 and links to each other with hoisting mechanism 4, and described suspension hook 502 is connected steel rope 501 front ends.
Shipping platform 1 framework is made by channel-section steel, on cover checkered steel plate 103, the center is fixed with circular adapter plate 101 on the described shipping platform 1, platform center and adapter plate 101 are provided with centre hole 102; Described main suspension rod 301 lower ends extend in the centre hole 102 of shipping platform and are rotationally connected by rotor plate 303 and shipping platform upper mounted plate 101.
Described traveling gear 2 is a road wheel, and the width between centers of both sides road wheel meets the width between centers of light rail rail.
As shown in Figure 2, described hoisting mechanism 4 comprises handle 401, rotating shaft 402, reel 403 and ratchet device 404.Entire mechanism is connected by elevator support and the main suspension rod and the rotor plate that rotate in the suspension rod.
Claims (4)
1. a sound barrier column is installed car, it is characterized in that, comprises shipping platform (1), traveling gear (2), rotation suspension rod (3), hoisting mechanism (4) and hoisting hook rigging (5); Described traveling gear (2) is arranged on shipping platform (1) bottom; Described rotation suspension rod (3) comprises that main suspension rod (301) and crosswise fixed are arranged on the arm (302) of main suspension rod (301) upper end, described main suspension rod (301) lower end is fixed with rotor plate (303), be rotationally connected by rotor plate (303) and shipping platform (1), described arm (302) distal portion (304) and main suspension rod (301) top are respectively equipped with pulley (305); Also be provided with elevator support (306) on the described rotor plate (303), described hoisting mechanism (4) is arranged on elevator support (306) upper end; Described hoisting hook rigging (5) comprises steel rope (501) and suspension hook (502), and described steel rope (501) passes pulley (305) and links to each other with hoisting mechanism (4), and described suspension hook (502) is connected steel rope (501) front end.
2. sound barrier column according to claim 1 is installed car, it is characterized in that, described shipping platform (1) is gone up the center and is fixed with adapter plate (101), and platform center and adapter plate (101) are provided with centre hole (102); Described main suspension rod (301) lower end extend in the centre hole (102) of shipping platform and is rotationally connected by rotor plate (303) and shipping platform upper mounted plate (101).
3. sound barrier column according to claim 1 is installed car, it is characterized in that described traveling gear (2) is a road wheel, and the width between centers of both sides road wheel meets the width between centers of light rail rail.
4. sound barrier column according to claim 1 is installed car, it is characterized in that described hoisting mechanism (4) comprises handle (401), rotating shaft (402), reel (403) and ratchet device (404).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200720076026XU CN201132738Y (en) | 2007-11-12 | 2007-11-12 | Acoustical barrier column tool car |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200720076026XU CN201132738Y (en) | 2007-11-12 | 2007-11-12 | Acoustical barrier column tool car |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201132738Y true CN201132738Y (en) | 2008-10-15 |
Family
ID=40061013
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU200720076026XU Expired - Fee Related CN201132738Y (en) | 2007-11-12 | 2007-11-12 | Acoustical barrier column tool car |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201132738Y (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102060241A (en) * | 2010-10-29 | 2011-05-18 | 中交第一公路工程局有限公司 | Universal crane for construction process of high-speed railway sound barrier |
CN102275832A (en) * | 2011-07-12 | 2011-12-14 | 江苏赛富隆重工有限公司 | Goods turning device for crane |
CN102303819A (en) * | 2011-08-12 | 2012-01-04 | 中国水电建设集团铁路建设有限公司 | Railway bridge sound barrier upright hoisting trolley |
CN103278314A (en) * | 2013-04-28 | 2013-09-04 | 江南大学 | Safety valve check bench |
CN104891348A (en) * | 2015-05-20 | 2015-09-09 | 北京市自来水集团门城污水处理有限公司 | Small movable crane |
CN105293323A (en) * | 2015-11-30 | 2016-02-03 | 中国一冶集团有限公司 | Ratchet-wheel type air tube elevator |
CN105460825A (en) * | 2015-11-30 | 2016-04-06 | 中国一冶集团有限公司 | Portable air pipe hoister |
CN107857200A (en) * | 2017-10-23 | 2018-03-30 | 芜湖市长江起重设备制造有限公司 | A kind of crane gear |
CN109056564A (en) * | 2018-09-04 | 2018-12-21 | 中铁二十局集团第四工程有限公司 | Railway sound barrier installs special equipment and application method |
CN113186843A (en) * | 2021-04-09 | 2021-07-30 | 中铁六局集团太原铁路建设有限公司 | Busy trunk concrete sound barrier installation construction method |
-
2007
- 2007-11-12 CN CNU200720076026XU patent/CN201132738Y/en not_active Expired - Fee Related
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102060241A (en) * | 2010-10-29 | 2011-05-18 | 中交第一公路工程局有限公司 | Universal crane for construction process of high-speed railway sound barrier |
CN102275832A (en) * | 2011-07-12 | 2011-12-14 | 江苏赛富隆重工有限公司 | Goods turning device for crane |
CN102303819A (en) * | 2011-08-12 | 2012-01-04 | 中国水电建设集团铁路建设有限公司 | Railway bridge sound barrier upright hoisting trolley |
CN103278314A (en) * | 2013-04-28 | 2013-09-04 | 江南大学 | Safety valve check bench |
CN103278314B (en) * | 2013-04-28 | 2015-08-12 | 江南大学 | Safety valve checkout platform |
CN104891348A (en) * | 2015-05-20 | 2015-09-09 | 北京市自来水集团门城污水处理有限公司 | Small movable crane |
CN105293323A (en) * | 2015-11-30 | 2016-02-03 | 中国一冶集团有限公司 | Ratchet-wheel type air tube elevator |
CN105460825A (en) * | 2015-11-30 | 2016-04-06 | 中国一冶集团有限公司 | Portable air pipe hoister |
CN105293323B (en) * | 2015-11-30 | 2018-01-19 | 中国一冶集团有限公司 | A kind of ratchet-type airduct elevator |
CN107857200A (en) * | 2017-10-23 | 2018-03-30 | 芜湖市长江起重设备制造有限公司 | A kind of crane gear |
CN109056564A (en) * | 2018-09-04 | 2018-12-21 | 中铁二十局集团第四工程有限公司 | Railway sound barrier installs special equipment and application method |
CN113186843A (en) * | 2021-04-09 | 2021-07-30 | 中铁六局集团太原铁路建设有限公司 | Busy trunk concrete sound barrier installation construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201132738Y (en) | Acoustical barrier column tool car | |
US11884307B2 (en) | Overhead transport and route management system | |
CN103711301A (en) | Construction method and device for two-track movable electric basket and lifting hoist | |
CN106285020B (en) | The prefabricated panel mounting in high-altitude | |
CN107043060A (en) | A kind of installation method of inverse formula installation lift | |
CN106088660B (en) | A kind of building up station platform widens the construction method of reconstruction structure system | |
CN101476292B (en) | Method and equipment for mounting precast beam | |
CN107253675A (en) | Self-propelled tower crown crane | |
CN206828042U (en) | A kind of inspection platform of power station main building rack illuminator | |
CN108625270A (en) | Nose girder gantry crane installs bridge prefabrication box girder construction method | |
CN202879487U (en) | Transfer carriage in steel box | |
CN103193137A (en) | Full-automatic overhead lifting machine and application method thereof | |
CN111287498B (en) | Protective shed frame for construction of overhead bridge box girder crossing railway and erection method | |
CN204804360U (en) | High altitude prefabricated plate mounting plate | |
CN1193150C (en) | Block curtain wall hanging and carrying and installing system | |
CN103848333B (en) | Door frame Lift-on/Lift-off System and using method thereof | |
CN204212065U (en) | Bridge crossing anticollision barrier punching block erection equipment | |
CN206680096U (en) | One kind is used for restricted clearance hanging apparatus | |
CN215591798U (en) | Curtain wall plate traction transfer device for tower crane dismantling part | |
JP6873435B2 (en) | Suspended scaffolding and its erection method | |
CN112065023A (en) | Hanging basket traveling crane for nuclear reactor-based high-altitude outer wall operation | |
JP2683171B2 (en) | Construction transport scaffolding equipment | |
CN201002929Y (en) | Small-sized road maintenance machinery hoisting transporting vehicle | |
CN217419309U (en) | A construction platform for installation of bridge below drainage pipe | |
CN205472319U (en) | Between maintenance of combination mobile formula |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20081015 Termination date: 20091214 |