CN201132738Y - Acoustical barrier column tool car - Google Patents

Acoustical barrier column tool car Download PDF

Info

Publication number
CN201132738Y
CN201132738Y CNU200720076026XU CN200720076026U CN201132738Y CN 201132738 Y CN201132738 Y CN 201132738Y CN U200720076026X U CNU200720076026X U CN U200720076026XU CN 200720076026 U CN200720076026 U CN 200720076026U CN 201132738 Y CN201132738 Y CN 201132738Y
Authority
CN
China
Prior art keywords
suspension rod
sound barrier
shipping platform
hoisting mechanism
hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200720076026XU
Other languages
Chinese (zh)
Inventor
朱琦
江强
周镇江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Installation Engineering Co Ltd
Original Assignee
Shanghai Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Installation Engineering Co Ltd filed Critical Shanghai Installation Engineering Co Ltd
Priority to CNU200720076026XU priority Critical patent/CN201132738Y/en
Application granted granted Critical
Publication of CN201132738Y publication Critical patent/CN201132738Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses a sound barrier upright post installation vehicle which comprise a transportation platform, a running mechanism, a rotary suspender, a hoisting mechanism and a crane sling, wherein, the running mechanism is arranged at the lower part of the transportation platform; the rotary suspender comprises a main suspender and a suspension arm transversely and fixedly arranged at the upper end of the main suspender, the lower end of the main suspender is fixedly provided with a rotary board, the main suspender is connected with the transportation platform by the rotary board, and the distal end part of the suspension arm and the top of the main suspender are respectively provided with a pulley; a lifting bracket is arranged on the rotary board, and the hoisting mechanism is arranged at the upper end of the lifting bracket; the crane sling comprises a cable wire and a hook, the cable wire passes through the pulley to be connected with the hoisting mechanism, and the hook is connected at the front end of the cable wire. The sound barrier upright post installation vehicle has the advantages of simple structure, agile operation, and convenient use, etc., and can safely perform the transportation and lifting of the sound barrier upright posts.

Description

The sound barrier column is installed car
Technical field
The utility model relates to a kind of sound barrier column car is installed, particularly a kind of sound barrier column erecting device about lifting sound barrier steel column on light rail bridge floor side wall along the line.
Background technology
The noise that produces in the time of stoping the light rail train operation that is provided with of sound barrier spreads, and makes noise effectively absorption, isolated in the sound barrier section of setting.Therefore in the noise-sensitive zone sound barrier is set, the control noise radiation is the effective measures of environmental protection.
The execution conditions that sound barrier is installed are: installation exercise carries out after the track installation and in the time period before the contact system installation; The storage of material and midget plant and vertical transport are all interior AT STATION to be implemented; When needing to install on the circuit by transport trolley from storage medium, equipment platform AT STATION be transported to the place of erection.
Install to proofread and correct on the pre-embedded bolt that vertically is inserted in side shelves wall (H=1.5m) top after sound barrier needs earlier the column of L=3.0m, Q=780kN to be sling and fix, then the absorbing screen body is fixed between the column.It is the critical process that sound barrier is installed that its central post is installed.
Column when lifting bridge floor terrain clearance all>10m, ground all is again main vital communication lines, vehicle and pedestrian are seething.The construction operation difficulty is very big, causes column to fall from bridge floor in case misoperation occurs, and its consequence is hardly imaginable.
The orthodox method of column lifting: the one, adopt the track traffic special purpose crane on the track that bridge floor has been laid, to travel, to finish the column lifting operation.But this method lease expenses height, cost are big.The 2nd, adopt T101 type (10t) car hosit on ground along line direction berth successively, to finish the column lifting operation.But this method is that lease expenses height, cost are big equally, influence ground-surface traffic, and some ground region can't sail at all for car hosit into.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of simple in structure, flexible operation, easy to use and can realize safely and reliably that the transportation of sound barrier column and the sound barrier column of lifting purpose install car, to overcome the above-mentioned defective that prior art exists.
The technical scheme of the utility model technical solution problem is as follows:
A kind of sound barrier column is installed car, it is characterized in that, comprises shipping platform, traveling gear, rotation suspension rod, hoisting mechanism and hoisting hook rigging; Described traveling gear is arranged on the shipping platform bottom; Described rotation suspension rod comprises that main suspension rod and crosswise fixed are arranged on the arm of main suspension rod upper end, and described main suspension rod lower end is fixed with rotor plate, is rotationally connected by rotor plate and shipping platform, and described arm distal portion and main suspension rod top are respectively equipped with pulley; Also be provided with the elevator support on the described rotor plate, described hoisting mechanism is arranged on elevator support upper end; Described hoisting hook rigging comprises steel rope and suspension hook, and described steel wire penetrating pulley links to each other with hoisting mechanism, and described suspension hook is connected the steel rope front end.
The utility model is to use like this: the sound barrier column is deposited on the shipping platform, shelves batten between sound barrier column and shipping platform in order to anti-skidding, colligation firmly back is pushed into the place of erection with manpower.When carrying out the lifting task, with the bolt chucking, carry out the lifting task by rotation suspension rod, hoisting mechanism, hoisting hook rigging then between wheel in the traveling gear and rail.The column installation procedure is as follows:
When installing, car will be installed earlier carry out the column that is stacked on the shipping platform being tied up with nylon sling, be hung on the suspension hook, and rotate hoisting mechanism column is sling to the place of erection.Revolution rotation suspension rod puts down column and makes the column lower end bolt hole be inserted in pre-embedded bolt to the installation site, and just tight nut unclamps nylon sling.Adjust column squareness and levelness with parallels, eventually tight bolt is finished installation.
The utlity model has simple in structure, flexible operation, advantage such as easy to use, and can transportation of security implementation sound barrier column and lifting.Adopting the utility model can be a kind ofly can guarantee safety, cost-cutting, not influence under the operating environment of ground communications and be convenient to the workmen implements the sound barrier column on light rail bridge floor along the line installation.
Description of drawings
Fig. 1 is the utility model facade structures scheme drawing;
Fig. 2 is the hoisting mechanism structural representation.
The specific embodiment
Further specify the utility model below in conjunction with accompanying drawing.
As shown in Figure 1, the utility model sound barrier column is installed car, comprises shipping platform 1, traveling gear 2, rotation suspension rod 3, hoisting mechanism 4 and hoisting hook rigging 5; Described traveling gear 2 is arranged on shipping platform 1 bottom; Described rotation suspension rod 3 comprises that main suspension rod 301 and crosswise fixed are arranged on the arm 302 of main suspension rod 301 upper ends, described main suspension rod 301 lower ends are fixed with rotor plate 303, be rotationally connected by rotor plate 303 and shipping platform 1, described arm 302 distal portion 304 and main suspension rod 301 tops are respectively equipped with pulley 305, and the pulley place is provided with the baffle plate that anti-steel rope skids off. Also be provided with elevator support 306 on the described rotor plate 303, described hoisting mechanism 4 is arranged on elevator support 306 upper ends; Described hoisting hook rigging 5 comprises steel rope 501 and suspension hook 502, and described steel rope 501 passes pulley 305 and links to each other with hoisting mechanism 4, and described suspension hook 502 is connected steel rope 501 front ends.
Shipping platform 1 framework is made by channel-section steel, on cover checkered steel plate 103, the center is fixed with circular adapter plate 101 on the described shipping platform 1, platform center and adapter plate 101 are provided with centre hole 102; Described main suspension rod 301 lower ends extend in the centre hole 102 of shipping platform and are rotationally connected by rotor plate 303 and shipping platform upper mounted plate 101.
Main suspension rod 301 is made by solid drawn pipe.The arm 302 on main suspension rod top is welded by two steel square tubes and main suspension rod; Main suspension rod 301 bottom rotor plates 303 are strengthened gusset and 301 solid weldings of main suspension rod by four.Before main suspension rod 301 bottoms and shipping platform 1 assembling, be coated with grease between adapter plate 101 and the rotor plate 303.
Described traveling gear 2 is a road wheel, and the width between centers of both sides road wheel meets the width between centers of light rail rail.
As shown in Figure 2, described hoisting mechanism 4 comprises handle 401, rotating shaft 402, reel 403 and ratchet device 404.Entire mechanism is connected by elevator support and the main suspension rod and the rotor plate that rotate in the suspension rod.

Claims (4)

1. a sound barrier column is installed car, it is characterized in that, comprises shipping platform (1), traveling gear (2), rotation suspension rod (3), hoisting mechanism (4) and hoisting hook rigging (5); Described traveling gear (2) is arranged on shipping platform (1) bottom; Described rotation suspension rod (3) comprises that main suspension rod (301) and crosswise fixed are arranged on the arm (302) of main suspension rod (301) upper end, described main suspension rod (301) lower end is fixed with rotor plate (303), be rotationally connected by rotor plate (303) and shipping platform (1), described arm (302) distal portion (304) and main suspension rod (301) top are respectively equipped with pulley (305); Also be provided with elevator support (306) on the described rotor plate (303), described hoisting mechanism (4) is arranged on elevator support (306) upper end; Described hoisting hook rigging (5) comprises steel rope (501) and suspension hook (502), and described steel rope (501) passes pulley (305) and links to each other with hoisting mechanism (4), and described suspension hook (502) is connected steel rope (501) front end.
2. sound barrier column according to claim 1 is installed car, it is characterized in that, described shipping platform (1) is gone up the center and is fixed with adapter plate (101), and platform center and adapter plate (101) are provided with centre hole (102); Described main suspension rod (301) lower end extend in the centre hole (102) of shipping platform and is rotationally connected by rotor plate (303) and shipping platform upper mounted plate (101).
3. sound barrier column according to claim 1 is installed car, it is characterized in that described traveling gear (2) is a road wheel, and the width between centers of both sides road wheel meets the width between centers of light rail rail.
4. sound barrier column according to claim 1 is installed car, it is characterized in that described hoisting mechanism (4) comprises handle (401), rotating shaft (402), reel (403) and ratchet device (404).
CNU200720076026XU 2007-11-12 2007-11-12 Acoustical barrier column tool car Expired - Fee Related CN201132738Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200720076026XU CN201132738Y (en) 2007-11-12 2007-11-12 Acoustical barrier column tool car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200720076026XU CN201132738Y (en) 2007-11-12 2007-11-12 Acoustical barrier column tool car

Publications (1)

Publication Number Publication Date
CN201132738Y true CN201132738Y (en) 2008-10-15

Family

ID=40061013

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200720076026XU Expired - Fee Related CN201132738Y (en) 2007-11-12 2007-11-12 Acoustical barrier column tool car

Country Status (1)

Country Link
CN (1) CN201132738Y (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102060241A (en) * 2010-10-29 2011-05-18 中交第一公路工程局有限公司 Universal crane for construction process of high-speed railway sound barrier
CN102275832A (en) * 2011-07-12 2011-12-14 江苏赛富隆重工有限公司 Goods turning device for crane
CN102303819A (en) * 2011-08-12 2012-01-04 中国水电建设集团铁路建设有限公司 Railway bridge sound barrier upright hoisting trolley
CN103278314A (en) * 2013-04-28 2013-09-04 江南大学 Safety valve check bench
CN104891348A (en) * 2015-05-20 2015-09-09 北京市自来水集团门城污水处理有限公司 Small movable crane
CN105293323A (en) * 2015-11-30 2016-02-03 中国一冶集团有限公司 Ratchet-wheel type air tube elevator
CN105460825A (en) * 2015-11-30 2016-04-06 中国一冶集团有限公司 Portable air pipe hoister
CN107857200A (en) * 2017-10-23 2018-03-30 芜湖市长江起重设备制造有限公司 A kind of crane gear
CN109056564A (en) * 2018-09-04 2018-12-21 中铁二十局集团第四工程有限公司 Railway sound barrier installs special equipment and application method
CN113186843A (en) * 2021-04-09 2021-07-30 中铁六局集团太原铁路建设有限公司 Busy trunk concrete sound barrier installation construction method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102060241A (en) * 2010-10-29 2011-05-18 中交第一公路工程局有限公司 Universal crane for construction process of high-speed railway sound barrier
CN102275832A (en) * 2011-07-12 2011-12-14 江苏赛富隆重工有限公司 Goods turning device for crane
CN102303819A (en) * 2011-08-12 2012-01-04 中国水电建设集团铁路建设有限公司 Railway bridge sound barrier upright hoisting trolley
CN103278314A (en) * 2013-04-28 2013-09-04 江南大学 Safety valve check bench
CN103278314B (en) * 2013-04-28 2015-08-12 江南大学 Safety valve checkout platform
CN104891348A (en) * 2015-05-20 2015-09-09 北京市自来水集团门城污水处理有限公司 Small movable crane
CN105293323A (en) * 2015-11-30 2016-02-03 中国一冶集团有限公司 Ratchet-wheel type air tube elevator
CN105460825A (en) * 2015-11-30 2016-04-06 中国一冶集团有限公司 Portable air pipe hoister
CN105293323B (en) * 2015-11-30 2018-01-19 中国一冶集团有限公司 A kind of ratchet-type airduct elevator
CN107857200A (en) * 2017-10-23 2018-03-30 芜湖市长江起重设备制造有限公司 A kind of crane gear
CN109056564A (en) * 2018-09-04 2018-12-21 中铁二十局集团第四工程有限公司 Railway sound barrier installs special equipment and application method
CN113186843A (en) * 2021-04-09 2021-07-30 中铁六局集团太原铁路建设有限公司 Busy trunk concrete sound barrier installation construction method

Similar Documents

Publication Publication Date Title
CN201132738Y (en) Acoustical barrier column tool car
US11884307B2 (en) Overhead transport and route management system
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN106285020B (en) The prefabricated panel mounting in high-altitude
CN107043060A (en) A kind of installation method of inverse formula installation lift
CN106088660B (en) A kind of building up station platform widens the construction method of reconstruction structure system
CN101476292B (en) Method and equipment for mounting precast beam
CN107253675A (en) Self-propelled tower crown crane
CN206828042U (en) A kind of inspection platform of power station main building rack illuminator
CN108625270A (en) Nose girder gantry crane installs bridge prefabrication box girder construction method
CN202879487U (en) Transfer carriage in steel box
CN103193137A (en) Full-automatic overhead lifting machine and application method thereof
CN111287498B (en) Protective shed frame for construction of overhead bridge box girder crossing railway and erection method
CN204804360U (en) High altitude prefabricated plate mounting plate
CN1193150C (en) Block curtain wall hanging and carrying and installing system
CN103848333B (en) Door frame Lift-on/Lift-off System and using method thereof
CN204212065U (en) Bridge crossing anticollision barrier punching block erection equipment
CN206680096U (en) One kind is used for restricted clearance hanging apparatus
CN215591798U (en) Curtain wall plate traction transfer device for tower crane dismantling part
JP6873435B2 (en) Suspended scaffolding and its erection method
CN112065023A (en) Hanging basket traveling crane for nuclear reactor-based high-altitude outer wall operation
JP2683171B2 (en) Construction transport scaffolding equipment
CN201002929Y (en) Small-sized road maintenance machinery hoisting transporting vehicle
CN217419309U (en) A construction platform for installation of bridge below drainage pipe
CN205472319U (en) Between maintenance of combination mobile formula

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081015

Termination date: 20091214