The detachable canopy of hydraulic crawler excavator
Technical field
The utility model relates to the hydraulic crawler excavator canopy, the detachable canopy of particularly a kind of hydraulic crawler excavator.
Background technology
At present, the canopy height of hydraulic crawler excavator is fixed mostly, can not work under the low environment of complete machine requirement for height or whole canopy need be removed earlier, as crossing the bridge opening, work in the tunnel etc., and dismantles whole canopy inconvenience.When present hydraulic crawler excavator was walked with operation down on the big inclined-plane of the gradient, the foot rest that is installed in the canopy bottom surface can not provide the comfortable reliable strong point to the operator.
Summary of the invention
The purpose of this utility model is to provide a kind of canopy to be divided into main body and ceiling two parts up and down, and the ceiling fast demountable is installed 2 foot rests on the main body front beam.Solving the hydraulic crawler excavator canopy can not quickly dismantled, with not giving the simple in structure of reliable comfortable support point arranged when the operator works with a kind of fast demountable of comfortable secure support point with on the inclined-plane when working on the inclined-plane, easy to manufacture, easy to install, the detachable canopy of safe and reliable hydraulic crawler excavator.
Technical solution of the present utility model is such, the hydraulic crawler excavator canopy comprises main body, ceiling, foot rest, and feature is: canopy has main body and ceiling two parts, the ceiling column is enclosed within on the bearing pin of main body column, and the column of bearing pin and main body welds together.Bearing pin inserts the main body column.
Installing plate is welded on the main body front beam, and foot rest is installed on the installing plate of main body front beam.
The utility model has the advantages that canopy is divided into two parts up and down, the use bearing pin connects, and utilizes the gravitational orientation of bearing pin and ceiling self, does not need to dismantle whole canopy requiring to reduce under the operating mode of complete machine height, the ceiling of can dismantling fast can reinstall again when needing fast.In addition, 2 foot rests are installed on the canopy front beam, when direction is worked down or is walked on the big inclined-plane of the gradient, for avoid operator's center of gravity toward lean forward, fatigue and safety reduce easily, operator's both feet can be supported on the foot rest of front beam, increase comfortableness and safety.
Description of drawings
It is such that structure of the present utility model constitutes:
Fig. 1 is the right view of the detachable canopy of the utility model.
Fig. 2 is the front view of Fig. 1 of the present utility model.
Fig. 3 is an I partial enlarged view among the utility model Fig. 2.
Among Fig. 1~Fig. 3: main body (1), ceiling (2), bearing pin (3), foot rest (4), bolt (5), front beam (6), installing plate (7).
The specific embodiment
Most preferred embodiment of the present utility model is such, with reference to accompanying drawing 1~Fig. 3, canopy is divided into main body (1) and ceiling (2) two parts up and down from the centre, on main body (1) column, weld bearing pin (3), ceiling (2) column is enclosed within on the bearing pin (3) of main body (1) column, utilize the gravity of ceiling (2) self and the position-limiting action of bearing pin (3) that ceiling (2) and column are linked together, difference welded and installed plate (7) is installed in 2 foot rests (4) on the installing plate (7) with bolt about canopy main body front beam.Bearing pin (3) is a notch cuttype, because bearing pin (3) will weld together with main body (1), so bearing pin (3) insertion main body (1) column one end external diameter is bigger, gos deep into length and will guarantee that main body (1) column is not shattered.Ceiling (2) column packs into bearing pin (3) external diameter than small end, and the size of bearing pin (3) external diameter small end will guarantee ceiling (2) dismounting smoothly, and length will guarantee that ceiling (2) column can not shattered because of contact surface is too little and come off.In order to guarantee precision and manufacturability, main body (1) and ceiling (2) mating face are positioned at vertical section of column as far as possible, are positioned at the quadrantal points place as the divisional plane that makes at arc section as far as possible, and main body during welding (1) and ceiling (2) will be joined weldering.
Go up welding 2 installing plates (7) at the front beam (6) of main body (1), 2 foot rests (4) are separately fixed on 2 installing plates (7) with bolt (5).Foot rest (4) will meet ergonomics with the relative position that seat SIP is ordered.Guarantee that comfortableness is advisable when on the big inclined-plane of the gradient, working.Foot rest (4) is gone up the dress rubber pad, plays anti-skidding effect.Concrete fitting operation is such, main body and ceiling mating face overhead height are determined with concrete operating mode, the general height that should not be lower than ground to the operation peak, reduce the weight of ceiling as far as possible, easy disassembly, the main body column is a steel pipe, the column of bearing pin and main body welds together, bearing pin inserts steel pipe earlier and welds, and the column steel pipe can not shattered when the bearing pin insertion main body column degree of depth will guarantee to be with ceiling work.The ceiling column is a steel pipe, and the bearing pin external diameter is littler than ceiling column internal diameter, guarantees ceiling dismounting and motionless smoothly.The length that bearing pin inserts the ceiling column guarantees that ceiling does not take off control when work and column is not shattered.Installing plate is welded on the main body front-axle beam, and 2 foot rests are installed on the installing plate with bolt, and the relative position that foot rest and seat SIP are ordered must can provide the comfortable reliable strong point when guaranteeing in the work of the big inclined-plane of the gradient.