CN201095717Y - Red beds filled high-speed railway roadbed - Google Patents

Red beds filled high-speed railway roadbed Download PDF

Info

Publication number
CN201095717Y
CN201095717Y CNU2007200813572U CN200720081357U CN201095717Y CN 201095717 Y CN201095717 Y CN 201095717Y CN U2007200813572 U CNU2007200813572 U CN U2007200813572U CN 200720081357 U CN200720081357 U CN 200720081357U CN 201095717 Y CN201095717 Y CN 201095717Y
Authority
CN
China
Prior art keywords
subgrade
mudstone
bed
speed railway
roadbed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200813572U
Other languages
Chinese (zh)
Inventor
魏永幸
蒋关鲁
朱颖
李海光
王智猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CNU2007200813572U priority Critical patent/CN201095717Y/en
Application granted granted Critical
Publication of CN201095717Y publication Critical patent/CN201095717Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a high-speed railway subgrade filled by a red-bed mudstone. The subgrade consists of a red-bed mudstone filled layer (3), a subgrade bed (2) and a track concrete foundation (1) that are filled on a subgrade fundus (4) in sequence. The cross section of the subgrade is a rectangle, the subgrade surface adopts a fully-enclosed waterproof structure (5) and the side slope of the subgrade is provided with a slope protection structure (6) and reinforced by a side slope reinforcing structure (11). A waterproof and draining cushion layer (7) is arranged between the subgrade fundus (4) and the bottom surface of the red-bed mudstone filled layer (3). The subgrade has the advantages of high strength, small deformation, excellent stability and durability and economy and can meet the requirements of high smoothness, stability and durability for a railway line by a ballastless track. The construction method has simple technique and reasonable technology, the filling quality is easy to control, the cost for purchasing and transporting high-quality filling materials can be saved, the waste can be reduced when the subgrade is filled, the environment is protected and important economic and social benefit is available.

Description

Redbeds mudstone filled high-speed railway subgrade
Technical field
The utility model relates to railway bed, particularly a kind of in the high-speed railway engineering with Redbeds mudstone filled track base without broken stones.
Background technology
Ballastless track on the high-speed railway ballastless track proposes requirement, particularly soil subgrade very high to the ride comfort of circuit, stability, durability etc., the settlement amount after construction of the base base that satisfies the need and differential settlement amount all have strict restriction.In general, track base without broken stones should adopt high quality filler such as A, B group filler etc. to fill.
Red-bed mudstone is a kind of special coarse grain class filler, and its particle is easily broken, and intensity is low, and easy disintegrating also has weak dilatancy with softening behind the chance water, shows and the general different engineering mechanics property of filler.It is extensive that China's west and south district railway construction is faced with red beds branch, and the problem that high quality filler lacks is particularly outstanding.China also lacks the rational method that uses red-bed mudstone in the high-speed railway engineering at present, therefore, press for and carry out the application study of red-bed mudstone in the high-speed railway track base without broken stones, propose the Redbeds mudstone filled roadbed and the construction method thereof of use of a cover system.
The utility model content
Technical problem to be solved in the utility model provides a kind of Redbeds mudstone filled high-speed railway subgrade, this roadbed has intensity height, little, the stability of distortion and good endurance, economic dispatch characteristics, can adapt to ballastless track to circuit high ride, stability, durability requirement.
The technical scheme that its technical problem that solves the utility model adopts is: Redbeds mudstone filled high-speed railway subgrade of the present utility model, red-bed mudstone packing course, subgrade bed, track concrete foundation that this roadbed is filled by order in the roadbed substrate constitute, it is characterized in that: the cross section of described roadbed is a rectangle, subgrade and pavement adopts totally-enclosed water proof structure, and roadbed side slope has the slope protection structure and reinforced by the slope reinforcement structure; Be provided with anti-drainage blanket between described roadbed substrate and the red-bed mudstone packing course bottom surface.
The beneficial effects of the utility model are, slope protection, slope reinforcement and perfect waterproof, drainage measure have comprehensively been adopted, therefore have that intensity height, distortion are little, stability and good endurance, economic dispatch characteristics, can adapt to ballastless track to circuit high ride, stability, durability requirement.And technology is simple, and technology is reasonable, fills system easy to control the quality, can save the expense that is used to buy, transport high quality filler in a large number, also can reduce spoir, protection environment when filling roadbed, has important economy and society benefit.
Description of drawings
This manual comprises following nine width of cloth accompanying drawings:
Fig. 1 is the structural map section of the utility model Redbeds mudstone filled high-speed railway subgrade;
Fig. 2 is the structural map section of the utility model Redbeds mudstone filled high-speed railway subgrade;
Fig. 3 is the top structural map section of the utility model Redbeds mudstone filled high-speed railway subgrade;
Fig. 4 is the structural representation that reinforcement is reinforced structure in the utility model Redbeds mudstone filled high-speed railway subgrade;
Fig. 5 is the structural representation that reinforcement is reinforced structure in the utility model Redbeds mudstone filled high-speed railway subgrade;
Fig. 6 is the enlarged diagram of local A among Fig. 2;
Fig. 7 is the enlarged diagram of local B among Fig. 1 and Fig. 2;
Fig. 8 is the structural representation of domatic protective construction in the utility model Redbeds mudstone filled high-speed railway subgrade;
Fig. 9 is the structural representation of domatic protective construction in the utility model Redbeds mudstone filled high-speed railway subgrade.
Position and pairing mark among the figure: track concrete foundation 1, subgrade bed 2, red-bed mudstone packing course 3, roadbed substrate 4, totally-enclosed water proof structure 5, slope protection structure 6, rhone 6a, anti-drainage blanket 7, sand gravel layer 7a, composite earthwork rete 7b, waterproof bed course 8, medium-sand seam 8a, composite earthwork rete 8b, gutter 9, slope reinforcement structure 11, the short muscle material of geo-grid 11a, the long muscle material of geo-grid 11b.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further specified.
See figures.1.and.2, Redbeds mudstone filled high-speed railway subgrade of the present utility model, red-bed mudstone packing course 3, subgrade bed 2, track concrete foundation 1 that this roadbed is filled by order in roadbed substrate 4 constitute.For making roadbed have good stable, the cross section of described roadbed is a rectangle, and the height of red-bed mudstone packing course 3 should be less than 8m.The side slope form adopts linear pattern, and the side slope ratio of slope is preferably 1:1.8; According to local amount of precipitation feature, roadbed both sides curb 9 should respectively be widened 0.6~1.0m than the standard roadbed.For the intensity that improves roadbed and reduce its distortion, roadbed side slope has slope protection structure 6 and is reinforced by slope reinforcement structure 11.For strengthening the waterproof and the drainage performance of roadbed, be provided with anti-drainage blanket 7 between described roadbed substrate 4 and red-bed mudstone packing course 3 bottom surfaces.
Roadbed substrate 4 should meet following condition: basic bearing capacity is not less than 200kpa, and embankment completion groundwork settlement after construction is not more than 15mm.
With reference to Fig. 3, described subgrade bed 2 can adopt 0.4m graded broken stone+2.3mA, B group filler or 0.5~0.7m graded broken stone to fill.Between described subgrade bed 2 bottom surfaces and red-bed mudstone packing course 3 end faces herringbone weathering (gradient is generally 4%) is set, and is equipped with waterproof bed course 8 betwixt.With reference to Fig. 6, described waterproof bed course 8 is made of medium-sand seam 8a and middle folded one deck composite earthwork rete 8b thereof, and the thickness of medium-sand seam 8a is generally 20cm.Carry out draining, water proof processing by anti-7 pairs of subgrade beds of drainage blanket 2.With reference to Fig. 7, described anti-drainage blanket 7 is made of sand gravel layer 7a and middle folded one deck composite earthwork rete 7b thereof, and the common thickness of sand gravel layer 7a is 40cm.Composite earthwork rete 7b should lay along the subgrade cross section direction, adopts ultrasonic bonding between the width of cloth and the width of cloth.Composite geo-membrane 7b, 7b adopt the composite geo-membrane of " geotextiles--geomembrane--geotextiles " structure, and its geotextiles is a non-woven geotextile, and every square of weight is not less than 100g, and the thickness of geomembrane is not less than 0.4mm.
With reference to Fig. 3 and Fig. 4, the short muscle material of geo-grid 11a, the long muscle material of geo-grid 11b that described slope reinforcement structure 11 is laid by longitudinal separation in red-bed mudstone packing course 3 constitute.The short muscle material of worker's grid 11a extends internally by roadbed side slope is domatic.Usually, it is 4m that the short muscle material of geo-grid 11a lays width, vertically is spaced apart 0.6m.The long muscle material of geo-grid 11b draws the wide bed to establish in the full section width of roadbed, and the long muscle material of geo-grid 11b lays two-layer at interval, and wherein bottom is not more than 1.0m apart from the distance on roadbed substrate 4 surfaces, and the second layer is 1.8m apart from the distance of bottom.The short muscle material of geo-grid 11a, the long muscle material of geo-grid 11b structure should adopt the low two-way geo-grid of strain high strength, and its ultimate tensile strength is not less than 50KN/m, and the nominal strength elongation per unit length is not more than 10%, mesh size 80~150mm, fabric width 4m.With reference to Fig. 8 and Fig. 9, described slope protection structure 6 is along the mortar flag stone of slope masonry or the concrete skeleton bank protection of burying underground that has rhone 10a.Concrete skeleton is arch form or the chevron shaped skeleton of 6a with drainage channels, turfing in the skeleton, hydraulic pressure sow grass seeds by duster grass planting or mortar flag stone etc.The skeleton buried depth is not less than 0.4m, needs with mortar flag stone or concrete fringing around the bank protection, and toe is provided with gutter 9 outward.
With reference to Fig. 3, described totally-enclosed water proof structure 5 is for covering the asphalt concrete layer on the curb 9.
By road bed, roadbed side slope and roadbed toe draining building, in conjunction with the anti-drainage of substrate, form perfect waterproof and water drainage system, guaranteed that the red-bed mudstone roadbed is not softened by surface water or phreatic infiltration.
Concrete construction technology and control as follows:
1. base treatment and prepare sub-layer
Substrate should meet following condition: basic bearing capacity is not less than 200kpa, and embankment completion groundwork settlement after construction is not more than 15mm.
Carry out substrate draining, water proof facility according to designing requirement.
The sub-layer surfacing is solid, has the road camber (4% draining horizontal wall inscription) of regulation, without any discrete material and weak place.The planeness and the degree of compaction of sub-layer are up to specification.During base treatment, press the construction of design and construction standard relevant requirements.
2. construction lofting
(1) recover center line on sub-layer, every 10m establishes one, and in both sides curb peripheral hardware indication stake.
(2) carry out horizontal survey, in the indication stake of both sides, tie up the design height that red cloth bar (or white line rope) indicates every layer of edge.
3. get the raw materials ready and mix and stir
A, place are selected:
(1) place should be smooth, and drainage measure is arranged.
(2) sidewalk is unobstructed, is convenient to transport.
(3) should there be the area of economical rationality in the place, adapting to construction period, and is beneficial to and reclaims.
B, native fully:
(1) there are not tree root, turf and assorted soil in the soil.
(2) fetch earth and note pulverizing as far as possible soil block in the process.
C, check filler:
Need in the melting process filler is carried out the basic index check, meet table 1 requirement.
The requirement of table 1 red-bed mudstone basic index
The red-bed mudstone index Requirement
Particle diameter after disintegration or the fragmentation <15cm
Maximum compacted dry density >2.10g/cm3
Bearing ratio (CBR) value ≥5
Coefficient of softening ≥0.4
Expansion rate ≤0.10%
4. filler transportation
The filler that mixes and stirs will be transported to the making scene as early as possible, and heavy duty dump truck is adopted in the filler transportation, and the filler on the car should cover, to reduce moisture loss.
5. filler paves
When adopting machineries such as bulldozer, land leveller to pave, according to calculating the good per car filler area that paves, the equidistant stacking of filler is in heaps, push away flat with bulldozer 4% horizontal wall inscription in accordance with regulations, with land leveller filler is paved evenly by loose laying depth again, should be behind the land leveller at any time with the levelling of hollow place.The filler paving width should design curb edge extra-fill and be not less than 0.5m.
6. roll
In time roll after the filler leveling with vibratory roller, roll in the middle of curb two side direction and carry out, the wheel seal is answered overlapping 0.4m when rolling, first pass adopts static pressure, rise for second time and change vibroroller cmpacting into, shake to shaking by force, roll and be performed until the degree of compaction that reaches regulation by weak, last is all over using static pressure instead, to eliminate the rut seal.Multiple pressure is answered 2~3 times in curb limit, both sides, and the part that the curb edge is not pressed onto can take oblique advance and retreat method to roll.
The connection of adjacent roadbed can be taked the staggered mode that overlaps of layering, and longitudinal lap joint length is not less than 2m, to guarantee the stability of roadbed.
After rolling, every layer of red-bed mudstone should possess weathering, so that discharge rainwater during rainfall rapidly; After the rainfall, should on the red-bed mudstone roadbed, roll several times.If have ready conditions, can when rainfall, in time the red-bed mudstone roadbed be covered with canvas cloth.
7. lay bed thickness management material
The artificial geo-grid of laying is adopted in roadbed placement in layers and after the assay was approved.
The short muscle material 11a of geo-grid vertically lays on road along the line, and the muscle material is 0.10m apart from the distance of roadbed side slope.The long muscle material of geo-grid 11b lays along cross-sectional direction, and muscle material end is 0.10m apart from the distance of roadbed side slope.Should volume is long consistent with the laying direction during laying.The geo-grid vertical, horizontal connects, and adopts overlap joint and pricks knot with the less nylon rope of elongation per unit length.Lap width is not less than 20cm, pricks the node interlaced arrangement, and spacing generally is not more than 50cm.Require bond strength to be not less than material body intensity.Geo-grid should be strained exceptionally straight, phenomenons such as arch camber, fold must not occur, and is fixed on " U " shape iron nail and fills Tu Mianshang, guarantees must not be moved when banketing.
Should in time fill filler after geo-grid paves, be exposed to the sun for a long time to avoid being subjected to sunlight.Generally speaking, blanking time should be above 48 hours.
As finding that geo-grid has quality problems such as breakage, crackle, should in time repair or do to change and handle before banketing.
The thickness of the layer must not be less than 15cm between construction machinery and the geo-grid, and the first floor filler should adopt light-duty bulldozer or front end loader operation.
Geo-grid should be transported to the scene from storehouse according to the daily requirement amount, unnecessary grid must not be deposited in the sun.
8. brush is sloping
Adopt man-machine cooperation brush slope, excavator brush slope, manual amendment.The brush slope is taken all factors into consideration according to mechanical performance and raising opportunity, but must not surpass the roadbed design shoulder height.Be advisable with raising 4m in general brush for the first time slope, later every raising 3m brush slope once.
Pave at roadbed filling, roll and fill in the process of the test, should test the rolling effect of Different Weight rolling compaction machine, different paving thickness, different number of rolling, to determine reasonable, economic paving thickness, number of rolling.
9. quality examination
Red-bed mudstone filling compaction quality control standards (QCS) should meet the requirement of table 2, in time test data is carried out finishing analysis, notices that each detects the correlation of index.
Table 2 red-bed mudstone filling compaction quality control standards (QCS)
Inspection item Coefficient of consolidation Kh K30 (MPa/m) Ev2(MPa)
Test stone ≥0.95 ≥150 ≥60
Other
Base treatment, bedding are built, side slope protection, laying ballastless track and bituminous concrete waterproofing course are implemented by relevant design, job specfication.

Claims (8)

1. Redbeds mudstone filled high-speed railway subgrade, this roadbed is by go up red-bed mudstone packing course (3), subgrade bed (2), track concrete foundation (1) formation that order is filled in roadbed substrate (4), it is characterized in that: the cross section of described roadbed is a rectangle, subgrade and pavement adopts totally-enclosed water proof structure (5), and roadbed side slope has slope protection structure (6) and reinforced by slope reinforcement structure (11); Be provided with anti-drainage blanket (7) between described roadbed substrate (4) and red-bed mudstone packing course (3) bottom surface.
2. Redbeds mudstone filled high-speed railway subgrade as claimed in claim 1 is characterized in that: between described subgrade bed (2) bottom surface and red-bed mudstone packing course (3) end face herringbone weathering is set, and is equipped with waterproof bed course (8) betwixt.
3. Redbeds mudstone filled high-speed railway subgrade as claimed in claim 2 is characterized in that: described waterproof bed course (8) is made of medium-sand seam (8a) and middle folded one deck composite earthwork rete (8b) thereof.
4. as claim 2 or 3 described Redbeds mudstone filled high-speed railway subgrades, it is characterized in that: described subgrade bed (2) adopts 0.4m graded broken stone+2.3mA, B group filler or 0.5~0.7m graded broken stone to fill.
5. Redbeds mudstone filled high-speed railway subgrade as claimed in claim 1, it is characterized in that: the short muscle material (11a) of geo-grid, the long muscle material of geo-grid (11b) that described slope reinforcement structure (11) is laid by longitudinal separation in red-bed mudstone packing course (3) constitute, wherein the short muscle material of worker's grid (11a) extends internally by roadbed side slope is domatic, and the long muscle material of geo-grid (11b) draws the wide bed to establish in the full section width of roadbed.
6. Redbeds mudstone filled high-speed railway subgrade as claimed in claim 5 is characterized in that: described slope protection structure (6) is along the mortar flag stone of slope masonry or the concrete skeleton bank protection of burying underground that has rhone (6a).
7. Redbeds mudstone filled high-speed railway subgrade as claimed in claim 1 is characterized in that: described anti-drainage blanket (7) is made of sand gravel layer (7a) and middle folded one deck composite earthwork rete (7b) thereof.
8. Redbeds mudstone filled high-speed railway subgrade as claimed in claim 1 is characterized in that: described totally-enclosed water proof structure (5) is for covering the asphalt concrete layer on the curb.
CNU2007200813572U 2007-09-30 2007-09-30 Red beds filled high-speed railway roadbed Expired - Fee Related CN201095717Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200813572U CN201095717Y (en) 2007-09-30 2007-09-30 Red beds filled high-speed railway roadbed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200813572U CN201095717Y (en) 2007-09-30 2007-09-30 Red beds filled high-speed railway roadbed

Publications (1)

Publication Number Publication Date
CN201095717Y true CN201095717Y (en) 2008-08-06

Family

ID=39922768

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200813572U Expired - Fee Related CN201095717Y (en) 2007-09-30 2007-09-30 Red beds filled high-speed railway roadbed

Country Status (1)

Country Link
CN (1) CN201095717Y (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101153475B (en) * 2007-09-30 2010-05-19 中铁二院工程集团有限责任公司 Redbeds mudstone filled high-speed railway subgrade and construction method thereof
CN101979766A (en) * 2010-10-21 2011-02-23 中铁第四勘察设计院集团有限公司 Subgrade bed structure of high-speed railway red clay cutting
CN102330398A (en) * 2011-07-23 2012-01-25 中铁二院工程集团有限责任公司 High-speed railway roadbed structure of unsaturated soil foundation in plain region
CN102561133A (en) * 2012-03-27 2012-07-11 中铁第四勘察设计院集团有限公司 Foundation bed structure of railway soil and soft rock cutting
CN103132403A (en) * 2013-02-28 2013-06-05 中铁第一勘察设计院集团有限公司 Dustproof railway ballast covering layer
CN103757995A (en) * 2014-02-13 2014-04-30 铁道第三勘察设计院集团有限公司 Ballastless track railroad roadbed surface water sealing layer structure
CN104047210A (en) * 2014-06-26 2014-09-17 李社军 Railway line roadbed
CN104179078A (en) * 2014-08-06 2014-12-03 中南大学 Hydrophobic treatment method for CRTS II slab track structural cracks
CN109281234A (en) * 2018-11-29 2019-01-29 西南交通大学 A kind of scoria railway bed and its construction method
CN109680564A (en) * 2019-01-23 2019-04-26 西南交通大学 A kind of soft rockmass railway bed and its construction method

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101153475B (en) * 2007-09-30 2010-05-19 中铁二院工程集团有限责任公司 Redbeds mudstone filled high-speed railway subgrade and construction method thereof
CN101979766A (en) * 2010-10-21 2011-02-23 中铁第四勘察设计院集团有限公司 Subgrade bed structure of high-speed railway red clay cutting
CN101979766B (en) * 2010-10-21 2012-07-11 中铁第四勘察设计院集团有限公司 Subgrade bed structure of high-speed railway red clay cutting
CN102330398A (en) * 2011-07-23 2012-01-25 中铁二院工程集团有限责任公司 High-speed railway roadbed structure of unsaturated soil foundation in plain region
CN102561133A (en) * 2012-03-27 2012-07-11 中铁第四勘察设计院集团有限公司 Foundation bed structure of railway soil and soft rock cutting
CN103132403B (en) * 2013-02-28 2015-10-28 中铁第一勘察设计院集团有限公司 Resistance flue tiny fragments of stone, coal, etc. covering layer
CN103132403A (en) * 2013-02-28 2013-06-05 中铁第一勘察设计院集团有限公司 Dustproof railway ballast covering layer
CN103757995A (en) * 2014-02-13 2014-04-30 铁道第三勘察设计院集团有限公司 Ballastless track railroad roadbed surface water sealing layer structure
CN104047210A (en) * 2014-06-26 2014-09-17 李社军 Railway line roadbed
CN104179078A (en) * 2014-08-06 2014-12-03 中南大学 Hydrophobic treatment method for CRTS II slab track structural cracks
CN104179078B (en) * 2014-08-06 2016-01-06 中南大学 A kind of hydrophobic processing method of CRTS II plate-type track structure gap
CN109281234A (en) * 2018-11-29 2019-01-29 西南交通大学 A kind of scoria railway bed and its construction method
CN109680564A (en) * 2019-01-23 2019-04-26 西南交通大学 A kind of soft rockmass railway bed and its construction method

Similar Documents

Publication Publication Date Title
CN101153475B (en) Redbeds mudstone filled high-speed railway subgrade and construction method thereof
CN201095717Y (en) Red beds filled high-speed railway roadbed
CN206928164U (en) A kind of drainage type concrete road
CN113445396B (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN106283944B (en) The method for pressing washer stone and/or block stone to reinforce shallow layer soft ground
CN104264680B (en) The method for processing foundation of Tian Wa joint portion, a kind of collapsible loess slope
CN112726310A (en) Reinforced roadbed with concrete building rubbish mixed soil as roadbed filler and construction method thereof
CN206828898U (en) A kind of roadbed for filling high liquid limit soil
CN111549598B (en) Construction method of highway reinforced bridgehead roadbed in collapsible loess region
CN110924254A (en) Construction process for filling carbonaceous shale roadbed
CN107489137A (en) A kind of method that collapsible loess foundation is handled using cement soil padding
CN106676993B (en) Reinforced broken stone frame structure roadbed reinforcing system and reinforcing method thereof
CN110777588A (en) Pressure filling construction method for soil-stone mixed high-filling roadbed
CN104452510B (en) Immediate construction method of rural road
CN102704364A (en) Clay serging tailings subgrade structure and construction method thereof
CN107119505A (en) The general fast railway bed filling construction method of desert area
CN104863031B (en) A kind of karst area ductility anti-collapse road structure and construction method thereof
CN110761137B (en) Non-damage layered rolling construction method using cement-modified fine silt as roadbed filler
CN207727452U (en) A kind of back filling behind abutment structure sheaf for preventing culvert jump vehicle
CN204570720U (en) A kind of widening of subgrade culvert foundation
CN206625096U (en) A kind of reinforced rubble frame structure subgrade strengthening system
CN110820456A (en) Anti-settling and replacement-filling alternate airport runway and construction method thereof
CN109537389B (en) EPS (expandable polystyrene) lower embankment structure and construction method thereof
CN116377780A (en) Mountain highway high-fill roadbed filling construction method
CN110792009A (en) Bridge head bump prevention and control structure based on concrete composite pavement and laying method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080806

Termination date: 20091030