CN201077954Y - Steel anchor beam of canting pull stayd-cable bridge cable tower end coupling of stayd-cable bridge - Google Patents

Steel anchor beam of canting pull stayd-cable bridge cable tower end coupling of stayd-cable bridge Download PDF

Info

Publication number
CN201077954Y
CN201077954Y CNU2007201073768U CN200720107376U CN201077954Y CN 201077954 Y CN201077954 Y CN 201077954Y CN U2007201073768 U CNU2007201073768 U CN U2007201073768U CN 200720107376 U CN200720107376 U CN 200720107376U CN 201077954 Y CN201077954 Y CN 201077954Y
Authority
CN
China
Prior art keywords
cable
steel
stayed bridge
steel anchor
anchor beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201073768U
Other languages
Chinese (zh)
Inventor
郑明珠
白雨东
张胜利
黄华定
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIANDAO ENGINEERING CONSTRUCTION COMMAND POST ZHOUSHAN ZHEJIANG
Zhejiang Provincial Institute of Communications Planning Design and Research Co Ltd
Original Assignee
LIANDAO ENGINEERING CONSTRUCTION COMMAND POST ZHOUSHAN ZHEJIANG
Zhejiang Provincial Institute of Communications Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIANDAO ENGINEERING CONSTRUCTION COMMAND POST ZHOUSHAN ZHEJIANG, Zhejiang Provincial Institute of Communications Planning Design and Research Co Ltd filed Critical LIANDAO ENGINEERING CONSTRUCTION COMMAND POST ZHOUSHAN ZHEJIANG
Priority to CNU2007201073768U priority Critical patent/CN201077954Y/en
Application granted granted Critical
Publication of CN201077954Y publication Critical patent/CN201077954Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model belongs to the manufacturing technical field of the bridge component, in particular relates to a steel anchor beam for connecting the cable tower ends of a cable-stayed bridge, which comprises steel beams and anchoring heads for fixedly connecting with one end of the cable of the cable-stayed bridge. The steel beam presents a box type and is formed by welding steel plates; the four anchoring heads are symmetrically arranged at the both ends of the box-shaped steel beam. The steel anchor beam of the utility model has the advantages that the structure design is reasonable, the stress is definite, the use amount of steel is small, the cost is low, and the hoisting weight is light, and the steel anchor beam can be applied to the cable-stayed bridge with the parallel cable surface and the cable-stayed bridge with the spatial cable surface.

Description

The steel anchor beam of the oblique tensile tower client link of cable stayed bridge
Technical field
The utility model belongs to bridge member manufacturing technology field, particularly a kind of steel anchor beam of oblique tensile tower client link of cable stayed bridge.
Background technology
The suspension cable of cable stayed bridge and the bind mode of king-post have three kinds usually: prestress anchoraging, steel anchor box anchoring and the anchoring of steel anchor beam.Wherein, stride the footpath cable stayed bridge for a short time and adopt the prestress anchoraging mode more, but its loss of prestress is big.The long span stayed-cable bridge Sarasota is higher, and work high above the ground influences construction quality, and concrete is easy to crack, to the tower end anchorage style employing steel anchor box anchoring of long span stayed-cable bridge.Steel anchor box can be made in batches, and can ensure the quality of products, speed of application is fast, stressed reliable.But no matter be built-in or the steel anchor box of external, owing to there are two kinds of different materials of steel and concrete, both actings in conjunction cause concrete towers wall cracking inevitably, influence the durability and the stability of tower column structure, and the steel anchor box steel using amount is big, cost is high, during installation construction equipment is required height, need the large-scale hanging device of configuration, especially in marine environment, higher to Sarasota durability of structures and stability requirement, so the application of steel anchor box has limitation.Extensively adopt the anchoring of steel anchor beam at present, it has plurality of advantages.But in the present steel anchor beam anchor structure, owing to exist horizontal out-of-balance force, this mode to be only applicable to parallel rope face cable stayed bridge, can not be applicable to Spatial Cable face cable stayed bridge, its scope of application is subjected to greatly limiting; In addition, though the horizontal out-of-balance force of king-post anchorage zone is little, also can the king-post of parallel rope face cable stayed bridge be had a negative impact.So, be necessary to design a kind of energy and be suitable for parallel and Spatial Cable face cable stayed bridge, both economy and durability, the steel anchor beam structure of convenient construction again.
Summary of the invention
The utility model discloses the steel anchor beam of the oblique tensile tower client link of a kind of reasonable in design, stressed clear and definite, rolled steel dosage is few, cost is low, hoisting weight is light cable stayed bridge, it both can be used for parallel rope face cable stayed bridge, also can be used for Spatial Cable face cable stayed bridge.
For solving the problems of the technologies described above technical solution adopted in the utility model: the steel anchor beam of the oblique tensile tower client link of cable stayed bridge, comprise the anchorage head of girder steel and fixedly connected suspension cable one end, girder steel is box-shaped, is welded by steel plate; Four suspension cable anchorage heads are symmetrically set in the two ends of box steel beam.
The steel anchor beam of the oblique tensile tower client link of described cable stayed bridge, anchorage head is welded by anchor slab and gripper shoe, and anchor slab and gripper shoe are all welded with girder steel; Anchor slab is vertical with suspension cable, and gripper shoe is parallel with suspension cable.
The steel anchor beam of the oblique tensile tower client link of described cable stayed bridge, box steel beam inside is welded with stiffener.
The steel anchor beam is the individual member in the stayed bridge pylon cable, is supported on the vertical bracket of the hollow king-post tower of cable stayed bridge wall, and respectively there are two anchorage heads that connect suspension cable at its two ends, and anchorage head is used for fixing the upper end of suspension cable.The anchorage head that steel anchor beam of the present utility model welds four symmetries altogether is used to connect suspension cable, and the inside and outside equilibrium level component of the face of every pair of suspension cable is born by the steel anchor beam, and the outer a small amount of uneven horizontal component of face is born by king-post; The vertical force component of suspension cable passes to the tower wall by bracket and is born by king-post.It is both applicable to parallel rope face cable stayed bridge, also applicable to Spatial Cable face cable stayed bridge, also in the construction applicable to other bridge.
Description of drawings
Fig. 1 is the structural representation of the utility model steel anchor beam.
Fig. 2 is the structure vertical view of the utility model steel anchor beam.
In the diagram, 1-girder steel, 2-upper cover plate, 3-lower cover, 4-diaphragm, 5-anchorage head, 6-anchor slab, 7-gripper shoe, 8-web, 9-side plate, 10-stiffener.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is elaborated.
As shown in Figure 1, 2, the steel anchor beam of the oblique tensile tower client link of cable stayed bridge is made of the anchorage head 5 that box steel beam 1 and four are used to connect suspension cable.Box steel beam 1 is welded by upper cover plate 2, biside plate 9 and lower cover 3, and the middle intersegmental part of box steel beam 1 is five diaphragms 4 of welding evenly, and inner two ends is respectively welded five stiffeners 10, and diaphragm 4 and stiffener 10 have been strengthened the intensity of box steel beam 1.Two anchorage heads 5 are respectively welded at the two ends of box steel beam 1, and anchorage head 5 is symmetrically distributed, and anchorage head 5 is welded by anchor slab 6 and gripper shoe 7, and anchor slab 6, gripper shoe 7 are all welded with girder steel 1.The upper end of suspension cable penetrates anchorage head 5 and is connected to a fixed, and suspension cable is vertical with anchor slab 6, and is parallel with gripper shoe 7.Four anchorage head 5 symmetric arrangement can balance the equilibrium level component of the inside and outside horizontal direction of face, make the king-post of parallel rope face cable stayed bridge more stable, also make the steel anchor beam go for Spatial Cable face cable stayed bridge, have enlarged its scope of application.
Compared with prior art, the steel anchor beam of the oblique tensile tower client link of the utility model cable-stayed bridge has knot Structure rationally, stress balance, rolled steel dosage is few, cost is low, hoisting weight is light advantage.
The steel anchor beam of the oblique tensile tower client link of the utility model cable-stayed bridge also can in other bridge construction To use.

Claims (3)

1. the steel anchor beam of the oblique tensile tower client link of cable stayed bridge comprises the anchorage head of girder steel and fixedly connected suspension cable one end, and it is characterized in that: girder steel is box-shaped, is welded by steel plate; Four suspension cable anchorage heads are symmetrically set in the two ends of box steel beam.
2. the steel anchor beam of the oblique tensile tower client link of cable stayed bridge according to claim 1, it is characterized in that: described anchorage head is welded by anchor slab and gripper shoe, and anchor slab and gripper shoe are all welded with girder steel; Anchor slab is vertical with suspension cable, and gripper shoe is parallel with suspension cable.
3. the steel anchor beam of the oblique tensile tower client link of cable stayed bridge according to claim 1, it is characterized in that: box steel beam inside is welded with stiffener.
CNU2007201073768U 2007-03-21 2007-03-21 Steel anchor beam of canting pull stayd-cable bridge cable tower end coupling of stayd-cable bridge Expired - Fee Related CN201077954Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201073768U CN201077954Y (en) 2007-03-21 2007-03-21 Steel anchor beam of canting pull stayd-cable bridge cable tower end coupling of stayd-cable bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201073768U CN201077954Y (en) 2007-03-21 2007-03-21 Steel anchor beam of canting pull stayd-cable bridge cable tower end coupling of stayd-cable bridge

Publications (1)

Publication Number Publication Date
CN201077954Y true CN201077954Y (en) 2008-06-25

Family

ID=39570010

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201073768U Expired - Fee Related CN201077954Y (en) 2007-03-21 2007-03-21 Steel anchor beam of canting pull stayd-cable bridge cable tower end coupling of stayd-cable bridge

Country Status (1)

Country Link
CN (1) CN201077954Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103981807A (en) * 2014-05-30 2014-08-13 中建三局集团有限公司 Steel anchor beam without corbels
CN104060534A (en) * 2014-06-11 2014-09-24 上海市政工程设计研究总院(集团)有限公司 Tower external cross beam stay cable anchoring system
CN104088228A (en) * 2014-07-24 2014-10-08 中建三局集团有限公司 Method for exerting pre-stress to bracket-free steel anchor beam in electrically-heating mode
CN104452602A (en) * 2014-12-17 2015-03-25 中交第二航务工程局有限公司 First steel anchor beam elevation control method
CN105040589A (en) * 2015-07-29 2015-11-11 北京市市政专业设计院股份公司 Stayed-cable steel anchor beam structure
CN105421230A (en) * 2015-12-10 2016-03-23 中铁大桥局集团有限公司 Multi-directional adjusting type buckle beam and anchor beam device
CN111945568A (en) * 2020-08-11 2020-11-17 中铁四局集团有限公司 Temporary limiting structure and method for arc-shaped tower body ultra-wide steel box girder cable-stayed bridge tower beam

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103981807A (en) * 2014-05-30 2014-08-13 中建三局集团有限公司 Steel anchor beam without corbels
CN103981807B (en) * 2014-05-30 2015-11-18 中建三局集团有限公司 A kind of without bracket steel anchor beam
CN104060534B (en) * 2014-06-11 2016-02-24 上海市政工程设计研究总院(集团)有限公司 The outer crossbeam oblique anchor-hold system of tower
CN104060534A (en) * 2014-06-11 2014-09-24 上海市政工程设计研究总院(集团)有限公司 Tower external cross beam stay cable anchoring system
CN104088228A (en) * 2014-07-24 2014-10-08 中建三局集团有限公司 Method for exerting pre-stress to bracket-free steel anchor beam in electrically-heating mode
CN104088228B (en) * 2014-07-24 2016-04-13 中建三局集团有限公司 Without the method for bracket steel anchor beam electrical heating Shi Hanzhang
CN104452602A (en) * 2014-12-17 2015-03-25 中交第二航务工程局有限公司 First steel anchor beam elevation control method
CN105040589A (en) * 2015-07-29 2015-11-11 北京市市政专业设计院股份公司 Stayed-cable steel anchor beam structure
CN105040589B (en) * 2015-07-29 2020-05-08 北京市市政专业设计院股份公司 Stay cable steel anchor beam structure
CN105421230A (en) * 2015-12-10 2016-03-23 中铁大桥局集团有限公司 Multi-directional adjusting type buckle beam and anchor beam device
CN105421230B (en) * 2015-12-10 2017-07-07 中铁大桥局集团有限公司 A kind of multidirectional adjustable type button anchor beam device
CN111945568A (en) * 2020-08-11 2020-11-17 中铁四局集团有限公司 Temporary limiting structure and method for arc-shaped tower body ultra-wide steel box girder cable-stayed bridge tower beam
CN111945568B (en) * 2020-08-11 2022-05-03 中铁四局集团有限公司 Temporary limiting structure and method for arc-shaped tower body ultra-wide steel box girder cable-stayed bridge tower beam

Similar Documents

Publication Publication Date Title
CN201077954Y (en) Steel anchor beam of canting pull stayd-cable bridge cable tower end coupling of stayd-cable bridge
WO2022160386A1 (en) Prefabricated assembly-type frame, prefabricated assembly-type beam-column joint and construction method therefor
CN110747746A (en) Temporary supporting system for small box girder type hidden cover beam prefabricated on road and bridge and construction method thereof
CN201553986U (en) Stay cable steel anchoring beam structure
CN203729193U (en) Low tower stay cable reinforced T-type rigid framework system with suspension beams
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN105369736B (en) Outer anchoring structure of cable-stayed bridge tower body
CN203296361U (en) Long-span steel structure cross assembling hoisting platform
CN104005338A (en) Three-directional temporary tower and girder consolidation structure of large-span cable-stayed bridge
CN207749417U (en) Concrete tower post centre form strength nature skeleton
CN202688848U (en) Anchoring connecting structure for nodes of composite truss girder cable-stayed bridge
CN111395210B (en) Method for improving bearing capacity of truss girder bridge by using external prestressed tendons
CN106638265B (en) A kind of steel reinforced concrete beam rigid framed structure arch bridge
CN204644869U (en) Drag-line bridge tower anchoring structure
CN205636521U (en) Basket is hung in construction of truss -like cantilever
CN102230312B (en) Cable-stayed cradle cambered head
CN204126297U (en) A kind of temporary support of steel truss roof
CN203175092U (en) Processing shed capable of being assembled with hanging structure
CN205804149U (en) Bridge rigid pulling force is put
CN210194449U (en) Tower beam temporary consolidation structure for construction of main beam of semi-floating body system cable-stayed bridge
CN105088962B (en) A kind of integral hoisting method of Wavelike steel webplate part
CN210621477U (en) Steel structure hanging frame for cantilever assembly of segment prefabricated bent cap
CN206204784U (en) Steel anchor beam
CN203188109U (en) Multi-span ground anchor type suspension bridge
CN201952736U (en) Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080625

Termination date: 20100321