CN201075607Y - 铰链式走板 - Google Patents
铰链式走板 Download PDFInfo
- Publication number
- CN201075607Y CN201075607Y CNU2007201123127U CN200720112312U CN201075607Y CN 201075607 Y CN201075607 Y CN 201075607Y CN U2007201123127 U CNU2007201123127 U CN U2007201123127U CN 200720112312 U CN200720112312 U CN 200720112312U CN 201075607 Y CN201075607 Y CN 201075607Y
- Authority
- CN
- China
- Prior art keywords
- plate assembly
- guide plate
- assembly
- limp
- connecting plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
本实用新型涉及一种铰链式走板,该走板主要由导向板总成和连接板总成构成,导向板总成后端与连接板总成前端之间通过铰链轴相连接,导向板总成前端呈自由状态;导向板总成上连接有用于与牵引绳相连接的前旋转连接器,连接板总成的后端分别连接有平衡锤总成、用于与导线相连接的后旋转连接器。本实用新型有益的效果是:这种铰链轴的连接方式,使得走板的板身就象尾锤一样能够弯曲自如,通过放线滑车时就能随着滑车的圆弧自动弯曲,降低了走板通过滑车的阻力,尤其是在复杂的地形中,显现了普通平板式走板无法比拟的优势,极大地提高了工作效率。
Description
技术领域
本实用新型涉及架设电路线导线时的走板,主要是一种铰链式走板。
背景技术
如图1所示,在500kV输电线路的导线架设中,通常采用一根牵引绳牵引四根导线,牵引绳与导线之间是通过走板连接的。该走板的形式从80年代初从国外引进后,一直沿用至今。从20多年来的实际运用来看,此板存在着明显的缺陷:通过滑车时的阻力过大,导致直线杆瓷瓶串偏斜角过大、滑车两侧张力不平衡,一旦走板通过滑车后阻力消失,由于惯性的作用,导线就会以4-5倍的正常牵引速度飞速向前运动,直至运行40-50米后才恢复到正常的牵引速度。在此段失去控制的距离中,若出现导线跳槽、缠绕等问题就无法及时处理,严重威胁施工安全。
发明内容
本实用新型要解决上述现有的缺点,提供一种结构简单,使用便捷的铰链式走板。
本实用新型解决其技术问题采用的技术方案:这种铰链式走板,该走板主要由导向板总成和连接板总成构成,导向板总成后端与连接板总成前端之间通过铰链轴相连接,导向板总成前端呈自由状态;导向板总成上连接有用于与牵引绳相连接的前旋转连接器,连接板总成的后端分别连接有平衡锤总成、用于与导线相连接的后旋转连接器。
本实用新型有益的效果是:这种铰链轴的连接方式,使得走板的板身就象尾锤一样能够弯曲自如,通过放线滑车时就能随着滑车的圆弧自动弯曲,降低了走板通过滑车的阻力,尤其是在复杂的地形中,显现了普通平板式走板无法比拟的优势,极大地提高了工作效率。
附图说明
图1是现有技术的平板式走板过滑车时状况示意图;
图2是本实用新型俯视结构示意图;
图3是本实用新型主视结构示意图;
图4是本实用新型过滑车时状况示意图。
附图标记:走板1,导向板总成2,第一连接孔2-1,连接块2-2,铰链轴3,连接板总成4,平衡锤总成5,后旋转连接器6,前旋转连接器7,牵引绳8,导线9,滑车10,第一销轴11,第二销轴12,第三销轴13,第四销轴14。
具体实施方式
下面结合附图及实施例对本实用新型作进一步详细的说明。
如图2-3所示,这种铰链式走板,该走板1主要由导向板总成2和连接板总成4构成,导向板总成2后端与连接板总成4前端之间通过铰链轴3相连接,导向板总成2前端呈自由状态。所述导向板总成2上表面设有连接块2-2,连接块2-1上开有第一连接孔2-1,前旋转连接器1和导向板总成2之间通过第一销轴11和第一连接孔2-1相互轴接;前旋转连接器1主要用于与与牵引绳8相连接。所述后旋转连接器6与连接板总成2后端之间通过第二销轴12相连接,后旋转连接器6用于与导线9相连接。所述后平衡锤总成5与连接板总成2后端之间通过第三销轴13相连接,平衡锤总成5由一组部件串接而成,部件之间通过第四销轴14相连接。
如图4所示,这种结构减短了走板从牵引绳8到导线9连接点的节距,使走板1通过直线上扬和转角滑车10时,由于导向板总成2前端呈自由状态,因此能随着线路的垂直和水平角度自动弯曲,从而减少走板过滑车10的阻力。增加了走板头部上翘角度,避免头部顶住滑车10。走板前端的三角部位设计成流线型,使走板通过转角滑车10时从水平方向能自动侧转到滑车10的倾斜角,达到与转角滑车10的角度一致,从而提高张力放线的效力。
采用该铰链式走板进行牵引,为安全、优质、高效的完成施工任务起到了积极的作用。
除上述实施例外,本实用新型还可以有其他实施方式。凡采用等同替换或等效变换形成的技术方案,均落在本实用新型要求的保护范围。
Claims (4)
1.一种铰链式走板,其特征是:该走板(1)主要由导向板总成(2)和连接板总成(4)构成,导向板总成(2)后端与连接板总成(4)前端之间通过铰链轴(3)相连接,导向板总成(2)前端呈自由状态;导向板总成(2)上连接有用于与牵引绳(8)相连接的前旋转连接器(1),连接板总成(4)的后端分别连接有平衡锤总成(5)、用于与导线(9)相连接的后旋转连接器(6)。
2.根据权利要求1所述的铰链式走板,其特征是:所述导向板总成(2)上表面设有连接块(2-2),连接块(2-1)上开有第一连接孔(2-1),前旋转连接器(1)和导向板总成(2)之间通过第一销轴(11)和第一连接孔(2-1)相互轴接。
3.根据权利要求1所述的铰链式走板,其特征是:所述后旋转连接器(6)与连接板总成(2)后端之间通过第二销轴(12)相连接。
4.根据权利要求1所述的铰链式走板,其特征是:所述后平衡锤总成(5)与连接板总成(2)后端之间通过第三销轴(13)相连接,平衡锤总成(5)由一组部件串接而成,部件之间通过第四销轴(14)相连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201123127U CN201075607Y (zh) | 2007-07-23 | 2007-07-23 | 铰链式走板 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201123127U CN201075607Y (zh) | 2007-07-23 | 2007-07-23 | 铰链式走板 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201075607Y true CN201075607Y (zh) | 2008-06-18 |
Family
ID=39520864
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007201123127U Expired - Fee Related CN201075607Y (zh) | 2007-07-23 | 2007-07-23 | 铰链式走板 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201075607Y (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102361259A (zh) * | 2011-07-19 | 2012-02-22 | 河南送变电建设公司 | 一种姿态可测量的走板 |
CN101877461B (zh) * | 2009-04-29 | 2012-05-23 | 国网交流工程建设有限公司 | 特高压双牵引走板 |
CN103199478A (zh) * | 2012-09-25 | 2013-07-10 | 邯郸供电公司 | 联板放线器 |
CN105207111A (zh) * | 2015-09-07 | 2015-12-30 | 天津送变电工程公司 | 一种输电线路导引绳牵引放线工艺 |
-
2007
- 2007-07-23 CN CNU2007201123127U patent/CN201075607Y/zh not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101877461B (zh) * | 2009-04-29 | 2012-05-23 | 国网交流工程建设有限公司 | 特高压双牵引走板 |
CN102361259A (zh) * | 2011-07-19 | 2012-02-22 | 河南送变电建设公司 | 一种姿态可测量的走板 |
CN103199478A (zh) * | 2012-09-25 | 2013-07-10 | 邯郸供电公司 | 联板放线器 |
CN105207111A (zh) * | 2015-09-07 | 2015-12-30 | 天津送变电工程公司 | 一种输电线路导引绳牵引放线工艺 |
CN105207111B (zh) * | 2015-09-07 | 2017-12-01 | 天津送变电工程公司 | 一种输电线路导引绳牵引放线工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201075607Y (zh) | 铰链式走板 | |
CN205025179U (zh) | 单回路耐张塔 | |
CN203675885U (zh) | 一种新型的张网网口结构 | |
CN203808580U (zh) | 一种卷扬驱动钢丝绳起吊固定装置 | |
CN207552837U (zh) | 燕尾砖 | |
CN205070337U (zh) | 一种网格桥架机构 | |
CN208293947U (zh) | 一种外挂板的安装节点 | |
CN208733710U (zh) | 绞吸船横移锚防走锚装置 | |
CN207526478U (zh) | 一种新型立式抽油机 | |
CN207985116U (zh) | 一种适用沙泥地质的船锚 | |
CN202181741U (zh) | 采用绝缘横担连接对角主材的输电铁塔塔头结构 | |
CN208235950U (zh) | 一种z字形穿楼面角铁拉杆 | |
CN206785292U (zh) | 一种多功能绝缘折叠梯 | |
CN217972345U (zh) | 一种塔机标准节的连接结构 | |
CN206052955U (zh) | 阳光房防塌立柱机构 | |
CN218514309U (zh) | 一种抗拉性好的光伏架垫块 | |
CN202424027U (zh) | 建筑导线牵引装置 | |
CN209586869U (zh) | 多用结构的围壁板 | |
CN211766128U (zh) | 一种新型三角锚 | |
CN208167335U (zh) | 一种折角形晾衣架结构 | |
CN203034503U (zh) | 挖掘机张紧绳机构 | |
CN203525313U (zh) | 一种传统式风筝 | |
CN208309895U (zh) | 一种环保建筑保温组合墙面 | |
CN2336008Y (zh) | 电铲绷绳装置 | |
CN208935271U (zh) | 一种混凝土输送机输送通道连接固定套 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080618 |