CN201068733Y - Aerated drilling safety gas injection device - Google Patents

Aerated drilling safety gas injection device Download PDF

Info

Publication number
CN201068733Y
CN201068733Y CNU2007200131287U CN200720013128U CN201068733Y CN 201068733 Y CN201068733 Y CN 201068733Y CN U2007200131287 U CNU2007200131287 U CN U2007200131287U CN 200720013128 U CN200720013128 U CN 200720013128U CN 201068733 Y CN201068733 Y CN 201068733Y
Authority
CN
China
Prior art keywords
gas injection
high pressure
safety
injection device
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200131287U
Other languages
Chinese (zh)
Inventor
李春吉
陈思路
郑晓霞
汪良波
徐照友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaohe Petroleum Exploration Bureau
Original Assignee
Liaohe Petroleum Exploration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaohe Petroleum Exploration Bureau filed Critical Liaohe Petroleum Exploration Bureau
Priority to CNU2007200131287U priority Critical patent/CN201068733Y/en
Application granted granted Critical
Publication of CN201068733Y publication Critical patent/CN201068733Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

A charging well drilling safety gas injection device used for underbalance well drilling consists of a high pressure union female button, flanges, a safety valve, a piezometer tube, a lathe dog, a brake valve, a high pressure union male button, a tee joint T and an obturating ring. The high pressure union female button is connected with the safety valve through the flanges, the obturating ring is added among the flanges, the safety valve is connected with the tee joint T through the flanges, the lower part of the body of the tee joint T is provided with a small hole to install the piezometer tube, the brake valve is connected with the tee joint T through the lathe dog, and the high pressure union male button is connected with the brake valve through the lathe dog. The utility model solves the problems existing in the prior art that the security is not high, the pressure cannot be discharged in time, and the manual operation is easy to meet danger. The safety gas injection device can be widely used in the underbalance well drilling work.

Description

A kind of air-filling well-drilling safety gas injection device
Technical field:
The utility model relates to a kind of air-filling well-drilling safety gas injection device that a kind of under balance pressure drilling is used.
Background technology:
Along with polytype petroleum resources constantly is exploited, the exploration and development of low pressure and low permeability oil gas field more and more is subject to people's attention, so under-balanced drilling technology has obtained unprecedented development.The charge air conditioning drilling well is a kind of mode of most economical practicality in the under balance pressure drilling, and it is that gas is filled in the mud, reduces the equal yield density of mud, reaches the purpose that reduces bottom pressure with this.Newly Yan Zhi safe gas injection device is because the requirement difference of aeration quantity, can select to connect a cover or two cover gas injection car groups according to situation at that time, from piezometer tube, can accurately read the instantaneous numerical value of gas injection pressure, simultaneously when gas injection pressure surpasses design safety pressure, safe gas injection device automatically unloading has guaranteed that injection-gas manifold is in safe pressure limit.It is not high that it has overcome the safety that conventional gas injection device exists, and the timely shortcoming of automatically unloading is if manually-operated is prone to Personal Risk's problem.
The utility model content:
The purpose of this utility model provides a kind of air-filling well-drilling safety gas injection device, this device solves the safety that exists in the prior art not high, the timely shortcoming of automatically unloading is if manually-operated is prone to Personal Risk's problem.
The technical scheme that its technical problem that solves the utility model adopts is: a kind of air-filling well-drilling safety gas injection device is made up of high pressure union box, flange, safety valve, piezometer tube, clip, gate valve, high pressure union pin thread, threeway, sealing ring: high pressure union box is connected by flange with safety valve, add sealing ring between the flange, be connected by flange between safety valve and the threeway, threeway body bottom is provided with aperture piezometer tube is installed, gate valve and threeway are by clamp connection, and high pressure union pin thread and gate valve are by clamp connection.The implementation process of this device: air injection pipe firmly is connected with high pressure union box.If a gas injection car group is arranged, the gas injection flexible pipe of gas injection car group firmly is connected with one of them union pin thread, open continuous end brake valve, other end brake valve cuts out.If two gas injection car groups, the gas injection flexible pipe with gas injection car group firmly is connected with the union pin thread respectively, and two gate valves are opened simultaneously.The safety guard that opens the safety-valve checks whether piezometer tube is intact.Determining to open gas injection car group under the situation that gate valve is being opened, whether the pressure that continues 5 minutes observation piezometer tube is identical with the pressure of gas injection car group, difference then will be stopped, and checks that manifold connects sealing, when treating that piezometer tube pressure equates with the pressure of gas injection car group, can carry out the gas injection operation.
The beneficial effects of the utility model are, and are simple in structure, easy to operate, this device does not have safety valve and pressure tap energy automatically unloading, realizes safe gas injection under the high-pressure situations, and can in time read pressure data accurately, reduce manually-operated danger, improve the safety of high-pressure gas injection.
Description of drawings:
Accompanying drawing is the utility model overall structure schematic diagram.
Among the figure 1, high pressure union box, 2, flange, 3, safety valve, 4, piezometer tube, 5, clip, 6, gate valve, 7, high pressure union pin thread, 8, threeway, 9, sealing ring.
The specific embodiment:
In the accompanying drawings, a kind of air-filling well-drilling safety gas injection device is made up of high pressure union box 1, flange 2, safety valve 3, piezometer tube 4, clip 5, gate valve 6, high pressure union pin thread 7, threeway 8, sealing ring 9: high pressure union box 1 is connected by flange 2 with safety valve 3, add sealing ring 9 between the flange 2, be connected by flange 2 between safety valve 3 and the threeway 8, threeway 8 body bottoms are provided with aperture piezometer tube 4 are installed, and gate valve 6 all is connected by clip 5 with gate valve 6 with threeway 8, high pressure union pin thread 7.

Claims (1)

1. an air-filling well-drilling safety gas injection device is by high pressure union box (1), flange (2), safety valve (3), piezometer tube (4), clip (5), gate valve (6), high pressure union pin thread (7), threeway (8), sealing ring (9) is formed, it is characterized in that: high pressure union box (1) is connected by flange (2) with safety valve (3), add sealing ring (9) between the flange (2), be connected by flange (2) between safety valve (3) and the threeway (8), threeway (8) body bottom is provided with aperture piezometer tube (4) is installed, gate valve (6) and threeway (8), high pressure union pin thread (7) all is connected by clip (5) with gate valve (6).
CNU2007200131287U 2007-07-05 2007-07-05 Aerated drilling safety gas injection device Expired - Fee Related CN201068733Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200131287U CN201068733Y (en) 2007-07-05 2007-07-05 Aerated drilling safety gas injection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200131287U CN201068733Y (en) 2007-07-05 2007-07-05 Aerated drilling safety gas injection device

Publications (1)

Publication Number Publication Date
CN201068733Y true CN201068733Y (en) 2008-06-04

Family

ID=39490113

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200131287U Expired - Fee Related CN201068733Y (en) 2007-07-05 2007-07-05 Aerated drilling safety gas injection device

Country Status (1)

Country Link
CN (1) CN201068733Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704862A (en) * 2012-07-02 2012-10-03 中国石油集团西部钻探工程有限公司 Special wellhead tee connecting device for underbalanced drilling
CN109612329A (en) * 2018-12-27 2019-04-12 中国人民解放军陆军工程大学 Double balancing machine connection gas injection devices and inflating method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704862A (en) * 2012-07-02 2012-10-03 中国石油集团西部钻探工程有限公司 Special wellhead tee connecting device for underbalanced drilling
CN102704862B (en) * 2012-07-02 2015-05-13 中国石油集团西部钻探工程有限公司 Special wellhead tee connecting device for underbalanced drilling
CN109612329A (en) * 2018-12-27 2019-04-12 中国人民解放军陆军工程大学 Double balancing machine connection gas injection devices and inflating method

Similar Documents

Publication Publication Date Title
CN205719639U (en) A kind of static on-line period device
CN205036295U (en) Full well section is from inhaling anti - recycle gas drilling system of formula
CN208294498U (en) A kind of tapping equipment of adjustable well mouth of oil well casing gas
CN201068733Y (en) Aerated drilling safety gas injection device
CN201080804Y (en) Multifunctional wellhead pressure test packer
CN205689155U (en) A kind of self-locking compensation-type bidirectional hydraulic impacting device for drilling machine
CN204476357U (en) Anti-erosion device for fracturing wellhead
CN113123742B (en) Well control system and method for offshore high-temperature high-pressure narrow safety density window well
CN204492776U (en) A kind of on-line control separate zone production flow string
CN201110154Y (en) Oil production, gas well mouth apparatus
CN201106454Y (en) Firedamp pipeline slagoff drainage device
CN207583427U (en) Gas discharge in mine negative pressure automatic drainage device
CN218716673U (en) Servo constant pressure sealing system for coal seam gas extraction
CN201071707Y (en) Oil gas anti-theft constant-pressure recovery valve of casing tube
CN201488892U (en) Bolt-free gravity piston type columnar sediment fidelity sampler
CN2821148Y (en) Double path cock valve
CN202108466U (en) Bivalve check valve of continuous pipe
CN201778788U (en) Downhole double-barreled water adding device
CN201053574Y (en) Pipeline leakage alarming device
CN107989578A (en) A kind of recyclable nitrogen jet current of coiled tubing pumps drainage system and method
CN203230402U (en) Anti-freezing constant pressure gas production automatic recovery device
CN202596697U (en) Fracturing wellhead ball catching device
CN207073404U (en) Oil well mark produces switch valve
CN201133241Y (en) Minor diameter eccentric bridge type distributor
CN201568003U (en) Ultra-high pressure fracturing and acidizing oil-extracting wellhead device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080604

Termination date: 20110705