CN201050062Y - Sand bed soil reinforcing piece - Google Patents
Sand bed soil reinforcing piece Download PDFInfo
- Publication number
- CN201050062Y CN201050062Y CNU2007202005382U CN200720200538U CN201050062Y CN 201050062 Y CN201050062 Y CN 201050062Y CN U2007202005382 U CNU2007202005382 U CN U2007202005382U CN 200720200538 U CN200720200538 U CN 200720200538U CN 201050062 Y CN201050062 Y CN 201050062Y
- Authority
- CN
- China
- Prior art keywords
- soil
- steel tube
- thin
- construction
- wall steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Disclosed is a sand layer soil stiffener whose main body is a thin-wall steel tube. The head of the thin-wall steel tube is tapered. A grout outlet and a barb are distributed on the lateral wall of the thin-wall steel tube. The thin-wall steel tube can be arranged to have one segment or multiple segments according to the design depth. The connection between the segments can be screwed connection or inner liner tube welding connection. The disadvantage of a traditional soil nail when being used in the sand soil construction is solved by the utility model. Hole collapse during construction is avoided when the utility model is applied in the construction. The work is finished at one time, saving labor, materials and accelerating the construction speed; meanwhile, the nail-forming quality in the sand soil construction is ensured. The utility model is applicable to reinforcing the support sand layer position of the soil nail wall and the soil between the side slope piles in construction engineering.
Description
(1) technical field
The utility model relates to a kind of strenthening member of foundation pit stope support, particularly a kind of girth member that is applied in soil-nail wall support layer of sand position and the side slope inter-pile soil.
(2) background technology
In the foundation pit stope support engineering, adopt soil-nail wall support more.The general luoyang spade that adopts is earlier drawn the hole during soil nailing construction, after finish in hole to be drawn, adopt again and manually reinforcing bar is delivered to projected depth, but in work progress, if run into layer of sand, when manually sending reinforcing bar in addition to the hole wall disturbance, the regular hole of collapsing, wasted human and material resources, caused construction delay, the soil nailing difficult quality guarantee is brought great potential safety hazard.So traditional soil nailing construction technology is demanded urgently improving.
(3) utility model content
The purpose of this utility model provides a kind of layer of sand soil girth member, solve the easy hole of collapsing owing to adopt traditional soil nailing, often incurs loss through delay the problem of duration; Also to solve the problem that causes engineering safety hidden danger because of the difficult quality guarantee of soil nailing.
For achieving the above object, the utility model adopts following technical scheme: this layer of sand soil girth member, it is characterized in that: main body is a thin-wall steel tube 1, and its head is taper, is distributed with slurry outlet 4 and hangnail 3 on its sidewall.
Above-mentioned head 2 can be taper shape or pyramid.
Optimized technical scheme: the diameter of above-mentioned slurry outlet 4 can be 1.0~1.5cm.
Can be screwed connection or welding between above-mentioned thin-wall steel tube 1 and the head 2.
Above-mentioned thin-wall steel tube 1 is a joint or a plurality of sections of steel pipes screwed connection, perhaps, between joint and the joint internal lining pipe is arranged, and the junction is welding.
Compared with prior art the utlity model has following characteristics and beneficial effect:
The utility model has overcome the shortcoming of traditional soil nailing in the sandy soil construction, use the utility model hole phenomenon of in construction, can not collapsing, can disposablely survive, not only saved human and material resources, accelerate speed of application, also guaranteed the one-tenth nail quality in the sandy soil construction.Can be applicable to soil-nail wall support layer of sand position and the reinforcing of side slope inter-pile soil in the construction work.
(4) description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is an operating principle schematic diagram of the present utility model.
Among the figure: 1-thin-wall steel tube, 2-head, 3-hangnail, 4-slurry outlet, 5-cement paste post, 6-soil sidewall, 7-soil nailing metope reinforcing bar.
(5) specific embodiment
Embodiment is referring to shown in Figure 1, this layer of sand soil girth member, and it is characterized in that: main body is a thin-wall steel tube 1, its head 2 is taper shape or pyramid.Be distributed with the hangnail 3 of slurry outlet 4 and steel on the sidewall of thin-wall steel tube 1.The hangnail 3 of steel welds with the sidewall of thin-wall steel tube 1, and the diameter of above-mentioned slurry outlet 4 is 1.0~1.5cm.
Between above-mentioned thin-wall steel tube 1 and the head 2 for screwed connection or for the welding.Above-mentioned thin-wall steel tube 1 is a joint or a plurality of sections of steel pipes screwed connection; Perhaps, between joint and the joint internal lining pipe is arranged, the junction is welding.Thin-wall steel tube can adopt the scaffold tubes of φ 48 * 3 as main body.
Referring to Fig. 2, adopt hammering method that layer of sand soil girth member is used to sandy soil during construction earlier, when layer of sand soil girth member is used to into to predetermined depth the time, hangnail 3 is pricked in the native sidewall 6 fixing, inject cement paste from the afterbody of layer of sand soil girth member, the grouting pressure of afterbody is 2~3Mpa, formation has the cement paste post 5 of certain adhesion strength, in the sandy soil around cement paste penetrates into by slurry outlet 4, setting and harden, be connected as a single entity with sandy soil, at last soil nailing metope reinforcing bar 7 be connected with layer of sand soil girth member afterbody, thereby reach the effect of the stable side slope soil body.
Claims (7)
1. layer of sand soil girth member, it is characterized in that: main body is a thin-wall steel tube (1), and its head (2) is taper, is distributed with slurry outlet (4) and hangnail (3) on its sidewall.
2. layer of sand soil girth member according to claim 1, it is characterized in that: above-mentioned head (2) is taper shape or pyramid.
3. layer of sand soil girth member according to claim 2, it is characterized in that: the diameter of above-mentioned slurry outlet (4) is 1.0~1.5cm.
4. layer of sand soil girth member according to claim 2 is characterized in that: be screwed connection between above-mentioned thin-wall steel tube (1) and the head (2).
5. layer of sand soil girth member according to claim 2 is characterized in that: be welding between above-mentioned thin-wall steel tube (1) and the head (2).
6. according to claim 4 or 5 described layer of sand soil girth members, it is characterized in that: above-mentioned thin-wall steel tube (1) is a joint or a plurality of sections of steel pipes screwed connection.
7. according to claim 4 or 5 described layer of sand soil girth members, it is characterized in that: above-mentioned thin-wall steel tube (1) is plurality of sections of steel pipes, between joint and the joint internal lining pipe is arranged, and the junction is welding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007202005382U CN201050062Y (en) | 2007-06-26 | 2007-06-26 | Sand bed soil reinforcing piece |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007202005382U CN201050062Y (en) | 2007-06-26 | 2007-06-26 | Sand bed soil reinforcing piece |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201050062Y true CN201050062Y (en) | 2008-04-23 |
Family
ID=39336545
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007202005382U Expired - Fee Related CN201050062Y (en) | 2007-06-26 | 2007-06-26 | Sand bed soil reinforcing piece |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201050062Y (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102660948A (en) * | 2012-05-30 | 2012-09-12 | 甘肃省建设投资(控股)集团总公司 | Steel tube locked anchor rod construction method |
CN106494573A (en) * | 2016-11-02 | 2017-03-15 | 上海理工大学 | A kind of floating marine formula platform seabed mooring fixing device with fractal characteristic |
CN106555399A (en) * | 2017-01-23 | 2017-04-05 | 贵州正业工程技术投资有限公司 | A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement and its construction method |
CN106638592A (en) * | 2016-12-29 | 2017-05-10 | 青建集团股份公司 | Drive anchor rod in complicated geological condition and construction method thereof |
CN106638571A (en) * | 2017-01-04 | 2017-05-10 | 成都佳美嘉科技有限公司 | Building pile convenient to construct |
CN110206043A (en) * | 2019-06-18 | 2019-09-06 | 新疆交通建设集团股份有限公司 | Soil nailing and construction method for supporting |
-
2007
- 2007-06-26 CN CNU2007202005382U patent/CN201050062Y/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102660948A (en) * | 2012-05-30 | 2012-09-12 | 甘肃省建设投资(控股)集团总公司 | Steel tube locked anchor rod construction method |
CN106494573A (en) * | 2016-11-02 | 2017-03-15 | 上海理工大学 | A kind of floating marine formula platform seabed mooring fixing device with fractal characteristic |
CN106638592A (en) * | 2016-12-29 | 2017-05-10 | 青建集团股份公司 | Drive anchor rod in complicated geological condition and construction method thereof |
CN106638571A (en) * | 2017-01-04 | 2017-05-10 | 成都佳美嘉科技有限公司 | Building pile convenient to construct |
CN106555399A (en) * | 2017-01-23 | 2017-04-05 | 贵州正业工程技术投资有限公司 | A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement and its construction method |
CN110206043A (en) * | 2019-06-18 | 2019-09-06 | 新疆交通建设集团股份有限公司 | Soil nailing and construction method for supporting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201050062Y (en) | Sand bed soil reinforcing piece | |
CN105201530A (en) | Repairing and strengthening method for large cracks on rock tunnel lining | |
CN202544883U (en) | Self-boring full thread hollow grouting anchor rod | |
CN103422873B (en) | Strong-strength extendable anchor rod | |
CN201025038Y (en) | Adjustable pre-stress steel arch frame | |
CN206396742U (en) | A kind of prefabricated pile | |
CN205422773U (en) | Novel hollow grouting anchor bolt | |
CN2780833Y (en) | Self-drill gruniting roofbolt | |
CN204436407U (en) | The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs | |
CN2154288Y (en) | Tube type mud auto-anchor solum anchor rod | |
CN210194627U (en) | Hole wall guniting device | |
CN112112159A (en) | Electromagnetic gun pile head hole guiding device of large-diameter overlong static pressure anchor pile | |
CN206204931U (en) | A kind of precast concrete anti-pulling pipe piles | |
CN208136912U (en) | A kind of small pre-stress pipe muscle formula soil nailing | |
CN202787275U (en) | Tubular soil nailing wall of novel pneumatic impact anchor | |
CN206158226U (en) | Quick reinforced concrete column structure of steel pipe slip casting | |
CN206467661U (en) | The resistance to compression attachment structure of secondary splitting grouting | |
CN201214788Y (en) | Grouting device under pressure for mortar anchor rod | |
CN208563321U (en) | Compaction grouting spike anchor tube | |
CN206693256U (en) | A kind of upright controling slip casting steel floral tube pile base beam barrier wall structure | |
CN106320327A (en) | Uplift pipe pile and connection method for uplift pipe pile and foundation bottom plate | |
CN205636736U (en) | Tip disc holder type stock | |
CN201943071U (en) | Implantable steel tube anchor rod with stabs | |
CN214738025U (en) | Framework structure of driving-in type combined anchor rod | |
CN206591513U (en) | Slip casting cylinder for PHC pile tubes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080423 Termination date: 20140626 |
|
EXPY | Termination of patent right or utility model |