CN201046462Y - 万向接轴拆卸装置 - Google Patents

万向接轴拆卸装置 Download PDF

Info

Publication number
CN201046462Y
CN201046462Y CNU2007200126626U CN200720012662U CN201046462Y CN 201046462 Y CN201046462 Y CN 201046462Y CN U2007200126626 U CNU2007200126626 U CN U2007200126626U CN 200720012662 U CN200720012662 U CN 200720012662U CN 201046462 Y CN201046462 Y CN 201046462Y
Authority
CN
China
Prior art keywords
buggy
bracket
fixed
spindle
travelling bogie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200126626U
Other languages
English (en)
Inventor
付威
刘震
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Heavy Industries Co Ltd
CFHI Dalian Design and Research Institute Co Ltd
Original Assignee
China First Heavy Industries Co Ltd
CFHI Dalian Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Heavy Industries Co Ltd, CFHI Dalian Design and Research Institute Co Ltd filed Critical China First Heavy Industries Co Ltd
Priority to CNU2007200126626U priority Critical patent/CN201046462Y/zh
Application granted granted Critical
Publication of CN201046462Y publication Critical patent/CN201046462Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Handcart (AREA)

Abstract

万向接轴拆卸装置,由运输小车、滑动小车和接轴托架组成,运输小车是与换辊小车同轨道运行,运输小车上设有轨道、滚轴和滑轮,滚轴用支架固定在运输小车的前端,轨道沿小车长度方向水平铺设,滑轮安装在小车的前后两端;滑动小车置于运输小车上的轨道上,滑动小车车体的下部设有定滑轮,接轴托架固定在接轴侧面的地面基础上,由上支架、下支架、中间托架、合页及销轴组成,下支架固接在地面基础上,上支架用合页与下支架连接,两根竖立的支架的顶端由中间托架连接。本实用新型的效果在于不但解决了主传动装置传动侧的空间受到限制时接轴拆卸的技术问题,更为接轴的拆卸拓展了一条新路。

Description

万向接轴拆卸装置
技术领域
本实用新型属于冶金机械设备,尤其涉及带钢、型钢和线材热连轧机的粗轧机主传动的万向接轴拆卸和安装装置。
背景技术
目前已有技术中,热连轧机粗轧主传动装置的万向接轴的拆换,是通过起重天车吊运完成的。这种拆换方式的不足在于:在主传动装置传动侧的空间没有限制时,这种方式可行,当主传动装置传动侧的空间受到限制时,如万向接轴起吊后在机架与电机之间的摆角很小时,或接轴不可能起吊到轧机之上移出时,万向接轴在传动侧就无法用天车吊运完成拆卸和安装。
发明内容
本实用新型的目的是提供一种万向接轴拆卸装置,以克服已有技术中主传动装置传动侧的空间受到限制时,万向接轴在传动侧无法用天车吊运拆卸和安装的问题。本实用新型的技术方案是:万向接轴拆卸装置,由运输小车、滑动小车和接轴托架组成,其特征在于所述的运输小车是与换辊小车同轨道运行的小车,运输小车上设有轨道、滚轴和滑轮,滚轴用支架固定在运输小车的前端,轨道沿小车长度方向水平铺设,滑轮安装在小车的前后两端;所述的滑动小车置于运输小车上的轨道上,滑动小车车体的下部设有定滑轮,所述的接轴托架固定在接轴侧面的地面基础上,接轴托架由上支架、下支架、中间托架、合页及销轴组成,下支架固接在地面基础上,上支架用合页与下支架连接,两根竖立的支架的顶端由中间托架连接,中间托架的一端用销轴与一根支架滑动连接,另一端用卡销与另一根支架连接。
本实用新型的效果在于不但解决了主传动装置传动侧的空间受到限制时接轴拆卸的技术问题,更为接轴的拆卸拓展了一条新路。
附图说明
本实用新型有附图3副,其中:
图1为本实用新型结构的示意图。
图2为本实用新型结构的侧向示意图。
图3为本实用新型结构的接轴托架示意图。
附图中,1、运输小车 2、滑动小车 3、接轴托架 4、辊轴 5、上支架 6、下支架 7、中间托架 8、合页 9、销轴 10、工作辊直径 11、接轴轧辊侧回转架直径 12、接轴中间轴直径
具体实施方式
附图所示的实施例是热连轧机粗轧机上用的接轴拆卸和安装装置。装置由运输小车1、滑动小车2和接轴托架3组成,运输小车与换辊小车同轨道运行,运输小车上设有轨道、滚轴和滑轮,滚轴用支架固定在运输小车的前端,轨道沿小车长度方向水平铺设,滑轮安装在小车的前后两端;滑动小车置于运输小车上的轨道上,滑动小车车体的下部设有定滑轮,接轴托架固定在接轴侧面的地面基础上,接轴托架由上支架、下支架、中间托架、合页及销轴组成,下支架固接在地面基础上,上支架用合页与下支架连接,两根竖立的支架的顶端由中间托架连接,中间托架的一端用销轴与一根支架滑动连接,另一端用卡销与另一根支架连接。
本实用新型工作过程分为拆卸和安装两种情况。
当拆卸接轴时,第一步,用天车将上接轴从C位置吊起经过接轴卡紧龙门达到D位置以上,使运输小车1能顺利到达接轴位置;第二步,用工作辊换辊小车将运输小车1推入机架内,此时滑动小车2置于运输小车的前端位置并固定;第三步,使接轴头部落在滑动小车2上,并调整好接轴托架3的高度使接轴后头部落在中间托架7上,并保证接轴水平,此时接轴应与滚轴4接触,且运输小车1前部有换辊小车压紧固定;第四步,天车落下,将起吊接轴的钢丝绳移到接轴的后部,吊在接轴后头部和接轴与滚轴4接触处的适当位置;第五步将换辊小车与运输小车1脱开,并固定运输小车1,在滑动小车2的前端挂一钢丝绳,绕过滑轮后,另一端与换辊小车连接,然后用换辊小车拉动滑动小车2,使接轴在滚轴4上滑动,同时随动天车钩使接轴后部与滑动小车2同步移动,直到接轴重心G位置滑过三个滚轴4完全进入到运输小车1上为止;第六步将接轴在运输小车1上固定,然后摘掉天车及换辊小车上的钢丝绳;第七步用换辊小车将运输小车1上的接轴拉至磨辊间进行检修,完成上接轴的拆卸。下接轴的拆卸步骤与上接轴拆卸相同。
当安装接轴时,与上述拆卸接轴的步骤相反。先用换辊小车将运输小车1上的下接轴推到机架内,然后在滑动小车2的后端挂一钢丝绳,绕过滑轮与换辊小车连接,同时在接轴后部挂钢丝绳用天车钩吊挂,再用换辊小车拉滑动小车2、天车钩上钢丝绳与滑动小车2同步运动,直到到达位置后,重新用天车吊起接轴进行安装。上接轴的安装与下接轴安装相同。
接轴托架3的作用是接轴拆卸和安装缓钩时,用于支撑接轴。当接轴拆装完毕后,将上支架5沿合页8放下,再将中间托架7用销轴固定在一侧的下支架6上。

Claims (1)

1.万向接轴拆卸装置,由运输小车、滑动小车和接轴托架组成,其特征在于所述的运输小车(1)是与换辊小车同轨道运行的小车,运输小车(1)上设有轨道、滚轴(4)和滑轮,滚轴(4)用支架固定在运输小车的前端,轨道沿小车长度方向水平铺设,滑轮安装在小车的前后两端;所述的滑动小车(2)置于运输小车(1)上的轨道上,滑动小车(2)车体的下部设有定滑轮,所述的接轴托架(3)固定在接轴侧面的地面基础上,接轴托架由上支架(5)、下支架(6)、中间托架(7)、合页(8)及销轴(9)组成,下支架(6)固接在地面基础上,上支架(5)用合页(8)与下支架(6)连接,两根竖立的支架的顶端由中间托架(7)连接,中间托架(7)的一端用销轴(9)与一根支架滑动连接,另一端用卡销与另一根支架连接。
CNU2007200126626U 2007-06-15 2007-06-15 万向接轴拆卸装置 Expired - Fee Related CN201046462Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200126626U CN201046462Y (zh) 2007-06-15 2007-06-15 万向接轴拆卸装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200126626U CN201046462Y (zh) 2007-06-15 2007-06-15 万向接轴拆卸装置

Publications (1)

Publication Number Publication Date
CN201046462Y true CN201046462Y (zh) 2008-04-16

Family

ID=39299036

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200126626U Expired - Fee Related CN201046462Y (zh) 2007-06-15 2007-06-15 万向接轴拆卸装置

Country Status (1)

Country Link
CN (1) CN201046462Y (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104891323A (zh) * 2015-05-13 2015-09-09 莱芜钢铁集团有限公司 快速更换水平轧机下接轴的装置及方法
CN104924043A (zh) * 2014-03-17 2015-09-23 五冶集团上海有限公司 一种用于校正轧机本体接轴托架的模具制作方法
CN111715699A (zh) * 2020-06-09 2020-09-29 中冶宝钢技术服务有限公司 一种轧机主传动轴的拆装装置及工艺

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104924043A (zh) * 2014-03-17 2015-09-23 五冶集团上海有限公司 一种用于校正轧机本体接轴托架的模具制作方法
CN104924043B (zh) * 2014-03-17 2017-04-19 五冶集团上海有限公司 一种用于校正轧机本体接轴托架的模具制作方法
CN104891323A (zh) * 2015-05-13 2015-09-09 莱芜钢铁集团有限公司 快速更换水平轧机下接轴的装置及方法
CN111715699A (zh) * 2020-06-09 2020-09-29 中冶宝钢技术服务有限公司 一种轧机主传动轴的拆装装置及工艺

Similar Documents

Publication Publication Date Title
CN203972473U (zh) 冷轧机轧辊装配装置
CN106218739B (zh) 磁悬浮列车轨道牵引专用车
CN201046462Y (zh) 万向接轴拆卸装置
CN107555350A (zh) 一种汽车传动轴的移动提升装置
CN100471589C (zh) 前后背挂立辊轧机的水平轧机连接轴更换装置及方法
CN210163025U (zh) 一种钢丝防脱装置
CN202037179U (zh) 一种轧机多功能检修装置
CN101712049B (zh) 一种用于两辊冷轧管机的侧向换辊机构的设计方法及装置
CN115258964A (zh) 一种电动葫芦桥式起重机
CN202717267U (zh) 重型工件输送结构
CN2827651Y (zh) 轧机支撑辊轴承座拆卸装置
CN201980858U (zh) 一种平整机支撑辊吊装工具
CN102320079A (zh) 脱模勾推摆渡车
CN206466483U (zh) 一种运料框
CN205966776U (zh) 一种双工位通用型液压自动拆辊设备
CN204737380U (zh) 可活动鞍座
CN204262064U (zh) 可移出式卷取炉炉底辊道
CN207416667U (zh) 一种用于带钢运输的无轨小车
CN215657742U (zh) 一种车式铸坯运送装置及垂直半连铸机
CN205908083U (zh) 立体停车库的过道移动小车
CN205500608U (zh) 一种自动化吊装设备
CN211846928U (zh) 一种工业管廊施工用吊车
CN113714479A (zh) 一种车式铸坯运送装置、垂直半连铸机及铸造工艺
CN104370246B (zh) 炉体或槽体沉没辊道安装装置及方法
CN208103786U (zh) 一种建筑工程用重物提升用防脱装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA FIRST HEACY MACHINE STOCK CO., LTD.

Free format text: FORMER OWNER: CHINESE NO.1 HEAVY MECHANICAL GROUP CO.

Effective date: 20090814

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: Zhang Qian Road, Fulaerji District, Qigihar City, Heilongjiang Province, zip code: 161042

Co-patentee after: DALIAN DESIGN INSTITUTE Co.,Ltd. CHINA FIRST HEAVY INDUSTRIES

Patentee after: China First Heavy Industries

Address before: Zhang Qian Road, Fulaerji District, Qigihar City, Heilongjiang Province, zip code: 161042

Co-patentee before: Dalian Design and Research Institute, First Heavy Industries Group

Patentee before: China First Heavy Industries

TR01 Transfer of patent right

Effective date of registration: 20090814

Address after: Zhang Qian Road, Fulaerji District, Qigihar City, Heilongjiang Province, zip code: 161042

Co-patentee after: DALIAN DESIGN INSTITUTE Co.,Ltd. CHINA FIRST HEAVY INDUSTRIES

Patentee after: China First Heavy Machinery Co., Ltd.

Address before: Zhang Qian Road, Fulaerji District, Qigihar City, Heilongjiang Province, zip code: 161042

Co-patentee before: DALIAN DESIGN INSTITUTE Co.,Ltd. CHINA FIRST HEAVY INDUSTRIES

Patentee before: China First Heavy Industries

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080416

Termination date: 20130615