CN201031333Y - Overpass in town - Google Patents

Overpass in town Download PDF

Info

Publication number
CN201031333Y
CN201031333Y CNU2006201220298U CN200620122029U CN201031333Y CN 201031333 Y CN201031333 Y CN 201031333Y CN U2006201220298 U CNU2006201220298 U CN U2006201220298U CN 200620122029 U CN200620122029 U CN 200620122029U CN 201031333 Y CN201031333 Y CN 201031333Y
Authority
CN
China
Prior art keywords
road
city
intersection
vehicle
overpass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2006201220298U
Other languages
Chinese (zh)
Inventor
郜小天
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2006201220298U priority Critical patent/CN201031333Y/en
Application granted granted Critical
Publication of CN201031333Y publication Critical patent/CN201031333Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

The utility model discloses an urban overpass, the proposal for settling the increasingly serious problem of traffic jams at road crossings in urban areas is provided. The existing solution adopts electronic signal lights to guide the vehicles at a road crossing by distributing time in accordance with vehicle flowrate. However, the existing solution is incapable to settle the problem of increasingly serious traffic jams at road crossings. The utility model is characterized in that a stilt layer is constructed based on the existing road to achieve a crossover to solve the disadvantages of the prior art.

Description

Overpass bridge in the city
Technical field: the utility model relates to overpass bridge in the not stifled city of intersection, a kind of urban traffic road vehicle.
Background technology: the vehicle clogging that urban traffic presents when road intersects is common existence, increase day by day along with vehicle, it is serious that this problem more and more seems, existing scheme utilizes electronic signal light rationally to control its passing through by the crossing staff vehicles by the vehicle flowrate distribution time, though can play certain remission effect, but still can't be resolved to serious day by day crossing vehicle traffic congestion phenomenon, traditional overpass bridge is brought the intersection that is built in the city, its cost extra-high-speed not only, and to take up an area of big also be problem, what tearing open of original building around the crossing brought one is problem, is infeasible equally.
Summary of the invention: at present in the city traffic route intersection motor vehicles by the time be to utilize electronic signal light to come the current of distribution time control staff vehicles.
The feature of overpass bridge is in the city: the basis of intersection in former city, and stop up serious intersection at the generation traffic route and do not tear original building all around open, go up overhead one deck and build up overpass bridge in a city.
Overpass bridge is an invention on the overpass bridge architectural history in this city, has solved vehicle pass-through not smooth present situation in traffic route intersection exists in the city defective and deficiency.
Description of drawings:
Describe in further detail below in conjunction with accompanying drawing:
Accompanying drawing 1 is the overpass bridge schematic diagram behind overhead one deck.
(1) is major trunk roads among the figure, (2) high rack-layer auxiliary main road.
Figure (1) major trunk roads, for the more vehicle of straightgoing vehicle flow keep straight on and the four directions to the vehicle of direction running to the right.
Accompanying drawing 2 is that high rack-layer and four directions make progress lower channel guardrails of both sides schematic diagram.(1) Shape is to support guardrail, and (2) are the soft rubbers of all adorning.
The specific embodiment:
Accompanying drawing 2 is that less through vehicles of vehicle and major-minor arterial highway road need the porte-cochere of direction running left for last high rack-layer, at 200-400 rice, intersection, distance road from slope, turnpike road right side by extending upwardly paramount rack-layer, in like manner high rack-layer lower channel has been designed in the left side.
Its overhead layer height is apart from 4 meters of path layers, and accompanying drawing 1 is that the more major trunk roads of original path vehicle flowrate are done to keep straight on and cubic porte-cochere to the need right travel, and upper and lower like this shunting vehicle has reached the purpose that the road traffic intersection does not block up in the city.

Claims (1)

1. overpass bridge is that overhead one deck forms on the basis of road traffic intersection in former city in the city, it is characterized in that: on the basis of original path traffic intersection, overhead one deck does not cause overpass bridge in a city on the original building around tear open the serious intersection of generation traffic route obstruction.
CNU2006201220298U 2006-06-26 2006-06-26 Overpass in town Expired - Fee Related CN201031333Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2006201220298U CN201031333Y (en) 2006-06-26 2006-06-26 Overpass in town

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2006201220298U CN201031333Y (en) 2006-06-26 2006-06-26 Overpass in town

Publications (1)

Publication Number Publication Date
CN201031333Y true CN201031333Y (en) 2008-03-05

Family

ID=39163226

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2006201220298U Expired - Fee Related CN201031333Y (en) 2006-06-26 2006-06-26 Overpass in town

Country Status (1)

Country Link
CN (1) CN201031333Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102277815A (en) * 2011-04-28 2011-12-14 张光裕 Suspension type urban overhead bus channel
CN102345259A (en) * 2010-08-03 2012-02-08 陈海水 Overhead gain road connection method
CN102433813A (en) * 2011-09-28 2012-05-02 孙禄刚 Four-side steady plum blossom type flyover
CN102444062A (en) * 2010-10-02 2012-05-09 郜小天 Network overpass
CN103334355A (en) * 2013-08-06 2013-10-02 兰州理工大学 Pipe network and construction method thereof of urban underground automobile pipeline traffic and traffic method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102345259A (en) * 2010-08-03 2012-02-08 陈海水 Overhead gain road connection method
CN102444062A (en) * 2010-10-02 2012-05-09 郜小天 Network overpass
CN102277815A (en) * 2011-04-28 2011-12-14 张光裕 Suspension type urban overhead bus channel
CN102433813A (en) * 2011-09-28 2012-05-02 孙禄刚 Four-side steady plum blossom type flyover
CN103334355A (en) * 2013-08-06 2013-10-02 兰州理工大学 Pipe network and construction method thereof of urban underground automobile pipeline traffic and traffic method

Similar Documents

Publication Publication Date Title
WO2005031069A1 (en) A full interchange urban road system and the traffic method of using it
CN202194041U (en) Flyover
CN201031333Y (en) Overpass in town
CN207073044U (en) Bridge tunnel composite cross crossing road
CN201245803Y (en) Crossroad overhead passage for relieving traffic congestion
CN102268852A (en) Two-phase implementation method of urban road transport system
CN101008171A (en) Obstacle-free crossover for city road crossing
CN202017171U (en) Three-layer flyover for urban roads
CN102296504A (en) Viaduct with a junction of three roads
CN102912701B (en) Multi-functional left-turn directional interchange overpass
CN201080585Y (en) Unidirectional straight-through crossroad for crossroad
CN1776094A (en) Semi-submersible full-interpass man-vehicle separate flyover
CN100478519C (en) Bridge tunel combined crossing road on different level for crossroads
CN101792994A (en) Multifunctional tunnel grade separation hub bridge
CN209602887U (en) A kind of no red light overpass at crossroads
CN102121221B (en) Flyover with five bridges
CN101338541B (en) Crossing elevated passage for relaxing traffic jam
CN202139520U (en) Flyover without left turn
CN102900000B (en) Comprehensive complete straight-through direct left-hand rotation right lateral viaduct
CN1395007A (en) Two-layer intercommunication footway and vehicular travelway separated overpass
CN203451962U (en) Intersection fast-slow diverging cross road structure
CN101177927A (en) Rapid passing road system
CN201317903Y (en) Lane tunnel bridge at crossing
CN201648900U (en) Multifunctional tunnel interchange hinge bridge
CN202164518U (en) Cross directional barrier-free overpass

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Gao Xiaotian

Document name: Notification of Termination of Patent Right

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080305

Termination date: 20100626