The utility model content
Task of the present utility model is to provide a kind of scene easy to use, safe, economic overpressure resistant and explosion-proof mobile gas-liquid heating equipment at the problem of prior art existence.
This novel task is realized by following technical scheme: a kind of overpressure resistant and explosion-proof mobile gas-liquid heating equipment, comprise the electric-heating assembly of forming by many electric heating tubes, automatic electric controller, automatic temperature control, also have dolly, explosion-proof electric heating apparatus is installed on the dolly: many electric heating tubes of described electric-heating assembly are assembled in the pressure vessel and boundling is fixed in the flange end of pressure vessel; A plurality of deflection plates along the upper and lower one by one dislocation of pressure vessel axis be fixed on the pressure vessel inwall, the import of heat medium is located near the flange end of this container, the outlet of heat medium is located near this vessel head end, and this container is provided with pressure relief safety valve, and automatic electric controller and temperature are controlled device automatically and be installed on the dolly.
Above-mentioned pressure vessel is outside equipped with adiabator layer, is covered with metal shell on the adiabator layer, and insulation material and metal shell are formed the insulation casing.
Above-mentioned electric heating tube is the explosion-proof type electric heating tube.
The pressure vessel of above-mentioned insulation casing and explosion-proof electric-heating assembly one and explosion-proof electrical autocontrol cabinet, explosion-proof electronic temperature controller, connecting line etc. are installed on the dolly.
This novel employing Electric heating replaces existing Steam Heating or blowtorch mode of heating, on the one hand, existing management expectancy in view of the oil field, must reduce operating cost from each link, and can't stand the Steam Heating mode of existing high cost expenditure and thermo oil boiler Steam Heating pollution and destruction environment; On the other hand, because the electric power facility in oil field can possess the external condition that adopts the electric heater mode in the electricity consumption easily of each scene.
This novel electric heating equipment is a kind of electric energy directly to be converted to heat energy, and gas, liquid medium to the need heating heat as air.After flow media enters the pressure vessel heating, in container, make the rotation wave through the deflection plate left hand material and flow, carry out sufficient heat exchange with the surface of electric heating tube, make medium obtain heating, thereby obtain the high-temperature medium of technological requirement in outlet.Because medium is turbulence state, contacts with the electric heating tube surface in container.Therefore this heater is than the heat exchanger effectiveness height of existing general electric heater unit.
This novel automatic temperature control is regulated the electric heater power output automatically according to the temperature sensor signal that is arranged on the heat medium outlet, makes the medium temperature of outlet reach technological requirement; When thermal medium is lower than technological requirement; can connect power supply automatically, when the heater element overtemperature, overtemperature protection system cuts off heating power supply immediately; avoid adding the thermal material overtemperature and cause coking, rotten, charing, cause heater element to burn out when serious, effectively prolong electric heater service life.
Compared with prior art, this novel beneficial effect is:
1, have mobility, operation field is easy to use.
2, compare with Steam Heating, the present invention is energy-conservation, economy, environmental protection
With the steam oil burning boiler is example, the one, and boiler is necessary continuous service between whole turn(a)round, and this novel electric heating equipment then can not move during whole continuously, only uses the period to move in the needs heating; The 2nd, under little firer's condition, (promptly only keep the basic operational situation of boiler with boiler, and be the big fire operating mode during externally normal vapour work), one day burning 1000L (No. 0) diesel oil, in 4.8 yuan/L diesel oil, then per hour the fuel cost of boiler is 200 yuan, and this novel electric heating equipment, with 18K watt of heating tube power, air compressor machine power 18.5 kilowatt meters, then per hour electricity consumption 28.5 is spent, by 1 yuan/degree electricity, then this novel per hour electric cost is 28.5 yuan, only is 1/7 of boiler oil cost.Therefore, this novel not only saving but also environmental protection has been saved cost of use, has reduced production cost, and has not produced any waste gas waste water, and environment for use is pure and fresh clean.
3, heating tank adopts pressure vessel and corresponding blasting protection facilities, and promptly explosion-proof electric-heating assembly adopts the EXdIIBT4 explosive-proof grade, and explosion-proof automatic electric controller adopts the ExdIIBT6 explosive-proof grade.Magnetic valve, electro connecting pressure gauge etc. all adopt explosion-proof type in addition, and therefore this novel security has in use had practical assurance.
4, heat medium time of staying in heating tank long, and form turbulent flow on heating tube surface and strengthened temperature efficient, thereby the heat transfer efficiency height.The external heat-insulation layer that adds of heating tank, this just makes this electric heater unit have the advantage of conserver power source, thereby than the corresponding reduction use cost of similar products.
5, reach service life more than 3 years: because its heater is special alloy material, so under the impact of high-pressure medium stream, it is all better than the mechanical performance and the intensity of any heater, can satisfy long-time continuous and constantly add heat request.
6, this novel problem such as stifled of freezing that can solve the thawing of present drilling well, light maintenance, heavy repair task scene, de-plugging and well head preferably to the gathering station petroleum pipeline, eliminate and use the blowtorch solution to freeze disaster hidden-trouble stifled and that frozen problem exists, avoid the generation of fire incident, for realizing that winter, safety in production provided material base.Simultaneously this kind mini-plant can also be applied to the special process occasion of industry such as northern motor vehicle repair and metallurgy, chemical industry, pharmacy, food service industry.
7, this novel low-temperature zone that is provided with can solve the heating problem that the aboveground worker in oil field has a rest, sleeps.
The specific embodiment
Fig. 3 illustrates, and explosion-proof electric heating apparatus is installed on the dolly 3: electric-heating assembly is to be assembled in the pressure vessel 16 and boundling is fixed in the flange end 16a of pressure vessel by many electric heating tubes; A plurality of deflection plates 17 along the upper and lower one by one dislocation of pressure vessel 16 axis be fixed on the pressure vessel inwall, the import of heat medium is located near this vessel flange end, outlet is located near this vessel head end, and this container is provided with pressure relief safety valve 11, and automatic electric controller is that explosion-proof electrical autocontrol cabinet 13 (Fig. 2) and temperature are controlled device automatically and be installed on the dolly.2/3 of the circular cross section that is shaped as pressure vessel 16 of deflection plate 17.Referring to Fig. 3, after air enters from the heat medium inlet 14 on the pressure vessel 16, by first deflection plate guiding of right number downwards, enter between first, second deflection plate, again upwards by the guiding of second deflection plate, enter second again, between the 3rd deflection plate, mode like this, air by electric heater for heating after, at last, export 15 outflow pressure containers 16 through heat medium.Explosion-proof solenoid valve 10 and pressure-reducing valve 9 are installed on the inlet tube of the heat medium of pressure vessel 16.Pressure relief safety valve 11 is installed on the pressure vessel 16.Pressure vessel 16 is provided with adiabator layer, and adiabator layer is covered with metal shell 2, and the two forms the insulation casing; Be equipped with on the dolly 3 as the detachable prefabricated house 22 (Fig. 4) that holds all devices and equipment.Dolly 3 can be manpower formula dolly or electrodynamic type dolly or motor driven dolly.Fig. 5 illustrates, and subregion is provided with electric heater unit (promptly a dashed rectangle is interior) and explosion-proof electrical autocontrol cabinet 13 (dashed rectangle in the right is interior below being installed in) in the above on the dolly, also is provided with auxiliary assembly section 21 (following left side dashed rectangle) on the dolly.Referring to Fig. 1, dolly 3 is provided with directional wheel 1, universal wheel 4, and the handlebar on the dolly 3 is a retractable handle 20, can pull out or take in.The pipeline of the thermal medium import of heater is provided with imported valve 6, and the pipeline of thermal medium outlet is provided with outlet valve 7.Pressure relief safety valve 11 is arranged on the relief valve connection pipe 19 on the pressure vessel 16 (Fig. 3), also is connected with explosion-proof electro connecting pressure gauge 8 on the safety valve export pipeline.Temp probe 5 is arranged on the heat medium exit (right end plate 12 of pressure vessel is detachable end plate among Fig. 3, conveniently to take apart, electric heating tube is safeguarded) of pressure vessel 16.
Specification requirement:
1, heating system voltage (being explosion-proof electrical autocontrol cabinet operating voltage): 380V or 220V or 110V, electric heating tube power 6~120KW.
2, the operating pressure of pressure vessel is 0.2~1MPa (gauge pressure).Pressure is controlled to be at air inlet pressure-reducing valve, magnetic valve is installed, and the input gas pressure from 0.8MPa, is reduced to 0.4MPa.When the tank body internal pressure surpasses 0.4MPa, control pressurer system will be closed magnetic valve automatically, stop air inlet; Temperature control adopts multistage multistage to control automatically, can set according to user's request in 60~300 ℃ of scopes.
3, the material that contacts with medium all adopts corrosion resistant steel, and other parts adopt the 10# steel, and equipment surface is carried out oil resistant and handled.
4, heating system, electric-control system are all carried out explosion-proof processing; Explosive-proof grade ExdIIBT6; Electric heating tube component adopts explosion-proof type electric heating tube (every electric heating tube be shaped as U-shaped), explosive-proof grade EXdIIBT4.
The special electric-heating assembly of this novel employing is installed in corrosion resistant gas, the hydraulic coupling container, and adopts the insulation casing, is installed on the detachable travelling car, and in addition, explosion-proof electrical control cubicles, connecting line etc. are installed on the dolly.Therefore, this novel mobility is good, has operation field characteristics easy to use.