The road kerbstone
Technical field:
The utility model relates to a kind of road pavement material field, particularly relates to a kind of road kerbstone.
Background technology:
Raising along with people's living standard, people are more and more higher to the requirement of dwelling environment, and pay attention to energy-conserving and environment-protective more, and the ponding on road surface has brought a lot of inconvenience for people's trip during rainy season, in order to solve the surface gathered water problem, people are provided with some negative wells or catch pit at the edge on road surface; But the limited amount of some negative wells or catch pit can not all be drained the ponding on the road surface when rainy season in time.
The utility model content:
In order to solve road drainage problem in the prior art, the utility model proposes a kind of simple in structure, easy for installation, road kerbstone that has rhone that drainage effect is good.
The technical solution of the utility model is: a kind of road kerbstone, comprise the kerbstone body, and its side at this kerbstone body is provided with rhone, and this rhone and kerbstone body are wholely set, and the top of described rhone is provided with the groove lid.
Described rhone can be the seepy material body, and described groove lid is saturating sink cover, and saturating sink cover as described is the seepy material body or covers at groove and to be provided with permeable hole.
Described kerbstone body is provided with recess in the opposite side bottom of a side of establishing rhone, to save the kerbstone material cost.
Described kerbstone body also can be the seepy material body.Described kerbstone upper part of body skin is coated with luminescent layer, and this luminescent layer is by the luminescent layer that includes embedded photoluminescent material.
The utility model makes to the utlity model has following beneficial effect owing to adopt technique scheme:
1, simple in structure, road kerbstone, rhone one are laid, and be easy for installation, efficient height, and good stability;
2, drainage effect is good, can effectively solve surface gathered water problem in rainy season, and when each parts all adopted seepy material, drainage effect was better.
3, kerbstone upper part of body skin is coated with luminescent layer, and night can be luminous after solar radiation, plays sign and illuminating effect.
Description of drawings:
Fig. 1: the body part generalized section of the road kerbstone of embodiment 1 in the utility model;
Fig. 2: the groove of the road kerbstone of embodiment 1 lid generalized section in the utility model;
Fig. 3: the groove of the road kerbstone of embodiment 2 lid generalized section in the utility model;
Fig. 4: the road kerbstone generalized section of embodiment 1 in the utility model;
Fig. 5: the road kerbstone generalized section of embodiment 2 in the utility model;
Fig. 6: the road kerbstone generalized section of embodiment 3 in the utility model;
Fig. 7: the road kerbstone generalized section of embodiment 4 in the utility model;
Fig. 8: the road kerbstone of embodiment 2 generalized section of state of mating formation in the utility model;
The specific embodiment:
In conjunction with specific embodiments the utility model is further described inventive concept of the present utility model and design scheme in order better to illustrate:
Embodiment 1:
As Fig. 1, Fig. 2, shown in Figure 4: a kind of road kerbstone, comprise kerbstone body 1, outside a side one of this kerbstone body 1, be provided with drainage groove 2; Described drainage groove 2 is provided with the rest portion 3 of installing for the groove lid; Described drainage groove 2 is supporting to be provided with movable groove lid 4, and the state after the combination as shown in Figure 4.Described drainage groove 2, kerbstone body 1, groove lid 4 are the seepy material body.When rainy season, the rainwater on road surface is seeped into drainage groove by saturating sink cover 4 like this, and the water part in the drainage groove is seeped into underground, and the water yield can be discharged to negative well and permeate the ground additional underground water by this drainage groove in time when big.
Embodiment 2:
As Fig. 1, Fig. 3, shown in Figure 4: a kind of road kerbstone, comprise kerbstone body 1, outside a side one of this kerbstone body 1, be provided with drainage groove 2; Described drainage groove 2 is provided with the rest portion 3 of installing for the groove lid; The described drainage groove 2 supporting movable groove lids 5 (being the permeable brick that size and drainage groove 2 are complementary) that are provided with, the state after the combination as shown in Figure 5.Described drainage groove 2, kerbstone body 1, groove lid 5 are the seepy material body, for resinoid bond and the quartz sand that is added with hydrophilic agglomerant forms by mold pressing.When rainy season, the rainwater on road surface can be discharged to negative well and the additional underground water that permeates the ground by this drainage groove in time in time like this.Its use state of mating formation, as shown in Figure 8.
Implement 3:
As shown in Figure 6: a kind of road kerbstone, comprise kerbstone body 1, outside a side one of this kerbstone body 1, be provided with drainage groove 2; The top of drainage groove 2 is for sealing.Described drainage groove 2, kerbstone body 1, groove lid 5 are the seepy material body.When rainy season, the rainwater on road surface can be discharged to negative well and the additional underground water that permeates the ground by this drainage groove in time in time like this.
Embodiment 4:
As shown in Figure 7: above-mentioned road kerbstone can be provided with breach 6 at the kerbstone body at a side lower part of not establishing drainage groove, to save the raw material of road kerbstone, reduces cost.