CN201016239Y - Gymnasium safety guards - Google Patents

Gymnasium safety guards Download PDF

Info

Publication number
CN201016239Y
CN201016239Y CNU200720105583XU CN200720105583U CN201016239Y CN 201016239 Y CN201016239 Y CN 201016239Y CN U200720105583X U CNU200720105583X U CN U200720105583XU CN 200720105583 U CN200720105583 U CN 200720105583U CN 201016239 Y CN201016239 Y CN 201016239Y
Authority
CN
China
Prior art keywords
guardrail
base
rice
stadiums
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200720105583XU
Other languages
Chinese (zh)
Inventor
魏启定
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou Yunfeng Electrical Appliance Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU200720105583XU priority Critical patent/CN201016239Y/en
Application granted granted Critical
Publication of CN201016239Y publication Critical patent/CN201016239Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a stadium guardrail which is connected with base through a pole; wherein the pole is provided with a horizontal lever with a vertical rod on the lever. The stadium guardrail is characterized in that the base is a hollow base with a cavity. The technical proposal is that the base is molded into a hollow base frame with a cavity. When the guardrail is fast positioned, the cavity can be filled with substance such as sand, water, etc. Thus the base becomes heavy, thereby, the guardrail is fixed, and sand or water is filled on site to bring convenience for transportation. When the fence needs to be dismantled, the sand or water can be chucked away. The fence is easy to be dismantled and recycled.

Description

The stadiums guardrail
Technical field
The utility model relates to guardrail, particularly relate to a kind ofly be used to train, stadiums guardrail that competition area, demonstration place are provided with.
Background technology
Present guardrail or fence, steel, wooden and plastic guardrail are arranged, and wooden guardrail now seldom uses, and the steel guardrail generally is to adopt at very heavy base (basic blocks) to go up non-floating rail, transport and be provided with inconvenience very, generally all no longer move after setting.But, often need to be provided with and be beneficial to mobile guardrail, so plastic guardrail normally in some provisional demonstration or performance on-the-spot (or stadiums etc.).The top of existing plastic guardrail is prefabricated component, and the bottom is a fixture, and as the cement product, the prefabricated component with plastics during use is connected with fixture, and fixtures such as cement not only freight volume are big, moves trouble, and is not easy to reclaim.
Summary of the invention
The purpose of this utility model is in order to overcome the shortcoming of prior art, a kind of convenient transportation to be provided, and is provided with fast temporarily, and it is firm to set the back guardrail, helps removing the stadiums guardrail of recovery again.
The technical scheme of the utility model stadiums guardrail is: connect base by column, cross bar is installed on column, montant is installed on the cross bar is constituted, it is characterized in that described base is the hollow base that is shaped on cavity.
Stadiums guardrail of the present utility model, base is injection molded into the hollow base that is shaped on cavity, after guardrail sets quickly, can in cavity, adorns and irritate filler, as sand, water etc., base becomes heavy like this, and guardrail is firm, and cans on the spot such as sand, water, transportation economizes, when removing guardrail sand, water etc. is outwelled just passablely, dismounting easily helps the recovery of guardrail.
Stadiums guardrail of the present utility model can be installed support bar in a side or the both sides of column, guarantees the firm of guardrail.The height of its guardrail from base to the top is 0.3-3 rice, and the length from an end to the other end is 1.8-2.8 rice, adapts to all-environment needs.The high H of its guardrail 1Can be 1.2-1.3 rice, long L 1Can be 2.5-2.8 rice.The perhaps high H of guardrail 2Be 1.6-2 rice, long L 2Be 1.8-2.2 rice.The perhaps high H of guardrail 3Be 2.32.8 rice, long L 3Be 1.8-2.2 rice.The head of its guardrail can be made the elbow shape, prevents that people from climbing guardrail.Its described guardrail is that plastic material is made, and its plastic material be have fire-retardant, antistatic.The column of its guardrail, cross bar, montant are that metal insert is installed in the plastic pipe, and metal insert has been arranged, and not only improve intensity, and promptly use and burnt plastic outer layer and also do not produce breach, prevent that the people from piercing.
Description of drawings
Fig. 1 is that the utility model stadiums guardrail is that a kind of its base of low type is the hollow schematic diagram;
Fig. 2 is the low type structural representation of the utility model stadiums guardrail;
Fig. 3 is another embodiment schematic diagram of the utility model stadiums guardrail;
Fig. 4 is that the head of the utility model stadiums guardrail is made elbow and the support bar schematic diagram is arranged.
The specific embodiment
The utility model relates to the stadiums guardrail, as Fig. 1-shown in Figure 4, connect base by column 1, cross bar 4 is installed on column 1, montant 3 is installed on the cross bar 4 to be constituted, its cross bar 4 and column 1 with can fix montant 3 and being connected of cross bar 4 by securing member, its major technology is characterised in that described base is the hollow base 2 that is shaped on cavity 21, at first be each unit construction to be constituted guardrail during use as existing plastic guardrail, dress is irritated filler 5 in the guardrail base that sets then, as sand, water etc., guardrail has had heavier base, is provided with firm.In order to guarantee the solid and reliable property of guardrail, can support bar 6 be installed in a side or the both sides of column.The height of its guardrail from base to the top can be 0.3-3 rice, and the length from an end to the other end can be 1.8-2.8 rice, adapts to the needs of various situations and environment.The high H of its guardrail 1Be 1.2-1.3 rice, long L 1Be 2.5-2.8 rice.The perhaps high H of guardrail 2Be 1.6-2 rice, long L 2Be 1.8-2.2 rice.The perhaps high H of guardrail 3Be 2.3-2.8 rice, long L 3Be 1.8-2.2 rice.The head of its guardrail can be made elbow 7 shapes, prevents that the someone from climbing guardrail.Its described guardrail is that plastic material is made, and the material requirements of guardrail has fire-retardant, antistatic, avoids producing friction spark.The column 1 of its guardrail, cross bar 4, montant 3 are that metal insert is installed in the plastic pipe, and metal insert not only improves the intensity of guardrail, and promptly use and burnt plastic outer layer and also do not produce breach, prevent that the people from piercing, and metal are fire-retardant.In order to prevent that the someone is wounded by stabbing or abrades, the top of fence upright 1 and montant 3 is to make tack or blunt nosed.

Claims (9)

1. the stadiums guardrail connects base by column, and cross bar is installed on column, montant is installed on the cross bar is constituted, and it is characterized in that described base is the hollow base (2) that is shaped on cavity (21).
2. stadiums guardrail as claimed in claim 1 is characterized in that column one side installation support bar (6).
3. stadiums guardrail as claimed in claim 1 is characterized in that the height of guardrail from base to the top is 0.3-3 rice, and the length from an end to the other end is 1.8-2.8 rice.
4. stadiums guardrail as claimed in claim 1 is characterized in that guardrail height (H 1) be 1.2-1.3 rice, long (L 1) be 2.5-2.8 rice.
5. stadiums guardrail as claimed in claim 1 is characterized in that guardrail height (H 2) be 1.6-2 rice, long (L 2) be 1.8-2.2 rice.
6. stadiums guardrail as claimed in claim 1 is characterized in that guardrail height (H 3) be 2.3-2.8 rice, long (L 3) be 1.8-2.2 rice.
7. stadiums guardrail as claimed in claim 1 is characterized in that the head of guardrail is made elbow (7).
8. stadiums guardrail as claimed in claim 1 is characterized in that described guardrail is that plastic material is made.
9. stadiums guardrail as claimed in claim 1 is characterized in that column (1), cross bar (4), the montant (3) of guardrail is that metal insert is installed in the plastic pipe.
CNU200720105583XU 2007-01-13 2007-01-13 Gymnasium safety guards Expired - Fee Related CN201016239Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200720105583XU CN201016239Y (en) 2007-01-13 2007-01-13 Gymnasium safety guards

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200720105583XU CN201016239Y (en) 2007-01-13 2007-01-13 Gymnasium safety guards

Publications (1)

Publication Number Publication Date
CN201016239Y true CN201016239Y (en) 2008-02-06

Family

ID=39056723

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200720105583XU Expired - Fee Related CN201016239Y (en) 2007-01-13 2007-01-13 Gymnasium safety guards

Country Status (1)

Country Link
CN (1) CN201016239Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296885A (en) * 2011-06-09 2011-12-28 攀枝花十九冶集团工业开发有限公司 Large temporary enclosing wall and construction method for rapidly building same
CN102359080A (en) * 2011-10-14 2012-02-22 东南大学 Rotating wheel type anti-collision guardrail capable of moving quickly
CN104005352A (en) * 2014-04-11 2014-08-27 黄靓 Roadside guardrail base for road and construction method for same
CN105040998A (en) * 2015-07-10 2015-11-11 国家电网公司 Transformer substation fence windbreak reinforcement device
CN105401539A (en) * 2015-11-26 2016-03-16 成都佳美嘉科技有限公司 Movable barrier
CN108033310A (en) * 2017-12-22 2018-05-15 梅吉玲 A kind of power ampere puts line apparatus

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296885A (en) * 2011-06-09 2011-12-28 攀枝花十九冶集团工业开发有限公司 Large temporary enclosing wall and construction method for rapidly building same
CN102359080A (en) * 2011-10-14 2012-02-22 东南大学 Rotating wheel type anti-collision guardrail capable of moving quickly
CN104005352A (en) * 2014-04-11 2014-08-27 黄靓 Roadside guardrail base for road and construction method for same
CN105040998A (en) * 2015-07-10 2015-11-11 国家电网公司 Transformer substation fence windbreak reinforcement device
CN105401539A (en) * 2015-11-26 2016-03-16 成都佳美嘉科技有限公司 Movable barrier
CN108033310A (en) * 2017-12-22 2018-05-15 梅吉玲 A kind of power ampere puts line apparatus
CN108033310B (en) * 2017-12-22 2024-01-30 山西国嘉送变电安装有限公司 Electric power installation pay-off

Similar Documents

Publication Publication Date Title
CN201016239Y (en) Gymnasium safety guards
CN202578107U (en) Combined expansion rod tower footing
CN203613817U (en) Base device for steel-structured safety protection fence
CN202866311U (en) Construction stair protective barrier and veering connecting device
CN202148503U (en) Saddle type combined guardrail structure
CN201598583U (en) Reinforcing device of aluminum alloy guardrail vertical post
CN204728227U (en) The special snow hurdle of a kind of railway
CN202809529U (en) Traffic guardrail
CN107604833A (en) A kind of detachable sound barrier
CN205531674U (en) Strenghthened type subway deep basal pit barricade
CN201649003U (en) Active powder concrete column and steel pipe combination rail structure
CN202416576U (en) Pre-embedded casing
CN203201164U (en) Tool type guard bar for construction site
CN209025015U (en) A kind of median of ecological, environmental protective
CN202220053U (en) Novel maintenance platform
CN202611293U (en) Assembly type motor pool and system
CN207538514U (en) A kind of wood moulding bus shelter
CN201106159Y (en) Separation fence column for railway, highroad and grassland
CN206957349U (en) Encorbelment protection advertisement enclosure wall
CN212317636U (en) Security fence for construction
CN206016160U (en) A kind of sky parking on aluminum floor
CN210622358U (en) Combined steel structure protective fence
CN205296525U (en) Lower hanging steel bar truss structure
CN201339170Y (en) Guardrail
CN105464425A (en) Space combined type steel structure parking lot

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: TAIZHOU YUNFENG ELECTRIC APPLIANCE CO., LTD.

Free format text: FORMER OWNER: WEI QIDING

Effective date: 20090717

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20090717

Address after: No. 318, East Ring Road, Taizhou, Zhejiang: 318000

Patentee after: Taizhou Yunfeng Electrical Appliance Co., Ltd.

Address before: Taizhou Yunfeng Electric Appliance Co., Ltd., No. 318, East Ring Road, Jiaojiang District, Zhejiang, Taizhou: 318000

Patentee before: Wei Qiding

DD01 Delivery of document by public notice

Addressee: Huang Zhaode

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice

Addressee: Huang Zhaode

Document name: Notification of Termination of Patent Right

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080206