CN200971506Y CN 200620067829 CN200620067829U CN200971506Y CN 200971506 Y CN200971506 Y CN 200971506Y CN 200620067829 CN200620067829 CN 200620067829 CN 200620067829 U CN200620067829 U CN 200620067829U CN 200971506 Y CN200971506 Y CN 200971506Y
Authority
CN
China
Prior art keywords
wall
counterfort
shingle nail
base plate
circulating pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620067829
Other languages
English (en)
Inventor
马兆荣
王晓村
林伶利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Original Assignee
Guangdong Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Electric Power Design Institute filed Critical Guangdong Electric Power Design Institute
Priority to CN 200620067829 priority Critical patent/CN200971506Y/zh
Application granted granted Critical
Publication of CN200971506Y publication Critical patent/CN200971506Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

本实用新型涉及一种用于循环水泵房前池的扶壁式挡墙,其特征是:由墙面板(1)、底板(2)和扶壁(3)构成;墙面板(1)的底部与底板(2)固结连接,墙面板(1)与底板(2)固结连接点的两侧分别延伸出墙趾板(21)和墙踵板(22),墙面板(1)为等厚的竖直板,扶壁(3)的上端与墙面板(1)的上端与固结连接、扶壁(3)的下端与墙踵板(22)远离墙面板(1)的一端固结连接,扶壁(3)呈倾斜状;墙面板(1)、底板(2)和扶壁(3)由钢筋混凝土浇注成一体成型结构。本实用新型应用在前池中时,所需的挡墙数据量大大少于现有技术的立柱结构,节点少、构造简单,克服了现有技术的容易造成节点下沉及偏位和造成水头损失的缺点。

Description

用于循环水泵房前池的扶壁式挡墙
技术领域
本实用新型涉及一种挡墙,特别是一种用于循环水泵房前池的扶壁式挡墙。属于发电***的基础设施技术领域。
背景技术
目前,在发电厂的循环水泵房前池,由于前池的四面墙壁较高(约15米),两侧墙壁的土压力较大,因此,必须设置立梁柱以支撑四周的土墙。现有技术中,大部分都是采用内支撑结构,由于前池较宽,因此,要求设置的支撑间距较密并且要设置较多的立柱以支承上部的支撑,至使采用这种内支撑结构时存在如下缺点:(1)节点较多,需要较多的支撑与柱的连接、支撑与墙的连接等,构造复杂,而且所述节点有下沉及偏位的危险,对支撑的受力影响很大。(2)梁柱分布太密,对前池流态有较大影响,并且会增加水头的损失,增加水泵运行费用。(3)所用的梁柱支撑结构复杂,成本高。
发明内容
本实用新型的目的,是为了克服现有技术的梁柱支撑结构复杂、影响前池流态、成本高的缺点,提供一种用于循环水泵房前池的扶壁式挡墙。
本实用新型的目的可以通过采取如下措施达到:
用于循环水泵房前池的扶壁式挡墙,其结构特点是:由墙面板、底板和扶壁构成;墙面板的底部与底板固结连接,墙面板与底板固结连接点的两侧分别延伸出墙趾板和墙踵板,墙面板为等厚的竖直板,扶壁的上端与墙面板的上端与固结连接、扶壁的下端与墙踵板远离墙面板的一端固结连接,扶壁呈倾斜状、在与墙踵板的连接处形成锐角α;墙面板、底板和扶壁由钢筋混凝土浇注成一体成型结构。
本实用新型的两个目的还可以通过采取如下措施达到:
本实用新型的一种实施方式是:所述底板可以向底部延伸出一个或二个以上防滑榫,该防滑榫可以加强扶壁式挡墙整体的防滑能力。
本实用新型的一种实施方式是:所述扶壁的上端可以通过一段水平板与墙面板的上端固结连接,形成“工”字形结构。
本实用新型的一种实施方式是:所述面板可以与底板垂直相交。
本实用新型的一种实施方式是:所述底板的宽度,可以相当于墙面板的高度的1/2~2/3。
本实用新型的一种实施方式是:所述墙趾板的宽度可以相当于墙踵板的宽度的1/4~1/2。
本实用新型的一种实施方式是:所述底板的长度可以为15~20、宽度为6~10米。
本实用新型的一种实施方式是:所述墙面板的厚度可以为200~600毫米。
本实用新型的一种实施方式是:所述墙踵板与扶壁之间的锐角可以为α=15°~75°。
本实用新型具有如下突出的有益效果:
1、本实用新型将挡墙设置成一体化的钢筋砼结构,可以直接前池的墙壁浇注成型或预制钢筋砼后移至前池的侧壁,而且在挡墙的底部设置了防滑榫,具有沉稳、坚实,承受能力强的特点,因此,应用在前池中时,所需的挡墙数据量大大少于现有技术的立柱结构,节点少、构造简单,不存在现有技术的节点下沉及偏位的缺点。
2、本实用新型由于可以根据现场需要设置挡墙之间的间隔,因此对前池流态没有影响,并且不会造成水头的损失,可以大大减少水泵运行费用。
3、本实用新型的高度可达到15米或以上,突破现有技术10米的限制。而且具有前池水流流态平顺、设计与施工简单、工序少、沉降变形小、结构整体性好、安全可靠的效果。
附图说明
图1为本实用新型实施例1的截面结构示意图。
图2为本实用新型实施例1的应用示意图。
具体实施方式
具体实施例1:
参照图1,本实施例由墙面板1、底板2和扶壁3构成;墙面板1的底部与底板2固结连接,墙面板1与底板2固结连接点的两侧分别延伸出墙趾板21和墙踵板22,墙面板1为等厚的竖直板,扶壁3的上端与墙面板1的上端与固结连接、扶壁3的下端与墙踵板22离墙面板1的一端固结连接,扶壁3呈倾斜状、在与墙踵板22的连接处形成锐角α;墙面板1、底板2和扶壁3由钢筋混凝土浇注成一体成型结构。底板2向底部延伸出一个防滑榫4,该防滑榫4可以加强扶壁式挡墙整体的防滑能力。扶壁3的上端通过一段水平板5与墙面板1的上端固结连接,形成“工”字形结构。面板1与底板2垂直相交。
参见图1,本实施例应用在广东省台山电厂循环水泵房前池。扶壁式挡墙的高度为H=15.8米,墙面板1的顶端至墙址板21端部的垂直距离为H1=13.5米,墙面板的顶端至根部的高度为H3=13.1米,墙址板21的坡度为H2=400毫米,墙址板21的端部厚度为H5=800毫米,墙踵板22的端部厚度为H6=800毫米,防滑榫4的高度度为H4=800毫米。墙面板底宽(相当于底板2的宽度)为M=9米,墙面板1厚为M0=400毫米,防滑榫4的宽度M5=2000毫米。墙址板21端部至防滑榫4的距离为M4=2500毫米,墙踵板22端部至防滑榫4的距离为M3=4500毫米;墙址板21端部至墙面板1的距离为M2=2000毫米,墙踵板22端部至墙面板1的距离为M1=6600毫米;扶壁3的上端与墙面板1之间的水平板5的宽度为M6=1米。
参见图2,在一期循环水泵房S1、二期循环水泵房S2和热电循环水泵房S3的前池V,三面的墙壁设置等距离分布的扶壁式挡墙T,在水泵房前池的扶壁挡墙T之间设置沉降伸缩缝U,沉降伸缩缝U的大小为600mm。在前池V的较长的墙壁设置三个进水箱涵Q。
本实施例中:
墙踵板22与扶壁3之间的锐角α=45°~60°。扶壁3的厚度等于前述间距的1/8~1/6。扶壁3为固结于墙踵板22的“工”字型变截面悬臂梁,墙面板1可视为扶壁的翼缘板。
其他具体实施例:
本实用新型其他具体实施例的特点是:底板2的宽度,可以相当于墙面板1的高度的1/2~2/3。墙趾板21的宽度可以相当于墙踵板22的宽度的1/4~1/2。底板2的长度可以为15~20米,宽度为6~10米。墙面板1的厚度可以为200~600毫米。墙踵板22与扶壁3之间的锐角α=15°~75°。所述底板2可以向底部延伸出二个以上防滑榫4,增加防滑榫4的数量可以增加扶壁式挡墙整体的防滑能力。沉降伸缩缝U的大小为500mm~700mm。

Claims (9)

1、用于循环水泵房前池的扶壁式挡墙,其特征是:由墙面板(1)、底板(2)和扶壁(3)构成;墙面板(1)的底部与底板(2)固结连接,墙面板(1)与底板(2)固结连接点的两侧分别延伸出墙趾板(21)和墙踵板(22),墙面板(1)为等厚的竖直板,扶壁(3)的上端与墙面板(1)的上端与固结连接、扶壁(3)的下端与墙踵板(22)远离墙面板(1)的一端固结连接,扶壁(3)呈倾斜状、在与墙踵板(22)的连接处形成锐角α;墙面板(1)、底板(2)和扶壁(3)由钢筋混凝土浇注成一体成型结构。
2、根据权利要求1所述的用于循环水泵房前池的扶壁式挡墙,其特征是:所述底板(2)向底部延伸出一个或二个以上防滑榫(4)。
3、根据权利要求1所述的用于循环水泵房前池的扶壁式挡墙,其特征是:所述扶壁(3)的上端通过一段水平板(5)与墙面板(1)的上端固结连接,形成“工”字形结构。
4、根据权利要求1所述的用于循环水泵房前池的扶壁式挡墙,其特征是:所述面板(1)与底板(2)垂直相交。
5、根据权利要求1所述的用于循环水泵房前池的扶壁式挡墙,其特征是:所述底板(2)的宽度,相当于墙面板(1)的高度的1/2~2/3。
6、根据权利要求1所述的用于循环水泵房前池的扶壁式挡墙,其特征是:所述墙趾板(21)的宽度相当于墙踵板(22)的宽度的1/4~1/2。
7、根据权利要求1所述的用于循环水泵房前池的扶壁式挡墙,其特征是:所述底板(2)的长度为15~20米、宽度为6~10米。
8、根据权利要求1所述的用于循环水泵房前池的扶壁式挡墙,其特征是:所述墙面板(1)的厚度为200~600毫米。
9、根据权利要求1所述的用于循环水泵房前池的扶壁式挡墙,其特征是:所述墙踵板(22)与扶壁(3)之间的锐角α=15°~75°。
CN 200620067829 2006-11-20 2006-11-20 用于循环水泵房前池的扶壁式挡墙 Expired - Lifetime CN200971506Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620067829 CN200971506Y (zh) 2006-11-20 2006-11-20 用于循环水泵房前池的扶壁式挡墙

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620067829 CN200971506Y (zh) 2006-11-20 2006-11-20 用于循环水泵房前池的扶壁式挡墙

Publications (1)

Publication Number Publication Date
CN200971506Y true CN200971506Y (zh) 2007-11-07

Family

ID=38882762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620067829 Expired - Lifetime CN200971506Y (zh) 2006-11-20 2006-11-20 用于循环水泵房前池的扶壁式挡墙

Country Status (1)

Country Link
CN (1) CN200971506Y (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101787710A (zh) * 2010-03-19 2010-07-28 黄靓 一种装配整体式扶壁式挡土墙及其施工方法
CN102094427A (zh) * 2009-12-10 2011-06-15 贵阳铝镁设计研究院 一种深地坑施工方法及地坑结构
CN101412605B (zh) * 2008-11-21 2011-11-16 中冶宝钢技术服务有限公司 钢渣可移动挡墙及其制作方法
CN103452133A (zh) * 2012-05-28 2013-12-18 上海市政工程设计研究总院(集团)有限公司 全包防水地下结构中主体结构与附属结构间的连接方法
CN107059801A (zh) * 2017-05-16 2017-08-18 佛山科学技术学院 一种不锈钢钢筋混凝土水坝
CN109306720A (zh) * 2017-07-26 2019-02-05 中国能源建设集团广东省电力设计研究院有限公司 取水构筑物
US10676890B2 (en) 2016-03-30 2020-06-09 Robert Gordon McIntosh Retaining wall system, method of supporting same, and kit for use in constructing same
USD895153S1 (en) 2018-10-05 2020-09-01 Pacific Prebenched Ltd. Block for a retaining wall

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101412605B (zh) * 2008-11-21 2011-11-16 中冶宝钢技术服务有限公司 钢渣可移动挡墙及其制作方法
CN102094427A (zh) * 2009-12-10 2011-06-15 贵阳铝镁设计研究院 一种深地坑施工方法及地坑结构
CN102094427B (zh) * 2009-12-10 2013-07-24 贵阳铝镁设计研究院有限公司 一种深地坑施工方法及地坑结构
CN101787710A (zh) * 2010-03-19 2010-07-28 黄靓 一种装配整体式扶壁式挡土墙及其施工方法
CN101787710B (zh) * 2010-03-19 2012-03-14 黄靓 一种装配整体式扶壁式挡土墙及其施工方法
CN103452133A (zh) * 2012-05-28 2013-12-18 上海市政工程设计研究总院(集团)有限公司 全包防水地下结构中主体结构与附属结构间的连接方法
CN103452133B (zh) * 2012-05-28 2016-12-14 上海市政工程设计研究总院(集团)有限公司 全包防水地下结构中主体结构与附属结构间的连接方法
US10676890B2 (en) 2016-03-30 2020-06-09 Robert Gordon McIntosh Retaining wall system, method of supporting same, and kit for use in constructing same
CN107059801A (zh) * 2017-05-16 2017-08-18 佛山科学技术学院 一种不锈钢钢筋混凝土水坝
CN109306720A (zh) * 2017-07-26 2019-02-05 中国能源建设集团广东省电力设计研究院有限公司 取水构筑物
CN109306720B (zh) * 2017-07-26 2020-05-01 中国能源建设集团广东省电力设计研究院有限公司 取水构筑物
USD895153S1 (en) 2018-10-05 2020-09-01 Pacific Prebenched Ltd. Block for a retaining wall

Similar Documents

Publication Publication Date Title
CN200971506Y (zh) 用于循环水泵房前池的扶壁式挡墙
CN102367653A (zh) 大跨度连续梁施工支架结构
CN208917702U (zh) 鱼腹式混凝土箱梁现浇施工模板支撑架
CN200964654Y (zh) 异形钢管混凝土组合柱
CN201730330U (zh) 一种建筑用梁模板
CN203403511U (zh) 一种基于冷弯薄壁型钢的型钢混凝土结构
CN109537470A (zh) 可实时调节斜腿应力的y构施工支架结构
CN202164551U (zh) 一种悬浇拱桥的挂篮
CN215562756U (zh) 桥梁悬挑式路灯基础模板支撑体系
CN204920196U (zh) 灌浆墙板支模
CN210529916U (zh) 低层装配式钢砼结构建筑
CN203113514U (zh) 一种组合拼装式房屋装置
CN209368859U (zh) 一种低层建筑的基础结构体系
CN208917660U (zh) 现浇景观拱桥
CN220099813U (zh) 一种陡崖地形渡槽支架
CN216515419U (zh) 一种渡槽施工用支撑结构
CN102418415A (zh) 小板跨现浇梁密肋楼板早拆模板支模体系
CN204803740U (zh) 预制钢筋混凝土埋置式直立框架桥
CN217378988U (zh) 一种预制拉杆型卸荷板加筋挡土墙
CN210066812U (zh) 一种加筋土挡墙面板浇筑模板
CN211598682U (zh) 一种pba地铁车站导洞内顶纵梁浇筑装置
CN102071643A (zh) 一种桥梁架设方法
CN103147510A (zh) 一种组合拼装式房屋装置
CN212641539U (zh) 一种道路桥梁基桩加固装置
CN213625607U (zh) 单侧模支架及基坑侧墙单侧模支护体系

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC

Free format text: FORMER NAME: GUANGDONG ELECTRIC POWER DESIGN INSTITUTE

CP01 Change in the name or title of a patent holder

Address after: 510600 No. 846 Dongfeng East Road, Guangdong, Guangzhou

Patentee after: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC POWER DESIGN INSTITUTE Co.,Ltd.

Address before: 510600 No. 846 Dongfeng East Road, Guangdong, Guangzhou

Patentee before: Guangdong Electric Power Design Institute

CP02 Change in the address of a patent holder

Address after: 510670 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee after: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC POWER DESIGN INSTITUTE Co.,Ltd.

Address before: 510600 No. 846 Dongfeng East Road, Guangdong, Guangzhou

Patentee before: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC POWER DESIGN INSTITUTE Co.,Ltd.

CX01 Expiry of patent term

Granted publication date: 20071107

EXPY Termination of patent right or utility model