CN200971503Y - Pile clamping mechanism - Google Patents

Pile clamping mechanism Download PDF

Info

Publication number
CN200971503Y
CN200971503Y CN 200620129519 CN200620129519U CN200971503Y CN 200971503 Y CN200971503 Y CN 200971503Y CN 200620129519 CN200620129519 CN 200620129519 CN 200620129519 U CN200620129519 U CN 200620129519U CN 200971503 Y CN200971503 Y CN 200971503Y
Authority
CN
China
Prior art keywords
pile
oil cylinder
stake
folder
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620129519
Other languages
Chinese (zh)
Inventor
蔡宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200620129519 priority Critical patent/CN200971503Y/en
Application granted granted Critical
Publication of CN200971503Y publication Critical patent/CN200971503Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

A pile-clamping device can conveniently realize the approximate direct proportional relation between the clamp pile force and the press pile force during the press pile process by the hydraulic pressure static force pile driver, which ensures that the prefabricated pile do not slide or damaged. The device mainly comprises a main pile-clamping device and an auxiliary pile-clamping device, wherein, the auxiliary pile-clamping device provides primary pile-clamping force to assist the pile clamping process and the auxiliary pile-clamping device mainly comprises one or two small pile-clamping oil cylinder and a clamp wedge; the pile-clamping oil cylinder drives the clamp wedge to clamp the pile. The main pile-clamping device provides main pile-clamping force, which mainly comprises a pile-clamping oil cylinder, an active wedge, a passive wedge and a clamp wedge. In the vertical direction, the pile-clamping oil cylinder drives the active wedge to move downward and the active wedge drives the passive wedge in the horizontal direction and the passive wedge drives the clamp wedge to clamp the pile. The device can ensure that the clamp pile force can change in accordance with the change of the press pile force to realize the ideal proportional relation between the clamp pile force and the press pile force.

Description

Pile holding mechanism
Affiliated technical field
The utility model relates to a kind of novel Pile holding mechanism of hydraulic static pile pressing machine, and the maximum characteristics of this Pile holding mechanism are to have saved used leverage of traditional Pile holding mechanism and folder stake oil cylinder, and can guarantee that pile locking force becomes rational proportional relationship with pile driving pressure.
Background technology
The piling function of hydraulic static pile pressing machine is to clamp preformed pile (non-slip) by Pile holding mechanism, and piling oil cylinder promotion Pile holding mechanism moves downward to be realized.At present, the pile locking force of known Pile holding mechanism all is to provide by special-purpose folder stake oil cylinder: 1. or with four-hole (or six mouthfuls, eight mouthfuls) press from both sides the stake oil cylinder directly to folder; 2. or with folder stake oil cylinder clamp by various levers (containing skewback) mechanism.
1. along with continue to increase (having reached 1000 tons in the market) of static pile press tonnage, the clamping cylinder diameter has reached 500-600 to scheme, and not only processing cost is big, and the intensity of cylinder also is subjected to baptism, the more fragile oil cylinder of folder stake; Though 2. scheme reaches boosting function by lever (or skewback), thereby reduce folder stake cylinder diameter, but increased impulse stroke, the complexity and the fine finishining cost of Pile holding mechanism structure have been increased, and above two kinds of tradition folder stake scheme disadvantage are that Pile holding mechanism and piling mechanism are independent separately, there is not necessary relation between pile locking force and the pile driving pressure (as 200 tons of pile driving pressures and 1000 ton hours, pile locking force may all be the same) so not only wasted pile locking force, increased destruction, and exclusive clamps stake cylinder has also increased manufacturing cost to pile body.
Summary of the invention
To use exclusive clamps stake cylinder not only cost is higher in order to solve present Pile holding mechanism, the Pile holding mechanism failure ratio is more frequent, and pile locking force and pile driving pressure are independent mutually, there are not deficiencies such as rational proportion relation each other, the utility model provides a kind of new Pile holding mechanism, this Pile holding mechanism has been cancelled traditional Pile holding mechanism exclusive clamps stake oil cylinder, adopt the piling cylinder to be folder stake cylinder, be that the piling cylinder not only produces the piling effect, also produce folder stake effect simultaneously, so not only cancelled folder stake cylinder, reduced cost, and what is more important guarantees that pile locking force becomes with pile driving pressure closely with proportional relation, exist a kind of rational proportion to concern between they the two, thereby the reduction Pile holding mechanism is to the destructiveness of precast pile.
The technical scheme that its technical problem that solves the utility model adopts is
This folder pilework is made up of main folder stake mechanism and sub-folder stake mechanism two parts of arranging up and down, they are bound up by big screw rod, the lower secondary Pile holding mechanism presss from both sides the stake oil cylinder by the stake of linkage folder by tradition folder stake mode by one, this pile locking force need only guarantee to satisfy at 3 and get final product: the one, can overcome the deadweight of whole Pile holding mechanism, and do not glide when making it clamp pre-; The 2nd, can overcome the stratum frictional resistance that pulls up Pile feeder and run into and (after a stake position pressed, need preformed pile be delivered to the underground certain depth with special-purpose Pile feeder: the degree of depth that needs that guarantees the ground excavation); The 3rd, the flanging stake can be provided, (the edge corner location in some building site is because the restriction of locus for the required pile locking force in special stake such as angle stake position, stake machine fuselage does not arrive the position, just can only use special-purpose skirt piles, angle pile holder stake mechanism and piling mechanism come piling, the general tonnage in this type of position is less, pile driving pressure is little, required pile locking force is also not too big, comprehensive above 3 the required pile locking force of sub-folder stake mechanism is less as can be known, required oil cylinder cylinder diameter is also less, thereby skirt piles, the profile bulk of angle stake mechanism is just less, can reduce minimum skirt piles effectively, the angle pilespacing from, improve a stake machine flanging stake, the ability of angle stake.Top main folder stake mechanism links together by screw rod and lower secondary Pile holding mechanism; (skirt piles during piling; except the stake of angle) the folder stake oil cylinder of the mechanism of operation sub-folder stake earlier stretches out and drives pile-clamp by linkage and " hold " preformed pile tightly; thereby guarantee when whole Pile holding mechanism of moment that the piling oil cylinder stretches out downwards do not glide (pile-clamp of main folder stake this moment mechanism also " is not held " preformed pile tightly); the piling cylinder stretches out initiatively voussoir of downward promotion then; initiatively voussoir promotes passive voussoir; jaw clamps preformed pile thereby passive voussoir promotes main folder stake mechanism; simultaneously the active force of piling oil cylinder promotes whole Pile holding mechanism and " holds " preformed pile tightly and move downward; thereby realize the piling process; the downward active force of piling cylinder (being pile driving pressure) is big more; then the jaw of main folder stake mechanism is just big more by the component (being pile locking force) that passive voussoir obtains; thereby realize the rational proportion relation of pile driving pressure and pile locking force; protect the preformed pile surface quality better, realize piling quality preferably.
The beneficial effects of the utility model are to have saved the heavy caliber folder stake oil cylinder and the complicated leverage of traditional Pile holding mechanism, the special special-purpose flanging stake of general Pile holding mechanism, the Pile holding mechanism of angle stake have also been saved simultaneously, what is more important has realized getting in touch of pile driving pressure and pile locking force, make and keep a rational proportion relation between the two, thereby guarantee the non-slip and not excessively folder stake of pile-clamp in the piling process at any time, improved the folder quality of pile to greatest extent.
Below in conjunction with drawings and Examples the utility model is further specified
Fig. 1 is the main pseudosection and the vertical view of the utility model assembling drawing.
Fig. 2 is the sectional view of sub-folder stake mechanism
Fig. 3 is the plan view of clamping slide block
Among the figure 1---main folder stake mechanism, 2---voussoir initiatively, 3---the piling oil cylinder, 4---passive voussoir, 5---main folder stake jaw, 6---preformed pile, 7---sub-folder stake mechanism, 8---connect screw rod, 9---main folder stake slide block, 10---main folder stake slide block back-moving spring, 11---folder stake oil cylinder, 12---connect pull bar, 13---sub-folder stake slide block, 14---sub-folder stake jaw, 15---sub-folder stake slide block back-moving spring, 16---coupking shaft, 17---connect hinge
The specific embodiment
In Fig. 1, main folder stake mechanism (1) and sub-folder stake mechanism (7) are coupled to one by connecting screw rod (8)
In embodiment illustrated in fig. 2, at first controlling folder stake oil cylinder (11) during piling stretches out, hold slide block (13) to central motion by connecting two sub-folders of pull bar (12) drive, make sub-folder stake jaw (14) " hold " preformed pile (6) tightly, thereby " embracing " preformed pile (6), the whole clamping device of moment that the piling oil cylinder (3) among assurance Fig. 1 stretches out downwards do not glide [this moment main folder stake jaw (5) also fail " holding tightly " preformed pile (6)], controlling piling oil cylinder (3) then stretches out downwards, initiatively voussoir (2) promotes downwards, initiatively voussoir (2) promotes passive voussoir (4) again, passive voussoir (4) promotes main folder stake slide block (9) again, drive main folder stake jaw (5) to central motion, thereby main folder stake jaw (5) also " is held " preformed pile (6) tightly, when piling oil cylinder (3) (can just overcome the resistance between preformed pile and the layer of ground soil) when pressure reaches certain value, piling oil cylinder (3) just promotes whole Pile holding mechanism and " embraces " preformed pile (6) and move downward together, thereby preformed pile (6) is pressed into soil layer realizes the piling process, after piling oil cylinder (3) has moved downward an impulse stroke, control folder stake oil cylinder (10) withdrawal, then sub-folder hold slide block (13) under the thrust of sub-folder stake slide block back-moving spring (15) away from the center, thereby make sub-folder stake jaw (14) unclamp preformed pile (6), control piling oil cylinder (3) withdrawal simultaneously, main folder stake slide block (9) is away from the center under the thrust of main folder stake slide block back-moving spring (10), drive main folder stake jaw (5) and unclamp preformed pile (6), thereby make whole Pile holding mechanism break away from preformed pile (6), under the effect of piling cylinder (3), be promoted to the starting point of next piling impulse stroke.

Claims (4)

1. Pile holding mechanism, its principal character is: main pile locking force is not to be produced by exclusive clamps stake oil cylinder, but form by voussoir by the piling oil cylinder on the vertical direction, it comprises main folder stake mechanism and sub-folder stake mechanism, the two links into an integrated entity by connecting screw rod, and whole Pile holding mechanism links together by piling oil cylinder and hydraulic static pile pressing machine again.
2. Pile holding mechanism according to claim 1, it is characterized in that: sub-folder stake mechanism provides " initially " pile locking force, it comprises that mainly the small-bore clamping oil cylinder of a bite, sub-folder are held slide block, sub-folder is held the embedding mouth, and they " float " by connection pull bar composition one and hold in the cavity in sub-folder.
3. Pile holding mechanism according to claim 1 is characterized in that: main folder stake mechanism does not have exclusive clamps stake oil cylinder, and its chucking power is provided by voussoir by the piling oil cylinder, and it mainly comprises initiatively voussoir, passive voussoir, main folder stake embedding mouth and back-moving spring.
4. Pile holding mechanism according to claim 1 is characterized in that: per two pile-clamps are assemblied on the folder stake slide block by coupking shaft and are synchronized with the movement together thereupon.
CN 200620129519 2006-07-17 2006-07-17 Pile clamping mechanism Expired - Fee Related CN200971503Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620129519 CN200971503Y (en) 2006-07-17 2006-07-17 Pile clamping mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620129519 CN200971503Y (en) 2006-07-17 2006-07-17 Pile clamping mechanism

Publications (1)

Publication Number Publication Date
CN200971503Y true CN200971503Y (en) 2007-11-07

Family

ID=38882759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620129519 Expired - Fee Related CN200971503Y (en) 2006-07-17 2006-07-17 Pile clamping mechanism

Country Status (1)

Country Link
CN (1) CN200971503Y (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102268872A (en) * 2011-06-01 2011-12-07 安徽力达实业股份有限公司 Mechanical pile-clamping case
CN102328732A (en) * 2011-07-12 2012-01-25 武汉高智创新科技有限公司 Offshore pile driving, pile pressing and installing united engineering ship
CN102672070A (en) * 2011-03-14 2012-09-19 辽阳石化机械设计制造有限公司 Hydraulic clamping head for bending push machine
CN102877469A (en) * 2011-07-12 2013-01-16 武汉高智创新科技有限公司 Universal double-beam pile pressing holder for offshore operation
CN104099930A (en) * 2013-04-08 2014-10-15 陈清贵 Tube drawing anti-skid device for static pressure immersed tube filling pile pressing machine
CN105780775A (en) * 2016-02-29 2016-07-20 济南轨道交通集团有限公司 Anti-draft precast pile conveying device capable of being reused and construction method
CN108222535A (en) * 2017-12-29 2018-06-29 上海建工集团股份有限公司 An a kind of column construction method and mechanism of pile
CN112095598A (en) * 2020-09-24 2020-12-18 蚌埠龙淮建筑科技有限公司 A dual-purpose stake machine for building engineering pile foundation construction

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102672070A (en) * 2011-03-14 2012-09-19 辽阳石化机械设计制造有限公司 Hydraulic clamping head for bending push machine
CN102268872A (en) * 2011-06-01 2011-12-07 安徽力达实业股份有限公司 Mechanical pile-clamping case
CN102268872B (en) * 2011-06-01 2013-06-26 安徽力达实业股份有限公司 Mechanical pile-clamping case
CN102328732A (en) * 2011-07-12 2012-01-25 武汉高智创新科技有限公司 Offshore pile driving, pile pressing and installing united engineering ship
CN102877469A (en) * 2011-07-12 2013-01-16 武汉高智创新科技有限公司 Universal double-beam pile pressing holder for offshore operation
CN102877469B (en) * 2011-07-12 2015-01-14 武汉博硕聚才科技有限公司 Universal double-beam pile pressing holder for offshore operation
CN104099930A (en) * 2013-04-08 2014-10-15 陈清贵 Tube drawing anti-skid device for static pressure immersed tube filling pile pressing machine
CN104099930B (en) * 2013-04-08 2016-09-07 陈清贵 A kind of tube drawing shoe of static pressure, immersed tube perfusion pile press machine
CN105780775A (en) * 2016-02-29 2016-07-20 济南轨道交通集团有限公司 Anti-draft precast pile conveying device capable of being reused and construction method
CN105780775B (en) * 2016-02-29 2017-07-25 济南轨道交通集团有限公司 Reusable anti-offset prefabricated pile Pile feeder and construction method
CN108222535A (en) * 2017-12-29 2018-06-29 上海建工集团股份有限公司 An a kind of column construction method and mechanism of pile
CN112095598A (en) * 2020-09-24 2020-12-18 蚌埠龙淮建筑科技有限公司 A dual-purpose stake machine for building engineering pile foundation construction

Similar Documents

Publication Publication Date Title
CN200971503Y (en) Pile clamping mechanism
CN1944810A (en) Pressure maintaining device for static pressure pile machine
CN2808748Y (en) Cup distributor for filling sealing and packaging machine
CN1434175A (en) Anchoring method and end-bearing anchor
CN101761082B (en) Compulsory pouring device and construction method of bored pile underwater concrete
CN106182166B (en) A kind of ornamental strip die cutting device
CN201137056Y (en) Reinforcement type wedge plate claw structure
CN116277392A (en) Automatic powder burying device for blanks for special ceramic production
CN215669434U (en) Reinforcing auxiliary device for backfill construction of large-scale retaining wall table back
CN101463596A (en) Reinforcing wedge-shaped block claw structure
CN213018068U (en) Telescopic prefabricated culvert section automatic jacking trolley conveying clamping fixing mechanism
CN2511723Y (en) Hydraulic static pile press with side pile
CN2442815Y (en) Single-head hydraulic deep-blank rolling shaper
CN1850384A (en) Automatic combined switching mechanism for two-way straightening pivot point
CN202519666U (en) Pile toe assembly for construction of injection-compression molding earth-rock composite pile
CN207244693U (en) The rotatable hydraulic grab of excavator Special back
CN206265462U (en) Hydraulic press-packing with lower platen
CN207078737U (en) Autoclave aerated concrete building block automatic separator
CN2835674Y (en) Pile pressing hydraulic control loop for hydraulic static pile pressing machine
CN101324068A (en) Hydraulic pipe drawing device
CN2818961Y (en) Synchronized coal-shoot spray operating valve of hydraulic moving stand
CN2839377Y (en) Light-duty pile press
CN221027478U (en) Wood fork of loader
CN115094891B (en) High-efficiency variable-length pile driver with positioning device
CN2885444Y (en) Automatic combination and switching device for bi-directional aligning fulcra

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: Room 2, unit 22, Mizuki Kiyoka District, Triangle Lake Road, Wuhan economic and Technological Development Zone, Hubei Province: Room 601: 430056

Patentee after: Cai Yu

Address before: 331-10, Hou Hou Jie, Hanyang District, Hubei, Wuhan, China: 430052

Patentee before: Cai Yu

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee