CN200967705Y - Clamp apparatus for handling H-bar - Google Patents

Clamp apparatus for handling H-bar Download PDF

Info

Publication number
CN200967705Y
CN200967705Y CN 200620027618 CN200620027618U CN200967705Y CN 200967705 Y CN200967705 Y CN 200967705Y CN 200620027618 CN200620027618 CN 200620027618 CN 200620027618 U CN200620027618 U CN 200620027618U CN 200967705 Y CN200967705 Y CN 200967705Y
Authority
CN
China
Prior art keywords
tongue
press
utility
block head
components
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620027618
Other languages
Chinese (zh)
Inventor
纪鸿恩
杨加永
井伟
庄鸿文
张双俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN HARBOUR FIRST STEVEDORING CO Ltd
Original Assignee
TIANJIN HARBOUR FIRST STEVEDORING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN HARBOUR FIRST STEVEDORING CO Ltd filed Critical TIANJIN HARBOUR FIRST STEVEDORING CO Ltd
Priority to CN 200620027618 priority Critical patent/CN200967705Y/en
Application granted granted Critical
Publication of CN200967705Y publication Critical patent/CN200967705Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a I-shaped steel load-unload fixture, the fixture includes a block head and a press tongue, the block head consists of two similar ''C-shaped'' components, the two components are connected together by a connection reinforcement plate, the run-through holes of the same center are arranged on the two components of the block head. The press tongue is tongue-shape arc device; a shackle connected with the wire rope is arranged on the upper part of the press tongue. A connecting axis pin runs through the holes on the block head and the run-through hole at the center of the press tongue, so the press tongue is fixed between two components of the block head and rotates freely. The utility model shows the effect that the fixture is of easy operation, the lifting is stable and safe, which avoids the quality accident during the operation. The utility model saves the wire rope and sling cost, reduces the number of workers and lowers labor intensity for 50%, which ensures the safety and quality. The utility model has the advantages of reasonable design, light weight, heavy load, high intensity, less investment and high efficacy.

Description

The jig of loading and unloading I-beam section
Technical field
The utility model belongs to the harbour handling steel tools, particularly relates to a kind of jig of loading and unloading I-beam section of the single or I-beam section of in bundling.
Background technology
In recent years, along with the increase year by year of China's steel output, the I-beam section that exports by the harbour also increased gradually.Because I-beam section kind, specification is numerous and diverse, cause great difficulty for the harbour handling operation, accident takes place again and again in loading and unloading.Particularly in traditional handling technology mode, after the use wire rope sling hangs head, re-use the mode of operation that wire rope sling carries out the lashing lifting, not only cause a large amount of damages of wire rope sling to scrap, and operation is long non-cutting time, and operating efficiency is low, and the hoisting crane fuel oil consumption is big.
Summary of the invention
For solving an above-mentioned production difficult problem, the purpose of this utility model provides a kind of jig that loads and unloads I-beam section, is beneficial to improve handling efficiency, guarantees job safety, guarantees the loading and unloading quality.
The technical scheme that the utility model adopted provides a kind of jig that loads and unloads I-beam section, wherein: this jig includes dop and presses tongue, described dop is by two identical shaped component set-ups like " C " font, and be provided with the connection gusset between two parts and make it to form one, described dop two upper parts of components have concentric through hole, the camber parts that described pressure tongue is an approximate tongue shape, press the top of tongue to be provided with circular hole and joining shackle and steel wire cable, press the bottom of tongue to be provided with pressing plate, press the middle part of tongue to be provided with through hole, press tongue can be rotatably fixed between two parts of dop with connecting the through hole that bearing pin passes the through hole on described dop top and presses the tongue middle part, making.
Effect of the present utility model be this jig project organization rationally, from heavy and light, load is big, intensity is high, small investment, instant effect.Use simple to operately, goods lifting is steadily, and is safe and reliable, avoided the quality accident in the loading and unloading operation, compares former loading and unloading technology mode, has following characteristics:
1. reduce goods in the operation and hang head and lashing process, saved production time, improve nearly 2 times of operating efficiency.
2. reduce operating worker labour intensity more than 50%.
3. reduce operating personnel's quantity (every lines reduces workman 2-3 name)
4. save steel rope and hoist cable processing charges in a large number.
5. guarantee operating personnel's safety and cargo handing quality.
Description of drawings
Fig. 1 is the integral structure scheme drawing of I-beam section special mould clamp;
Fig. 2 is I-beam section special mould clamp lifting 1 a bundle I-beam section situation scheme drawing;
Fig. 3 is the many bundles of an I-beam section special mould clamp lifting I-beam section situation scheme drawing.
Among the figure:
1, shackle 2, pressure tongue
3, connect bearing pin 4, dop
5, pressing plate
The specific embodiment
Reaching embodiment in conjunction with the accompanying drawings is illustrated the jig structure of loading and unloading I-beam section of the present utility model.
The jig structure of loading and unloading I-beam section of the present utility model is that this jig includes dop 4 and presses tongue 2, described dop 4 is by two identical shaped component set-ups like " C " font, and be provided with the connection gusset between two parts and make it to form one, 4 liang of upper parts of components of described dop have concentric through hole, the camber parts that described pressure tongue 2 is approximate tongue shapes, press the top of tongue 2 to be provided with circular hole and joining shackle 1 and steel wire cable, press the bottom of tongue 2 to be provided with pressing plate 5, press the middle part of tongue 2 to be provided with through hole, press tongue 2 can be rotatably fixed between two parts of dop 4 with connecting the through hole that bearing pin 3 passes the through hole on described dop 4 tops and presses tongue 2 middle parts, making.
The jig of loading and unloading I-beam section of the present utility model all adopts the 16Mn steel plate of low-alloy high-strength material to make, and this jig is mainly made shape by band matrix channel-section steel and pressed tongue 2 and be connected pivot pin 3 three part-structure spares like dop 4, the camber of the parts of " C " font and assembly.2 tons of every dop safety loads, about 5Kg conducts oneself with dignity.During operation, can be according to the packaged form and the single-piece weight of I-beam section, per 2 dops are one group, can lift by crane single weight below 4 tons or one group of the I-beam section in bundled, and also can organize lifting according to crane load more.
The jig of this loading and unloading I-beam section is when operation, and operating worker can be determined the jig usage quantity of these loading and unloading I-beam section according to the single-piece weight of every of I-beam section or every bundle.Each lifting quantity is no more than 3 or 3 bundle I-beam sections at most.The jig of this loading and unloading I-beam section is applicable to loading and unloading vehicle, heap de-stacking and the loading and unloading shipping work process of all size I-beam section goods class.
This jig is when operation, should earlier jig be hung on the crane hook by shackle 1 bonded assembly wire rope sling, after commander's crane driver rises and is raised to certain altitude, the dop 4 that will load and unload the jig of I-beam section again is stuck in the center of I-beam section end face by putting in order, can command lifting, the pressing plate 5 of this jig is pressed on the surface of I-beam section naturally during lifting.Utilize the centripetal force of steel rope lifting angle and the lever pressure that camber is pressed tongue 2, whole or every bundle I-beam section are sling.When taking jig, only need this jig is removed successively, promptly finish handling process one time.

Claims (1)

1, a kind of jig that loads and unloads I-beam section, it is characterized in that: this jig includes dop (4) and presses tongue (2), described dop (4) is by two identical shaped component set-ups like " C " font, and be provided with the connection gusset between two parts and make it to form one, two parts tops of described dop (4) have concentric through hole, described pressure tongue (2) is the camber parts of an approximate tongue shape, press the top of tongue (2) to be provided with circular hole and to connect steel wire cable by shackle (1), press the bottom of tongue (2) to be provided with pressing plate (5), press the middle part of tongue (2) to be provided with through hole, to connect the through hole that bearing pin (3) passes the through hole on described dop (4) top and presses tongue (2) middle part, and make and press tongue (2) can be rotatably fixed between two parts of dop (4).
CN 200620027618 2006-10-16 2006-10-16 Clamp apparatus for handling H-bar Expired - Fee Related CN200967705Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620027618 CN200967705Y (en) 2006-10-16 2006-10-16 Clamp apparatus for handling H-bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620027618 CN200967705Y (en) 2006-10-16 2006-10-16 Clamp apparatus for handling H-bar

Publications (1)

Publication Number Publication Date
CN200967705Y true CN200967705Y (en) 2007-10-31

Family

ID=38967273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620027618 Expired - Fee Related CN200967705Y (en) 2006-10-16 2006-10-16 Clamp apparatus for handling H-bar

Country Status (1)

Country Link
CN (1) CN200967705Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862594A (en) * 2015-01-20 2016-08-17 任丘市永基建筑安装工程有限公司 Hoisting technique of steel arch bridge member
CN106081862A (en) * 2016-08-10 2016-11-09 连云港艾可新型建材有限公司 A kind of special hanger for concrete tubular pile lifting
KR20180095264A (en) * 2017-02-17 2018-08-27 최종선 Reinforced block moving apparatus

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862594A (en) * 2015-01-20 2016-08-17 任丘市永基建筑安装工程有限公司 Hoisting technique of steel arch bridge member
CN106081862A (en) * 2016-08-10 2016-11-09 连云港艾可新型建材有限公司 A kind of special hanger for concrete tubular pile lifting
KR20180095264A (en) * 2017-02-17 2018-08-27 최종선 Reinforced block moving apparatus
KR102130740B1 (en) * 2017-02-17 2020-07-06 최종선 Reinforced block moving apparatus

Similar Documents

Publication Publication Date Title
CN2851215Y (en) Dedicated sling for bulk steel pipe with anti-loose clamp
CN201240756Y (en) Special sling for loading and unloading sheet billet
CN201458522U (en) Double-layer special clamping tool for bundling I irons
CN202321966U (en) Special lifting appliance for multi-lifting-point high wire coil rod
CN107934750A (en) Steel plate hoist
CN201458659U (en) Quick change fixture device with forklift and for transporting blocky whole stack type objects
CN200967705Y (en) Clamp apparatus for handling H-bar
CN2855988Y (en) Special hook block of trail beam type heavy lorry
CN200967703Y (en) Chain binding rigging
CN201901515U (en) Special lifting device for ship cabin cleaning machinery
CN206810994U (en) Diel erecting device
CN201077715Y (en) Container lifting base angle lockhole sling with localization
CN201077714Y (en) Container lifting base angle lockhole special slings
CN202022652U (en) Device capable of fast lifting oil tanks in group
CN201151607Y (en) Clamper for handling shell ring structural member
CN203128025U (en) Special hanger for loading and unloading work of glass packed in box
CN200961084Y (en) Square steel loading and unloading gripping apparatus
CN105712200A (en) Lifting hook pulley with function of rapidly regulating rope reeling rate
CN202848844U (en) Rapid assembling and disassembling tool for oil barrel
CN2825567Y (en) Clamp for vertical lifting of coiled plate
CN201254425Y (en) Binding type I steel composite hanging fixture
CN201236104Y (en) Special slings for loading and unloading heavy steel tube
CN2851216Y (en) Back-press type anti-falling steel plate sling clamp
CN200949006Y (en) Square steel loading and unloading sling
CN2723407Y (en) Hoist special for 8 ton aluminium ingot

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20071031

Termination date: 20141016

EXPY Termination of patent right or utility model