CN200955124Y - Novel railway bridging machine - Google Patents

Novel railway bridging machine Download PDF

Info

Publication number
CN200955124Y
CN200955124Y CN 200620130127 CN200620130127U CN200955124Y CN 200955124 Y CN200955124 Y CN 200955124Y CN 200620130127 CN200620130127 CN 200620130127 CN 200620130127 U CN200620130127 U CN 200620130127U CN 200955124 Y CN200955124 Y CN 200955124Y
Authority
CN
China
Prior art keywords
girder
main longitudinal
supporting leg
main girder
lower edge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620130127
Other languages
Chinese (zh)
Inventor
宋鹏伟
吴贵臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU HUAZHONG CONSTRUCTION MACHINERY CO Ltd
Original Assignee
ZHENGZHOU HUAZHONG CONSTRUCTION MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU HUAZHONG CONSTRUCTION MACHINERY CO Ltd filed Critical ZHENGZHOU HUAZHONG CONSTRUCTION MACHINERY CO Ltd
Priority to CN 200620130127 priority Critical patent/CN200955124Y/en
Application granted granted Critical
Publication of CN200955124Y publication Critical patent/CN200955124Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a new railway bridge girder erecting machine, comprising a main girder, a hydraulic system and an electric control system, wherein the front and back side of the main girder are provided with front and back outrigger; the main girder is provided with slingingcrown block; the side of the main girder is honeycomb structure and its center is provided with middle outrigger; the middle outrigger is arranged at the bottom of the main girder through pulley card; the bottom of the main girder is provided with an auxiliary carriage; the front and back outriggers are provided with an expansion cylinder respectively at the bottom of them. According to the technical scheme of the utility model, it has the advantages of that: the side of the main girder is honeycomb structure, making it portable, low in deflection and high in rigidity; main longitudinal girder is composed of a plurality of separate ganglion girders wherein the ganglion girders are connected with each other by pintles, making assembling rapid and the main girder firm and reliable; the side surface of the main longitudinal girder is isosceles triangle, the center of gravity is low, no counterbalance is needed when doing vias, thereby making it safe and reliable.

Description

New Erecting Bridge Machine of Railway
Technical field
The utility model relates to a kind of New Erecting Bridge Machine of Railway.
Background technology
But traditional railway bridge formation machine is mainly by the lifting overhead traveling crane of the girder of trussed construction and configuration vertical shift above it and be fixed on supporting leg in the front leg strut that moves forward and backward under the nose girder, the O type and the rear support leg that can upwards turn down etc. is partly formed, and girder length can not be striden 2.5 times of pier less than two.Need big cantilever via hole during this bridge formation machine operation, the longitudinal stability of bridge machine is relatively poor.In order to overcome the defective of this bridge formation machine, the user who has increases counterweight toward the bridge formation drive end unit when the via hole operation, makes the bridge formation machine too heavy, and the cost height uses inconvenient.
Summary of the invention
The purpose of this utility model provides a kind of light and use reliable and stable New Erecting Bridge Machine of Railway.
For achieving the above object, the utility model adopts following technical scheme: a kind of New Erecting Bridge Machine of Railway, comprise girder and hydraulic system and electrical control system, subordinate side, girder front and back end is provided with front leg strut and rear support leg, and girder is provided with the lifting overhead traveling crane, and the side of described girder is a honeycomb structure, its middle part is provided with middle supporting leg, supporting leg is installed on the girder lower edge by pulley in described, and the girder lower edge also is provided with accessory cart, and described front leg strut and rear support leg bottom are equipped with telescopic oil cylinder.
In order to reduce the equipment center of gravity, assembly unit is quick, described girder by about two main longitudinal griders form, be provided with middle joist between two main longitudinal griders, every main longitudinal grider independently saves beam separately by more piece to be formed, and connects with pin between the joint beam, the main longitudinal grider end face is the isoceles triangle shape, and described lifting overhead traveling crane has two.
Supporting leg is installed on the pulley of main longitudinal grider lower edge, the left and right sides and is equipped with drive motors in described, and drive motors all is arranged on the supporting leg crossbeam.
The length of described girder is 2.05~2.2 times of span of setting a roof beam in place, carriage and tail-bracket during the middle part of girder lower edge and rear end are provided with, and described accessory cart has two, in being installed in respectively on carriage and the tail-bracket.
Adopt technical scheme described in the utility model because the side of girder is a honeycomb structure, have light and amount of deflection little, the characteristics that rigidity is big.Main longitudinal grider independently saves beam separately by more piece to be formed, and connects with pin between the joint beam, and assembly unit is quick, and is solid and reliable.The main longitudinal grider end face adopts the isoceles triangle shape, and center of gravity is low, and via hole do not need to add counterweight, and is safe and reliable.
Description of drawings
Figure 1 shows that the utility model structural representation;
Figure 2 shows that the front leg strut left side among Fig. 1 looks enlarged drawing;
Figure 3 shows that the middle supporting leg left side among Fig. 1 looks enlarged drawing;
Figure 4 shows that the rear support leg left side among Fig. 1 looks enlarged drawing (the bale handle state of setting a roof beam in place);
Figure 5 shows that the view that the utility model via hole is preceding;
The view of operation 1 when Figure 6 shows that the utility model via hole;
The view of operation 2 when Figure 7 shows that the utility model via hole;
The view of operation 3 when Figure 8 shows that the utility model via hole;
Figure 9 shows that the view after the utility model via hole finishes;
Figure 10 shows that the set a roof beam in place view of operation 1 of the utility model;
Figure 11 shows that the set a roof beam in place view of operation 2 of the utility model;
Figure 12 shows that the set a roof beam in place view of operation 3 of the utility model;
Figure 13 shows that the set a roof beam in place view of operation 4 of the utility model.
The specific embodiment
Shown in Fig. 1,2,3,4, the utility model comprises girder and hydraulic system and electrical control system, and girder is made up of left main longitudinal grider 13 ' and right main longitudinal grider 13, is provided with middle joist 14 between two main longitudinal griders 13 ', 13, middle joist 14 has two, and a lifting overhead traveling crane 2,5 is installed respectively on it.Every main longitudinal grider independently saves beam 3 separately by seven joints to be formed, and connects with pin 4 between the joint beam 3, and carriage 7 and tail-bracket 10 during the middle part of girder lower edge and rear end are provided with are installed accessory cart 8,11 respectively on middle carriage 7 and tail-bracket 10.The length overall of main longitudinal grider is slightly larger than the twice of the span of setting a roof beam in place, and the part that the rear portion grows is enough installed accessory cart 11 and got final product, and generally gets 2.1 times.Main longitudinal grider 13 ', 13 end face are the isoceles triangle shape, the side is a honeycomb structure, subordinate side, girder front and back end is provided with front leg strut 1 and rear support leg 9, supporting leg 6 during the middle part is provided with, middle supporting leg 6 is installed on the girder lower edge by pulley, be equipped with drive motors 15 on the pulley, drive motors 15 all is arranged on the supporting leg crossbeam 16.The bottom of front leg strut 1 and rear support leg 9 is respectively equipped with telescopic oil cylinder 19,20.
In the view before the utility model via hole shown in Figure 5, middle carriage 7 and tail-bracket 10 are installed to the girder lower edge, place respectively near supporting leg 6 and the rear support leg 9.As shown in Figure 6, telescopic oil cylinder 19 jackings of HYDRAULIC CONTROL SYSTEM front leg strut 1 bottom, supporting leg 6 is unsettled in making, near supporting leg 6 moved forward to front leg strut 1 along the girder lower edge during electrical control system startup drive motors 15 drove, 700mm place, center to center distance bridge pier center, telescopic oil cylinder 19 retractions of front leg strut 1 bottom, the crossbeam 16 of supporting leg 6 is fallen on the beam 12 that frame is good in making.As shown in Figure 7, the telescopic oil cylinder 19,20 of the bottom of front leg strut 1 and rear support leg 9 bounces back simultaneously and mentions, and lifting overhead traveling crane 2,5 walks to bridge machine end, starts drive motors 15, accessory cart 8,11 drive complete machine reach via holes.As shown in Figure 8, when bridge formation machine front leg strut 1 was crossed the 600mm place, center of the place ahead bridge pier 18, the bridge machine stopped, and front leg strut 1, middle supporting leg 6 and rear support leg 9 all fall to bridge pier 18, put on safety pin.As shown in Figure 9, bridge machine via hole finishes, carriage 7 and tail-bracket 10 in removing, and Beam transportation vehicle is left.During moving forward to, lifting overhead traveling crane 2 near the supporting leg 6, prepares hanging beam.
As shown in figure 10, remove rear support leg and partly get in touch framework, Beam transportation vehicle carries beam 12 and sails bridge machine inside into.As shown in figure 11, Beam transportation vehicle is exercised to the distance supporting leg 6 about 1 meter and is stopped the bundle beam.As shown in figure 12, lifting overhead traveling crane 2,5 to bridge machine feeding beam end two suspension centres of slinging are respectively taken beam 12 and are moved forward to the end of setting a roof beam in place, and Beam transportation vehicle withdraws from.As shown in figure 13, the contraposition beam that falls, setting a roof beam in place finishes.

Claims (4)

1, a kind of New Erecting Bridge Machine of Railway, comprise girder and hydraulic system and electrical control system, subordinate side, girder front and back end is provided with front leg strut and rear support leg, girder is provided with the lifting overhead traveling crane, it is characterized in that: the side of described girder is a honeycomb structure, and its middle part is provided with middle supporting leg, and described middle supporting leg is installed on the girder lower edge by pulley, the girder lower edge also is provided with accessory cart, and described front leg strut and rear support leg bottom are equipped with telescopic oil cylinder.
2, New Erecting Bridge Machine of Railway as claimed in claim 1, it is characterized in that: described girder by about two main longitudinal griders form, be provided with middle joist between two main longitudinal griders, every main longitudinal grider independently saves beam separately by more piece and forms, connect with pin between the joint beam, the main longitudinal grider end face is the isoceles triangle shape, and described lifting overhead traveling crane has two.
3, New Erecting Bridge Machine of Railway as claimed in claim 2 is characterized in that: supporting leg is installed on the pulley of main longitudinal grider lower edge, the left and right sides and is equipped with drive motors in described, and drive motors all is arranged on the supporting leg crossbeam.
4, as claim 1 or 2 or 3 described New Erecting Bridge Machine of Railway, it is characterized in that: the length of described girder is 2.05~2.2 times of span of setting a roof beam in place, carriage and tail-bracket during the middle part of girder lower edge and rear end are provided with, described accessory cart has two, is installed in respectively on middle carriage and the tail-bracket.
CN 200620130127 2006-10-18 2006-10-18 Novel railway bridging machine Expired - Fee Related CN200955124Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620130127 CN200955124Y (en) 2006-10-18 2006-10-18 Novel railway bridging machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620130127 CN200955124Y (en) 2006-10-18 2006-10-18 Novel railway bridging machine

Publications (1)

Publication Number Publication Date
CN200955124Y true CN200955124Y (en) 2007-10-03

Family

ID=38773707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620130127 Expired - Fee Related CN200955124Y (en) 2006-10-18 2006-10-18 Novel railway bridging machine

Country Status (1)

Country Link
CN (1) CN200955124Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101942811A (en) * 2010-10-22 2011-01-12 中铁六局集团有限公司 Auxiliary travel device for bridge girder erection machine
CN101581073B (en) * 2008-07-10 2011-08-17 中铁大桥局股份有限公司 Downlink movable mould frame and walking method thereof
CN104894979A (en) * 2015-06-02 2015-09-09 中铁二十三局集团有限公司 Side-fed bridge girder erection machine and girder erection method thereof
US10214395B2 (en) 2017-07-12 2019-02-26 Da Pan Gantry assembly and a system for replacing single or double railway bridges
CN110607754A (en) * 2019-09-30 2019-12-24 合肥正浩机械科技有限公司 Method for reducing winding degree of main girder during hole crossing of single-girder descending type bridge girder erection machine

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101581073B (en) * 2008-07-10 2011-08-17 中铁大桥局股份有限公司 Downlink movable mould frame and walking method thereof
CN101942811A (en) * 2010-10-22 2011-01-12 中铁六局集团有限公司 Auxiliary travel device for bridge girder erection machine
CN104894979A (en) * 2015-06-02 2015-09-09 中铁二十三局集团有限公司 Side-fed bridge girder erection machine and girder erection method thereof
US10214395B2 (en) 2017-07-12 2019-02-26 Da Pan Gantry assembly and a system for replacing single or double railway bridges
CN110607754A (en) * 2019-09-30 2019-12-24 合肥正浩机械科技有限公司 Method for reducing winding degree of main girder during hole crossing of single-girder descending type bridge girder erection machine

Similar Documents

Publication Publication Date Title
CN200955124Y (en) Novel railway bridging machine
CN1880580A (en) Bridging method by cooperation of temporary bridge and bridge girder erection machine at tunnel exit
CN1737267A (en) Walking type box beam bridge formation machine
CN202298476U (en) Bridge variable cross-section box girder surface operation trolley
CN2871633Y (en) Walk cased beamed bridge erecting apparatus
CN102094394A (en) Through-tunnel lower pilot girder type non-moving lifting bridge girder erection machine
CN201567164U (en) Large-span self-propelled tower crane
CN209873592U (en) Lifting type movable auxiliary tool for installing variable-section cantilever on steel box girder
CN101920913B (en) Self-propelled wide-span tower crane
CN2333687Y (en) Climbing mechanism for internal climbing tower crane
CN203007831U (en) Bridge maintenance vehicle
CN213951981U (en) Basket is hung with safe type to bridge construction
CN211947971U (en) Standardized multi-functional operation platform truck of bridge anticollision wall
CN203684097U (en) Mountain overhead tower-attached cantilever type beam-lifting purlin-hoisting system
CN2507903Y (en) Front and back self-telescopic guide beam bridge girder erection machine
CN203474321U (en) Tower crane used for constructing and erecting electric transmission line iron towers
CN202730646U (en) Bridge maintenance car with articulated type hanging bracket and capable of avoiding bridge-side barriers
CN202465115U (en) Double main beam gantry crane
CN101774516A (en) Lifting device and construction method for replacing rake crane bridge
CN2213199Y (en) Cantilever shuttering support
CN217266954U (en) Sliding type three-dimensional rigid frame for mounting and stabilizing corrugated steel web
CN216587576U (en) Truss overhauls platform
CN217839706U (en) Steel truss girder stiffening chord member connecting operation platform
CN213625273U (en) Hanging basket for hoisting corrugated steel web continuous rigid frame bridge
CN209635842U (en) A kind of crane support frame easy to repair

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20071003

Termination date: 20151018

EXPY Termination of patent right or utility model