CN200949707Y - Underwater dry-type maintaining chamber - Google Patents
Underwater dry-type maintaining chamber Download PDFInfo
- Publication number
- CN200949707Y CN200949707Y CN 200620010523 CN200620010523U CN200949707Y CN 200949707 Y CN200949707 Y CN 200949707Y CN 200620010523 CN200620010523 CN 200620010523 CN 200620010523 U CN200620010523 U CN 200620010523U CN 200949707 Y CN200949707 Y CN 200949707Y
- Authority
- CN
- China
- Prior art keywords
- maintenance
- cabin
- underwater
- cable
- submersible
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model relates to an improvement of an underwater pipeline and a cable maintenance device with a aim to offer a underwater working type maintenance working cabin for the maintenance spot of the underwater pipeline and the cable. The maintenance working cabin is a thin wall cylinder shape structure without the top and bottom through the connection of three lifting oil cylinder and a submersible. The maintenance working cabin is a sealing pressure cabin, and according to the different water depth, the inner presser of the cabin can be changed. The utility model includes the maintenance working cabin, a lifting oil cylinder, a jetting impact, an aspiration system and the sealing device. The underwater working type maintenance working cabin is characterized in that: 1. the utility model can be installed with the submersible with the self-navigation capacity without the cooperation of the water surface working boat to independently work for the maintenance work of the underwater pipeline and cable; 2. The special water altering technology and the cooperation of the lifting oil cylinder can makes the maintenance working cabin deserted to the deep sea, and can do the maintenance work of the pipeline and cable embedding under a mud surface, which solves the difficult problem of the submarine pipeline and cable of offshore oilfield in our nation.
Description
Technical field
The utility model belongs to underwater line, cable maintenance apparatus.
Background technique
At present external offshore oilfield mostly is enclosed sea territory or big lake greatly, foundation of sea floor is all more solid, and general pipeline all adopts gravity prefabricated, and pipeline is directly put into seabed, not pre-buried.Therefore utilize the submarine diving car abroad usually,, adopt technology such as leakage field to visit in managing and leak by the radar fix system, as finding the pipeline breakage, or whole section replacing, or adopt buoyancy tank to sink to the seabed, and water in the buoyancy tank is got rid of, personnel enter to carry out the pipeline repairing work.Said method all needs cooperatively interacting of water craft and submersible.And at present underwater line, the cable in oil field, China shallow sea adopt filling-up method to lay usually, and buried depth is all more than 1m, and the sea situation complexity, and ocean current washes away, excavate, to empty phenomenon serious.Adopt above-mentioned external method to carry out pipeline, cable maintenance operation, economically with construction effect on not very good.
Summary of the invention
The purpose of this utility model is that the maintenance sites for underwater line, cable provides a kind of underwater dry-type repairing work cabin.By vertical, level spray flushing system, suction system water-bed silt is sprayed and to dash suction, expose and just can carry out maintain and replace after being embedded in the following underwater line of mud face, cable.
Underwater dry-type repairing work cabin is processed into the cylinder type of upper and lower end open type, direction has two rectangular apertures in the edge, bottom, workover module is installed in the diving body, the upper end is evenly equipped with 3 hydraulic lifting oil cylinders and is connected with the upper deck of submersible, between workover module and the submersible seal arrangement is housed.Vertical spray is installed towards the spray of house steward and level towards house steward and be connected respectively to the vertical spray flushing device and the level spray flushing device of workover module bottom in workover module.Suction pump is housed in submersible, is connected to the aspiration line in the workover module.In the workover module upper side locking device is housed.
Good effect of the present utility model is that it can be installed on the submersible with the ability of navigating certainly, and the cooperation that need not the water-surface working boat oceangoing ship can be carried out the maintenance operation of underwater line, cable independently.More outstanding advantage is, can insert below the water-bed mud face by its unique water replacement technique workover module, and anhydrous working space of band pressure of silt formation is dashed, aspirates out in spray, thereby can carry out maintenance operation to underwater line, the cable of imbedding below the mud face, be applicable to the production status of China's offshore oilfield more.
Description of drawings
Fig. 1 underwater dry-type repairing work cabin schematic representation
1, hoist cylinder 2, vertical spray are sprayed towards house steward towards house steward 3, level
4, level spray flushing device 5, vertically spray flushing device 6, workover module
7, seal arrangement 8, aspiration line 9, submersible
10, positioning device
Embodiment
Now the utility model will be further described in conjunction with Figure of description 1:
1, workover module heavy cabin operation:
After the submersible 9 that underwater dry-type repairing work cabin is housed being reached the predetermined work position and sitting location, the end, begin heavy cabin operation.At first opening positioning device 10 makes workover module be in free state, open vertical spray in the submersible 9 again towards pump, high-pressure water flow dashes through vertically spraying vertically to spray to vertical spray flushing device 5 towards house steward 2, after treating 6 times slotting certain depths of workover module, the level of opening again in the submersible 9 is sprayed towards pump and suction pump, high-pressure water flow sprays flushing device 4 through the level spray towards house steward 3 to level, make the silt of work chamber bottom form the mud eddy flow, and by outside the suction piping 8 discharge work chambers 6.Inflation in seal arrangement 7 simultaneously, annular seal space.Along with the mud that has been stirred is drawn out of out of my cabin, under the cooperation of the hoist cylinder 1 at workover module top, workover module 6 sinks gradually.After treating down to be inserted into predetermined depth, close vertical, level and spray towards pump, injecting compressed air makes cabin external and internal pressure maintenance balance in workover module 6.After treating that suction pump pumps the water in the workover module, just formed a band and pressed anhydrous working space.The operating personnel just can enter maintenance lock behind the decompression chamber petroleum pipeline or cable are carried out maintenance operation by adding.
2, work chamber rises the cabin operation:
After maintenance operation was finished, workover module was withdrawn the scene.At first the operating personnel discharges the pressurized air in the seal arrangement 7 by adding decompression chamber decompression recession from workover module.Open hydraulic system then, workover module 6 be promoted to operational configuration by hoist cylinder 1, last locking and positioning device 10 with workover module 6 positioning and lockings after, the submersible floating is left the job site.
Claims (4)
1, underwater dry-type repairing work cabin, comprise workover module (6), hoist cylinder (1) and vertical spray are towards house steward (2), the level spray is towards house steward (3), level spray flushing device (4), vertical spray flushing device (5) and aspiration line (8) is characterized in that workover module (6) is processed into, the cylinder type of lower end open type, direction has two rectangular apertures in the edge, bottom, workover module (6) is installed in submersible (9) body, the upper end is evenly equipped with 3 hydraulic lifting oil cylinders (1) and is connected with the upper deck of submersible (9), between workover module (6) and the submersible (9) seal arrangement (7) is housed.
2, underwater dry-type repairing work cabin according to claim 1 is characterized in: in workover module (6), be equipped with vertical spray towards the spray of house steward (2) and level towards house steward (3) and the vertical spray flushing device (5) and the level that are connected respectively to workover module (6) bottom spray flushing device (4).
3, underwater dry-type repairing work cabin according to claim 1 is characterized in: in submersible (9) suction pump is housed, is connected to the aspiration line (8) in the workover module (6).
4, underwater dry-type repairing work cabin according to claim 1 is characterized in: in workover module (6) upper side locking device (10) is housed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620010523 CN200949707Y (en) | 2006-09-27 | 2006-09-27 | Underwater dry-type maintaining chamber |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620010523 CN200949707Y (en) | 2006-09-27 | 2006-09-27 | Underwater dry-type maintaining chamber |
Publications (1)
Publication Number | Publication Date |
---|---|
CN200949707Y true CN200949707Y (en) | 2007-09-19 |
Family
ID=38892251
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200620010523 Expired - Fee Related CN200949707Y (en) | 2006-09-27 | 2006-09-27 | Underwater dry-type maintaining chamber |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN200949707Y (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1877181B (en) * | 2006-06-01 | 2010-05-12 | 中国石化集团胜利石油管理局钻井工艺研究院 | Underwater dry-type repairing work cabin |
WO2012130273A1 (en) | 2011-03-25 | 2012-10-04 | Statoil Petroleum As | Subsea cable repair |
CN104006216A (en) * | 2013-02-27 | 2014-08-27 | 中国海洋石油总公司 | Offshore platform crude oil riser maintenance and replacement method and device |
CN104876158A (en) * | 2014-02-28 | 2015-09-02 | 上海核工程研究设计院 | System for remote precision delivery from water surface to underwater positions |
CN105552821A (en) * | 2016-03-09 | 2016-05-04 | 青岛海澄知识产权事务有限公司 | Water proofing type underwater cable connecting method |
-
2006
- 2006-09-27 CN CN 200620010523 patent/CN200949707Y/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1877181B (en) * | 2006-06-01 | 2010-05-12 | 中国石化集团胜利石油管理局钻井工艺研究院 | Underwater dry-type repairing work cabin |
WO2012130273A1 (en) | 2011-03-25 | 2012-10-04 | Statoil Petroleum As | Subsea cable repair |
US9166386B2 (en) | 2011-03-25 | 2015-10-20 | Statoil Petroleum As | Subsea cable repair |
CN104006216A (en) * | 2013-02-27 | 2014-08-27 | 中国海洋石油总公司 | Offshore platform crude oil riser maintenance and replacement method and device |
CN104006216B (en) * | 2013-02-27 | 2016-04-13 | 中国海洋石油总公司 | A kind of crude oil of offshore platform standpipe maintain and replace method and apparatus |
CN104876158A (en) * | 2014-02-28 | 2015-09-02 | 上海核工程研究设计院 | System for remote precision delivery from water surface to underwater positions |
CN105552821A (en) * | 2016-03-09 | 2016-05-04 | 青岛海澄知识产权事务有限公司 | Water proofing type underwater cable connecting method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1877181B (en) | Underwater dry-type repairing work cabin | |
CN200949707Y (en) | Underwater dry-type maintaining chamber | |
CN107905238A (en) | A kind of soil plug pullout type suction anchor foundation and its construction method | |
CN2900987Y (en) | Under water dry maintenance working cabin | |
CN103806422A (en) | Seabed leaked oil collecting system | |
CN103452086A (en) | Mat-assisted driving movable platform | |
CN104002937A (en) | Offshore oilfield extending testing platform | |
CN104250969A (en) | Piling-assisting submersible production oil storage and discharge platform penetrating upper ship body and lower ship body | |
CN105003232B (en) | A kind of ultra-deep sea marine oil and gas dry type production system and its installation evacuation method | |
CN201615337U (en) | Submarine pipeline oil catcher | |
CN103374905B (en) | Movable self-installation platform | |
CN1613717A (en) | Floating transported and sucking cylindered anchor device and its operating method | |
CN203363521U (en) | Anti-oil spillage collecting cover for submarine pipeline | |
CN113070258B (en) | Pile-washing and seawater taking device | |
CN101684869B (en) | Gravity-type atmospheric dry chamber | |
CN101665181B (en) | Large-scale oil storage unit applicable to shallow sea area and installation and oil storage methods thereof | |
CN201678202U (en) | Cylindrical oil storing device placed in deep seabed | |
CN210315544U (en) | Bidirectional pile punching system | |
CN101648633B (en) | Oil storage device adapted for high pressure environment in the deep sea and installation method and oil storage method | |
CN113309059A (en) | Platform for offshore marginal oil field development | |
CN105604110B (en) | The seat beach of cutter suction dredger waits for construction method | |
CN201258730Y (en) | Under deep water oil storage and oil production device with dynamic positioning float bowl | |
CN202790907U (en) | High-pressure water jet and gas lift pipeline sinking machine tool | |
CN110805017A (en) | Movable offshore self-installation dry type operation environment construction device | |
CN215761499U (en) | Suction section of thick bamboo little waterline face type offshore drilling basis |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20070919 Termination date: 20100927 |