CN200949707Y - Underwater dry-type maintaining chamber - Google Patents

Underwater dry-type maintaining chamber Download PDF

Info

Publication number
CN200949707Y
CN200949707Y CN 200620010523 CN200620010523U CN200949707Y CN 200949707 Y CN200949707 Y CN 200949707Y CN 200620010523 CN200620010523 CN 200620010523 CN 200620010523 U CN200620010523 U CN 200620010523U CN 200949707 Y CN200949707 Y CN 200949707Y
Authority
CN
China
Prior art keywords
maintenance
cabin
underwater
cable
submersible
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620010523
Other languages
Chinese (zh)
Inventor
邬可谊
田海庆
韩益民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Drilling Technology Research Institute of Sinopec Shengli Petroleum Administration Bureau
Original Assignee
Drilling Technology Research Institute of Sinopec Shengli Petroleum Administration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Drilling Technology Research Institute of Sinopec Shengli Petroleum Administration Bureau filed Critical Drilling Technology Research Institute of Sinopec Shengli Petroleum Administration Bureau
Priority to CN 200620010523 priority Critical patent/CN200949707Y/en
Application granted granted Critical
Publication of CN200949707Y publication Critical patent/CN200949707Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to an improvement of an underwater pipeline and a cable maintenance device with a aim to offer a underwater working type maintenance working cabin for the maintenance spot of the underwater pipeline and the cable. The maintenance working cabin is a thin wall cylinder shape structure without the top and bottom through the connection of three lifting oil cylinder and a submersible. The maintenance working cabin is a sealing pressure cabin, and according to the different water depth, the inner presser of the cabin can be changed. The utility model includes the maintenance working cabin, a lifting oil cylinder, a jetting impact, an aspiration system and the sealing device. The underwater working type maintenance working cabin is characterized in that: 1. the utility model can be installed with the submersible with the self-navigation capacity without the cooperation of the water surface working boat to independently work for the maintenance work of the underwater pipeline and cable; 2. The special water altering technology and the cooperation of the lifting oil cylinder can makes the maintenance working cabin deserted to the deep sea, and can do the maintenance work of the pipeline and cable embedding under a mud surface, which solves the difficult problem of the submarine pipeline and cable of offshore oilfield in our nation.

Description

Underwater dry-type repairing work cabin
Technical field
The utility model belongs to underwater line, cable maintenance apparatus.
Background technique
At present external offshore oilfield mostly is enclosed sea territory or big lake greatly, foundation of sea floor is all more solid, and general pipeline all adopts gravity prefabricated, and pipeline is directly put into seabed, not pre-buried.Therefore utilize the submarine diving car abroad usually,, adopt technology such as leakage field to visit in managing and leak by the radar fix system, as finding the pipeline breakage, or whole section replacing, or adopt buoyancy tank to sink to the seabed, and water in the buoyancy tank is got rid of, personnel enter to carry out the pipeline repairing work.Said method all needs cooperatively interacting of water craft and submersible.And at present underwater line, the cable in oil field, China shallow sea adopt filling-up method to lay usually, and buried depth is all more than 1m, and the sea situation complexity, and ocean current washes away, excavate, to empty phenomenon serious.Adopt above-mentioned external method to carry out pipeline, cable maintenance operation, economically with construction effect on not very good.
Summary of the invention
The purpose of this utility model is that the maintenance sites for underwater line, cable provides a kind of underwater dry-type repairing work cabin.By vertical, level spray flushing system, suction system water-bed silt is sprayed and to dash suction, expose and just can carry out maintain and replace after being embedded in the following underwater line of mud face, cable.
Underwater dry-type repairing work cabin is processed into the cylinder type of upper and lower end open type, direction has two rectangular apertures in the edge, bottom, workover module is installed in the diving body, the upper end is evenly equipped with 3 hydraulic lifting oil cylinders and is connected with the upper deck of submersible, between workover module and the submersible seal arrangement is housed.Vertical spray is installed towards the spray of house steward and level towards house steward and be connected respectively to the vertical spray flushing device and the level spray flushing device of workover module bottom in workover module.Suction pump is housed in submersible, is connected to the aspiration line in the workover module.In the workover module upper side locking device is housed.
Good effect of the present utility model is that it can be installed on the submersible with the ability of navigating certainly, and the cooperation that need not the water-surface working boat oceangoing ship can be carried out the maintenance operation of underwater line, cable independently.More outstanding advantage is, can insert below the water-bed mud face by its unique water replacement technique workover module, and anhydrous working space of band pressure of silt formation is dashed, aspirates out in spray, thereby can carry out maintenance operation to underwater line, the cable of imbedding below the mud face, be applicable to the production status of China's offshore oilfield more.
Description of drawings
Fig. 1 underwater dry-type repairing work cabin schematic representation
1, hoist cylinder 2, vertical spray are sprayed towards house steward towards house steward 3, level
4, level spray flushing device 5, vertically spray flushing device 6, workover module
7, seal arrangement 8, aspiration line 9, submersible
10, positioning device
Embodiment
Now the utility model will be further described in conjunction with Figure of description 1:
1, workover module heavy cabin operation:
After the submersible 9 that underwater dry-type repairing work cabin is housed being reached the predetermined work position and sitting location, the end, begin heavy cabin operation.At first opening positioning device 10 makes workover module be in free state, open vertical spray in the submersible 9 again towards pump, high-pressure water flow dashes through vertically spraying vertically to spray to vertical spray flushing device 5 towards house steward 2, after treating 6 times slotting certain depths of workover module, the level of opening again in the submersible 9 is sprayed towards pump and suction pump, high-pressure water flow sprays flushing device 4 through the level spray towards house steward 3 to level, make the silt of work chamber bottom form the mud eddy flow, and by outside the suction piping 8 discharge work chambers 6.Inflation in seal arrangement 7 simultaneously, annular seal space.Along with the mud that has been stirred is drawn out of out of my cabin, under the cooperation of the hoist cylinder 1 at workover module top, workover module 6 sinks gradually.After treating down to be inserted into predetermined depth, close vertical, level and spray towards pump, injecting compressed air makes cabin external and internal pressure maintenance balance in workover module 6.After treating that suction pump pumps the water in the workover module, just formed a band and pressed anhydrous working space.The operating personnel just can enter maintenance lock behind the decompression chamber petroleum pipeline or cable are carried out maintenance operation by adding.
2, work chamber rises the cabin operation:
After maintenance operation was finished, workover module was withdrawn the scene.At first the operating personnel discharges the pressurized air in the seal arrangement 7 by adding decompression chamber decompression recession from workover module.Open hydraulic system then, workover module 6 be promoted to operational configuration by hoist cylinder 1, last locking and positioning device 10 with workover module 6 positioning and lockings after, the submersible floating is left the job site.

Claims (4)

1, underwater dry-type repairing work cabin, comprise workover module (6), hoist cylinder (1) and vertical spray are towards house steward (2), the level spray is towards house steward (3), level spray flushing device (4), vertical spray flushing device (5) and aspiration line (8) is characterized in that workover module (6) is processed into, the cylinder type of lower end open type, direction has two rectangular apertures in the edge, bottom, workover module (6) is installed in submersible (9) body, the upper end is evenly equipped with 3 hydraulic lifting oil cylinders (1) and is connected with the upper deck of submersible (9), between workover module (6) and the submersible (9) seal arrangement (7) is housed.
2, underwater dry-type repairing work cabin according to claim 1 is characterized in: in workover module (6), be equipped with vertical spray towards the spray of house steward (2) and level towards house steward (3) and the vertical spray flushing device (5) and the level that are connected respectively to workover module (6) bottom spray flushing device (4).
3, underwater dry-type repairing work cabin according to claim 1 is characterized in: in submersible (9) suction pump is housed, is connected to the aspiration line (8) in the workover module (6).
4, underwater dry-type repairing work cabin according to claim 1 is characterized in: in workover module (6) upper side locking device (10) is housed.
CN 200620010523 2006-09-27 2006-09-27 Underwater dry-type maintaining chamber Expired - Fee Related CN200949707Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620010523 CN200949707Y (en) 2006-09-27 2006-09-27 Underwater dry-type maintaining chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620010523 CN200949707Y (en) 2006-09-27 2006-09-27 Underwater dry-type maintaining chamber

Publications (1)

Publication Number Publication Date
CN200949707Y true CN200949707Y (en) 2007-09-19

Family

ID=38892251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620010523 Expired - Fee Related CN200949707Y (en) 2006-09-27 2006-09-27 Underwater dry-type maintaining chamber

Country Status (1)

Country Link
CN (1) CN200949707Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1877181B (en) * 2006-06-01 2010-05-12 中国石化集团胜利石油管理局钻井工艺研究院 Underwater dry-type repairing work cabin
WO2012130273A1 (en) 2011-03-25 2012-10-04 Statoil Petroleum As Subsea cable repair
CN104006216A (en) * 2013-02-27 2014-08-27 中国海洋石油总公司 Offshore platform crude oil riser maintenance and replacement method and device
CN104876158A (en) * 2014-02-28 2015-09-02 上海核工程研究设计院 System for remote precision delivery from water surface to underwater positions
CN105552821A (en) * 2016-03-09 2016-05-04 青岛海澄知识产权事务有限公司 Water proofing type underwater cable connecting method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1877181B (en) * 2006-06-01 2010-05-12 中国石化集团胜利石油管理局钻井工艺研究院 Underwater dry-type repairing work cabin
WO2012130273A1 (en) 2011-03-25 2012-10-04 Statoil Petroleum As Subsea cable repair
US9166386B2 (en) 2011-03-25 2015-10-20 Statoil Petroleum As Subsea cable repair
CN104006216A (en) * 2013-02-27 2014-08-27 中国海洋石油总公司 Offshore platform crude oil riser maintenance and replacement method and device
CN104006216B (en) * 2013-02-27 2016-04-13 中国海洋石油总公司 A kind of crude oil of offshore platform standpipe maintain and replace method and apparatus
CN104876158A (en) * 2014-02-28 2015-09-02 上海核工程研究设计院 System for remote precision delivery from water surface to underwater positions
CN105552821A (en) * 2016-03-09 2016-05-04 青岛海澄知识产权事务有限公司 Water proofing type underwater cable connecting method

Similar Documents

Publication Publication Date Title
CN1877181B (en) Underwater dry-type repairing work cabin
CN200949707Y (en) Underwater dry-type maintaining chamber
CN107905238A (en) A kind of soil plug pullout type suction anchor foundation and its construction method
CN2900987Y (en) Under water dry maintenance working cabin
CN103806422A (en) Seabed leaked oil collecting system
CN103452086A (en) Mat-assisted driving movable platform
CN104002937A (en) Offshore oilfield extending testing platform
CN104250969A (en) Piling-assisting submersible production oil storage and discharge platform penetrating upper ship body and lower ship body
CN105003232B (en) A kind of ultra-deep sea marine oil and gas dry type production system and its installation evacuation method
CN201615337U (en) Submarine pipeline oil catcher
CN103374905B (en) Movable self-installation platform
CN1613717A (en) Floating transported and sucking cylindered anchor device and its operating method
CN203363521U (en) Anti-oil spillage collecting cover for submarine pipeline
CN113070258B (en) Pile-washing and seawater taking device
CN101684869B (en) Gravity-type atmospheric dry chamber
CN101665181B (en) Large-scale oil storage unit applicable to shallow sea area and installation and oil storage methods thereof
CN201678202U (en) Cylindrical oil storing device placed in deep seabed
CN210315544U (en) Bidirectional pile punching system
CN101648633B (en) Oil storage device adapted for high pressure environment in the deep sea and installation method and oil storage method
CN113309059A (en) Platform for offshore marginal oil field development
CN105604110B (en) The seat beach of cutter suction dredger waits for construction method
CN201258730Y (en) Under deep water oil storage and oil production device with dynamic positioning float bowl
CN202790907U (en) High-pressure water jet and gas lift pipeline sinking machine tool
CN110805017A (en) Movable offshore self-installation dry type operation environment construction device
CN215761499U (en) Suction section of thick bamboo little waterline face type offshore drilling basis

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070919

Termination date: 20100927