CN200940245Y CN 200620122800 CN200620122800U CN200940245Y CN 200940245 Y CN200940245 Y CN 200940245Y CN 200620122800 CN200620122800 CN 200620122800 CN 200620122800 U CN200620122800 U CN 200620122800U CN 200940245 Y CN200940245 Y CN 200940245Y
Authority
CN
China
Prior art keywords
road
road surface
bedding
pipe support
stone filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620122800
Other languages
Chinese (zh)
Inventor
王志强
袁宏振
吴学才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN DAGANG OILFIELD GROUP ENGINEERING CONSTRUCTION Co Ltd
Dagang Oilfield Group Co Ltd
Original Assignee
TIANJIN DAGANG OILFIELD GROUP ENGINEERING CONSTRUCTION Co Ltd
Dagang Oilfield Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN DAGANG OILFIELD GROUP ENGINEERING CONSTRUCTION Co Ltd, Dagang Oilfield Group Co Ltd filed Critical TIANJIN DAGANG OILFIELD GROUP ENGINEERING CONSTRUCTION Co Ltd
Priority to CN 200620122800 priority Critical patent/CN200940245Y/en
Application granted granted Critical
Publication of CN200940245Y publication Critical patent/CN200940245Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

A unit construction case filling block stone road relates to a road used in construction of shallow sea, mudflat and reservoir. In order to overcome the shortcomings that the overall rigidity of road structure in the current shallow sea and mudflat roads is unfavorable, pipeline channels occupy road space, and pipeline maintenance is inconvenient, etc. The utility model comprises a bedding (30) and a road surface (20). In which, the bedding (30) includes a gauge pile (2), an upper tie beam (4), and a baffle (3), while the filling block stone road surface is provided with a wheel guard edge (6)and a sign post (8); moreover, the gauge piles (2) are vertical and paralleled, with the upper side connected through the upper tie beam (4), and the middle part connected through a lower tie beam (1); moreover, a baffle beam (5) is arranged between the bedding (30) and the road surface (20), and an overhanging beam extended outward along the wheel guard edges (6) on both sides of a concrete road (10) of the road surface (20) is a pipe support beam (7), on which a pipe frame (9) is fixed. The utility has such advantageous effects as rational case structure and high overall intensity, with pipelines laid on the externally overhanging pipe support beam, which is convenient for pipeline maintenance and construction.

Description

Assembling casing stone filling road
Technical field
The utility model relates to a kind of road that is used for shallow sea, beach, reservoir construction process, particularly relates to a kind of assembling casing stone filling road.
Background technology
At present permanent building is as advancing building of seaway road, man-made island in the water, and the method for employing is with in the entry under the assembly type cylinder caisson, after surfacing, increases and binds into sea-going road, and pipeline trench is set in the road lays various pipelines.Because marine ambient conditions is abominable, this road structure integral rigidity is relatively poor, and durability remains further to be improved; Because pipeline trench has captured path space, reduced the integral rigidity of road simultaneously,, influenced road during maintenance in case pipeline goes wrong.
The utility model content
The purpose of this utility model is in order to overcome in existing shallow sea, the beach road, and the road structure integral rigidity is relatively poor, and pipeline trench has captured path space, and pipeline maintenance is supported deficiencies such as inconvenience, and a kind of assembling casing stone filling road is provided.
In order to achieve the above object, assembling casing stone filling road of the present utility model, comprise bedding, road surface, bedding comprises guide pile, straining beam, baffle plate, stone filling, protect wheel bank and marker post on the road surface, guide pile is vertical and be parallel to each other, and the upper end is connected by last straining beam, and the middle part is by straining beam connection down; The retaining beam is arranged between bedding and the road surface; The concrete road on road surface protects the outer outrigger that extends outward of wheel bank along two ends be the pipe support beam, is fixed with pipe support above the pipe support beam.
The assembling casing stone filling road of realizing the utility model purpose can also be:
Assembling casing stone filling road comprises bedding, road surface, and bedding comprises guide pile, straining beam, baffle plate, stone filling, protects wheel bank and marker post on the road surface, and guide pile is vertical and be parallel to each other, and the upper end is connected by last straining beam, and the middle part is by straining beam connection down; The retaining beam is arranged between bedding and the road surface; The outer outrigger that last straining beam extends outward is the pipe support beam, is fixed with pipe support above the pipe support beam.
The beneficial effect of the utility model assembling casing stone filling road is: body structure is reasonable, and the bulk strength height is chosen outward on the pipe support beam and laid the line, and is convenient to the maintenance and the construction of pipeline.
Description of drawings
Fig. 1 is the utility model assembling casing stone filling road first embodiment sectional schematic diagram.
Fig. 2 is the utility model assembling casing stone filling road first embodiment side schematic view.
Fig. 3 is the utility model assembling casing stone filling road first embodiment vertical view.
Fig. 4 is the utility model assembling casing stone filling road second embodiment sectional schematic diagram.
Fig. 5 is the utility model assembling casing stone filling road second embodiment side schematic view.
Fig. 6 is the utility model assembling casing stone filling road second embodiment vertical view.
Among the figure: 1. descend straining beam, 2. guide pile, 3. baffle plate is 4. gone up straining beam, and 5. the retaining beam 6. protects the wheel bank, 7. pipe support beam, 8. marker post, 9. pipe support, 10. concrete road, 11. pipe support beams, 12. pipe supports, 13. filling piece stone, 14. filling piece stones, 15. locating holes, 16. pitched works, 20. road surfaces, 30. beddings.
The specific embodiment
With reference to Fig. 1, Fig. 2, Fig. 3.The utility model assembling casing stone filling road first embodiment, comprise bedding 30, road surface 20, bedding 30 comprises guide pile 2, straining beam, baffle plate 3, stone filling, protect wheel bank 6 and marker post 8 on the road surface 20, guide pile 2 is vertical and be parallel to each other, the upper end is connected by last straining beam 4, and the middle part is by straining beam 1 connection down; Retaining beam 5 is arranged between bedding 30 and the road surface 20; The concrete road 10 on road surface 20 protects the outer outrigger that extends outward of wheel bank 6 along two ends be pipe support beam 7, is fixed with pipe support 9 above the pipe support beam 7.There is the locating hole 15 of installing and locating stake 2 at the both ends of following straining beam 1, and locating hole 15 is reserved when prefabricated.Got rid of the beard muscle above the last straining beam 4, can be when building road surface 20 and road surface 20 monobloc casts.
With reference to Fig. 4, Fig. 5, Fig. 6.The utility model assembling casing stone filling road second embodiment, comprise bedding 30, road surface 20, bedding 30 comprises guide pile 2, straining beam, baffle plate 3, stone filling, protect wheel bank 6 and marker post 7 on the road surface 20, guide pile 2 is vertical and be parallel to each other, the upper end is connected by last straining beam 4, and the middle part is by straining beam 1 connection down; Retaining beam 5 is arranged between bedding 30 and the road surface 20; The outer outrigger that extend outward at last straining beam 4 two ends is a pipe support beam 11, is fixed with pipe support 12 above the pipe support beam 11.There is the locating hole 15 of installing and locating stake 2 at the both ends of following straining beam 1.Got rid of the beard muscle above the last straining beam 4, can be when building road surface 20 and road surface 20 monobloc casts.
Manufacturing process of the present utility model is, measures unwrapping wire earlier, determines the stake position, according to the stake site, straining beam 1 down is installed at first, and the locating hole 15 of guide pile 2 is left in following straining beam 1 end when prefabricated; Again guide pile 2 is inserted locating hole 15, the hypomere of guide pile 2 inserts in the seawater stratum; Baffle plate 3 is installed then, is inserted between the inside and outside wing plate of guide pile 2; Then install straining beam 4, form casing; In casing, throw stone filling 14, throw piece stone builder's road both sides pitched work 16 simultaneously.Behind casing Inner stiffener stone 13 approaching last straining beam 4 end faces, retaining beam 5 (got rid of the beard muscle above the retaining beam 5, be convenient to and road surface, top 20 monobloc casts) is installed.Retaining beam 5 installs, and begins to throw layer filling piece stone 14 and levelling.Install surface course and pipe support beam forms at last, get rid of with last straining beam 4 and retaining beam 5 that muscle is whole to be watered.Road surface 20 throws away when constructing and protects wheel bank 6, marker post 8 reinforcing bars, and partitioning slot should be in time cut on road surface 20.The partitioning slot cutting finishes, after reaching 75%, top course intensity installs to protect wheel bank 6, marker post 8 templates, and concreting, pipe support 9 or pipe support 12 are installed in maintenance on pipe support beam 7 or pipe support beam 11.
During construction, will descend straining beam 1, guide pile 2, baffle plate 3 in advance, go up straining beam 4, retaining beam 5 is pre-formed outside the venue, adopts the assembled on site mode to form casing, each member can calculate change member body weight according to field condition and lifting ability.
The baffle plate 3 of the utility model assembling casing stone filling road can be a solid slab, and in order to increase the water permeability of road, baffle plate 3 also can be a screen.Although the porous of this assembling casing stone filling road own when requiring to need in road aquaporin to be set, can cancel baffle plate 3 and pitched work 16 at channel position, is directly installed prefabricated bridge plate and can be realized more than the retaining beam.

Claims (8)

1. assembling casing stone filling road, comprise bedding, road surface, bedding comprises guide pile, straining beam, baffle plate, stone filling, protect wheel bank and marker post on the road surface, it is characterized in that: guide pile (2) is vertical and be parallel to each other, the upper end is connected by last straining beam (4), and the middle part is by straining beam (1) connection down; Between bedding (30) and road surface (20) retaining beam (5) is arranged; The concrete road (10) on road surface (20) protects the outer outrigger that extends outward of wheel bank (6) along two ends be pipe support beam (7), is fixed with pipe support (9) above the pipe support beam (7).
2. assembling casing stone filling road according to claim 1 is characterized in that: there is the locating hole (15) of installing and locating stake (2) at the described both ends of straining beam (1) down.
3. assembling casing stone filling road according to claim 2 is characterized in that: described going up on the straining beam (4) got rid of beard muscle and road surface (20) monobloc cast.
4. assembling casing stone filling road according to claim 3, it is characterized in that: described baffle plate (3) is a solid slab, also can be screen.
5. assembling casing stone filling road, comprise bedding, road surface, bedding comprises guide pile, straining beam, baffle plate, stone filling, protect wheel bank and marker post on the road surface, it is characterized in that: guide pile (2) is vertical and be parallel to each other, the upper end is connected by last straining beam (4), and the middle part is by straining beam (1) connection down; Between bedding (30) and road surface (20) retaining beam (5) is arranged; The outer outrigger that extend outward at last straining beam (4) two ends is pipe support beam (11), is fixed with pipe support (12) above the pipe support beam (11).
6. assembling casing stone filling road according to claim 5 is characterized in that: there is the locating hole (15) of installing and locating stake (2) at the described both ends of straining beam (1) down.
7. assembling casing stone filling road according to claim 6 is characterized in that: described going up on the straining beam (4) got rid of beard muscle and road surface (20) monobloc cast.
8. assembling casing stone filling road according to claim 7, it is characterized in that: described baffle plate (3) is a solid slab, also can be screen.
CN 200620122800 2006-07-28 2006-07-28 Road built by assembled casing filled with stone Expired - Lifetime CN200940245Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620122800 CN200940245Y (en) 2006-07-28 2006-07-28 Road built by assembled casing filled with stone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620122800 CN200940245Y (en) 2006-07-28 2006-07-28 Road built by assembled casing filled with stone

Publications (1)

Publication Number Publication Date
CN200940245Y true CN200940245Y (en) 2007-08-29

Family

ID=38746426

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620122800 Expired - Lifetime CN200940245Y (en) 2006-07-28 2006-07-28 Road built by assembled casing filled with stone

Country Status (1)

Country Link
CN (1) CN200940245Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306300A (en) * 2013-06-27 2013-09-18 陈振新 Assembled caisson for marine construction
CN106049365A (en) * 2016-05-23 2016-10-26 中交第航务工程局有限公司 Novel net tying ring construction technique
CN109371906A (en) * 2018-12-10 2019-02-22 四川港航建设工程有限公司 Active service dyke dam crest road upgradeable architecture and construction method
CN111456047A (en) * 2020-04-06 2020-07-28 沈斌 Hydraulic engineering keeps off and flows device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306300A (en) * 2013-06-27 2013-09-18 陈振新 Assembled caisson for marine construction
CN103306300B (en) * 2013-06-27 2015-07-01 陈振新 Assembled caisson for marine construction
CN106049365A (en) * 2016-05-23 2016-10-26 中交第航务工程局有限公司 Novel net tying ring construction technique
CN109371906A (en) * 2018-12-10 2019-02-22 四川港航建设工程有限公司 Active service dyke dam crest road upgradeable architecture and construction method
CN111456047A (en) * 2020-04-06 2020-07-28 沈斌 Hydraulic engineering keeps off and flows device

Similar Documents

Publication Publication Date Title
CN206070562U (en) Subassembly formula underground structure
CN104947682A (en) Foundation pit support construction method and device thereof
CN103122635B (en) Foundation pit confined water resistant system and uprush stability judging method thereof
CN204570711U (en) A kind of assembled steel reinforced concrete cofferdam
CN110158389A (en) A kind of light soil road structure and its construction method
CN105350526B (en) Method for setting up steel platform
CN205348391U (en) Take prefabricated beam column rebar mechanical connection node of lag
WO2017084573A1 (en) Upheaval-resisting support structure
CN107012871B (en) A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation pit fabricated construction
CN200940245Y (en) Road built by assembled casing filled with stone
CN210216254U (en) Concrete guardrail structure
CN109487641A (en) A kind of high-speed railway monoblock type cable slot structure and surface layer of subgrade bed construction method
CN100535264C (en) Steel boxed cofferdam and recovery method thereof
CN205134342U (en) Large -tonnage list double -walled combines steel cofferdam
CN105862662B (en) A kind of curl arched mole
CN109989407A (en) Railway increases two wires platform way of escape foundation pile pipe curtain supporting construction newly
CN106223355A (en) A kind of high bearing platform supported on piles in deep water Hold Hoop method has device and the construction method of end steel jacket box
CN107558388A (en) A kind of sound barrier and its installation method applied to existing railway line
CN107299640A (en) A kind of variable cross-section well shaft type ground continuous wall base and its construction method
CN203603525U (en) Reinforcing structure with clamp plate girder and clamp plate column externally arranged for stone structure
CN213014373U (en) Basement outer wall post-cast strip structure
CN209293069U (en) Soft base Self-sinking type underground space structure construction
CN210066645U (en) Cement prefabricated plate for slope protection
CN209429119U (en) A kind of cast-in-place concrete pile for mortar depositing construction
CN207314181U (en) A kind of sound barrier applied to existing railway line

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20070829