CN1987020B - 附着爬升式高耸桅杆结构安装方法及施工装置 - Google Patents

附着爬升式高耸桅杆结构安装方法及施工装置 Download PDF

Info

Publication number
CN1987020B
CN1987020B CN200510111743A CN200510111743A CN1987020B CN 1987020 B CN1987020 B CN 1987020B CN 200510111743 A CN200510111743 A CN 200510111743A CN 200510111743 A CN200510111743 A CN 200510111743A CN 1987020 B CN1987020 B CN 1987020B
Authority
CN
China
Prior art keywords
mast
segmental structure
framework
segmental
suspension hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200510111743A
Other languages
English (en)
Other versions
CN1987020A (zh
Inventor
朱骏
陆祥龙
韩国胜
张延泰
冯琰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Mechanized Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Co Ltd filed Critical Shanghai Mechanized Construction Co Ltd
Priority to CN200510111743A priority Critical patent/CN1987020B/zh
Publication of CN1987020A publication Critical patent/CN1987020A/zh
Application granted granted Critical
Publication of CN1987020B publication Critical patent/CN1987020B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明涉及一种附着爬升式高耸桅杆结构安装方法及施工装置。包括小型卷扬机,其特征在于:在框架的顶部有一横梁,横梁的两端伸出框架的边侧,在横梁的两端上有滑轮,在框架侧面上有一个能通过桅杆分段结构的开口,在框架顶部横梁的底面中部有一吊耳,吊耳设置倒链装置,将框架套在已安装的桅杆分段结构上,底部固定段固定连接在已安装的桅杆分段结构上的支撑角上,用小型卷扬机的吊钩提升桅杆分段结构至框架侧面的开口处,用吊耳承接桅杆分段结构,然后逐步放松小型卷扬机的吊钩,收紧倒链装置,桅杆分段结构进入框架内部。本发明优点是它附着于高耸桅杆结构本身并利用其作为爬升的支承***予以安装高耸桅杆结构,整个施工过程具有自我循环的特点。

Description

附着爬升式高耸桅杆结构安装方法及施工装置
技术领域
本发明涉及一种附着爬升式高耸桅杆结构安装方法及施工装置。
背景技术
高耸结构尤其是位于建筑物顶部的桅杆等结构的安装一直是建筑施工的一个难点,这主要是由于高耸桅杆结构重量大、结构高,且其所处的施工场地环境较差,无大型安装机械的停置场地或由于施工机械的起重性能无法满足起重高度以及起重量等要求而采用液压爬升(顶升)法、扳装法、脚手架承重散装法等予以施工,这些方法有的施工工艺较为复杂(液压爬升等),有的劳动强度大、技术要求高(扳装法),有的本身受重量制约无法安装较重的高耸结构(脚手架承重散装法)。
发明内容
本发明的目的是解决现有技术中在安装高耸桅杆结构时所存在的问题,提供一种附着爬升式高耸桅杆结构安装方法及施工装置,本发明设计实现附着爬升式高耸桅杆结构安装方法的施工装置,包括小型卷扬机,其特征在于:有一能包容桅杆分段结构的框架,在框架的顶部有一横梁,横梁的两端伸出框架的边侧,在横梁的两端上有滑轮,位于固定地点的小型卷扬机的钢缆穿过两个滑轮连接一吊钩,位于吊钩一侧的框架侧面上有一个能通过桅杆分段结构的开口,在框架顶部横梁的底面中部有一吊耳,吊耳设置倒链装置。附着爬升式高耸桅杆结构安装方法,其特征在于由下面的步骤完成:将框架套在已安装的桅杆分段结构上,框架的底部固定段位于已安装的桅杆分段结构的顶面之下,其底部固定段固定连接在已安装的桅杆分段结构上的支撑角上,将位于高耸桅杆安装基础面上的桅杆分段结构用小型卷扬机的吊钩提升至框架侧面的开口处,用吊耳承接桅杆分段结构,然后逐步放松小型卷扬机的吊钩,同时倒链装置同步收紧,直至桅杆分段结构进入框架内部完全由吊耳承受全部桅杆分段结构的重量,
然后撤除小型卷扬机的吊钩,将该桅杆分段结构与已安装的桅杆分段结构固定,当需要安装更高桅杆分段结构时,在最后安装的桅杆分段结构的顶部设置四个间隔均匀放置的倒链,该倒链与框架的底面固定连接,收紧倒链后,框架沿已安装的桅杆分段结构上升,当框架的底部固定段位于已安装的桅杆分段结构的顶面之下固定后,重复上述的安装过程,直至完成最后一段桅杆分段结构的安装。本发明的优点在于它附着于高耸桅杆结构本身并利用其作为爬升的支承***予以安装高耸桅杆结构,这一施工装置---“攀升吊”有效地解决了施工机械的施工高度受限制、起重量受制约的不足。本发明用于安装高耸桅杆结构,整个施工过程具有自我循环的特点,依此方法可施工至设计的任何高度。无需对高耸结构本身做过多的加固,也无需过多的辅助措施。提升物和动力***产生的力对结构基本不产生偏心弯矩。本装置构造简单,加工方便,因此具有较大的经济性。
附图说明
下面结合附图和实例对本发明做详细说明,
附图1为本发明的结构及在起吊分段结构的示意图,
附图2为本发明的在起吊分段后横移分段结构的示意图,
附图3为本发明的框架结构有开口侧面的示意图,
具体实施方式
图中包括小型卷扬机1,其特征在于:有一能包容桅杆分段结构2的框架3,在框架3的顶部有一横梁4,横梁4的两端伸出框架3的边侧,在横梁4的两端上有滑轮5,位于固定地点的小型卷扬机1的钢缆6穿过两个滑轮5连接一吊钩7,位于吊钩7一侧的框架3侧面上有一个能通过桅杆分段结构2的开口8,在框架3顶部横梁4的中部底面有一吊耳9,吊耳9上设有倒链装置10。实际的安装中,首先在固定地点上安装小型卷扬机1,依靠现场的吊具将最低层的桅杆分段结构吊到安装位固定,然后在最低层的桅杆分段结构2的上面安装框架3,或着可以利用已有的吊装设备将已装配完成的框架3吊在最低层的桅杆分段结构2的支撑11上进行框架3底部固定段的固定连接,框架3的底部固定段部分位于最低层的桅杆分段结构2的顶面之下,以保证框架3的稳定性,随后用现场的吊具将第二段桅杆分段结构2吊至框架3边侧的吊钩7下方,用小型卷扬机1提升吊钩7,将第二段桅杆分段结构2提升至框架3侧面的开口8处,用框架3顶部横梁的中部底面的吊耳9承接第二段桅杆分段结构2,然后逐步放松吊钩7,同时收紧倒链装置10,直至第二段桅杆分段结构2进入框架3内部完全由吊耳9承受全部第二段桅杆分段结构2的重量,撤除连接于小型卷扬机1上的吊钩7,松开倒链装置10将第二段桅杆分段结构2放至已安装的桅杆分段结构2上固定,到此完成了第二段桅杆分段结构2的安装。然后在已安装的第二段桅杆分段结构2的顶部安装四个间隔均匀放置的倒链,将倒链与框架3的底部固定段连接,收紧倒链将框架3沿已安装的第二段桅杆分段结构2上升,当框架3的底部固定段位于第二段桅杆分段结构2的顶面之下固定后,完成一个循环。重复上述的安装过程,直至完成最后一段桅杆分段结构的安装。安装后框架的拆除采用解体的方法,首先拆除框架顶部的横梁,然后将框架沿高耸桅杆结构用简易吊具降至适当的地点进行解体。

Claims (2)

1.实现附着爬升式高耸桅杆结构安装方法的施工装置,包括小型卷扬机,其特征在于:有一能包容桅杆分段结构的框架,在框架的顶部有一横梁,横梁的两端伸出框架的边侧,在横梁的两端上有滑轮,位于固定地点的小型卷扬机的钢缆穿过两个滑轮连接一吊钩,位于吊钩一侧的框架侧面上有一个能通过桅杆分段结构的开口,在框架顶部横梁的底面中部有一吊耳,吊耳设置有倒链装置。
2.附着爬升式高耸桅杆结构安装方法,其特征在于由下面的步骤完成:将框架套在已安装的桅杆分段结构上,框架的底部固定段位于已安装的桅杆分段结构的顶面之下,其底部固定段固定连接在已安装的桅杆分段结构上的支撑角上,将位于高耸桅杆安装基础面上的桅杆分段结构用小型卷扬机的吊钩提升至框架侧面的开口处,用吊耳承接桅杆分段结构,然后逐步放松小型卷扬机的吊钩,同时倒链装置同步收紧,直至桅杆分段结构进入框架内部完全由吊耳承受全部桅杆分段结构的重量后,撤除小型卷扬机的吊钩,将该桅杆分段结构与已安装的桅杆分段结构固定,当需要安装更高桅杆分段结构时,在最后安装的桅杆分段结构的顶部设置四个间隔均匀放置的倒链,该倒链与框架的底面固定连接,收紧倒链后,框架沿已安装的桅杆分段结构上升,当框架的底部固定段位于已安装的桅杆分段结构的顶面之下固定后,重复上述的安装过程,直至完成最后一段桅杆分段结构的安装。
CN200510111743A 2005-12-20 2005-12-20 附着爬升式高耸桅杆结构安装方法及施工装置 Expired - Fee Related CN1987020B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200510111743A CN1987020B (zh) 2005-12-20 2005-12-20 附着爬升式高耸桅杆结构安装方法及施工装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200510111743A CN1987020B (zh) 2005-12-20 2005-12-20 附着爬升式高耸桅杆结构安装方法及施工装置

Publications (2)

Publication Number Publication Date
CN1987020A CN1987020A (zh) 2007-06-27
CN1987020B true CN1987020B (zh) 2010-05-26

Family

ID=38183948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200510111743A Expired - Fee Related CN1987020B (zh) 2005-12-20 2005-12-20 附着爬升式高耸桅杆结构安装方法及施工装置

Country Status (1)

Country Link
CN (1) CN1987020B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101769076B (zh) * 2008-12-29 2012-12-12 五冶集团上海有限公司 高楼用避振器的框架顶升吊挂安装方法
CN107304030B (zh) * 2016-04-19 2023-05-23 五冶集团上海有限公司 横管冷却器换热管更换的专用吊装装置及其使用方法
CN112027940A (zh) * 2020-08-27 2020-12-04 中建科工集团有限公司 一种横移搬运器的吊装方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2099746U (zh) * 1991-05-30 1992-03-25 山东莱州市建筑机械厂 升降机顶升套架及钢丝绳自动紧放装置
CN2173230Y (zh) * 1993-09-14 1994-08-03 青州市机械设备制修厂 一种固定立柱旋臂起重机
CN2235961Y (zh) * 1995-09-06 1996-09-25 湘潭县电器设备厂 提升机
CN2391861Y (zh) * 1999-07-09 2000-08-16 肖俊祥 提升卷扬机钢丝绳防松装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2099746U (zh) * 1991-05-30 1992-03-25 山东莱州市建筑机械厂 升降机顶升套架及钢丝绳自动紧放装置
CN2173230Y (zh) * 1993-09-14 1994-08-03 青州市机械设备制修厂 一种固定立柱旋臂起重机
CN2235961Y (zh) * 1995-09-06 1996-09-25 湘潭县电器设备厂 提升机
CN2391861Y (zh) * 1999-07-09 2000-08-16 肖俊祥 提升卷扬机钢丝绳防松装置

Also Published As

Publication number Publication date
CN1987020A (zh) 2007-06-27

Similar Documents

Publication Publication Date Title
CN105401714B (zh) 一种附着式升降脚手架及升降方法
CN101284628B (zh) 大吨位压力机架的吊装方法
CN201417657Y (zh) 室内变压器的安装装置
CN101845912A (zh) 分段塔身组装式应急通讯塔
CN111980391A (zh) 一种整体吊运平台及建筑外立面施工平台的搭建方法
CN102251483A (zh) 自提升附着式吊机吊装钢管混凝土格构桥墩的施工方法
CN102198914A (zh) 风力发电机组安装工作平台
CN1987020B (zh) 附着爬升式高耸桅杆结构安装方法及施工装置
CN104989111B (zh) 钢结构高层吊装施工方法
CN102041779A (zh) 一种桥面吊机及其施工方法
CN101264845A (zh) 天车高空整体悬吊换位施工方法
CN201826320U (zh) 一种用于双壁钢围堰拼装和下沉的装置
CN218561044U (zh) 一种用于安装模板的作业平台
CN201635390U (zh) 高层建筑电梯井施工自动化支模机
CN101450766A (zh) 超长工件的起吊安装方法及其所使用的工装横梁
CN216549362U (zh) 一种基坑上方构件的拼装吊装装置
CN105152052A (zh) 一种玻璃幕墙构件提升装置及玻璃幕墙构件安装方法
CN211949625U (zh) 一种大跨度空间结构tmd安装***
CN114251516A (zh) 综合支吊架体系及其施工方法
CN210563326U (zh) 高空单元式架空滑动拼接操作平台
CN208517821U (zh) 一种拆除箱梁贝雷片的简易起重装置
CN216430870U (zh) 综合支吊架体系
CN221094848U (zh) 一种用于悬索桥猫道承重绳架设的托架
CN218088703U (zh) 一种钢筋桁架楼承板安装装置
CN205773026U (zh) 顶升装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI MECHANIZED CONSTRUCTION CO., LTD.

Free format text: FORMER NAME: SHANGHAI CITY MACHINERY CONSTRUCTION CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 200072, Shanghai, 200 old Shanghai Road

Patentee after: Shanghai Mechanized Construction Group Co., Ltd.

Address before: 200072, Shanghai, 200 old Shanghai Road

Patentee before: Shanghai Mechanized Construction Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100526

Termination date: 20191220

CF01 Termination of patent right due to non-payment of annual fee