CN1986111B - Fast continuous casting process - Google Patents

Fast continuous casting process Download PDF

Info

Publication number
CN1986111B
CN1986111B CN2006101707496A CN200610170749A CN1986111B CN 1986111 B CN1986111 B CN 1986111B CN 2006101707496 A CN2006101707496 A CN 2006101707496A CN 200610170749 A CN200610170749 A CN 200610170749A CN 1986111 B CN1986111 B CN 1986111B
Authority
CN
China
Prior art keywords
crystallizer
continuous casting
casting process
fast continuous
cooling water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2006101707496A
Other languages
Chinese (zh)
Other versions
CN1986111A (en
Inventor
华德明
赵小军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shagang Group Anyang Yongxing Special Steel Co., Ltd.
Original Assignee
Jiangsu Shagang Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Shagang Group Co Ltd filed Critical Jiangsu Shagang Group Co Ltd
Priority to CN2006101707496A priority Critical patent/CN1986111B/en
Publication of CN1986111A publication Critical patent/CN1986111A/en
Application granted granted Critical
Publication of CN1986111B publication Critical patent/CN1986111B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Metal Rolling (AREA)

Abstract

The present invention is fast continuous casting process, and belongs to the field of continuous casting technology in non-ferrous metallurgy. The present invention has one increased second molten steel infusing crystallizer, and the fast continuous casting process includes the steps of casting the first crystallizer with the tundish, removing the first crystallizer, setting the second crystallizer and casting the second crystallizer. By increasing the second crystallizer, the present invention realizes the continuous casting and thus has high production efficiency.

Description

A kind of fast continuous casting process
Technical field
The invention belongs to the continuous casting technology field in the smelting iron and steel, relate in particular to a kind of fast continuous casting process of trough casting crystallizer.
Background technology
In smelting iron and steel, the molten steel about 1600 ℃ is become steel, the first step is very important.This step carries out under the conticaster operation, makes molten steel cast steel billet, and the crystallizer that injects molten steel is arranged on conticaster top.Crystallizer is used for making solid profile in the continuous casting production process of steel production enterprise, crystallizer is one of most important member of continuous casting installation for casting, and molten steel begins progressively cooling formation steel billet in crystallizer.The key of continuous casting technology is that molten steel in mold base shell is evenly solidified, and casts the high-quality strand.
In casting cycle, tundish is placed in the crystallizer top.Tundish is the container that holds molten steel that connects between molten steel and the crystallizer, and it has decompression, shunting, removes the effect of field trash and storage molten steel.In conticaster, especially in billet caster, crystallizer will just can carry out next step technological operation by overhead traveling crane after casting finishes, and this moment, tundish need wait for that transporting original position again back behind the replacing EO of this crystallizer just can continue casting operation, generally need 15~25 minutes time therebetween, thereby make the time of tundish interruption casting longer, this will reduce the operating efficiency of casting, even can cause the tundish fault, cause heavy losses and delay production.
Summary of the invention
Main purpose of the present invention is to provide a kind of fast continuous casting process.Will just can carry out next step technological operation after instrument such as overhead traveling crane are transported to the conticaster replacing by transporting at continuous casting casting finishing post crystallization device in the prior art, and tundish is transported the deficiency that just can continue to cast back after need waiting for this crystallizer operation end again.
For realizing purpose of the present invention, the technical solution used in the present invention is as follows:
A kind of fast continuous casting process comprises that molten steel injects crystallizer, it is characterized in that this fast continuous casting process after comprising the steps: trough casting first crystallizer shifts out first crystallizer, and second crystallizer of packing into is cast.
Concretely, this fast continuous casting process comprises the steps:
(1) trough casting first crystallizer;
(2) first crystallizer is hung out;
(3) ready second crystallizer is packed into;
(4) trough casting second crystallizer;
(5) second crystallizer is hung out first crystallizer of packing into.
The concrete operations of described step (2) are as follows: tundish stops watering at first closes this first crystallizer cooling water after offing normal, and removes the crystallizer panel then, and the crystallizer suspension ring are installed, and middle hired car is left, and send instrument that first crystallizer is shifted out with hanging.
Describedly hang that to send instrument be overhead traveling crane.
Described concrete operations of closing this first crystallizer cooling water are closed back-water valve (BWV) then for closing the water intaking valve of cooling water earlier.
The concrete operations of described step (4) are as follows: hired car begins casting in the middle of after second crystallizer is packed into, the second crystallizer panel is installed, and is opened the second crystallizer cooling water.
Described concrete operations of opening the second crystallizer cooling water are opened the water intaking valve of cooling water then for opening the back-water valve (BWV) of cooling water earlier.
The main technical points of this fast continuous casting process is to increase a replacement crystallizer, i.e. second crystallizer can be at former crystallizer, and promptly first crystallizer is cast and finished when carrying out next step technological operation, replaces first crystallizer and carries out continuous casting.
After all processing steps are finished, promptly finished a process of changing first crystallizer fast.Replacing for second crystallizer also is same step, at first after tundish finishes to second crystallizer casting, also can utilize the instrument of transporting that this second crystallizer is transported to next step technology place of casting process operates, treat its end of operation transport back again the casting place, first crystallizer of finishing the continuous casting process operation that to transport back is simultaneously packed into, tundish is cast to it again, so constantly repeats above-mentioned steps.
Beneficial effect of the present invention is, by increasing by second crystallizer, has avoided because of waiting for that first crystallizer transports out of the casting tundish and carries out time delays, the rough sledding such as watering, cause heavy losses of being forced to break that next step technological operation causes; Simple to operate, efficient and convenient; The operator can change fast in very short time and finish, and can satisfy the quantity-produced needs fully, has improved production efficiency.
Description of drawings
The present invention is further illustrated below in conjunction with drawings and Examples, so that to purpose of the present invention, feature and advantage are carried out more deep understanding.
Fig. 1 is the flow chart that prior art is changed the crystallizer that is used for continuous casting installation for casting;
Fig. 2 is the flow chart of the embodiment of the invention.
The specific embodiment
As figure, in the casting cycle of iron and steel enterprise's continuous casting process, normal earlier casting first crystallizer of tundish; After casting finished, tundish stopped watering the steel stream of first crystallizer; Close the cooling water of this first crystallizer then, order is to close water intaking valve earlier, closes back-water valve (BWV) again; Then utilize professional tool to remove the panel and the screw of first crystallizer, and on this crystallizer, install suspension ring; At this moment, the instrument that the transports overhead traveling crane that ready second crystallizer is housed has been prepared to put in place; When tundish stop watering off normal after, utilize overhead traveling crane that first crystallizer is transported to next step technology place of casting process and take off ingot operation, treat that its end of operation transports the casting place again back; And first crystallizer is packed ready second crystallizer into after transporting at once; Tundish puts in place to open and waters subsequently, uses professional tool that the panel of second crystallizer is installed; Can open the second crystallizer cooling water after panel installs, order is to open back-water valve (BWV) earlier, opens water intaking valve again; Last tundish second crystallizer of can normally casting.
At this moment, the process of changing first crystallizer is fast finished.Replacing for second crystallizer also is same step, at first after tundish finishes to second crystallizer casting, also can utilize the instrument of transporting that this second crystallizer is transported to next step technology place of casting process operates, treat its end of operation transport back again the casting place, first crystallizer of finishing the continuous casting process operation that to transport back is simultaneously packed into, tundish is cast to it again, so constantly repeats above-mentioned steps, can increase work efficiency more than 80%.

Claims (7)

1. a fast continuous casting process comprises that molten steel injects crystallizer, it is characterized in that this fast continuous casting process after comprising the steps: trough casting first crystallizer shifts out first crystallizer, and second crystallizer of packing into is cast.
2. a kind of fast continuous casting process according to claim 1 is characterized in that this fast continuous casting process comprises the steps:
(1) trough casting first crystallizer;
(2) first crystallizer is hung out;
(3) ready second crystallizer is packed into;
(4) trough casting second crystallizer;
(5) second crystallizer is hung out first crystallizer of packing into.
3. a kind of fast continuous casting process according to claim 2, the concrete operations that it is characterized in that described step (2) are as follows: tundish stops watering at first closes this first crystallizer cooling water after offing normal, remove the crystallizer panel then, and installation crystallizer suspension ring, middle hired car is left, and send instrument that first crystallizer is shifted out with hanging.
4. a kind of fast continuous casting process according to claim 3 is characterized in that describedly hanging that to send instrument be overhead traveling crane.
5. a kind of fast continuous casting process according to claim 3 is characterized in that described concrete operations of closing this first crystallizer cooling water are the water intaking valve of closing cooling water earlier, closes back-water valve (BWV) then.
6. a kind of fast continuous casting process according to claim 2 is characterized in that the concrete operations of described step (4) are as follows: hired car begins casting in the middle of after second crystallizer is packed into, the second crystallizer panel is installed, and is opened the second crystallizer cooling water.
7. a kind of fast continuous casting process according to claim 6 is characterized in that described concrete operations of opening the second crystallizer cooling water are the back-water valve (BWV) of opening cooling water earlier, opens the water intaking valve of cooling water then.
CN2006101707496A 2006-12-22 2006-12-22 Fast continuous casting process Active CN1986111B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2006101707496A CN1986111B (en) 2006-12-22 2006-12-22 Fast continuous casting process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2006101707496A CN1986111B (en) 2006-12-22 2006-12-22 Fast continuous casting process

Publications (2)

Publication Number Publication Date
CN1986111A CN1986111A (en) 2007-06-27
CN1986111B true CN1986111B (en) 2010-04-14

Family

ID=38183132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2006101707496A Active CN1986111B (en) 2006-12-22 2006-12-22 Fast continuous casting process

Country Status (1)

Country Link
CN (1) CN1986111B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2205265Y (en) * 1994-11-15 1995-08-16 衡阳有色冶金机械总厂 Spraying cooling tube type continous casting crystallizing device
CN1188427A (en) * 1995-04-21 1998-07-22 计划地球工业公司 Enhanced adsorbent and room temperature catalyst particle and method of making and using therefor
CN1096899C (en) * 1997-08-08 2002-12-25 瑞士商康凯斯史丹股份公司 Device and method for replacing interchangeable part of ingot arrangement
CN2614814Y (en) * 2003-03-10 2004-05-12 张义方 Crystallizer applied to small-radius compact continuous casting machine
KR20040100431A (en) * 2003-05-23 2004-12-02 주식회사 포스코 Roll device of casting plant capable of adjusting alignment of the roll significantly

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2205265Y (en) * 1994-11-15 1995-08-16 衡阳有色冶金机械总厂 Spraying cooling tube type continous casting crystallizing device
CN1188427A (en) * 1995-04-21 1998-07-22 计划地球工业公司 Enhanced adsorbent and room temperature catalyst particle and method of making and using therefor
CN1096899C (en) * 1997-08-08 2002-12-25 瑞士商康凯斯史丹股份公司 Device and method for replacing interchangeable part of ingot arrangement
CN2614814Y (en) * 2003-03-10 2004-05-12 张义方 Crystallizer applied to small-radius compact continuous casting machine
KR20040100431A (en) * 2003-05-23 2004-12-02 주식회사 포스코 Roll device of casting plant capable of adjusting alignment of the roll significantly

Also Published As

Publication number Publication date
CN1986111A (en) 2007-06-27

Similar Documents

Publication Publication Date Title
CN201720406U (en) Continuous casting tundish stuffing sand separating device
CN102784902B (en) Metal mold pressure regulating casting device
CN101343711B (en) Method for producing nodular cast iron planetary supporter
CN102161080B (en) Manufacturing tool of high-compact wide and thick plate blank for wide and thick plate rolling mill and method
CN103820701A (en) Production technology for as-cast spheroidal graphite iron casting QT600-7
CN103962517B (en) A kind of apparatus for pouring of die casting electrode bar and pouring procedure thereof
CN1986111B (en) Fast continuous casting process
CN201579373U (en) Filtration system for heavy castings
CN202021336U (en) Sprue bushing for low pressure casting
CN108620540A (en) A kind of gravity casting apparatus of kirsite tap
CN209647543U (en) A kind of mo(u)lding line reclining device
CN1076646C (en) Opened water cooled die casting machine
CN104249142A (en) Pressure casting method of purified homogenized compacted fine-grained large steel blank
CN212168943U (en) Rotary type drainage device for molten steel drainage sand
CN202291264U (en) Pouring cup for sand coating pouring of iron mold
CN101602103A (en) The casting method of zinc base alloy for stamping die basal body
CN101708545B (en) High aluminum-zinc-base alloy bearing bush chemical composition control and inner core water-cooled casting technique
CN109226729B (en) Device and method for realizing continuous casting of vacuum induction furnace
CN101091981A (en) Upright casting plant for metal hollow ingot
CN113441685A (en) Tractor frame casting system and casting process
CN109865812B (en) Metal rheological purification pressure forming equipment
CN202655556U (en) Molten metal suspension pouring device for slurry pump wear-resistant part
CN204430223U (en) The continuous casting production equipment of surface coverage elastomeric material steel and conticaster
CN209077736U (en) A kind of moulds in casting wheel group producing liquid lead
CN205085347U (en) Modular self -interacting ferroalloy casting machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190626

Address after: 455133 North Section of Civilization Road, Shuiye Town, Anyang County, Henan Province

Patentee after: Shagang Group Anyang Yongxing Special Steel Co., Ltd.

Address before: 215625 Jiangsu Suzhou Zhangjiagang Jinfeng Town Jiangsu Shagang Group Co., Ltd.

Patentee before: Jiangsu Shagang Group Co., Ltd.

TR01 Transfer of patent right