CN1959170A - Refrigeration pipe composed of copper elbow and U pipe of aluminum, and preparation method - Google Patents

Refrigeration pipe composed of copper elbow and U pipe of aluminum, and preparation method Download PDF

Info

Publication number
CN1959170A
CN1959170A CN 200610153043 CN200610153043A CN1959170A CN 1959170 A CN1959170 A CN 1959170A CN 200610153043 CN200610153043 CN 200610153043 CN 200610153043 A CN200610153043 A CN 200610153043A CN 1959170 A CN1959170 A CN 1959170A
Authority
CN
China
Prior art keywords
pipe
aluminum
copper
elbow
copper elbow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610153043
Other languages
Chinese (zh)
Other versions
CN100445623C (en
Inventor
赵越
左铁军
尹衍升
孙德兴
杨训
万延尧
邵军
Original Assignee
左铁军
赵越
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 左铁军, 赵越 filed Critical 左铁军
Priority to CNB2006101530439A priority Critical patent/CN100445623C/en
Publication of CN1959170A publication Critical patent/CN1959170A/en
Application granted granted Critical
Publication of CN100445623C publication Critical patent/CN100445623C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)
  • Air Filters, Heat-Exchange Apparatuses, And Housings Of Air-Conditioning Units (AREA)

Abstract

A method for preparing refrigeration pipeline formed by copper elbow and aluminium U tube by welding includes as connecting two sets of movable electrodes with the same phase in insulation to each other separately to two ends of copper elbow, connecting aluminium U tube to fixed electrode board, setting hole on welding position of aluminium tube on said board and arranging mosaic block in said hole, pushing movable electrode with copper elbow to aluminium tube by push cylinder and carrying out resistance heating at CuAl combination region by switching on power then moving copper elbow continuously to internal of aluminium tube under action of said cylinder.

Description

Refrigeration pipe that copper elbow and U pipe of aluminum constitute and preparation method thereof
Technical field
The present invention relates to refrigeration pipe of a kind of copper elbow and U pipe of aluminum formation and preparation method thereof, especially relate to the refrigeration pipe that air conditioner two-unit is used, air conditioner two-unit is the abbreviation of A/C evaporator, air-conditioning condenser.
Background technique
Air conditioner two-unit is that being widely used in the refrigeration agent is in the refrigeration product of refrigerant with the surface radiating device of the outer coefficient of heat transfer of fin reinforcing pipe.In running, rely on the phase transition process of air conditioner two-unit pipeline inner refrigerant gas-liquid attitude to absorb or distribute heat, in circulating pipe system, refrigeration is relevant with the quantity of refrigeration agent, refrigeration agent too much or reduce and all can influence refrigeration, the seepage that causes because of technological reason in the pipeline will reduce the quantity of refrigeration agent, finally will lose the refrigerating capacity of refrigeration product, the pipe-line system seepage is the critical defect of this series products.
In the prior art, the refrigeration pipe in the air conditioner two-unit constitutes by copper pipe, needs in the production joint of One's name is legion is welded, and copper pipe is because the most suitable automatic gas brazing, thereby is the optimal selection of air conditioner two-unit pipeline.But copper pipe is the noble metal material, uses copper pipe to cause radiator cost height in a large number.And adopt complete aluminum pipe structure, then be faced with many technical barriers, as in the soldering between the aluminum pipe with regard to exist brazing flux narrow to influence, the technological temperature of intensity to the pollution in managing, brazing flux residue to the compactness of the burn into welded joint of aluminum pipe and weld seam fragility tissue, be difficult to realize insoluble problem such as large-scale production.
Change the main conduit line U pipe in the air conditioner two-unit into aluminum pipe by copper pipe, the copper pipe use amount reduces more than 80%, can reduce cost of material greatly.At this moment, the assembly technology of air conditioner two-unit is constant substantially, just can guarantee that the whole compactness of air conditioner two-unit does not reduce as long as guarantee the quality that copper and aluminium welding connects.
Pipeline in the air conditioner two-unit is to be made of U pipe and elbow welding, owing to be subjected to the air conditioner two-unit structural limitations, the two ends of copper elbow must weld together with two U pipe of aluminum mouths of pipe that are serially connected in its two ends at one time, if the two ends of sequencing soldering copper elbow at twice, the copper elbow of welding back rigidity all can produce permanent deformation with the U pipe of aluminum that is subjected to the fin restriction for the first time, and welding for the second time can't be finished.Promptly welding process must be finished the welding of two solder joints simultaneously.Prior art can't realize this welding.
Summary of the invention
The technical problem to be solved in the present invention is to provide one section copper elbow and U pipe of aluminum not to have the weld seam of copper aluminium eutectic structure, forms the refrigeration pipe that chemical bond connects in the weld seam between the copper aluminium.The mentioned copper aluminium eutectic structure of this specification is meant the low melting point eutectic alloy that copper aluminum metallization compound and aluminium form under the high temperature.
Another technical problem that the present invention will solve is directly to carry out between copper elbow and the U pipe of aluminum different metal materials welding and adopts the plug-in type method for resistance welding that the copper elbow two point is welded simultaneously.
Refrigeration pipe for copper elbow of the present invention and U pipe of aluminum formation, the present invention solves like this: there are straight tube-like guide portion and taper face of weld in the welded joint position of copper elbow, the external diameter of this guide portion is slightly smaller than the aluminum pipe internal diameter, form direct chemical bond between copper elbow taper face of weld and the U pipe of aluminum inwall and be connected, promptly form the weld seam of one section no eutectic structure.
The invention provides a kind of welding method of making above-mentioned refrigeration pipe, concrete steps are following downwards:
The first step is carried out the reducing processing to the copper pipe two ends, pipe end wall thickness reduction after the reducing, and attenuate is advisable more than 30%, then copper pipe is carried out the accurate bending of symmetry and becomes copper elbow;
Second step was fixed respectively with copper elbow and two U pipe of aluminum that welding equipment will need to weld, be connected respectively to the two ends of copper elbow with two groups of traveling electrodes, two groups of traveling electrodes independence that insulate separately, phase place is identical, can work simultaneously, and two U pipe of aluminum are connected to fixed plate electrode, have the hole on the welding position of fixed plate electrode aluminum pipe, install in the hole by having excellent mechanical intensity, the mosaic block that the material of high-fire resistance and low heat transfer efficient is made, mosaic block cavity shape and aluminum pipe profile match;
The 3rd step pushing tow cylinder will have the traveling electrode group of copper pipe and push aluminum pipe to, switch on simultaneously resistance heating is carried out in copper aluminium bond zone, and copper pipe is constantly inner mobile to aluminum pipe under the effect of pushing tow cylinder, finishes welding.
This method has following characteristics: 1, the U tubing system with existing air conditioner two-unit changes aluminum pipe into by copper pipe, and the elbow material continues to adopt copper pipe, adopts the welding of plug-in type method for resistance welding between copper pipe and the aluminum pipe; 2, two end points finishing a copper elbow weld simultaneously; 3, utilize the difference of two kinds of materials of copper aluminium on hardness, the high pressure effect when promptly utilizing copper pipe to insert aluminum pipe is cleaned out the oxide of aluminum pipe internal surface, thereby is avoided using any auxiliary agent; 4, energising is carried out resistance heating to the bond zone in cleaning aluminum pipe oxide, the limit adds the flanging heating, copper pipe is constantly inner mobile to aluminum pipe under the effect of pushing tow cylinder in this process, different with the conventional, electric-resistance welding method, the workpiece shift length can surpass 5mm between the welding process copper aluminium, the copper aluminium eutectic thing that produces is extruded by the high pressure between copper aluminium while producing, and avoids fragility to organize the influence of butt joint; 5, with having excellent mechanical intensity, the mosaic block that the material of high-fire resistance and low heat transfer efficient is made can increase the corrosion resistance of electrode material, and high-temperature behavior improves the aluminum pipe rate of warming fast.6, use a multidigit fixed plate electrode and the fixed electrode that separates of no use, it is advantageous that the design and the processing that have made things convenient for fixed electrode, compare that the present invention has simplified original technology with other air conditioner two-unit welding processings, both guarantee quality, and can reduce cost of material greatly again.
Change the rectangular electrode plate of multidigit into if will connect the fixed plate electrode of U pipe of aluminum, the rectangular electrode plate of multidigit is cut perforate open along center line, in the hole, inlay one group of mosaic block respectively according to U pipe of aluminum pipe end quantity, position in the air conditioner two-unit, then each welding process can be welded one group of copper elbow, thereby improves welding efficiency.
Description of drawings
The invention will be further described below in conjunction with the drawings and specific embodiments.
Fig. 1 embodiment 1 accompanying drawing
Fig. 2 embodiment 2 accompanying drawings
Fig. 3 copper elbow, Al pipe butt welding position schematic representation
Rectangular electrode plate 7,8 traveling electrodes of 1 copper elbow, 2 weld seams (outward appearance), 3 U pipe of aluminum, 4 fins, 5 mosaic blocks, 6 fixed plate electrodes, 6 ' multidigit 9 collets 10 straight tube-like guide portions 11 taper face of weld wherein
Embodiment
Below in conjunction with Fig. 1, provide a preferred version embodiment 1 of the present invention:
Present embodiment has comprised the step that aluminum pipe rises by pipe and wear fin outside U pipe of aluminum in conjunction with the actual fabrication procedure declaration of A/C evaporator, makes present embodiment have more more practical value.
First step copper elbow processing: select the external diameter copper pipe identical (aluminum pipe external diameter refer to U pipe of aluminum 3 worn rise again external diameter behind the pipe of fin 4) with the aluminum pipe external diameter, at first reducing is carried out at the copper pipe two ends and handled (pipe end wall thickness reduction 30% after the reducing), then copper pipe is carried out the accurate bending of symmetry and become copper elbow 1;
Second step aluminum pipe processing: adopt inwall light pipe or inwall to have the U pipe of aluminum 3 of radiating fin, U pipe of aluminum 3 has been worn the pipe that rises after the fin 4, rise before the pipe, do not need aluminum pipe 3 mouth of pipe enlarging and flange, be exposed to the outer aluminum pipe port length of fins set greater than 20mm to make things convenient for the layout of fixed plate electrode 6;
The 3rd step was put into the radiator that assembles on the welding equipment, fixed respectively with U pipe of aluminum 3 and copper elbow 1 that welding equipment will need to weld.Be connected respectively to the two ends of copper elbow with two groups of traveling electrodes 7,8, be separated with collets 9 between two groups of traveling electrodes 7,8, insulation is independent separately, phase place is identical, can work simultaneously, two U pipe of aluminum 3 are connected to fixed plate electrode 6, have the hole on the welding position of fixed plate electrode 6 aluminum pipes, the mosaic block of being made by titanium alloy 5 is installed in the hole, and mosaic block 5 cavity shapes and U pipe of aluminum 3 profiles match;
The 4th step was utilized the difference of two kinds of materials of copper aluminium on hardness with reference to Fig. 3, and the high pressure effect when promptly utilizing copper elbow 1 to insert aluminum pipe 3 is cleaned out the oxide of aluminum pipe 3 internal surfaces, thereby avoided using any auxiliary agent.Energising is carried out resistance heating to taper face of weld 11 in cleaning aluminum pipe oxide, the limit adds the flanging heating, copper elbow 1 is constantly inner mobile to aluminum pipe 3 under the effect of pushing tow cylinder in this process, different with the conventional, electric-resistance welding method, the workpiece shift length can surpass 5mm between the welding process copper aluminium, the copper aluminium eutectic thing that produces is extruded by the high pressure between copper aluminium while producing, and avoids fragility to organize the influence of butt joint.
Provide another embodiment of the present invention 2 below in conjunction with Fig. 2:
With the rectangular electrode plate 6 of multidigit ' replacement fixed plate electrode, the rectangular electrode plate 6 of multidigit ' cut perforate open, in the hole, inlay one group of mosaic block 5 respectively according to vertical or horizontal U pipe of aluminum pipe end quantity, position in the air conditioner two-unit along center line.With whole U pipe of aluminum of needs welding all be placed on the rectangular electrode plate 6 of multidigit ' the hole in, at the good copper elbow of U pipe of aluminum interpolation, every weldering finishes a pair of U pipe of aluminum, rectangular electrode plate of multidigit or traveling electrode move to the welding position with next group U pipe of aluminum, copper elbow automatically, adopt each welding process of this scheme can weld one group of copper elbow, thereby improve welding efficiency.
The present invention describes with reference to drawings and Examples, but protection domain is not limited thereto, and has those of ordinary skill and can pass through simple conversion in the technology of the present invention scope, and obtain the same technique effect of the present invention, equally in protection scope of the present invention.

Claims (4)

1, the refrigeration pipe of a kind of copper elbow and U pipe of aluminum formation, form by copper elbow, U pipe of aluminum, there are straight tube-like guide portion and taper face of weld in the welded joint position that it is characterized in that copper elbow, the external diameter of this guide portion is slightly smaller than the aluminum pipe internal diameter, forms direct chemical bond between copper elbow taper face of weld and the U pipe of aluminum inwall and is connected.
2, a kind of preparation method who makes copper elbow as claimed in claim 1 and U pipe of aluminum refrigeration pipe, it is characterized in that earlier reducing being carried out at the copper pipe two ends handles, then copper pipe is carried out the accurate bending of symmetry and become copper elbow, fix respectively with copper elbow and two U pipe of aluminum that welding equipment will need to weld, be connected respectively to the two ends of copper elbow with two groups of traveling electrodes, two groups of traveling electrodes independence that insulate separately, phase place is identical, can work simultaneously, two U pipe of aluminum are connected to fixed plate electrode, have the hole on the welding position of fixed plate electrode aluminum pipe, mosaic block is installed in the hole, mosaic block is by having excellent mechanical intensity, and the material of high-fire resistance and low heat transfer efficient is made, and mosaic block cavity shape and aluminum pipe profile match, the pushing tow cylinder will have the traveling electrode group of copper elbow and push aluminum pipe to, switch on simultaneously resistance heating is carried out in copper aluminium bond zone, the copper elbow pipe is constantly inner mobile to aluminum pipe under the effect of pushing tow cylinder, finishes welding.
3, the preparation method of a kind of copper elbow as claimed in claim 2 and U pipe of aluminum refrigeration pipe, it is characterized in that described fixed plate electrode replaces with the rectangular electrode plate of multidigit, the U pipe of aluminum pipe end quantity that the rectangular electrode plate of multidigit welds as required along center line, the position is cut perforate open, mosaic block is installed in the hole respectively, one group of U pipe of aluminum is placed in the hole of the rectangular electrode plate of multidigit, corresponding one group of copper elbow is inserted U pipe of aluminum to assemble, every weldering finishes a pair of U pipe of aluminum, rectangular electrode plate of multidigit or traveling electrode are automatically with next group U pipe of aluminum, copper elbow moves to the welding position, successively welding.
4,, it is characterized in that described mosaic block is that titanium alloy material is made as the preparation method of claim 2 or 3 described a kind of copper elbows and U pipe of aluminum refrigeration pipe.
CNB2006101530439A 2006-09-20 2006-09-20 Refrigeration pipe composed of copper elbow and U pipe of aluminum, and preparation method Expired - Fee Related CN100445623C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006101530439A CN100445623C (en) 2006-09-20 2006-09-20 Refrigeration pipe composed of copper elbow and U pipe of aluminum, and preparation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006101530439A CN100445623C (en) 2006-09-20 2006-09-20 Refrigeration pipe composed of copper elbow and U pipe of aluminum, and preparation method

Publications (2)

Publication Number Publication Date
CN1959170A true CN1959170A (en) 2007-05-09
CN100445623C CN100445623C (en) 2008-12-24

Family

ID=38070990

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006101530439A Expired - Fee Related CN100445623C (en) 2006-09-20 2006-09-20 Refrigeration pipe composed of copper elbow and U pipe of aluminum, and preparation method

Country Status (1)

Country Link
CN (1) CN100445623C (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105142846A (en) * 2013-03-25 2015-12-09 方地陶有限公司 Method for joining aluminum components, in particular for closing an end part of a heating radiator element, and aluminum radiator element
CN105605833A (en) * 2016-03-13 2016-05-25 合肥长城制冷科技有限公司 Direct-pull finned evaporator special for freezing chamber
CN105627637A (en) * 2016-03-15 2016-06-01 合肥长城制冷科技有限公司 Double-row skew finned evaporator special for novel refrigerating chamber
CN107448716A (en) * 2017-08-24 2017-12-08 海盐四通管件制造有限公司 A kind of threeway assembly variable tap
CN111843398A (en) * 2020-08-08 2020-10-30 浙江富源制冷设备股份有限公司 Low-cost U-shaped pipe welding method for gas-liquid separator

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4203329A1 (en) * 1991-06-15 1993-08-12 Krupp Vdm Gmbh GAS-TIGHT CONNECTION BETWEEN TUBE SMALL DIAMETER
US5549335A (en) * 1994-04-06 1996-08-27 Peerless Of America, Incorporated Solderless metallurgical joint
JP3311649B2 (en) * 1997-07-15 2002-08-05 森 繁夫 Joint and joining method of copper tube and aluminum tube
CN1299038C (en) * 2005-02-24 2007-02-07 左铁军 Copper-aluminium combined pipeline for refrigerating system and its preparing method
CN2807184Y (en) * 2005-07-08 2006-08-16 左铁军 Plate finned tube type heat radiator with copper-aluminium composite structured pipeline

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105142846A (en) * 2013-03-25 2015-12-09 方地陶有限公司 Method for joining aluminum components, in particular for closing an end part of a heating radiator element, and aluminum radiator element
CN105142846B (en) * 2013-03-25 2018-02-09 方地陶有限公司 For the method and Aluminium Radiator element of the end for closing radiator element
CN105605833A (en) * 2016-03-13 2016-05-25 合肥长城制冷科技有限公司 Direct-pull finned evaporator special for freezing chamber
CN105627637A (en) * 2016-03-15 2016-06-01 合肥长城制冷科技有限公司 Double-row skew finned evaporator special for novel refrigerating chamber
CN107448716A (en) * 2017-08-24 2017-12-08 海盐四通管件制造有限公司 A kind of threeway assembly variable tap
CN111843398A (en) * 2020-08-08 2020-10-30 浙江富源制冷设备股份有限公司 Low-cost U-shaped pipe welding method for gas-liquid separator

Also Published As

Publication number Publication date
CN100445623C (en) 2008-12-24

Similar Documents

Publication Publication Date Title
CN101844184B (en) Phase-change non-destructive pipe expanding method for inner finned tube
CN101319741B (en) Plug-in type copper aluminum pipe welded joint and method of producing the same
CN101319742B (en) Pipe connection used for indoor and outdoor units of air conditioner and its method for making production method
CN100445623C (en) Refrigeration pipe composed of copper elbow and U pipe of aluminum, and preparation method
KR20160126834A (en) Copper and steel multiunit tube, production method thereof, application and welding sturucture thereof
CN104838225A (en) Heat exchanger and method of manufacturing the same
CN2807184Y (en) Plate finned tube type heat radiator with copper-aluminium composite structured pipeline
CN200993541Y (en) Copper-aluminium welded combined heat exchanger pipe fitting
CN201129954Y (en) Copper aluminum welding assembled tube part for refrigeration system
CN219324901U (en) Pipe fitting with weld ring and branch pipe with pipe fitting
CN100420892C (en) Inner diameter of copper aluminum joint, copper aluminum joint with diameter being equal to inner diameter of aluminum pipe, and preparation method
CN1330436C (en) Method for making soldered hot-rolled composite metal tube
CN201402072Y (en) Heat exchanger using steel-copper composite connecting pieces
CN101033926B (en) Heat exchanger
EA002941B1 (en) Aluminium product and process of producing same
CN1030438C (en) Aluminium welding method for aluminium-copper heterogenous metal
CN2577076Y (en) Soldered multiple-unit tube
JPH0474099B2 (en)
CN202852234U (en) Thin-wall stainless steel pipeline socket brazing connecting structure
CN115781204A (en) Forming process method of flat copper pipe
CN201016607Y (en) Heat exchanger
CN206474819U (en) A kind of copper aluminium face face vadose solution formula connecting tube
CN101000157A (en) Air conditioner
CN1416995A (en) Pipe butt welding method and butt welded pipe
JPH0648148B2 (en) Heat exchanger

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081224