CN1917317A - Semicircular design of operation platform for installing and maintaining equipments in transformer substation - Google Patents

Semicircular design of operation platform for installing and maintaining equipments in transformer substation Download PDF

Info

Publication number
CN1917317A
CN1917317A CN 200510090857 CN200510090857A CN1917317A CN 1917317 A CN1917317 A CN 1917317A CN 200510090857 CN200510090857 CN 200510090857 CN 200510090857 A CN200510090857 A CN 200510090857A CN 1917317 A CN1917317 A CN 1917317A
Authority
CN
China
Prior art keywords
transformer substation
installing
operation platform
maintaining equipments
semicircular design
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200510090857
Other languages
Chinese (zh)
Inventor
安江英
孙茁
张照煌
曲海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power University
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200510090857 priority Critical patent/CN1917317A/en
Publication of CN1917317A publication Critical patent/CN1917317A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

Purpose of the disclosed design is to extend working space, reduce number of time to move equipment, and raise operating efficiency so that it is convenient for operation staffs to do work when working objects are columns, and equipment and apparatus on columns. Technical scheme is that semi-circle with diameter being as 400mm is setup in middle part of extended portion of working platform.

Description

Maintaining equipments in transformer substation job platform semi-circular design
Technical field transformer station and be similar to the jacking equipment of transformer station's operation occasion especially supplies the hoistable platform of personnel's operation thereon.
Background technology does not still have transformer station's installation and maintenance special operation platform both at home and abroad, and correlative technology field is not seen for the job area that enlarges the operating personnel adopts yet and is similar to technical pattern of the present invention.
Summary of the invention is for enlarging maintaining equipments in transformer substation operating personnel's job area, at the middle part of the sponson of lift job platform the semicircle that diameter is 400mm is set.Like this, in operation, this semicircle just blocks electric pole, increases the stability in this kind equipment availability process on the one hand, and prior one side is the job area that has enlarged the operating personnel.Embodiment can be by enforcement shown in Figure 1.
Description of drawings Fig. 1 is the patent of invention technical architecture plan.

Claims (1)

  1. It is manipulating object that maintaining equipments in transformer substation job platform semi-circular design is mainly used in the cylindrical body, to the equipment on it, device mounting and maintenance activity.At present its extension is all for non-notch design, all is considered as encroaching right as if the structure that patent occurs being similar to.
CN 200510090857 2005-08-18 2005-08-18 Semicircular design of operation platform for installing and maintaining equipments in transformer substation Pending CN1917317A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200510090857 CN1917317A (en) 2005-08-18 2005-08-18 Semicircular design of operation platform for installing and maintaining equipments in transformer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200510090857 CN1917317A (en) 2005-08-18 2005-08-18 Semicircular design of operation platform for installing and maintaining equipments in transformer substation

Publications (1)

Publication Number Publication Date
CN1917317A true CN1917317A (en) 2007-02-21

Family

ID=37738233

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200510090857 Pending CN1917317A (en) 2005-08-18 2005-08-18 Semicircular design of operation platform for installing and maintaining equipments in transformer substation

Country Status (1)

Country Link
CN (1) CN1917317A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111994844A (en) * 2020-08-25 2020-11-27 国网河南省电力公司内乡县供电公司 Transformer substation is with overhauing platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111994844A (en) * 2020-08-25 2020-11-27 国网河南省电力公司内乡县供电公司 Transformer substation is with overhauing platform

Similar Documents

Publication Publication Date Title
MX342375B (en) Assembly process of a telescopic tower.
CN102996062B (en) Maintenance lifting platform and application method thereof
CN201619105U (en) Equipment maintenance platform
CN203845689U (en) Indoor assembled large-scale equipment hoisting device
CN204434191U (en) A kind of electric power facility hanging apparatus
CN203781754U (en) Movable weight hoister
CN1917317A (en) Semicircular design of operation platform for installing and maintaining equipments in transformer substation
CN204732751U (en) On-load tap-changer of transformer service kit
CN204588449U (en) Hoisting device of steel structure
CN204053433U (en) A kind of thrust bearing shoe valve and Tuo Wa attaching/detaching apparatus
CN103138189A (en) Hanging bracket special for electric power disconnecting switch overhauling
CN202529699U (en) Three-claw folding sling for dismounting and mounting bearing
CN203961373U (en) Switchbox protection canopy
CN103334592B (en) Step-type sliding installation construction method for convex structure of high-rise building
CN203486864U (en) Lifting workbench
CN202632942U (en) Safety belt fixing support for transformer
CN201889945U (en) Disassembly/assembly jig for printing-plate shaft of rotary press
CN202940543U (en) High-voltage cable fixing device
CN201660407U (en) Simple rotary hanger for tile processing
CN204138153U (en) A kind of foundation for tower crane lifting self-locking mechanism
CN108988144A (en) A kind of power distribution cabinet Telescopic base structure
CN201990385U (en) Hoisting device of concrete precast slab
CN203103811U (en) Special holding pole for hoisting isolation switch
CN204457048U (en) Self lift type head tower installation hanger device
CN202423918U (en) Isolating switch maintenance car

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20070209

Address after: Beijing, Beijiao

Applicant after: North China Electric Power University

Address before: North China Electric Power University, Beijing, Changping District (Beijing)

Applicant before: An Jiangying

Co-applicant before: Sun Zhuo

Co-applicant before: Zhang Zhaohuang

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20070221