CN1884734A - Archaized architecture and its construction method - Google Patents

Archaized architecture and its construction method Download PDF

Info

Publication number
CN1884734A
CN1884734A CN 200610200665 CN200610200665A CN1884734A CN 1884734 A CN1884734 A CN 1884734A CN 200610200665 CN200610200665 CN 200610200665 CN 200610200665 A CN200610200665 A CN 200610200665A CN 1884734 A CN1884734 A CN 1884734A
Authority
CN
China
Prior art keywords
eave
wooden
concrete
rafter
column cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200610200665
Other languages
Chinese (zh)
Inventor
李勇
王鹏达
崔平贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING URBAN CONSTRUCTION YATAI CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
BEIJING URBAN CONSTRUCTION YATAI CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING URBAN CONSTRUCTION YATAI CONSTRUCTION ENGINEERING Co Ltd filed Critical BEIJING URBAN CONSTRUCTION YATAI CONSTRUCTION ENGINEERING Co Ltd
Priority to CN 200610200665 priority Critical patent/CN1884734A/en
Publication of CN1884734A publication Critical patent/CN1884734A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention relates to a pseudo-classic building and relative method, wherein the eave is formed by cylinder tile, sheet tile, roof panel, flying eave, eave edge, and post head; the post head is formed by eave edge, eave sheet and eave beam; the roof panel and post head are poured integrated; the bottom eave open of concrete roof panel has two steps; the outer step is fixed with wooden flying eave; the inner step is fixed with wooden eave edge; each step has at least tow rows of pre-embedded flat iron; the pre-embedded flat iron is connected to the bolt rod; the bolt rod is through the wooden flying eave or wooden eave edge; the nut fixes the wooden flying eave and wooden eave edge on the bottom of eave open; the nut is sealed with pastern ash; the concrete post head is fixed with one ring of wooden keel via expanding bolt; the wooden box in post head shape is arranged on the wooden keel, to be fixed integrated via nails. The invention has better simulate effect and short construction time.

Description

Archaized architecture and job practices thereof
(1) technical field
The present invention relates to a kind of building in the style of the ancients and job practices thereof.
(2) background technology
The traditional heritage buildings of China is a wooden construction, is combined into timber frame by wood stud, wooden crossbeam, a tree, used in making timber for boats and purlin with the tenon fourth of the twelve Earthly Branches, outwards transmits expansion eaves portion area with sets of brackets on top of the columns, and flying-rafter, eave-rafter have increased rainproof ability, and luxurious to show the honor prestige.The job practices of traditional heritage buildings is very complicated, and timber compoment adopts " numb five a lacquer putties battle " way, and the duration is longer.
(3) summary of the invention
The purpose of this invention is to provide a kind of archaized architecture and job practices thereof, it is more mainly to solve traditional heritage buildings consumption timber, the technical problem of unfavorable fire-fighting; Also solve the problem that the traditional ancient architecture construction is complicated, the duration is oversize.
The object of the present invention is achieved like this: this archaized architecture, at the eaves position semicircular tile, pan tile, roof panel, cornice, eave-rafter, column cap are arranged from up to down, and its column cap is combined by top-down eaves purlin, eaves board and eave beam, it is characterized in that:
Roof panel and column cap are inner for being cast in concrete structure together, there are two step steps at cornice position, concrete roof plate bottom surface, on the step of outer end, fix wooden cornice, fix wooden eave-rafter on the inner step, the pre-buried band iron of at least two row is arranged in each step, pre-buried band iron connecting bolt bar, this shank of bolt passes wooden cornice or wooden eave-rafter, by nut wooden cornice and wooden eave-rafter are fixed on concrete roof plate cornice bottom, above-mentioned nut outside shutoff glue ash;
A circle rough ground is fixed by expansion bolt in concrete column cap outside, and the wooden box of column cap shape is buckled on the rough ground, is fixed together by nail and rough ground.
The job practices of above-mentioned archaized architecture is characterized in that:
(1) the concrete structure pouring construction at cornice and column cap place: eave beam place concrete is poured into a mould with eaves board place concrete, eaves board place concrete is cast in concrete roof, the independent formwork cast of eaves purlin place concrete, section concrete is poured into a mould with the concrete roof plate in flying-rafter, the eave-rafter;
(2) eave-rafter and flying-rafter construction: make wooden eave-rafter, wooden flying-rafter, every wooden eave-rafter, wooden flying-rafter are connected and fixed with the pre-buried band iron in two bolts and the concrete roof plate, the shutoff of nut place embedding glue ash;
(3) column cap construction: make the wooden box of column cap shape with the solid wood plate, on concrete structure, fix a circle rough ground, and then wooden box and rough ground are fixed with nail with bloated bolt.
The job practices of above-mentioned archaized architecture is characterized in that: the joint treatment step between above-mentioned wooden box and the concrete column cap:
(a) the concrete column head surface is rooted out cleaned out;
(b) with the glue ash concrete column head surface is done leveling layer;
(c) the wooden box external surface of column cap shape completely pastes calico, and the seam between wooden box and the concrete column cap is encased;
(d) ash in smearing together on calico is spread thin ash together after doing again;
(e) after thin ash is done, carry out levigate brill and give birth to operation, surperficial oil slick is cleaned with the fiber crops head;
(f) paint colour painting in the column cap outside.
The present invention compares the beneficial effect that has with existing conventional art: building in the style of the ancients of the present invention adopts concrete and carpentery workshop combining form at cornice and column cap position, only matrix section adopts wood material outside cornice and column cap, not only improve the supporting capacity and the fire-fighting ability of building in the style of the ancients, also saved timber greatly; Owing to simplified working procedure greatly, make the archaized architecture construction simple, construction costs greatly reduces, and the duration shortens dramatically.The present invention adopts the modern concrete material that Chinese ancient architecture is improved, and the ancient building profile of copying out is true to nature, and simulated effect is good.
(4) description of drawings
Fig. 1 is the cross-sectional view at column cap of the present invention position;
Fig. 2 is the cross-sectional view at body of wall of the present invention position;
Fig. 3 is the axle side structure schematic diagram of eaves of the present invention below.
Fig. 4 is a fixedly detail drawing of eave-rafter.
Fig. 5 is a fixedly detail drawing of column cap.
Among the figure: 1-semicircular tile, 2-pan tile, 3-roof panel, the wooden flying-rafter of 4-, the wooden eave-rafter of 5-, the pre-buried band iron of 6-, 7-bolt, 8-nut, 9-eaves purlin, 10-concrete roof, 11-post, 12-body of wall, 13-rough ground, 14-expansion bolt, 15-huge pillar pollard make box, 16-nail, 17-pillar pollard and make box, 18-eaves board, 19-eave beam, 20-leveling layer.
(5) specific embodiment
Embodiment is referring to Fig. 1-2: this archaized architecture, at the eaves position semicircular tile 1 is arranged from up to down, pan tile 2, roof panel 3, cornice 4, eave-rafter 5, column cap, its column cap is by top-down eaves purlin 9, eaves board 18 and eave beam 19 combine, roof panel and column cap are inner for being cast in concrete structure together, there are two step steps at the cornice position, bottom surface of concrete roof plate 3, on the step of outer end, fix wooden cornice 4, fix wooden eave-rafter 5 on the inner step, at least two long 4 * 40 zinc-plated pre-buried band irons 6 that work are arranged in each step, pre-buried band iron is inner to be welded with the roof panel steel mesh reinforcement, pre-buried band iron outer end connects Φ 8 harness cord galvanized bolts 7, this bolt 7 passes wooden cornice or wooden eave-rafter, by nut 8 wooden cornice and wooden eave-rafter are fixed on concrete roof plate cornice bottom, above-mentioned nut outside shutoff atomic glue ash.A circle rough ground 13 is fixed by expansion bolt 14 in concrete column cap outside, and the huge pillar pollard of column cap shape makes box 15, the pillar pollard makes box 17 and is buckled on the rough ground, is fixed together by nail 16 and rough ground.
Cornice and column cap engineering adopt concrete and two kinds of forms of carpentery workshop, and eave-rafter adopts twice bolt and original pre-buried band iron to be connected and fixed; The carpentery workshop box that the system of column cap peace adopts the solid wood plate to make fixed dimension is fixed on the concrete column cap, fixes one with bloated bolt and encloses keel in that box is inboard earlier before fixing, and then the solid wood of column cap shape is made box and rough ground is fixed with nail.Rough ground 13 is 50 * 50 Korean pine flitch keel, and expansion bolt 14 Φ 8 expansion bolts, carpentery workshop box are to make of the thick Korean pine solid wood of 20mm plate.
After the body of wall 12 of archaized architecture is finished, carry out following construction:
(1) the concrete structure pouring construction at cornice and column cap place: eave beam 19 place's concrete are poured into a mould with eaves board 18 place's concrete, eaves board 18 place's concrete are cast in concrete roof 10, the independent formwork cast of eaves purlin 9 place's concrete, section concrete is with 3 cast of concrete roof plate in flying-rafter, the eave-rafter;
(2) eave-rafter and flying-rafter construction: make wooden flying-rafter 4, wooden eave-rafter 5, every wooden eave-rafter, wooden flying-rafter are connected and fixed with the pre-buried band iron 6 in two bolts 7 and the concrete roof plate, the shutoff of nut 8 places embedding glue ash;
(3) column cap construction: make the wooden box 15,17 of column cap shape with the solid wood plate, on concrete structure, fix a circle rough ground 13, and then wooden box and rough ground are fixed with nail 16 with bloated bolt.
Joint treatment step between above-mentioned wooden box and the concrete column cap:
(a) with perching knife, wire brush the concrete column head surface is rooted out and cleaned out;
(b) with the glue ash of 108 glue, roe, cement configuration the concrete column head surface is done leveling layer 20;
(c) the wooden box external surface of column cap shape completely pastes calico, and the seam between wooden box and the concrete column cap is encased;
(d) ash in smearing together on calico is spread thin ash together after doing again, and the material of thin ash comprises that pig blood and thin grey thickness are no more than 2mm, and joint is smooth, no stitch;
(e) after thin ash is done, carry out levigate brill and give birth to operation, be finely ground to disconnected spot, after having ground, bore immediately and give birth to tung oil with diamond.Bore and give birth to carefully ash of the necessary penetration of tung oil, must not be interrupted, after having bored, surperficial oil slick is cleaned with the fiber crops head, and crackle must not be arranged;
(f) paint colour painting in the column cap outside, the concrete pattern of colour painting is determined by Party A's sampling according to designing requirement.

Claims (3)

1. an archaized architecture from up to down has semicircular tile, pan tile, roof panel, cornice, eave-rafter, column cap at the eaves position, and its column cap is combined by top-down eaves purlin, eaves board and eave beam, it is characterized in that:
Roof panel and column cap are inner for being cast in concrete structure together, there are two step steps at cornice position, concrete roof plate bottom surface, on the step of outer end, fix wooden cornice, fix wooden eave-rafter on the inner step, the pre-buried band iron of at least two row is arranged in each step, pre-buried band iron connecting bolt bar, this shank of bolt passes wooden cornice or wooden eave-rafter, by nut wooden cornice and wooden eave-rafter are fixed on concrete roof plate cornice bottom, above-mentioned nut outside shutoff glue ash; A circle rough ground is fixed by expansion bolt in concrete column cap outside, and the wooden box of column cap shape is buckled on the rough ground, is fixed together by nail and rough ground.
2. the job practices of archaized architecture according to claim 1 is characterized in that:
(1) the concrete structure pouring construction at cornice and column cap place: eave beam place concrete is poured into a mould with eaves board place concrete, eaves board place concrete is cast in concrete roof, the independent formwork cast of eaves purlin place concrete, section concrete is poured into a mould with the concrete roof plate in flying-rafter, the eave-rafter;
(2) eave-rafter and flying-rafter construction: make wooden eave-rafter, wooden flying-rafter, every wooden eave-rafter, wooden flying-rafter are connected and fixed with the pre-buried band iron in two bolts and the concrete roof plate, the shutoff of nut place embedding glue ash;
(3) column cap construction: make the wooden box of column cap shape with the solid wood plate, on concrete structure, fix a circle rough ground, and then wooden box and rough ground are fixed with nail with bloated bolt.
3. the job practices of archaized architecture according to claim 2 is characterized in that: the joint treatment step between above-mentioned wooden box and the concrete column cap:
(a) the concrete column head surface is rooted out cleaned out;
(b) with the glue ash concrete column head surface is done leveling layer;
(c) the wooden box external surface of column cap shape completely pastes calico, and the seam between wooden box and the concrete column cap is encased;
(d) ash in smearing together on calico is spread thin ash together after doing again;
(e) after thin ash is done, carry out levigate brill and give birth to operation, surperficial oil slick is cleaned with the fiber crops head;
(f) paint colour painting in the column cap outside.
CN 200610200665 2006-07-06 2006-07-06 Archaized architecture and its construction method Pending CN1884734A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200610200665 CN1884734A (en) 2006-07-06 2006-07-06 Archaized architecture and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200610200665 CN1884734A (en) 2006-07-06 2006-07-06 Archaized architecture and its construction method

Publications (1)

Publication Number Publication Date
CN1884734A true CN1884734A (en) 2006-12-27

Family

ID=37583033

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200610200665 Pending CN1884734A (en) 2006-07-06 2006-07-06 Archaized architecture and its construction method

Country Status (1)

Country Link
CN (1) CN1884734A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101858108A (en) * 2010-05-31 2010-10-13 吕云于 Simple and removable archaized building structure and archaized building
CN102080453A (en) * 2010-12-22 2011-06-01 陕西省第三建筑工程公司 Process for prefabricating and constructing concrete rafters of pseudo-classic architectures
CN102220810A (en) * 2011-04-08 2011-10-19 天津住宅集团建设工程总承包有限公司 Method for connecting wooden members with concrete members of eaves of antique buildings
CN102767284A (en) * 2012-08-08 2012-11-07 张家口市第一建筑工程有限公司 Semi-prefabricating construction process for concrete thin-wall lower return eave
CN102828590A (en) * 2011-12-31 2012-12-19 常熟古建园林建设集团有限公司 Construction method of historic building oil paint colour painting ground layer
CN102877651A (en) * 2012-09-21 2013-01-16 山西一建集团有限公司 Construction method for coating rafters of pseudo-classic architecture roof by using aluminum veneers
CN103046698A (en) * 2012-12-29 2013-04-17 陕西省第三建筑工程公司 Method of crack resistance and seepage prevention for concrete roof eave edging in archaized architectures
CN103195214A (en) * 2013-04-24 2013-07-10 北京城建亚泰建设集团有限公司 Wood roof cornice decking and concrete composite structure in archaized buildings and construction method thereof
CN104264918A (en) * 2014-10-09 2015-01-07 中建八局第四建设有限公司 Wood rafter mounting process and wood rafter connector assembly
CN105625642A (en) * 2016-01-21 2016-06-01 郑州大学 Construction method of tile roofing of ancient building
CN107816173A (en) * 2017-11-04 2018-03-20 北京房修建筑工程有限公司 Building in the style of the ancients wood eave-rafter and cast-in-situ steel reinforced concrete Guttr board monolithic construction method
CN108396913A (en) * 2018-04-27 2018-08-14 北京六建集团有限责任公司 A kind of rear-loading type GRC eave structures and its construction method
CN110107008A (en) * 2019-05-17 2019-08-09 坤茂建设集团有限公司 A kind of pseudo-classic architecture wood sets of brackets on top of the columns roofing and concrete main body connection structure

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101858108A (en) * 2010-05-31 2010-10-13 吕云于 Simple and removable archaized building structure and archaized building
CN101858108B (en) * 2010-05-31 2012-03-28 吕云于 Simple and removable archaized building structure and archaized building
CN102080453A (en) * 2010-12-22 2011-06-01 陕西省第三建筑工程公司 Process for prefabricating and constructing concrete rafters of pseudo-classic architectures
CN102220810A (en) * 2011-04-08 2011-10-19 天津住宅集团建设工程总承包有限公司 Method for connecting wooden members with concrete members of eaves of antique buildings
CN102220810B (en) * 2011-04-08 2012-07-04 天津住宅集团建设工程总承包有限公司 Method for connecting wooden members with concrete members of eaves of antique buildings
CN102828590A (en) * 2011-12-31 2012-12-19 常熟古建园林建设集团有限公司 Construction method of historic building oil paint colour painting ground layer
CN102767284A (en) * 2012-08-08 2012-11-07 张家口市第一建筑工程有限公司 Semi-prefabricating construction process for concrete thin-wall lower return eave
CN102877651B (en) * 2012-09-21 2014-11-05 山西一建集团有限公司 Construction method for coating rafters of pseudo-classic architecture roof by using aluminum veneers
CN102877651A (en) * 2012-09-21 2013-01-16 山西一建集团有限公司 Construction method for coating rafters of pseudo-classic architecture roof by using aluminum veneers
CN103046698A (en) * 2012-12-29 2013-04-17 陕西省第三建筑工程公司 Method of crack resistance and seepage prevention for concrete roof eave edging in archaized architectures
CN103046698B (en) * 2012-12-29 2015-02-25 陕西省第三建筑工程公司 Method of crack resistance and seepage prevention for concrete roof eave edging in archaized architectures
CN103195214A (en) * 2013-04-24 2013-07-10 北京城建亚泰建设集团有限公司 Wood roof cornice decking and concrete composite structure in archaized buildings and construction method thereof
CN103195214B (en) * 2013-04-24 2015-01-07 北京城建亚泰建设集团有限公司 Wood roof cornice decking and concrete composite structure in archaized buildings and construction method thereof
CN104264918A (en) * 2014-10-09 2015-01-07 中建八局第四建设有限公司 Wood rafter mounting process and wood rafter connector assembly
CN105625642A (en) * 2016-01-21 2016-06-01 郑州大学 Construction method of tile roofing of ancient building
CN105625642B (en) * 2016-01-21 2017-10-27 郑州大学 A kind of ancient building tile roofing construction method
CN107816173A (en) * 2017-11-04 2018-03-20 北京房修建筑工程有限公司 Building in the style of the ancients wood eave-rafter and cast-in-situ steel reinforced concrete Guttr board monolithic construction method
CN107816173B (en) * 2017-11-04 2019-09-10 北京房修一建筑工程有限公司 Pseudo-classic architecture wood eave-rafter and cast-in-situ steel reinforced concrete Guttr board monolithic construction method
CN108396913A (en) * 2018-04-27 2018-08-14 北京六建集团有限责任公司 A kind of rear-loading type GRC eave structures and its construction method
CN108396913B (en) * 2018-04-27 2023-12-12 北京六建集团有限责任公司 Rear-mounted GRC cornice structure and construction method thereof
CN110107008A (en) * 2019-05-17 2019-08-09 坤茂建设集团有限公司 A kind of pseudo-classic architecture wood sets of brackets on top of the columns roofing and concrete main body connection structure

Similar Documents

Publication Publication Date Title
CN1884734A (en) Archaized architecture and its construction method
CN109518988B (en) Adjustable supporting device for assembled building
CN202000685U (en) Historic building wooden beams and columns reinforced through embedded ribs
CN1484726A (en) Cellular-core structural panel and building structure incorporating same
CN1715586A (en) Prestress mixed beam with concrete plate and corrugate steel web beam
CN114351853B (en) Complex archaized attic steel-wood combined structure and construction method thereof
CN1401873A (en) Method for pre-stressed reinforcing concrete compression member
CN102220810B (en) Method for connecting wooden members with concrete members of eaves of antique buildings
US20070144080A1 (en) Cementitious roofing systems and methods
CN209339738U (en) A kind of novel fabricated enclosure wall
CN1876996A (en) Integrally-cast mould-detachment-free concrete structure system and construction method thereof
CN204238264U (en) A kind of sole plate post-poured strip structure
CN2913498Y (en) Hall column of wood structure building
CN1108417C (en) Hollow grid structure pedestrain overcrossing
CN111827704A (en) Reinforced concrete structure and reinforcing method
CN202017292U (en) Connecting structure for wooden element and concrete element of pseudo-classic building eave
CN1222672C (en) Flat soffit, doubly prestressed, composite, roof-ceiling construction for large span industrial buildings
CN201433526Y (en) Rain-sun cover
CN209686249U (en) Longitudinal prestress tensioning end anchorage device structure
CN2876208Y (en) Self heat insulating wall body concrete beam, column external heat insulating structure of energy saving construction external protection construction
CN1584264A (en) Fastening method for high-strength concrete epibolic thin-layer and coupled columns
CN204212304U (en) A kind of fan-shaped imitative shell roofing
CN113417218A (en) Prestressed concrete half-inverted T-shaped invisible bent cap steel-wood combined template and construction method
CN106758682B (en) A kind of ecology wooden footway structure and its technique
CN1307159A (en) Steel-frame building structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication