CN1884711A - Double-pipe type immersed tube filling pile - Google Patents

Double-pipe type immersed tube filling pile Download PDF

Info

Publication number
CN1884711A
CN1884711A CN 200610087631 CN200610087631A CN1884711A CN 1884711 A CN1884711 A CN 1884711A CN 200610087631 CN200610087631 CN 200610087631 CN 200610087631 A CN200610087631 A CN 200610087631A CN 1884711 A CN1884711 A CN 1884711A
Authority
CN
China
Prior art keywords
pipe
tube
soil
post
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610087631
Other languages
Chinese (zh)
Other versions
CN100465384C (en
Inventor
区国雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2006100876317A priority Critical patent/CN100465384C/en
Publication of CN1884711A publication Critical patent/CN1884711A/en
Application granted granted Critical
Publication of CN100465384C publication Critical patent/CN100465384C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a method for producing dual-tube sink filling post, wherein said post tube is formed by inner and tow post tubes with space between them; the bottom of outer post tube is mounted with steel annular pins; said pins are divided into fixing kind and movable kind; the inner tube is longitudinally cut into two parts; the section is alternatively welded with small steel tubes; steel bolt is inserted into small steel tube to connect two parts; when sinking tube, sheathing inner post tube into outer post tube to be sink again; reaching preset position, to draw out inner post tube and inner soil; then using mechanical hopper to remove the left soil of outer post tube; then filling steel bar pouring concrete; at least, drawing out the outer post tube to form post. The invention has low compress effect, to avoid affecting the quality of post, and reduce the sink resistance.

Description

Double-pipe type immersed tube filling pile
Technical field the present invention relates to a kind of preparation method of tube-sinking cast-in-situ pile, specifically is exactly double-pipe type immersed tube filling pile.
The preparation method of the tube-sinking cast-in-situ pile that technical background is traditional is used the single pile pipe, load onto the shoe of concrete system or steel in the bottom of stake pipe, adopt methods such as hammering, vibrations, static pressure the stake pipe of band shoe to be sunk to formation stake hole in the soil by the mode of soil compaction, in the stake hole, put into the reinforcing cage placing of concrete then, again the stake pipe is extracted and pile.Because the strong soil compaction of immersed tube process produces soil compaction effect, cause the pile peripheral earth shifted laterally and the protuberance that makes progress, when serious even can adjacent stake be pulled off, during the pipe of pile pulling simultaneously because by quality accidents such as the resilience of the soil that squeezes and constriction that phreatic pressure causes pile concrete even broken piles.Because strong soil compaction during immersed tube, the resistance of immersed tube is very big, therefore can not make the bigger stake of diameter, generally can only make the following stake of stake footpath 600mm.
The caused quality accident of soil compaction effect of the tube-sinking cast-in-situ pile that summary of the invention the objective of the invention is to avoid traditional, and reduce the immersed tube resistance so that can make larger-diameter tube-sinking cast-in-situ pile.
Double-pipe type immersed tube filling pile of the present invention, the stake pipe is made up of inside and outside two pile pipes, leaves the gap between the interior stud pipe, and bottom of outer post tube is installed the steel annular pins.Pin has fixed and movable two kinds: fixed pin is welded on bottom of outer post tube, can extract with the stud pipe when tube drawing, reuses; Movable pin then separates with the stud pipe, does not extract during tube drawing and stays underground.Annular pins is made up of two parts up and down, the radial section on top is wide flat rectangle, and its external diameter is not less than the external diameter of stud pipe, and internal diameter is than the little 10~15mm of stud bore, so that the gap between the interior stud pipe is sheltered from, the gap in soil enters when preventing immersed tube between the stud pipe.The radial section of pin bottom is narrow and long rectangular, del, fall shape such as trapezoidal, makes pin be easy to enter in the soil when piling.When pin when being movable, at the stud pipe stopping means of the upper end on pin top welding steel, stud tube and tube pin relative position is correct when guaranteeing piling.The steel pipe that stud Guan Weiyi root is complete, interior stake pipe then vertically cuts open and is two halves, involutes again.The little steel pipe of staggered welding inserts elongated steel latch in the steel pipe on the vertical section of interior stake pipe, and two-part half interior pipe is connected to a complete interior stake pipe, and the purpose of doing like this is for the soil in the stake pipe in clearing up easily later on.Interior stake pipe upper end weldable steel system locating ring, the effect of locating ring is to guarantee the correct position of interior stake pipe in the stud pipe.Earlier interior stake pipe box is gone in the stud pipe when making, interior stud pipe is sunk in the soil simultaneously,, manage the soil compaction effect when having alleviated immersed tube greatly in the soil below the stake pipe can enter during immersed tube like this because interior stake pipe bottom is an opening.Interior stud pipe takes out the soil of interior stake Guan Lian the inside earlier after sinking to assigned address, form empty stake hole in the stud pipe, if there have residual surplus soil then to remove with artificial or machinery grab bucket in the stake hole to be clean, in the stake hole, put into the reinforcing cage placing of concrete then, extract the stud pipe at last and pile.In stake pipe then extract out and connect two-part steel latch, the inner soil of stake pipe cleaning in opening, and then link up and wait until next time and use.
The present invention compares with traditional tube-sinking cast-in-situ pile preparation method, because the stake pipe has held most soil in the stake hole in during immersed tube, so alleviated soil compaction effect greatly, avoided the infringement of soil compaction effect to tube-sinking cast-in-situ pile, help guaranteeing pile quality, resistance significantly reduces during simultaneously owing to immersed tube, therefore can make the bigger stake of diameter.
Description of drawings Fig. 1 is the longitudinal section of the interior stud pipe of double hose tube-sinking cast-in-situ pile when sinking to design attitude
Fig. 2 is the vertical view that interior stake pipe box is gone into the cross section behind the stud pipe
Fig. 3 is the longitudinal section that interior stake pipe box is gone into stud pipe rear lower
Fig. 4 is the two-part connection diagram of interior stake pipe
1, the pin 4 of stud pipe 2, interior stake pipe 3, stud pipe, the locating ring of interior stake pipe
5, the soil that holds in the gap 6 between the interior stud pipe, the interior stake pipe
7, the little steel pipe 8 that welds on the vertical section, the steel latch in the little steel pipe are managed in interior stake
9, the steel locating piece on the movable pin
The specific embodiment is further described the present invention below in conjunction with accompanying drawing.
In the accompanying drawings, the 1st, external diameter φ 800, wall thickness is 20 stud pipe, the 2nd, and external diameter φ 750, wall thickness is 20 interior stake pipe, the 3rd, and the movable pin of stud pipe, top is that thickness is 20 doughnut-shaped steel plate,, its external diameter φ 850, internal diameter φ 720, the bottom is external diameter φ 800, wall thickness 20, high 100 short round steel pipe, two parts connect with electric welding up and down, the 4th, the locating ring that thick 3 high 10 steel plate is made, be divided into the upper end that two semi-rings are welded in a pipe in two and half respectively, its outward flange flushes with upper orifice, and the 7th, the nominal bore is the low-pressure fluid conveying welded steel pipe of φ 20, every segment length 200, distance is 205 between two sections, interlaced welding on the vertical section of a pipe in two and half, the 8 elongated latches of making for φ 16 reinforcing bars, the 9th, 3 steel locating pieces on the movable pin, steel plate with thick 20 is made, and planar dimension is 20 * 30, and is longer along circumferential part, the long 415mm of radius that the locating piece center links to each other with the center of circle of annular pins, angle each other is 120 °.
In stake pipe will two-part half when installing in a pipe to good, then steel latch 8 is inserted in the little steel pipe, make in two-part half a pipe connect into complete interior stake and manage.Again interior stake pipe box is advanced in the stud pipe.
During piling interior stud pipe is sunk in the soil simultaneously, behind assigned address, interior stake pipe is connected inner soil taking-up, with the surplus soil in artificial or the grab bucket cleaning hole, put into the reinforcing cage placing of concrete then again, extract stud pipe pile again.Take out the steel latch after interior stake pipe takes out, dimidiation is managed in interior stake, remove the soil in the pipe, connect to complete interior stake pipe more again and when laying a pile, use.

Claims (2)

1, a kind of double-pipe type immersed tube filling pile, it is characterized in that, described preparation method is used inside and outside two pile pipes, under the stud pipe pin is housed, interior stake pipe lower open, the soil during immersed tube in the stake hole enters in the interior stake pipe, immersed tube after arriving design attitude is extracted interior stake pipe and soil wherein, remove surplus soil remaining in the stud pipe with artificial or machinery grab bucket, put into the reinforcing cage placing of concrete then, extract the stud pipe at last and pile.
2, double-pipe type immersed tube filling pile according to claim 1, it is characterized in that it is two and half pipes that interior stake pipe is vertically cut open, the little steel pipe of staggered welding on split surface, insert the steel latch then therein two and half pipes are connected to complete interior stake pipe, the soil of stake pipe and the inside in interior stud pipe sinks to and extracts behind the design attitude, extract the steel latch that connects a pipe in two and half then, interior stake pipe in two, remove the soil in the pipe, connect to complete interior stake pipe more again and treat to drive piles usefulness next time.
CNB2006100876317A 2006-06-07 2006-06-07 Double-pipe type immersed tube filling pile Expired - Fee Related CN100465384C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100876317A CN100465384C (en) 2006-06-07 2006-06-07 Double-pipe type immersed tube filling pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100876317A CN100465384C (en) 2006-06-07 2006-06-07 Double-pipe type immersed tube filling pile

Publications (2)

Publication Number Publication Date
CN1884711A true CN1884711A (en) 2006-12-27
CN100465384C CN100465384C (en) 2009-03-04

Family

ID=37583011

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100876317A Expired - Fee Related CN100465384C (en) 2006-06-07 2006-06-07 Double-pipe type immersed tube filling pile

Country Status (1)

Country Link
CN (1) CN100465384C (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013149471A1 (en) * 2012-04-01 2013-10-10 上海振中机械制造有限公司 Piling method based on hole-forming by sinking double pipes and pulling inner pipe, and application thereof
CN103711121A (en) * 2014-01-16 2014-04-09 上海强劲地基工程股份有限公司 Construction method for undisturbed soil pressure irrigation concrete pile with down-mounted pile top
CN104110029A (en) * 2014-07-09 2014-10-22 江苏鼎达建筑新技术有限公司 Construction method of static pressure tube-sinking soil-free support pile
CN109083138A (en) * 2018-09-06 2018-12-25 福建大力新型建材科技有限公司 A kind of synchronous grouting pile for prestressed pipe
CN112502137A (en) * 2020-11-30 2021-03-16 陈远 Construction method of pile and special equipment

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0656017B2 (en) * 1986-03-13 1994-07-27 旭化成工業株式会社 Construction method for ready-made piles
GB2300210B (en) * 1995-04-24 1998-11-04 Chan Yat S Piling
JPH09242068A (en) * 1996-03-08 1997-09-16 Nippon Steel Corp Cast-in-place pile, building method thereof, and building device thereof
CN1194319A (en) * 1997-03-26 1998-09-30 福建建专基础工程公司 Pile forming method for tube immersing and drilling concrete pile
CN1260424A (en) * 1999-11-25 2000-07-19 孟宪民 Vibratory pipe sinking dug-hole pile
CN1316570A (en) * 2000-04-05 2001-10-10 陈为群 Prefabrication and casting combined technology for forming piles
CN1265062C (en) * 2003-06-21 2006-07-19 闫瑞明 Construction for making piles and tools
CN2661771Y (en) * 2003-12-05 2004-12-08 郭兆泉 Reinforced concrete hollow pile technology adopting vibrating tube-sinking cast-in-situ ram machine

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013149471A1 (en) * 2012-04-01 2013-10-10 上海振中机械制造有限公司 Piling method based on hole-forming by sinking double pipes and pulling inner pipe, and application thereof
CN103711121A (en) * 2014-01-16 2014-04-09 上海强劲地基工程股份有限公司 Construction method for undisturbed soil pressure irrigation concrete pile with down-mounted pile top
CN103711121B (en) * 2014-01-16 2016-03-23 上海强劲地基工程股份有限公司 The underlying original state in stake top fetches earth the construction method of cast-with-pressure concrete pile
CN104110029A (en) * 2014-07-09 2014-10-22 江苏鼎达建筑新技术有限公司 Construction method of static pressure tube-sinking soil-free support pile
CN109083138A (en) * 2018-09-06 2018-12-25 福建大力新型建材科技有限公司 A kind of synchronous grouting pile for prestressed pipe
CN109083138B (en) * 2018-09-06 2020-06-02 福建大力新型建材科技有限公司 Device for synchronously grouting prestressed pipe pile
CN112502137A (en) * 2020-11-30 2021-03-16 陈远 Construction method of pile and special equipment

Also Published As

Publication number Publication date
CN100465384C (en) 2009-03-04

Similar Documents

Publication Publication Date Title
CN100465384C (en) Double-pipe type immersed tube filling pile
CN106836179B (en) The construction method of vertical strengthening ribs enhanced bellows grouting pile
JP5235748B2 (en) Wall metal fittings and underground continuous wall construction method
CN111893992A (en) Static breaking construction method for interior of pile head of cast-in-situ bored pile
CN210658340U (en) Prefabricated dado
CN210439291U (en) Cast-in-place pile does not have broken pile head structure of machinery
CN203007940U (en) Tubular pile protection structure in side slope hammering construction
JP7245654B2 (en) Construction method of cast-in-place concrete pile and bottom injection pipe
JP2018091038A (en) Pipe drawing-out method of existing wellhole
CN105804058B (en) A kind of diaphram wall and its construction method
CN101691753B (en) Pile mould for PCC pile and construction method for overlong PCC pile
CN211922599U (en) CFG pile end post-grouting device
JP2013253378A (en) Auxiliary tool for forming pile head space, hollow precast pile having the same, pile head treatment method using the hollow precast pile, and method for forming pile head space
CN102296598A (en) Construction method of PCC (cast-in-place concrete large-diameter pipe) pile
CN212983858U (en) Anchor rod static pressure pile head sealing device
CN106869139B (en) Ecological demolition construction method for reinforced concrete inner support
CN204715350U (en) A kind of for stake top mark height in the pile extension device of design elevation
CN212223506U (en) Prefabricated assembled concrete gutter
CN217734139U (en) Steel pipe shroud ring formula broken pile reinforced structure
CN215482881U (en) A piecing devices that is used for glass fiber muscle ground to link wall female groove
CN212561489U (en) Pile frame structure of cast-in-situ bored pile
CN218466538U (en) Post-grouting steel strip corrugated pipe
CN220414955U (en) Reinforced mould for wall hole mouth of stressed concrete structure
KR200291837Y1 (en) The multi-column concrete structure that is made by cast-in-place device
CN219490834U (en) Riverway retaining wall restoration structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Qu Guoxiong

Document name: Notification of Termination of Patent Right

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090304

Termination date: 20100607