CN1876994A - Mounting and caging system for composite thermal-insulation concrete building template and construction method thereof - Google Patents

Mounting and caging system for composite thermal-insulation concrete building template and construction method thereof Download PDF

Info

Publication number
CN1876994A
CN1876994A CN 200610200657 CN200610200657A CN1876994A CN 1876994 A CN1876994 A CN 1876994A CN 200610200657 CN200610200657 CN 200610200657 CN 200610200657 A CN200610200657 A CN 200610200657A CN 1876994 A CN1876994 A CN 1876994A
Authority
CN
China
Prior art keywords
horizontal
location
vertical
reinforcement
wall form
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610200657
Other languages
Chinese (zh)
Other versions
CN100417774C (en
Inventor
朱秦江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2006102006578A priority Critical patent/CN100417774C/en
Publication of CN1876994A publication Critical patent/CN1876994A/en
Application granted granted Critical
Publication of CN100417774C publication Critical patent/CN100417774C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a mounting limit system of composite thermal-insulated concrete mold plate and relative construction. Wherein, the foundation is mounted with horizontal positioning device, upright positing device and outer wall mold plate; the horizontal steel bar is positioned by horizontal positioning device and horizontal steel bar positioning clamper; the upright steel bar is positioned by upright positioning device and upright steel bar positioning clamper; the concrete used to pour wall and floor is poured with C track bottom; the inner wall mold plate is embedded into the groove of C track, to connect the pre-embedded steel plates inside two side wall mole plates. The invention is processed in factory, or on-site, to confirm the accurate installment of wall mold plate and floor mold plate, to avoid displacement of steel bar when pouring concrete.

Description

Composite thermal-insulation concrete building template is installed caging system and job practices thereof
(1) technical field
The present invention relates to a kind of building structure and job practices thereof.
(2) background technology
In available coagulation civil engineering building structure, vertical reinforcement, horizontal reinforcement and wall form are site operation, the on-the-spot installation, the problem that exists is: the site work amount is bigger, speed of application is slow, reinforcing bar and template are difficult for accurately location, construction precision and integral rigidity are relatively poor, and reinforcement displacement takes place in the concrete casting process easily, make workmanship be difficult to obtain assurance.
(3) summary of the invention
The purpose of this invention is to provide a kind of composite thermal-insulation concrete building template caging system and job practices thereof are installed, solve that traditional architecture template site work amount is big, speed of application is slow, reinforcing bar and template are difficult for accurately the location, reinforcement displacement takes place easily, make workmanship be difficult to obtain the problem of assurance in the concrete casting process.
Composite thermal-insulation concrete building template of the present invention is installed the technical scheme of caging system:
This composite thermal-insulation concrete building template is installed caging system, comprise vertical reinforcement, horizontal reinforcement and concrete in the wall form of both sides, it is characterized in that: the both sides wall form is the polyphenyl thermal insulation thermal insulation board of built-in pre-buried steel disc, horizontal reinforcement is by the horizontal location device and the fastener location, horizontal reinforcement location that place in the wall form of both sides, and vertical reinforcement is by the vertical locator and the fastener location, vertical reinforcement location that place in the wall form of both sides; Horizontal location device and vertical locator are fixedly connected into screen work by biside plate and tranverse connecting plate, and the outside of the interior plate of vertical locator is fixed with C type guide rail by rivet, the notch of this C type guide rail up, inboard wall form embeds in the notch of C type guide rail.
Above-mentioned C type guide rail is C shaped steel or channel-section steel.
Above-mentioned composite thermal-insulation concrete building template is installed the job practices of caging system, it is characterized in that construction sequence:
Step 1: horizontal location device, vertical locator and outside wall form are installed on the basis, and horizontal reinforcement is by horizontal location device and fastener location, horizontal reinforcement location, and vertical reinforcement is by vertical locator and fastener location, vertical reinforcement location;
Step 2: be fixed on C type guide rail on the vertical locator side external surface that is positioned at the slab form top with rivet;
Step 3: build the concrete of body of wall and floor, build above the concrete to C type guide rail bottom surface;
Step 4: inboard wall form is embedded in the notch of C type guide rail, connect the pre-buried steel chip module in the wall form of both sides.
The present invention compares the beneficial effect that has with existing conventional art: the horizontal reinforcement in the composite thermal-insulation concrete building template installation caging system of the present invention is by the horizontal location device and the fastener location, horizontal reinforcement location that place in the wall form of both sides, and vertical reinforcement is by the vertical locator and the fastener location, vertical reinforcement location that place in the wall form of both sides.By the fixedly connected C shaped steel of rivet template guide rail, this C shaped steel guide rail can guarantee the pouring on flat precision of floorslab concrete and the installation accuracy of wall form in the outside of vertical locator inboard in the present invention.Composite thermal-insulation concrete building template is installed caging system and is finished in factory process, can install fast in the building site, accurate, accelerates speed of application, guarantees workmanship.
(4) description of drawings
Fig. 1 is the schematic diagram of construction sequence 1 of the present invention;
Fig. 2 is the schematic diagram of construction sequence 2 of the present invention;
Fig. 3 is the schematic diagram of construction sequence 3 of the present invention;
Fig. 4 is the schematic diagram of construction sequence 4 of the present invention;
Fig. 5 is the structural representation of pre-buried steel chip module.
Fig. 6 is the pinpoint structural representation of reinforcing bar.
Fig. 7 is the structural representation of horizontal reinforcement location fastener.
Fig. 8 is the structural representation of vertical reinforcement location fastener.
1-outside wall form, 2-horizontal reinforcement, 3-vertical reinforcement, 4-pre-buried steel chip module, 5-slab form, 6-basis, 7-horizontal location device, the vertical locator of 8-, 9-C type guide rail, 10-rivet, 11-concrete, the inboard wall form of 12-, 13-horizontal reinforcement location fastener, 14-vertical reinforcement location fastener, 15-tranverse connecting plate.
The pre-buried steel disc of 41-, 42-connector, 43-double wedge, 44-through hole, the horizontal fastener of 45-, the vertical fastener of 46-, 47-inserted sheet, 48-socket.
(5) specific embodiment
Referring to Fig. 1, step 1: horizontal location device 7, vertical locator 8 and inboard wall form 1 are installed on basis 6, in system of the present invention, are carried out the installation of steel fixer, reinforcing bar and outside wall form.
Referring to Fig. 2, step 2: C type guide rail is fixing on vertical locator by rivet.Above-mentioned C type guide rail 9 is C shaped steel or channel-section steel.
Referring to Fig. 3, step 3: build the concrete 11 of body of wall and floor, build above the concrete to the bottom surface of C type guide rail 9;
Referring to Fig. 4, step 4: inboard wall form is installed on C type guide rail 9, and the root of inboard wall form 12 is embedded in the groove of C type guide rail 9, connects the pre-buried steel chip module 4 in the wall form of both sides.
Referring to Fig. 5, the structure of pre-buried steel chip module 4: place the pre-buried steel disc 41 in outside wall form and the inboard wall form, be installed with connector 42, two transverse connections between the through hole 44 of steel disc and fixed by horizontal fastener 45, every row connector is vertically fixed by vertical fastener 46.The cross section of above-mentioned pre-buried steel disc 41 is II shape or U-shaped.Above-mentioned connector 42 is] shape, there is crotch at two ends.Above-mentioned horizontal fastener 45 is a strip of sheet, and two grooves are arranged on the lateral attitude with respect to connector.Above-mentioned vertical fastener 46 is a strip of sheet, and a row groove is arranged on the lengthwise position with respect to connector.One end of pre-buried steel disc has inserted sheet 47, and the other end has socket 48, and two pre-buried steel discs are for pegging graft up and down.
Referring to Fig. 6, horizontal reinforcement 2 is by placing horizontal location device 7 and horizontal reinforcement location fastener 13 in the wall form of both sides to block the location.Vertical reinforcement 3 is by the vertical locator 8 and the location, vertical reinforcement location fastener 14 card jail that place in the wall form of both sides.Horizontal location device 7 and vertical locator 8 are fixedly connected into screen work by biside plate and tranverse connecting plate.For saving steel, can bore a hole on the tranverse connecting plate 15.
Referring to Fig. 7; horizontal reinforcement location fastener 13 is the rectangle cushion block of a band vertical clamping slot; its vertical clamping slot is plugged on the junction of outside plate and crosspiece, inner panel and the crosspiece of vertical locator; horizontal reinforcement is through between the inner panel and outside plate of vertical locator; be resisted against fastener inboard, horizontal reinforcement location, the thickness and the thickness of concrete cover of rectangle cushion block adapt.
Referring to Fig. 8, vertical reinforcement location fastener 14 is the right angle type cushion block of a two-way tape draw-in groove, and vertical reinforcement is plugged in the horizontal draw-in groove of lateral part, and horizontal card bottom land limit to the thickness and the thickness of concrete cover of opposite side entity adapts; Vertical draw-in groove is plugged on the outside plate or inner panel of horizontal location device; vertical reinforcement location fastener is fixed by holding screw and horizontal location device; vertical reinforcement is through between the inner panel and outside plate of horizontal location device; be resisted against fastener inboard, vertical reinforcement location, thickness and thickness of concrete cover that vertical reinforcement location fastener vertical portion is divided adapt.

Claims (3)

1. a composite thermal-insulation concrete building template is installed caging system, comprise vertical reinforcement, horizontal reinforcement and concrete in the wall form of both sides, it is characterized in that: the both sides wall form is the polyphenyl thermal insulation thermal insulation board of built-in pre-buried steel disc, horizontal reinforcement is by the horizontal location device and the fastener location, horizontal reinforcement location that place in the wall form of both sides, and vertical reinforcement is by the vertical locator and the fastener location, vertical reinforcement location that place in the wall form of both sides; Horizontal location device and vertical locator are fixedly connected into screen work by biside plate and tranverse connecting plate, and the outside of the interior plate of vertical locator is fixed with C type guide rail by rivet, the notch of this C type guide rail up, inboard wall form embeds in the notch of C type guide rail.
2. according to the described composite thermal-insulation concrete building template of claim 1 caging system is installed, it is characterized in that: above-mentioned C type guide rail is C shaped steel or channel-section steel.
3. composite thermal-insulation concrete building template according to claim 1 and 2 is installed the job practices of caging system, it is characterized in that construction sequence:
Step 1: horizontal location device, vertical locator and outside wall form are installed on the basis, and horizontal reinforcement is by horizontal location device and fastener location, horizontal reinforcement location, and vertical reinforcement is by vertical locator and fastener location, vertical reinforcement location;
Step 2: be fixed on C type guide rail on the vertical locator side external surface that is positioned at the slab form top with rivet;
Step 3: build the concrete of body of wall and floor, build above the concrete to C type guide rail bottom surface;
Step 4: inboard wall form is embedded in the notch of C type guide rail, connect the pre-buried steel disc in the wall form of both sides.
CNB2006102006578A 2006-07-04 2006-07-04 Mounting and caging system for composite thermal-insulation concrete building template and construction method thereof Expired - Fee Related CN100417774C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006102006578A CN100417774C (en) 2006-07-04 2006-07-04 Mounting and caging system for composite thermal-insulation concrete building template and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006102006578A CN100417774C (en) 2006-07-04 2006-07-04 Mounting and caging system for composite thermal-insulation concrete building template and construction method thereof

Publications (2)

Publication Number Publication Date
CN1876994A true CN1876994A (en) 2006-12-13
CN100417774C CN100417774C (en) 2008-09-10

Family

ID=37509531

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006102006578A Expired - Fee Related CN100417774C (en) 2006-07-04 2006-07-04 Mounting and caging system for composite thermal-insulation concrete building template and construction method thereof

Country Status (1)

Country Link
CN (1) CN100417774C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103097620A (en) * 2010-08-02 2013-05-08 阿尔弗雷德·雷德尔贝尔格 Method for producing prefabricated structural parts
CN105888108A (en) * 2016-05-25 2016-08-24 中大建设股份有限公司 Reinforced concrete shear wall with positioning prefabricated member inside and construction method of reinforced concrete shear wall

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60250126A (en) * 1984-05-26 1985-12-10 Chuo Jutaku:Kk Construction of foundation
CN1108421C (en) * 1998-12-23 2003-05-14 李国安 Vertical construction method and apparatus for architectural reinforcing bar groups
CN1284912C (en) * 2002-12-30 2006-11-15 徐亚柯 Non-detachable steel net formwork for in-situ casting concrete wall and its use
CN2656520Y (en) * 2003-09-25 2004-11-17 刘景林 Tool set-up device for assembling mould net
CN100390359C (en) * 2005-10-17 2008-05-28 朱秦江 Composite warm preservation heat insulation concrete graded layer integrated pouring system and its construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103097620A (en) * 2010-08-02 2013-05-08 阿尔弗雷德·雷德尔贝尔格 Method for producing prefabricated structural parts
CN105888108A (en) * 2016-05-25 2016-08-24 中大建设股份有限公司 Reinforced concrete shear wall with positioning prefabricated member inside and construction method of reinforced concrete shear wall
CN105888108B (en) * 2016-05-25 2018-02-02 中大建设股份有限公司 Built-in positioning prefabricated component reinforced concrete shear wall and construction method

Also Published As

Publication number Publication date
CN100417774C (en) 2008-09-10

Similar Documents

Publication Publication Date Title
CN108797847B (en) Assembled steel frame infilled wall structure system and construction method thereof
CN100339543C (en) Precise positioning system for steel bars of composite thermal-insulation concrete building and construction method thereof
CN1876995A (en) Integral mould-detachment-free casting system for concrete structure and construction method thereof
CN114046041B (en) Template reinforcing structure of bare concrete wall post-pouring strip and construction method thereof
CN1876994A (en) Mounting and caging system for composite thermal-insulation concrete building template and construction method thereof
CN111622026A (en) Plate girder structure suitable for magnetic suspension traffic and construction method thereof
CN103556758B (en) Lightweight steel construction lightweight concrete cast-in-place wall and construction method
CN118007829A (en) Structural steel anti-seismic unit at structural conversion layer and mounting method
CN213359004U (en) Stably-spliced lifting wall
CN110924678A (en) Construction method and device for large-span variable-section haunch plate template
CN213806590U (en) Reinforcing apparatus of roof beam side form board
CN111119346B (en) Connecting device suitable for assembled concrete frame-prefabricated wallboard
CN109057318B (en) Assembly type building template system and wall body module
CN202248943U (en) Auxiliary device for positioning pedestal embedded part of large steel structure
CN216662182U (en) Pre-buried hoisting point location structure of prefabricated panel
CN220395282U (en) Floor entrance to a cave block structure
CN210767842U (en) Slot type stair wood formwork
CN212506722U (en) Integral prefabricated balcony module adopting light ribbon board
CN213417445U (en) Universal mould for ballastless track bed plate
CN221167496U (en) Straightness self calibration template hangs down
CN112962960B (en) Early formwork stripping support system of coincide floor rigid coupling independent stay
CN218323871U (en) Shear wall template installation positioner
CN219931282U (en) Fastener for mounting external wall insulation board and external wall insulation board mounting structure
CN215717719U (en) Aluminum alloy wall template bottom leak protection thick liquid device
CN214782988U (en) Pre-buried single-cavity type positioning device for assembled road surface

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080910

Termination date: 20140704

EXPY Termination of patent right or utility model