CN1865615A - H-shape steel member with lateral restrain - Google Patents

H-shape steel member with lateral restrain Download PDF

Info

Publication number
CN1865615A
CN1865615A CNA2006100318433A CN200610031843A CN1865615A CN 1865615 A CN1865615 A CN 1865615A CN A2006100318433 A CNA2006100318433 A CN A2006100318433A CN 200610031843 A CN200610031843 A CN 200610031843A CN 1865615 A CN1865615 A CN 1865615A
Authority
CN
China
Prior art keywords
steel
section member
steel section
restrain
gap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2006100318433A
Other languages
Chinese (zh)
Other versions
CN100489207C (en
Inventor
肖岩
周涛
李贤�
张国伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan University
Original Assignee
Hunan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University filed Critical Hunan University
Priority to CNB2006100318433A priority Critical patent/CN100489207C/en
Publication of CN1865615A publication Critical patent/CN1865615A/en
Application granted granted Critical
Publication of CN100489207C publication Critical patent/CN100489207C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention relates to an H-shaped steel element with transverse restriction. Wherein, said H-shaped steel element is steel beam or steel post; it has transverse restriction near the end or bottom and flexible separation pad between said transverse restriction and the end or bottom; said transverse restriction comprises a package covering the H-shaped steel element and the stuff between the wing edge of H-shaped steel element and the web; said package and the outer profile of H-shaped steel element have the first space between them; and the second space is between the stuff and the H-shaped steel element. The invention can effectively improve the vibration resistance and improve its flexibility, with lower cost and simple production; therefore, it can solve the problem of local stability in earthquake, to improve its stability.

Description

The H Steel section member of lateral restrain
Technical field
The present invention is mainly concerned with the steel structure member field that is used for building structure, refers in particular to a kind of H Steel section member that can be used for the lateral restrain in the house architectural structure design and construction of antidetonation area.
Background technology
Steel work has the intensity height, from heavy and light, series of advantages such as anti-seismic performance is good, speed of application is fast, ground cost saving, area occupied is little, industrialization degree is high, good looking appearance, compare with concrete structure, adopting steel work environmental protection and also can utilizing once more more, also is the structure that is easy to industrialization.Developed countries such as the U.S., Japan, Germany extensively adopt steel work in engineering construction, steel building will account for more than 40% of whole building, and the shared proportion of steel building of China is less than 5% at present, and this is with China's steel are underproduce relevant in the past.China's output of steel promotes significantly in recent years, and supply exceed demand then become." Chinese architecture technical policy " announcement (1996-2010) is a strong promotion to the development of steel work, has started the new period that steel work is used under construction, makes construction steel structure obtain developing rapidly." national construction steel structure industry the Tenth Five-Year Plan (2001-2005) and development planning outline (draft) in 2015 " points out that the developing goal of construction steel structure is to strive for reaching annual construction steel structure to account for 3% of national steel output with steel during "the 10th five-years"; The developing goal of construction steel structure in 2015 is that the steel using amount of striving for annual construction steel structure reaches 6% of steel total output.Can predict, steel work will more and more be applied in the construction work from now on.
H shaped steel is the section bar that every performance that a kind of cross section forms through optimization all is better than common i iron.H shaped steel can be divided into according to the manufacturing process difference: hot rolled H-shaped and welded H section steel.H shaped steel can be used as the main material of using of all kinds of steel buildings.According to statistics, substantially all be to adopt H shaped steel to form the structure stress system in 13 the highest high-rise steel structure of the world, its H shaped steel steel using amount accounts for 40%~80% of total steel using amount.The nineties in last century, the horse steel utilized home equipment that 650 milling train transformations have been built up article one H type steel production line.Later on roll in Laigang, Anshan one, introduction of foreign technology such as Jiangyin Xing Cheng and equipment built up hot rolled H-shaped production line in succession.China H shaped steel production capacity in 2005 is nearly 4,000,000 tons according to estimates, and in Tianjin, ground such as Beijing, Shandong, Hebei, Anhui released a collection of steel house demonstration project.Why H shaped steel so extensively is because he has the following advantages if being used: it is wide that (1) and i iron are compared the edge of a wing, and lateral rigidity is big; Two surfaces, the edge of a wing are parallel to each other, and joint construction is convenient; (2) with the concrete structure structure compared from heavy and light, speed of application is fast.For rolling H shaped steel, owing to there is not weld seam, residual stress is little, ductility good in addition.
Nineteen ninety-five occurs in the violent earthquake of Japanese Hyogoken-Nanbu, and the typical case that steel work takes place destroys and mainly contains cripling, brittle fracture and low-cycle fatigue failure.Why the steel member produces crippling near the moment of flexure maximum cross-section, mainly be owing to have the limit value of the plate flakiness ratio of material impact can not satisfy the plastic strain under the cyclic loading effect and the requirement of consuming energy to the steel member in the design, particularly under the bigger situation of axial load, situation is more obvious.
Summary of the invention
The technical problem to be solved in the present invention just is: at the technical problem of prior art existence, the invention provides a kind of anti-seismic performance that can effectively strengthen steel work, improve its ductility, and cost is lower, the H Steel section member of the lateral restrain of easy construction, thereby solved the local stable problem that the H Steel section member is occurred under geological process, improved its stability.
For solving the problems of the technologies described above, the solution that the present invention proposes is: a kind of H Steel section member of lateral restrain, this H Steel section member is girder steel or steel column, it is characterized in that: be provided with horizontal restrain and be provided with flexible dottle pin between the end of horizontal restrain and girder steel or steel column or bottom near end or bottom place on described girder steel or the steel column, this horizontal restrain comprises the outsourcing thing that is wrapped in H Steel section member periphery and is located at the filler in the cavity between the H Steel section member edge of a wing and the web; Be provided with first gap between the outline of described outsourcing thing and H Steel section member, be provided with second gap between described filler and the H Steel section member surface.
Described outsourcing thing is fibre reinforced plastics cloth or steel loop or steel plate or steel concrete or the wire mesh mortar outer envelope that is wrapped in H Steel section member outline.
Described filler is a concrete.
Be filled with flexible material in second gap between first gap between described outsourcing thing and the H Steel section member outline and filler and the H Steel section member surface.
Compared with prior art, advantage of the present invention just is:
1, the H Steel section member of lateral restrain of the present invention, this steel member is mainly girder steel or steel column, behind close end on girder steel or the steel column or place, bottom lateral restrain, can limit the issuable crippling under earthquake or other effects of H Steel section member effectively, but it does not change the stress performance of H Steel section member at elastic stage;
2, the H Steel section member of lateral restrain of the present invention, this horizontal restrain can prevent or postpone development and the low-cycle fatigue failure of H Steel section member in the issuable cripling of areas of plasticity hinge effectively, slow down the rapid decline of steel member supporting capacity after the bearing capacity that reaches capacity, thereby improve the ductility of H Steel section member, improve the anti-seismic performance of structure;
3, the H Steel section member of lateral restrain of the present invention, only to the end or the bottom lateral restrain of girder steel or steel column, promptly only the position that plastic hinge may occur is applied horizontal restrain, like this, can not change the design of conventional steel frame structure system, construction, and horizontal restrain of the present invention is simple in structure, construction technology is easy, can be generalized to easily in many existing antidetonations district steel framed structure;
4, the H Steel section member of lateral restrain of the present invention also can be transformed existing steel building simultaneously, only need end or bottom lateral restrain, thereby finish reinforcing, gentrify work existing steel building to H Steel section member in the existing steel building.
Description of drawings
Fig. 1 is the main TV structure schematic diagram of H steel column in the embodiment of the invention 1;
Fig. 2 is the schematic cross-section of H steel column in the embodiment of the invention 1;
Fig. 3 is the main TV structure schematic diagram of H section steel beam in the embodiment of the invention 2;
Fig. 4 is the schematic cross-section of H section steel beam in the embodiment of the invention 2;
Fig. 5 is the main TV structure schematic diagram of H steel column in the embodiment of the invention 3;
Fig. 6 is the schematic cross-section of H steel column in the embodiment of the invention 3.
Marginal data
1, girder steel 2, steel column
3, end 4, bottom
5, outsourcing thing 6, filler
7, first gap 8, second gap
10, flexible dottle pin 11, horizontal restrain
The specific embodiment
Below with reference to the drawings and specific embodiments the present invention is described in further details.
Embodiment 1: as depicted in figs. 1 and 2, the H Steel section member of lateral restrain of the present invention, this H Steel section member can be girder steel 1 or steel column 2, its structural system still structural system with common H Steel section member is consistent, be example with steel column 2 in the present embodiment, build at steel column 2 upper strata floors and to make horizontal restrain 11 after finishing on steel column 2, this horizontal restrain 11 comprises the outsourcing thing 5 that is wrapped in H Steel section member periphery and is located at the filler 6 in the cavity between the H Steel section member edge of a wing and the web; Be provided with first gap 7 between the outline of outsourcing thing 5 and H Steel section member, be provided with second gap 8 between filler 6 and the H Steel section member surface.During construction, horizontal restrain 11 be produced on steel column 2 and girder steel 1 installation, carry out after the floorslab concrete pouring, make horizontal restrain 11 then and make corresponding position preset clearance on horizontal restrain 11 and the steel column 2; Can cast-in-site as the material of filler 6, also can install prefabricated back.Concrete steps, present embodiment as shown in the figure, at girder steel 1 with after steel column 2 is connected, be provided with horizontal restrain 11 respectively at 3 places, close end that girder steel 1 is connected with steel column 2 and near 4 places, bottom of steel column 2, preset clearance and be provided with flexible dottle pin 10 between the end 3 of horizontal restrain 11 and girder steel 1 and the bottom 4 of steel column 2 to avoid transmitting longitudinal stress.Be placed with filler 6 in the cavity between the H Steel section member edge of a wing and web, this filler 6 can adopt prefabricated packing materials such as concrete block (also can on-the-spot watering); Be provided with second gap 8 between filler 6 and H steel column 2 surfaces, can filled and process in this second gap 8 etc. flexible material; Periphery at H steel column 2 adds outsourcing thing 5 at last, this outsourcing thing 5 adopts steel loop or steel plate in the present embodiment, be provided with first gap 7 between the outline of steel loop or steel plate and H steel column 2, can filled and process in first gap 7 etc. flexible material, utilize first gap 7 can postpone, thereby avoid or reduce unnecessary bearing capacity and improve as the steel loop of outsourcing thing 5 or the time of steel plate participation work.This horizontal restrain 11 can prevent or postpone development and the low-cycle fatigue failure of H Steel section member in the issuable cripling of areas of plasticity hinge effectively, slow down the rapid decline of steel member supporting capacity after the bearing capacity that reaches capacity, thereby improve the ductility of H Steel section member, improve the anti-seismic performance of structure.
Embodiment 2: as shown in Figure 3 and Figure 4, the H Steel section member of lateral restrain of the present invention, this H Steel section member can be girder steel 1 or steel column 2, its structural system still structural system with common H Steel section member is consistent, be example with girder steel 1 in the present embodiment, the making of horizontal restrain 11 and steel column 2 are different in the H section steel beam 1, and its top is in-situ reinforced concrete slab.This horizontal restrain 11 comprises the outsourcing thing 5 that is wrapped in H Steel section member periphery and is located at the filler 6 in the cavity between the H Steel section member edge of a wing and the web; Be provided with first gap 7 between the outline of outsourcing thing 5 and H Steel section member, be provided with second gap 8 between filler 6 and the H Steel section member surface.During construction, horizontal restrain 11 be produced on steel column 2 and girder steel 1 installation, carry out after the floorslab concrete pouring, make horizontal restrain 11 then and make corresponding position preset clearance on horizontal restrain 11 and the steel column 2; Can cast-in-site as the material of filler 6, also can install prefabricated back.Concrete steps, present embodiment as shown in the figure when girder steel 1 is connected with steel column 2, is provided with horizontal restrain 11 near 3 places, end on girder steel 1, preset clearance and be provided with flexible dottle pin 10 to avoid transmitting longitudinal stress between the end 3 of horizontal restrain 11 and girder steel 1.Be placed with filler 6 in the cavity between the H Steel section member edge of a wing and web, this filler 6 can adopt prefabricated packing materials such as concrete block (also can on-the-spot watering); Be provided with second gap 8 between filler 6 and H section steel beam 1 surface, can filled and process in this second gap 8 etc. flexible material; Periphery at H section steel beam 1 adds outsourcing thing 5 at last, this outsourcing thing 5 adopts fiber-reinforced plastic layer (FRP cloth) in the present embodiment, certain lap length L will be left in FRP cloth and reinforced concrete floor bottom, be provided with first gap 7 between the outline of FRP cloth and H section steel beam 1, can filled and process in first gap 7 etc. flexible material, utilize first gap 7 can postpone time, thereby avoid or reduce unnecessary bearing capacity and improve as the FRP cloth participation work of outsourcing thing 5.This horizontal restrain 11 can prevent or postpone development and the low-cycle fatigue failure of H Steel section member in the issuable cripling of areas of plasticity hinge effectively, slow down the rapid decline of steel member supporting capacity after the bearing capacity that reaches capacity, thereby improve the ductility of H Steel section member, improve the anti-seismic performance of structure.
Embodiment 3: as shown in Figure 5 and Figure 6, the H Steel section member of lateral restrain of the present invention, this H Steel section member can be girder steel 1 or steel column 2, its structural system still structural system with common H Steel section member is consistent, be example with steel column 2 in the present embodiment, steel column 2 upper strata floors build finish after making layer studding horizontal restrain 11, this horizontal restrain 11 comprises the outsourcing thing 5 that is wrapped in H Steel section member periphery and is located at filler 6 in the cavity between the H Steel section member edge of a wing and the web; Be provided with first gap 7 between the outline of outsourcing thing 5 and H Steel section member, be provided with second gap 8 between filler 6 and the H Steel section member surface.During construction, horizontal restrain 11 be produced on steel column 2 and girder steel 1 installation, carry out after the floorslab concrete pouring, make horizontal restrain 11 then and make corresponding position preset clearance on horizontal restrain 11 and the steel column 2; Filler 6 materials can cast-in-site, also can install prefabricated back.Concrete steps, present embodiment as shown in the figure, at girder steel 1 with after steel column 2 is connected, the horizontal restrain 11 that is provided with respectively at 3 places, close end that girder steel 1 is connected with steel column 2 and near 4 places, bottom of steel column 2, preset clearance and be provided with flexible dottle pin 10 between the end 3 of horizontal restrain 11 and girder steel 1 and the bottom 4 of steel column 2 to avoid transmitting longitudinal stress.Be placed with filler 6 in the cavity between the H Steel section member edge of a wing and web, this filler 6 can adopt prefabricated packing materials such as concrete block (also can on-the-spot watering); Be provided with second gap 8 between filler 6 and H steel column 2 surfaces, can filled and process in this second gap 8 etc. flexible material; Periphery at H steel column 2 adds outsourcing thing 5 at last, this outsourcing thing 5 adopts steel concrete or wire mesh mortar outer envelope in the present embodiment, be provided with first gap 7 between the outline of steel concrete or wire mesh mortar outer envelope and H steel column 2, can filled and process in first gap 7 etc. flexible material, utilize first gap 7 can postpone as the steel concrete of outsourcing thing 5 or the time of wire mesh mortar outer envelope participation work, thereby avoid or reduce unnecessary bearing capacity and improve, make H Steel section member surface and outsourcing thing 5 break away from simultaneously so that it plays horizontal restrain 11 effects to the H Steel section member, this outsourcing thing 5 is double simultaneously does fire-resistant outer covering, thereby different with traditional steel reinforced concrete or steel reinforced concrete.This horizontal restrain 11 can prevent or postpone development and the low-cycle fatigue failure of H Steel section member in the issuable cripling of areas of plasticity hinge effectively, slow down the rapid decline of steel member supporting capacity after the bearing capacity that reaches capacity, thereby improve the ductility of H Steel section member, improve the anti-seismic performance of structure.

Claims (5)

1, a kind of H Steel section member of lateral restrain, this H Steel section member is girder steel (1) or steel column (2), it is characterized in that: described girder steel (1) or steel column (2) are gone up near end (3) or bottom (4) and are located to be provided with horizontal restrain (11) and be provided with flexible dottle pin (10) between the end (3) of horizontal restrain (11) and girder steel (1) or steel column (2) or bottom (4), and this horizontal restrain (11) comprises the outsourcing thing (5) that is wrapped in H Steel section member periphery and is located at the interior filler (6) of cavity between the H Steel section member edge of a wing and the web; Be provided with first gap (7) between the outline of described outsourcing thing (5) and H Steel section member, be provided with second gap (8) between described filler (6) and the H Steel section member surface.
2, the H Steel section member of lateral restrain according to claim 1 is characterized in that: described outsourcing thing (5) is for being wrapped in fibre reinforced plastics cloth or steel loop or steel plate or the steel concrete or the wire mesh mortar outer envelope of H Steel section member outline.
3, the H Steel section member of lateral restrain according to claim 1 and 2 is characterized in that: described filler (6) is a concrete.
4, the H Steel section member of lateral restrain according to claim 1 and 2 is characterized in that: be filled with flexible material in second gap (8) between first gap (7) between described outsourcing thing (5) and the H Steel section member outline and filler (6) and the H Steel section member surface.
5, the H Steel section member of lateral restrain according to claim 3 is characterized in that: be filled with flexible material in second gap (8) between first gap (7) between described outsourcing thing (5) and the H Steel section member outline and filler (6) and the H Steel section member surface.
CNB2006100318433A 2006-06-16 2006-06-16 H-shape steel member with lateral restrain Expired - Fee Related CN100489207C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100318433A CN100489207C (en) 2006-06-16 2006-06-16 H-shape steel member with lateral restrain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100318433A CN100489207C (en) 2006-06-16 2006-06-16 H-shape steel member with lateral restrain

Publications (2)

Publication Number Publication Date
CN1865615A true CN1865615A (en) 2006-11-22
CN100489207C CN100489207C (en) 2009-05-20

Family

ID=37424745

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100318433A Expired - Fee Related CN100489207C (en) 2006-06-16 2006-06-16 H-shape steel member with lateral restrain

Country Status (1)

Country Link
CN (1) CN100489207C (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101260691A (en) * 2008-04-18 2008-09-10 华南理工大学 Collapse-resisting column top slipping reinforced concrete frame construction
CN103334511A (en) * 2013-07-19 2013-10-02 东南大学 Anti-flection energy consumption support
CN103953123A (en) * 2014-05-14 2014-07-30 天津城建大学 H-shaped steel frame node with partially restricted beam end and construction method thereof
CN106223461A (en) * 2016-08-30 2016-12-14 姚攀峰 A kind of hybrid industrialized building structural system and construction method thereof
CN107476497A (en) * 2017-10-09 2017-12-15 沈阳建筑大学 A kind of steel structure column of antiknock power consumption
CN114278010A (en) * 2021-12-24 2022-04-05 上海泰大建筑科技有限公司 Steel and concrete part combined three-section steel beam structure and column structure thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101260691A (en) * 2008-04-18 2008-09-10 华南理工大学 Collapse-resisting column top slipping reinforced concrete frame construction
CN103334511A (en) * 2013-07-19 2013-10-02 东南大学 Anti-flection energy consumption support
CN103953123A (en) * 2014-05-14 2014-07-30 天津城建大学 H-shaped steel frame node with partially restricted beam end and construction method thereof
CN106223461A (en) * 2016-08-30 2016-12-14 姚攀峰 A kind of hybrid industrialized building structural system and construction method thereof
CN107476497A (en) * 2017-10-09 2017-12-15 沈阳建筑大学 A kind of steel structure column of antiknock power consumption
CN114278010A (en) * 2021-12-24 2022-04-05 上海泰大建筑科技有限公司 Steel and concrete part combined three-section steel beam structure and column structure thereof

Also Published As

Publication number Publication date
CN100489207C (en) 2009-05-20

Similar Documents

Publication Publication Date Title
CN201381556Y (en) Connected node of steel girder and combined steel and concrete column
CN101982629B (en) Assembly-type self-compaction steel tube and concrete composite structure
CN103711330B (en) A kind of prestressing force assembling precast reinforced concrete frame reinforces the method for existing structure
CN100510262C (en) Bamboo bridge
CN100489207C (en) H-shape steel member with lateral restrain
CN109667354B (en) Vertical energy dissipation seam connecting device of assembled shear force wall
CN102733486B (en) High-efficiency ductile node for prefabrication assembly concrete frame
CN104674649A (en) Novel earthquake damage control system for thin-wall hollow pier
CN206625402U (en) A kind of side intersection of cracking is put more energy into profiled sheet shear wall
CN104790675A (en) Reinforced concrete block masonry structure assemblage construction method
CN2915982Y (en) H-shape steel member with lateral restrain
CN216239138U (en) ECC assembled infilled wall that anti performance of collapsing is good
Zhou et al. Seismic performance of square, thin-walled steel tube/bamboo plywood composite hollow columns with binding bars
CN102400509A (en) Assembled prefabricated light steel composite floor
Bian et al. Seismic research of prefabricated CFST frame with various H-steel frame shear walls
CN2918523Y (en) Bamboo wood bridge
CN201526006U (en) Prestressed concrete continuous box girder
CN214462924U (en) Earthquake area UHPC temporary board house
CN112069584B (en) Design method of ductile structural pier for railway
CN204509979U (en) A kind of Novel thin wall hollow bridge pier seismic Damage hierarchy of control
CN107201796A (en) A kind of truss plate
CN207776254U (en) A kind of novel lateral resisting reinforcing bar sews part lattice column
CN112523547A (en) UHPC temporary board house in earthquake region and erection method
CN202831752U (en) Combinedly force-bearing baseless reinforced concrete stock stop wall
CN221422393U (en) Concrete laminated slab

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20061122

Assignee: Hunan Leed Metal Structure Co., Ltd.

Assignor: Hunan University

Contract record no.: 2010430000020

Denomination of invention: H-shape steel member with lateral restrain

Granted publication date: 20090520

License type: Exclusive License

Record date: 20100415

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090520

Termination date: 20150616

EXPY Termination of patent right or utility model