CN1818495B - Boiler for warming rooms - Google Patents

Boiler for warming rooms Download PDF

Info

Publication number
CN1818495B
CN1818495B CN 200610044487 CN200610044487A CN1818495B CN 1818495 B CN1818495 B CN 1818495B CN 200610044487 CN200610044487 CN 200610044487 CN 200610044487 A CN200610044487 A CN 200610044487A CN 1818495 B CN1818495 B CN 1818495B
Authority
CN
China
Prior art keywords
water
boiler
heating
region
flow region
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200610044487
Other languages
Chinese (zh)
Other versions
CN1818495A (en
Inventor
赵铜元
朴璟镐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weihai Aiwen Water Blanket Co., Ltd.
Original Assignee
WEIHAI AIWEN WATER BLANKET CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WEIHAI AIWEN WATER BLANKET CO Ltd filed Critical WEIHAI AIWEN WATER BLANKET CO Ltd
Priority to CN 200610044487 priority Critical patent/CN1818495B/en
Publication of CN1818495A publication Critical patent/CN1818495A/en
Application granted granted Critical
Publication of CN1818495B publication Critical patent/CN1818495B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Catching Or Destruction (AREA)

Abstract

The internal structure of the invention includes upper and lower layers. The lower layer is a heating area and the upper layer is a flow area. In the heating area and the flow area there are connection pipes for delivering the heated water upward. In the flow area there is a pipe for delivering the heated water outward and in the heating area there is a pipe capable of recovering the heat water. In the flow area, there is also a steam circulating pipe for feeding the produced steam and pressure to the recovery pipeline.

Description

Boiler for warming rooms
Affiliated technical field
The present invention relates to the boiler mechanical field, specifically a kind of do not having under the situation of water pump, the boiler for warming rooms that can the hot water of generation be circulated through the recirculated water heating coil.
Background technology
We know; Existing boiler be with coal gas or electric heater with the water heating after, utilize water pump by its heating service that circulates, boiler is not having can't to let under the situation of water pump the water heating that in named pipe, circulates; As to let the water circulation must use water pump; Just must need electricity consumption with water pump, not have electricity just can not use, existing in addition steam boiler also causes potential safety hazards such as blast easily because of misoperation.
Summary of the invention
In order to overcome the deficiency of above-mentioned prior art; The purpose of this invention is to provide a kind of heating boiler; This boiler does not need water pump, under the situation that does not have electricity, utilizes coal gas or naked light can normally use too; Reach the effect of heating service equally, do not having the heating of normally warming oneself under the situation of water pump, can be with the hot water that produces in the boiler heating service that in the circulating line of a sealing, circulates; And got rid of in the past boiler fully because of the potential safety hazard that operational issue produced, be a kind of also can operate as normal under the situation that is not having water pump power in the container of a sealing and the invention of heating service.
The technical solution adopted for the present invention to solve the technical problems is: be provided with boiler body; The inner chamber of boiler body is divided into two-layer up and down; Be flow region above; Be heating region below, be connected through being connected pipeline between flow region and the heating region that boiler body is provided with efferent duct and the recovery tube that is connected with flow region and heating region respectively.
The present invention can realize that also the steam circulating pipe of the upper end of flow region outside being installed in boiler body is connected with recovery tube through following measure.Efferent duct is one or more.Connecting pipeline can also directly be connected with efferent duct, connects the pipeline top and is provided with the additional zone of water.The upper lateral part that water replenishes the zone is provided with the water level complementary apertures.The following side that water replenishes the zone is equipped with level sensor.The position, upper end of flow region is equipped with the overvoltage snifting valve.Heating region can be one or more.
The invention has the beneficial effects as follows do not having under the situation of water pump, water is flowed in the container of sealing; Because of there not being water pump to stop the trouble of loss and repairing, having stopped fully because of adding the potential safety hazard that pressure that hot water produces and steam bring, and behind disposable injection water, can need not change for a long time and supplementing water; More convenient to use; Under the situation that does not have electricity, utilize the way of heating such as naked light, can use too in the open air.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is further specified.
Fig. 1 is the integrally-built vertical view of boiler heating system of the present invention, also is the sketch map that the present invention forms first embodiment of heating system.
Fig. 2 is a profile of the present invention among Fig. 1.
Fig. 3 is the cutaway view of second embodiment of the invention.
Fig. 4 is the cutaway view of third embodiment of the invention.
Fig. 5 is the integrally-built vertical view of boiler heating system of the present invention, also is the sketch map that the present invention forms the 4th embodiment of heating system.
Fig. 6 is the integrally-built vertical view of boiler heating system of the present invention, also is the sketch map that the present invention forms the 5th embodiment of heating system.
Fig. 7 is a profile of the present invention among Fig. 6.
Fig. 8 is the cutaway view of sixth embodiment of the invention.
10. boiler bodies among the figure, 11. power switches, 12. dividing plates, 12a. dividing plate, 13. heating regions, 14. flow regions, 15. tube connectors; 16. efferent duct, 17. recovery tubes, the zone at 20. recirculated water heating coils place, 22. recirculated water heating coils, 24. heaters, 24a. external heat device; 30. steam circulating pipe, 30a. steam (vapor) outlet, 30b. steam (vapor) outlet, 32. overvoltage snifting valves, 40. attaching parts, 210. boiler bodies; 212. efferent duct, 214. water levels replenish inlet, 220. heating regions, 222. central dividing plates, 224. heaters, 226. recovery tubes; 228. tube connector, the straight type tube connector of 228a., 228b. arc tube connector, 230. steam circulating pipes, 230a. steam round, 230b. steam delivery outlet; 240. attaching parts, 310. heating regions, 312. recovery tubes, 314. heaters, 320. water replenish zone, 321. water level complementary apertures; 323. the water level induction device, 327. tube connectors, 328. efferent ducts, 325. overvoltage snifting valves, 330. steam circulating pipes, 340. recovery holes.
The specific embodiment
Through embodiment the present invention is carried out detailed description below in conjunction with accompanying drawing.
The embodiment of the invention one is with reference to figure 1 and Fig. 2.Boiler body to the hot water heating is (10), and the zone at recirculated water heating coil place is (20), and the recirculated water heating coil is (22).
The four directions type boiler body (10), be installed in recirculated water heating coil region (20) above.But this is just used in order to test and to narrate, and boiler can be arbitrary shapes such as cylinder type or rectangle also, and the zone of installation also can be the arbitrary orientation of recirculated water heating coil region (20).
Boiler body (10) is inner by a central dividing plate (12), is divided into two parts up and down, and following part is heating region (13), and top part is flow region (14).
Central dividing plate (12) can be the straight dividing plate (12) shown in Fig. 2.It also can be the dividing plate (12a) of the camber shown in Fig. 3.Comparatively speaking the dividing plate of camber (12a) can better be concentrated hot water and faster delivery arrived flow region (14).
Heating region (13) is for the heating of can feeding water, and inside needs a heater (24) that can let water temperature raise.The hot water that heater (24) is produced on every side flows to the flow region (14) above the boiler through tube connector (15).
The heater (24) of inside can be the electric heating tube among Fig. 2 and Fig. 3 in the heating region (13), also can be arranged on external heat device (24a).
Tube connector (15) can be the single tube connector shown in Fig. 2 and Fig. 3.It also can be two or more multi-link pipe shown in Fig. 4.
The one water input recirculated water heating coil (22) with heating in the flow region (14) is arranged on the body of boiler (10) outer wall, and the water that will cool off a little is recovered to the recovery tube (17) in the heating region (13).
Efferent duct (16) must be at the bottom surface of tube connector (15) delivery port, and such purpose is in order to produce water-head and differential water pressures, the water that heats better to be outputed to recirculated water heating coil (22).
One steam circulating pipe (30) with steam and pressure recovery utilization is arranged between attaching parts (40) that recovery tube (17) links to each other and the flow region (14).
The water vapour that flow region (14) is produced gets in the steam circulating pipe (30) through steam (vapor) outlet (30a), and the steam in the steam circulating pipe (30) gets into attaching parts (40) through steam (vapor) outlet (30b).Water vapour has become water through cooling during this period, and has flowed into heating region again (13).This device has been avoided can't getting rid of the potential safety hazard of being brought because of water vapour and pressure that the water heating is produced.
On boiler, in a single day installed the pressure-relief device overvoltage snifting valve (32) that the undesired ability of pressure automatic discharging pressure occurs additional, the effect of this device is just in case the pressure in the boiler will reduce pressure above 3KG automatically.Make boiler more safe, effectively avoided the potential safety hazard of bringing because of improper use.
Efferent duct (16) and recovery tube (17) can be that the different directions among Fig. 1 to Fig. 4 is installed.It also can be the equidirectional installation among Fig. 5 and Fig. 6.
Recirculated water heating coil (22) is if arrange according to the mode of Fig. 1, and output and input part branch produce the temperature difference, if arrange and will well-proportionedly dispel the heat by Fig. 5, Fig. 6 form.Recirculated water heating coil (22) can be fixed on ground, also can be installed in as on Fig. 5 and the transportable mattress shown in Figure 6.
Be installed on the transportable mattresses such as Fig. 5 and Fig. 6, it is more convenient to use, and because of using under the situation of power supply not having, makes this product can take use out of.Recirculated water heating coil (22) also can be that copper pipe or metal tube also can be plastic flexible pipes.
To introduce the operation principle of Automatic Cycle of the present invention below.
Turn on the power switch (11) heater (24) and start, the water in the heating region (13) begins heating.Heated water has got into flow region (14) through tube connector (15).
Water in heating region (13) flows into through tube connector (15) in the flow region (14), because of being sealing device, so will be automatically the water of recovery tube (17) be recovered to heating region (13).Circulate like this, constantly feedwater heating is in the effect that does not have also can reach under the situation of water pump heating service.The steam and the pressure that when heating, produce have been recovered to heating region (13) through steam circulating pipe (30), have eliminated completely through this device in the potential safety hazard that does not have to be produced under the situation of row pressure.
It below is the detailed description of Fig. 6 Fig. 7
This is the whole profile of fifth embodiment of the invention.With the operation principle of the boiler of top narration is the same, but textural difference to some extent.
Heating region (220) in the boiler body (210) is the zone through central dividing plate (222) camber, and heater (224) is arranged in this zone.Why to this zone design be become present this pattern? That is that the faster circulation of water heating is just fast more because the heater (224) of same power can be faster with the water heating in the less zone that compares, and whole heats can be better.
Quick heated water flows into flow region through camber tube connector (228b) through tube connector (228) through straight type tube connector (228a) again.Why will tube connector (228) be designed to camber? Through testing to such an extent that demonstrate,prove repeatedly, such design can make water reach smooth inflow flow region more smoothly, makes whole operating efficiency more quick.
The water of flow region flows to the circulation heating tube through the efferent duct (212) of design in the bottom.The efferent duct design reason in the bottom is, the gravity through water itself makes water mobile more efficiently.On basis before, utilized natural principle fully.
What water level replenished inlet (214) is the design that water level replenishes.Water vapour that in flow region, produces and pressure; Get into steam circulating pipe (230) through steam round (230a); Water through supercooling gets into attaching parts (240) through steam delivery outlet (230b), has come back to heating region through recovery tube (226) with the water that the recirculated water heating coil flows back to.The reason of this design: the one, solve feedwater and heated the alleviation that produces water vapour and make the whole pressure of boiler internal.The 2nd, further utilized self to produce pressure and converted water vapour to water again, and eliminated pressure fully through water-cooled, solved the potential safety hazard that pressure brings.
It below is detailed description to Fig. 8 of the 6th embodiment
The lower part of this figure is heating region (310), and upper part is that water replenishes zone (320), has heating region (310) and water are replenished the tube connector (327) that zone (320) links together.
Fig. 1 is to heating region identical functions illustrated in fig. 7 before having in the heating region (310).It also can be two or more that heating region (310) can be one, also can be more than one but corresponding water additional area is one.If it is the temperature for independent fully control opposed area that two or more heating regions (310) are arranged.Under area identical, there are a plurality of thermals treatment zone just can on average control and think under the situation of same power, can the heating district with homalographic to be made it to be heated more uniformly like this in corresponding zone.
Water at heating region (310) gets into the additional zone of water (320) through tube connector (327), gets into the recirculated water heating coil through efferent duct (328).
At water (320) top, additional zone and side is respectively pressure-relief device overvoltage snifting valve (325) and water level complementary apertures (321) and water level inductor (323).
Water replenishes the water vapour and the pressure that are produced in the zone (320) and gets into recovery tube (312) through steam circulating pipe (330).
Water through the recirculated water heating coil also gets into recovery tube (312) through recovery holes (340).
Total the above; The heating boiler of present embodiment is on the basis of preceding several figure, to have increased a moisturizing zone; The reason of this design is that the water of heating outputs to the recirculated water heating coil again through tube connector entering flow region and compares and can directly the water that heats be outputed to the recirculated water heating coil, thermal loss reduction wherein; Improved service efficiency greatly, the heater assembly (314) of feedwater heating has been arranged in the thermal treatment zone.

Claims (7)

1. boiler for warming rooms; Be provided with boiler body, it is characterized in that: the inner chamber of boiler body is divided into two-layer up and down, is flow region above; Be heating region below; Be connected through being connected pipeline between flow region and the heating region, boiler body is provided with efferent duct and the recovery tube that is connected with flow region and heating region respectively, and the steam circulating pipe of the upper end of flow region outside being installed in boiler body is connected with recovery tube.
2. boiler for warming rooms according to claim 1 is characterized in that said efferent duct is one or more.
3. boiler for warming rooms according to claim 1 is characterized in that said connection pipeline can also directly be connected with efferent duct, connects the pipeline top and is provided with the additional zone of water.
4. boiler for warming rooms according to claim 3 is characterized in that said water replenishes regional upper lateral part and is provided with the water level complementary apertures.
5. boiler for warming rooms according to claim 3 is characterized in that said water replenishes regional following side level sensor is installed.
6. boiler for warming rooms according to claim 1 is characterized in that the position, upper end of said flow region is equipped with the overvoltage snifting valve.
7. boiler for warming rooms according to claim 1 is characterized in that said heating region can be one or more.
CN 200610044487 2006-03-06 2006-03-06 Boiler for warming rooms Expired - Fee Related CN1818495B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200610044487 CN1818495B (en) 2006-03-06 2006-03-06 Boiler for warming rooms

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200610044487 CN1818495B (en) 2006-03-06 2006-03-06 Boiler for warming rooms

Publications (2)

Publication Number Publication Date
CN1818495A CN1818495A (en) 2006-08-16
CN1818495B true CN1818495B (en) 2012-10-31

Family

ID=36918619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200610044487 Expired - Fee Related CN1818495B (en) 2006-03-06 2006-03-06 Boiler for warming rooms

Country Status (1)

Country Link
CN (1) CN1818495B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW201634886A (en) * 2015-03-23 2016-10-01 Zun-Tian Lin Improved structure of heater
CN104748359B (en) * 2015-03-25 2017-10-17 山东上特智控科技有限公司 Efficient boiler
CN104864476A (en) * 2015-04-30 2015-08-26 四川远畅新能源科技有限公司 Multifunctional steam radiator

Also Published As

Publication number Publication date
CN1818495A (en) 2006-08-16

Similar Documents

Publication Publication Date Title
CN101392952B (en) Self-circulation boiler for heating
CN103322613A (en) Multi-energy wall-mounted stove type hot water and heat supplying system
CN1818495B (en) Boiler for warming rooms
KR100626540B1 (en) A hot-water boiler of thermal medium combined boiler of a thermal medium oil and a water-heater
CN203258724U (en) Multi-energy heat supply system
KR100393917B1 (en) Electric boiler using thermal oil
KR101716027B1 (en) Large capacity boiler system using pump heater
CN2932196Y (en) Boiler for heating
CN201166447Y (en) Hot water generating device and heat pump hot water system with same
CN203771666U (en) Water heater
CN107062349B (en) Boiler heating system and boiler heating main system
KR200442961Y1 (en) Electric boiler using heat storage material
CN106123309A (en) Intake pre-heated electric heater
CN206073217U (en) A kind of multi-functional complementary heating plant
CN202581813U (en) Plate exchange integrated water path of gas-fired heating water heater
CN206113296U (en) Preheating -type electric water heater of intaking
KR200446980Y1 (en) Heating
CN219674351U (en) Water heating blanket system of coal stove
CN203258736U (en) Multi-energy wall-hanging stove type heat supply heating system
CN206656494U (en) Graphene carbon electric boiler
CN101849144A (en) Heating device with directionally-flowing medium and circulating heating system provided with the device
KR100713620B1 (en) System united cogeneration and individual heating
CN2572292Y (en) Heating and water boiling two-purpose electric water heater
CN105642623B (en) The integrated auxiliary skid of large-scale oil storage tank mechanical cleaning system is put
CN221444890U (en) Steam heating high-temperature hot water circulation system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: WEIHAI AIWEN WATER HEAT BLANKET CO., LTD.

Free format text: FORMER OWNER: MAYA TRADE CO., LTD., WEIHAI

Effective date: 20100730

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20100730

Address after: 204 building C, Citic Tower, 2-2 North Qingdao Road, Shandong, Weihai, 264200

Applicant after: Weihai Aiwen Water Blanket Co., Ltd.

Address before: 204 building C, Citic Tower, 2-2 North Qingdao Road, Shandong, Weihai, 264200

Applicant before: Maya Trade Co., Ltd., Weihai

C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121031

Termination date: 20130306