CN1800531A - Joint construction method of prefabricated composite bearing wall structure - Google Patents

Joint construction method of prefabricated composite bearing wall structure Download PDF

Info

Publication number
CN1800531A
CN1800531A CN 200610012332 CN200610012332A CN1800531A CN 1800531 A CN1800531 A CN 1800531A CN 200610012332 CN200610012332 CN 200610012332 CN 200610012332 A CN200610012332 A CN 200610012332A CN 1800531 A CN1800531 A CN 1800531A
Authority
CN
China
Prior art keywords
prefabricated
network framework
sandwich
bearing wall
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610012332
Other languages
Chinese (zh)
Other versions
CN100416010C (en
Inventor
张晶廷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=36810712&utm_source=***_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN1800531(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Individual filed Critical Individual
Priority to CNB2006100123327A priority Critical patent/CN100416010C/en
Publication of CN1800531A publication Critical patent/CN1800531A/en
Application granted granted Critical
Publication of CN100416010C publication Critical patent/CN100416010C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention relates to the nodes of prefabricated composite bearing wall, which is characterized in that: pre-processing the main bearing steel network, the thermal-insulated layer and the steel network outside the thermal-insulated layer of said bearing wall into sandwich thermal-insulated network frame; using it to directly cover the beam and steel post; pouring the concrete of bearing wall, beam, post and sandwich thermal-insulated network frame at the back of support mode at the same time to form a three-dimensional structure. The node structure comprises: the connection part of prefabricated sandwich network frame has a steel post and rectangle frame steel; the horizontal connection part of sandwich network frame has connection anchor steel, steel post, and ring steel, while the connection anchor steel and the steel bar of prefabricated sandwich network frame can form integrated bearing structure. The inventive basic elements as thermal-insulated sandwich network frame and the high-pressure gesso forever mode can be produced in industry, and the part of sandwich network frame on the wall is two/three-layer solid intercross girder; and the beam, post and the bearing steel bars of them are integrated as a whole with the concrete outside the thermal-insulated layer to support force.

Description

The joint construction method of prefabricated composite bearing wall structure
Technical field
The present invention relates to a kind of node thermal insulation structure job practices of prefabricated composite bearing wall structure, belong to technical field of building construction.
Background technology
The emphasis of eleventh five year plan has been classified in building energy conservation work as, the heat preservation technology of external wall all be smear insulation layer or stickup in wall body structure outside, participation structure is not stressed for additional thermal insulation.It doesn't matter also just to hang over the outside of metope and the steel bar stress in the body of wall as existing steel wire sandwich web plate in the society; Another kind is that the shear wall structure of integral cast-in-situ band insulation such as " 95100283 ", " 99110073 ", " 03263843 " patent application document of applicant successively disclose novel 3 D architeccture system for house building and monolithic casting construction method and the light sandwich prefabricated panel with steel mesh reinforcement and fill insulant material, at first proposed main steel bar stress in the body of wall is prefabricated into beam, the post in the steel mesh frame of band insulation and house, the technical scheme of floor integral construction, proved that through the test of strictness this building structure and job practices are feasible fully.
Summary of the invention
The objective of the invention is on the basis of aforementioned patent applications, to change one-sided precast concrete screen plate with sandwich into prefabricated thermal insulation sandwich network framework, with this insulation steel mesh reinforcement skeleton that forms by load bearing wall main stress reinforcing bar, extend to the outside of beam, post, make beam, post form the composite force member of band insulation layer, the joint construction method of concrete prefabricated composite bearing wall structure is provided, to set up construction reference and standard, improve speed of application and quality, make it aspect stress performance, anti-seismic performance, embody the superiority of structural system.
Technical scheme of the present invention is achieved in that the joint construction method of this prefabricated composite bearing wall structure, it is characterized in that: load bearing wall adopts the prefabricated sandwich network framework of insulation, with the side permanent template of high pressure gypsum plank as casting concrete, whole directly spray or cast form post, beam, the three-dimensional structure of wallboard one, joint structure comprises: the overlapping part at prefabricated sandwich network framework is provided with post muscle and rectangular frame stirrup, and the plain net overlapping part of sandwich network framework is provided with the connection dowel, the post muscle, stirrup, the reinforcing bar that connects dowel and prefabricated sandwich network framework is connected to form whole force structure.
The joint construction method of described prefabricated composite bearing wall structure at the overlapping part of prefabricated sandwich network framework, connects the dowel colligation on sandwich network framework plain net.
The prefabricated sandwich network framework of the joint construction method of described prefabricated composite bearing wall structure is reserved at the plain net elongated end and is connected dowel or anchoring net sheet.
The joint construction method of described prefabricated composite bearing wall structure, prefabricated sandwich network framework are bilayer or compound steel silk plain net therebetween polystyrene foam plate insulation layer, planar steel wire screen are connected to become that truss is prefabricated to form by clover leaf steel wire stringer.
The joint construction method of described prefabricated composite bearing wall structure is characterized in that, at the overlapping part of prefabricated sandwich network framework reinforcing mat sheet and sandwich network framework colligation is set.
The joint construction method of described prefabricated composite bearing wall structure is provided with reinforcement angle net and sandwich network framework colligation at the corner of prefabricated sandwich network framework overlapping part.
The joint construction method of described prefabricated composite bearing wall structure is provided with U-shaped dowel and sandwich network framework colligation at the position, hole of prefabricated sandwich network framework.
The joint construction method of described prefabricated composite bearing wall structure, post muscle, dowel are reserved in the superstructure concrete pouring after the foundation construction, the prefabricated sandwich network framework of on-site hoisting, after in place with sandwich network framework and stirrup, be connected dowel, reinforcing mat sheet or strengthen angle net colligation or be welded into overall structure, wall, post, beam forms are installed, cast-in-site beam, post, web plate load bearing wall, maintenance, next floor structure of constructing.
The joint construction method of described prefabricated composite bearing wall structure, described sandwich network framework load-bearing-side fluid concrete thickness is 8-18cm, it is collaborative that load-bearing-side precast concrete thickness is 3-5Cm.
Adopt joint structure of the present invention and job practices, basic building block is incubated sandwich network framework, high pressure gypsum permanent template etc. and can finishes on the plant produced line, change prefabricated screen plate with sandwich into prefabricated sandwich network framework, not only having reduced transport pressure, also is that realization joint structure of the present invention and job practices have been expanded the application space.Sandwich network framework is that two layers or triple-decker truss are stressed at the position of wall, be combined into one, comprise that at beam, post position and beam, post steel bar stress the concrete outside the insulation layer is stressed jointly, this cooperative bearing increases bearing capacity 14% than the wall of stack pile after testing, can stressedly can be incubated again.Really realized the building batch production, housing industrialization has reduced labour intensity than brick mix structure, the workman operates easily, and speed of application improves 1/3, is applicable to the multistory building below 10 layers, the evidence anti-seismic performance improves 2-3 earthquake intensity than brick mix structure, is better than frame construction.
Description of drawings
Describe technology contents of the present invention in detail below in conjunction with embodiment and accompanying drawing:
Fig. 1 is double layer sandwich network framework shear wall structure figure of the present invention
Fig. 2 is three-layer sandwich network framework shear wall structure figure of the present invention
-figure, Fig. 2 are applicable to all shear walls of sandwich construction
Fig. 3 is an exterior-wall heat insulation angle node constructional drawing of the present invention
-be mainly used in more intense positions of twisting resistance such as multilayer exterior wall big angles, heat bridge sensitive area
Fig. 4 is a heat insulating inner wall angle node constructional drawing of the present invention
-connection of non-exterior wall such as be mainly used between building () ladder, also can be used for position, the insensitive regional multilayer exterior wall big angle of heat bridge
Fig. 5 is exterior wall of the present invention and indoor buttress joint structure figure
Fig. 6 is exterior wall of the present invention and party wall, staircase interior wall joint structure figure
Fig. 7 intersects the joint structure figure that connects for the indoor shear wall of the present invention
Fig. 8 is interior wall of the present invention, exterior wall wall king post joint constructional drawing
-be mainly used in indoor party wall, staircase wall or to insensitive regional exterior wall wall center pillar of heat bridge or beam lower prop position
Fig. 9 is shear wall of the present invention turning joint structure figure
-be mainly used in shear wall external corner position inner corner trim structure to be similar to therewith
Figure 10 is little high-rise exterior wall of the present invention and indoor composite wall joint structure figure
Figure 11 is little high-rise exterior wall of the present invention and indoor buttress joint structure figure
Figure 12 is multilayer exterior wall collar tie beam of the present invention (transverse edge member) joint structure figure
Figure 13 is the indoor collar tie beam joint structure of the present invention figure
-be mainly used in indoor or to the insensitive regional shear wall collar tie beam of heat bridge (transverse edge member)
Figure 14 is a periphery beam plate node constructional drawing of the present invention
Figure 15 is the shear wall joint structure figure of newel post of the present invention
Figure 16 is shear wall of the present invention hole joint structure figure
Among the figure: 1,2, cast-in-situ concrete 3, insulation layer 4, graded crossing steel wire stringer 5, planar steel wire screen 6, strengthen angle net 7,13, connect dowel 8, post muscle 9, stirrup 10, reinforcing mat sheet 11, anchoring net sheet 12, floor 14, U-shaped dowel 15, hole I, indoor 0, outdoor
The specific embodiment
To be prefabricated in the factory earlier as the sandwich network framework of exterior wall and load bearing wall according to construction process, after being transported to the job site hoisted in position, with sandwich network framework and stirrup, connect dowel, reinforcing mat sheet or strengthen angle net colligation or be welded into overall structure, wall is installed, post, beam gypsum permanent template and bury pipeline underground, the single face gypsum permanent template of knee wall, opposite side is a steel form, the cast-in-site beam, post, the web plate load bearing wall, because web plate is difficult for vibrating, adopt self-compaction cobble-stone diameter 10mm with interior concrete water jet pump spray in mould, flooring is plastered in order to reduce the flooring secondary with the jolt ramming of ordinary flat vibrator, and it is floating to add slurry during the flooring concrete construction.
Fig. 1, wallboard shown in Figure 2 are sandwich partially network framework form, and a thick side master load-bearing relies on netted steel wire to work in coordination with the bilateral load-bearing; Web plate therebetween heat insulating material is made insulation layer 3, and heat insulating material can be selected foamed polystyrene board.
Between Fig. 3-prefabricated sandwich network framework shown in Figure 16 or the joint structure between skeleton and beam, the post, between skeleton and the skeleton be connected dowel 7,13 or additional reinforcing mat sheet 10,11 colligations of anchoring net sheet connect; In actual applications, also to insert in addition between connection dowel 13 or the anchoring net sheet 11 that sandwich network framework also can prefabricated extension, cast-in-place post and prefabricated web plate and be connected dowel.
Foregoing description only proposes as the embodiment of several technical schemes of joint construction method of prefabricated composite bearing wall structure of the present invention, as the single restrictive condition to its structure.

Claims (9)

1, a kind of joint construction method of prefabricated composite bearing wall structure, it is characterized in that load bearing wall adopts the prefabricated sandwich network framework of insulation. with the high pressure gypsum plank as watering the concrete side permanent template that becomes rusty, whole directly spray or cast form post, beam, the three-dimensional structure of wallboard one, joint structure comprises: the overlapping part at prefabricated sandwich network framework is provided with post muscle (8) and rectangular frame stirrup (9). and the plain net of sandwich network framework (4) overlapping part setting is connected dowel (7), the post muscle, stirrup, the reinforcing bar that connects dowel and prefabricated sandwich network framework is connected to form whole force structure.
2, the joint construction method of prefabricated composite bearing wall structure according to claim 1 is characterized in that the overlapping part at prefabricated sandwich network framework, connects dowel (7) colligation on sandwich network framework plain net.
3, the joint construction method of prefabricated composite bearing wall structure according to claim 2 is characterized in that prefabricated sandwich network framework connects dowel (13) or anchoring net sheet (11) in the reservation of plain net elongated end.
4, the joint construction method of prefabricated composite bearing wall structure according to claim 1, it is characterized in that prefabricated sandwich network framework is bilayer or compound steel silk plain net (5) therebetween polystyrene foam plate (3) insulation layer, planar steel wire screen is connected to become that truss is prefabricated to form by clover leaf steel wire stringer (4).
5, the joint construction method of prefabricated composite bearing wall structure according to claim 1 is characterized in that, at the overlapping part of prefabricated sandwich network framework reinforcing mat sheet (10) and sandwich network framework colligation is set.
6, the joint construction method of prefabricated composite bearing wall structure according to claim 1 is characterized in that, is provided with at the corner of prefabricated sandwich network framework overlapping part and strengthens angle net (6) and sandwich network framework colligation.
7, the joint construction method of prefabricated composite bearing wall structure according to claim 1 is characterized in that, U-shaped dowel (14) and sandwich network framework colligation are set at the position, hole of prefabricated sandwich network framework.
8, the joint construction method of prefabricated composite bearing wall structure according to claim 1, it is characterized in that, post muscle, dowel are reserved in the superstructure concrete pouring after the foundation construction, the prefabricated sandwich network framework of on-site hoisting. after in place with sandwich network framework and stirrup, be connected dowel, reinforcing mat sheet or strengthen angle net colligation or be welded into overall structure, wall, post, beam forms are installed. cast-in-site beam, post, web plate load bearing wall, maintenance, next floor structure of constructing.
9, the joint construction method of prefabricated composite bearing wall structure according to claim 8 is characterized in that described sandwich network framework load-bearing one side fluid concrete thickness is 8-18cm, and collaborative load-bearing one side precast concrete thickness is 3-5cm.
CNB2006100123327A 2006-01-17 2006-01-17 Joint construction method of prefabricated composite bearing wall structure Active CN100416010C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100123327A CN100416010C (en) 2006-01-17 2006-01-17 Joint construction method of prefabricated composite bearing wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100123327A CN100416010C (en) 2006-01-17 2006-01-17 Joint construction method of prefabricated composite bearing wall structure

Publications (2)

Publication Number Publication Date
CN1800531A true CN1800531A (en) 2006-07-12
CN100416010C CN100416010C (en) 2008-09-03

Family

ID=36810712

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100123327A Active CN100416010C (en) 2006-01-17 2006-01-17 Joint construction method of prefabricated composite bearing wall structure

Country Status (1)

Country Link
CN (1) CN100416010C (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101260720B (en) * 2008-04-11 2010-06-09 山东龙新建材股份有限公司 Connection construction method for network frame prefabricated composite board
WO2010081278A1 (en) * 2008-12-30 2010-07-22 哈尔滨吴淑环建设工程技术研究有限公司 Construction composite heat preservation member
CN101831965A (en) * 2010-04-06 2010-09-15 北京华丽联合高科技有限公司 Thermal isolation and heat preservation wallboard made of inorganic material and manufacturing method thereof
CN101956437A (en) * 2010-09-29 2011-01-26 刘春� Low self-weight bionical bearing wall
CN101503890B (en) * 2009-02-04 2011-05-18 南通建筑工程总承包有限公司 L-shaped connection node of steel reinforced concrete full-prefabricated assembly structural beam
CN102535680A (en) * 2012-02-21 2012-07-04 北京工业大学 Compound mortar light hollow wall structure with embedded column and T-shaped steel plate net
CN102535639A (en) * 2011-12-26 2012-07-04 中国矿业大学 Connection method for reinforcing joints between pre-fabricated hollow slabs and horizontal beam by embedding steel reinforcements
CN102712104A (en) * 2009-11-13 2012-10-03 普拉特弗姆斯股份有限公司 Precast composite structural floor system
CN102864854A (en) * 2012-09-19 2013-01-09 初明进 L-shaped precast concrete wall connection
CN102864855A (en) * 2012-09-19 2013-01-09 初明进 T-shaped precast concrete wall connection
CN103243825A (en) * 2013-04-27 2013-08-14 陈久旺 High-strength composite steel wire net frame thermal insulation plate and construction method thereof
CN103266700A (en) * 2013-04-25 2013-08-28 中天建设集团有限公司 Splicing structure of cast-in-place outer insulation boards inside plugged large formwork
CN103343572A (en) * 2013-07-19 2013-10-09 四川大学 Novel prefabricated composite wallboard anti-seismic energy-saving rural residence structural system
CN103590509A (en) * 2013-11-27 2014-02-19 四川华构住宅工业有限公司 Wall-and-wall connecting joint structure based on pre-fabricated building
CN103711229A (en) * 2012-10-08 2014-04-09 中国石油化工集团公司 Method of allocating rebars in reinforced concrete anti-explosion wall body
CN104074312A (en) * 2014-05-07 2014-10-01 杜景云 Component rebar grid structure with internal insulation board and manufacturing and assembling method
CN105604221A (en) * 2016-03-08 2016-05-25 万保金 Preformed wall formwork with steel bars
CN106245813A (en) * 2016-09-30 2016-12-21 浙江宝业现代建筑工业化制造有限公司 Integration overlapped shear wall plate L-type horizontal connecting node
CN107724596A (en) * 2017-10-09 2018-02-23 清华大学建筑设计研究院有限公司 Partial precast sandwich type wall panel and its wall body structure and building
CN110439137A (en) * 2015-10-14 2019-11-12 史世英 Prefabricated panel, wall and prefabricated panel production method, precast wall body construction method
CN111255149A (en) * 2019-04-08 2020-06-09 中清大科技股份有限公司 House building method and house
CN114412014A (en) * 2022-02-07 2022-04-29 河北新农建节能科技有限公司 Hidden column visible template cast-in-place composite bearing wall and construction method thereof

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2168904Y (en) * 1993-09-23 1994-06-15 张晶廷 Light wire sandwich panel for support construction
CN1399047A (en) * 2002-08-13 2003-02-26 张晶廷 3D structural building and its industrialized construction process

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101260720B (en) * 2008-04-11 2010-06-09 山东龙新建材股份有限公司 Connection construction method for network frame prefabricated composite board
WO2010081278A1 (en) * 2008-12-30 2010-07-22 哈尔滨吴淑环建设工程技术研究有限公司 Construction composite heat preservation member
CN101503890B (en) * 2009-02-04 2011-05-18 南通建筑工程总承包有限公司 L-shaped connection node of steel reinforced concrete full-prefabricated assembly structural beam
CN102712104A (en) * 2009-11-13 2012-10-03 普拉特弗姆斯股份有限公司 Precast composite structural floor system
CN102712104B (en) * 2009-11-13 2014-07-16 普拉特弗姆斯股份有限公司 Precast composite structural floor system
CN101831965A (en) * 2010-04-06 2010-09-15 北京华丽联合高科技有限公司 Thermal isolation and heat preservation wallboard made of inorganic material and manufacturing method thereof
CN101956437A (en) * 2010-09-29 2011-01-26 刘春� Low self-weight bionical bearing wall
CN102535639A (en) * 2011-12-26 2012-07-04 中国矿业大学 Connection method for reinforcing joints between pre-fabricated hollow slabs and horizontal beam by embedding steel reinforcements
CN102535680A (en) * 2012-02-21 2012-07-04 北京工业大学 Compound mortar light hollow wall structure with embedded column and T-shaped steel plate net
CN102864854A (en) * 2012-09-19 2013-01-09 初明进 L-shaped precast concrete wall connection
CN102864855A (en) * 2012-09-19 2013-01-09 初明进 T-shaped precast concrete wall connection
CN103711229A (en) * 2012-10-08 2014-04-09 中国石油化工集团公司 Method of allocating rebars in reinforced concrete anti-explosion wall body
CN103711229B (en) * 2012-10-08 2016-04-13 中国石油化工集团公司 Steel concrete antiknock wall wall steel bar collocation method
CN103266700A (en) * 2013-04-25 2013-08-28 中天建设集团有限公司 Splicing structure of cast-in-place outer insulation boards inside plugged large formwork
CN103243825A (en) * 2013-04-27 2013-08-14 陈久旺 High-strength composite steel wire net frame thermal insulation plate and construction method thereof
CN103343572B (en) * 2013-07-19 2016-04-27 四川大学 The agriculture of prefabricated combined wall board earthquake-proof energy-saving occupies structural system
CN103343572A (en) * 2013-07-19 2013-10-09 四川大学 Novel prefabricated composite wallboard anti-seismic energy-saving rural residence structural system
CN103590509A (en) * 2013-11-27 2014-02-19 四川华构住宅工业有限公司 Wall-and-wall connecting joint structure based on pre-fabricated building
CN103590509B (en) * 2013-11-27 2016-03-02 四川华构住宅工业有限公司 Based on the wall wall connecting joint structure of assembled architecture
CN104074312B (en) * 2014-05-07 2016-08-03 杜景云 Bar frame structure, manufacture and the assemble method with inside holding plate of component
CN104074312A (en) * 2014-05-07 2014-10-01 杜景云 Component rebar grid structure with internal insulation board and manufacturing and assembling method
CN110439137A (en) * 2015-10-14 2019-11-12 史世英 Prefabricated panel, wall and prefabricated panel production method, precast wall body construction method
CN105604221A (en) * 2016-03-08 2016-05-25 万保金 Preformed wall formwork with steel bars
CN106245813A (en) * 2016-09-30 2016-12-21 浙江宝业现代建筑工业化制造有限公司 Integration overlapped shear wall plate L-type horizontal connecting node
CN107724596A (en) * 2017-10-09 2018-02-23 清华大学建筑设计研究院有限公司 Partial precast sandwich type wall panel and its wall body structure and building
CN107724596B (en) * 2017-10-09 2023-08-29 清华大学建筑设计研究院有限公司 Partially prefabricated sandwich wallboard, wall structure thereof and building
CN111255149A (en) * 2019-04-08 2020-06-09 中清大科技股份有限公司 House building method and house
CN114412014A (en) * 2022-02-07 2022-04-29 河北新农建节能科技有限公司 Hidden column visible template cast-in-place composite bearing wall and construction method thereof

Also Published As

Publication number Publication date
CN100416010C (en) 2008-09-03

Similar Documents

Publication Publication Date Title
CN100416010C (en) Joint construction method of prefabricated composite bearing wall structure
CN202559569U (en) Assembled monolithic self-insulation hidden dense rib light superposed floor slab
CN212957170U (en) Precast concrete bottom plate integrated with truss steel bars and prestressed steel wire meshes
CN1399047A (en) 3D structural building and its industrialized construction process
CN111155680A (en) All-bolt connection multilayer prefabricated section steel concrete shear wall structure and preparation and construction method thereof
CN114059699A (en) Precast concrete bottom plate integrated with truss steel bars and prestressed steel wire meshes
WO1984001402A1 (en) Structural members
CN108643429B (en) But height-adjusting's assembled coincide floor
CN1079130C (en) Construction method of 3D architeccture system for house building
CN219527957U (en) Concrete module box
CN219622069U (en) Assembled light steel strip hollow steel bar truss concrete strip superposed two-way floor slab
CN111411693A (en) Assembly and pouring integrated shear wall structure building system
CN111456227A (en) Assembly plate structure type building and construction method thereof
CN217517862U (en) Assembled L shape post and ecological interior wall self-tapping nail cluster connection structure
CN110593449A (en) Assembly type light vertical bar plate type bearing wall structure and construction method thereof
CN110593397A (en) Multilayer assembled plate type building
CN212001725U (en) Full bolted connection multilayer prefabricated section steel concrete shear wall structure
CN212453063U (en) Assembly and pouring integrated shear wall structure building system
CN210482370U (en) Assembled interior wall of track traffic
CN110593440B (en) Construction method of prefabricated wall structure
CN211200814U (en) Assembled light vertical bar plate type bearing wall structure
CN211200692U (en) Multilayer assembled plate type building
CN112982692A (en) One-way superimposed sheet joint connecting structure and construction method
CN112523547A (en) UHPC temporary board house in earthquake region and erection method
CN2476600Y (en) Steel reinforced concrete split hollow shear wallboard

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Shijiazhuang Jingda Building System Co., Ltd.

Assignor: Zhang Jingting

Contract fulfillment period: 2009.3.10 to 2017.3.10 contract change

Contract record no.: 2009130000068

Denomination of invention: Joint construction method of prefabricated composite bearing wall structure

Granted publication date: 20080903

License type: Exclusive license

Record date: 2009.5.15

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.3.10 TO 2017.3.10; CHANGE OF CONTRACT

Name of requester: SHIJIAZHUANG JINGDA ARCHITECTURAL SYSTEM CO., LTD.

Effective date: 20090515