CN1779191A - Precast member for reinforcing bar concrete - Google Patents

Precast member for reinforcing bar concrete Download PDF

Info

Publication number
CN1779191A
CN1779191A CN 200410097229 CN200410097229A CN1779191A CN 1779191 A CN1779191 A CN 1779191A CN 200410097229 CN200410097229 CN 200410097229 CN 200410097229 A CN200410097229 A CN 200410097229A CN 1779191 A CN1779191 A CN 1779191A
Authority
CN
China
Prior art keywords
rib
reinforcing bar
putting
energy
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200410097229
Other languages
Chinese (zh)
Other versions
CN100458063C (en
Inventor
邱则有
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Juxing Light Weight Building Material Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2004100972298A priority Critical patent/CN100458063C/en
Publication of CN1779191A publication Critical patent/CN1779191A/en
Application granted granted Critical
Publication of CN100458063C publication Critical patent/CN100458063C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

A pre-fabricated pre-stressed reinforced concrete consists of a substrate and at least one longitudinal rib to form a whole body. The rib is equipped with mould cavities with enhanced top portions for casting in site to form cross nodes, so that it has good mechanical performance and simple structure, saves materials, costs low, and can be constructed easily. It can be used for hollow board of reinforced concrete cast in site or pre-stressed concrete, roof, substrate, wall or hollow bridge beam.

Description

A kind of precast member for reinforcing bar concrete
(1) technical field
The present invention relates to a kind of precast member for reinforcing bar concrete.
(2) background technology
Floor spiced with the Ribbed Bar concrete prefabricated element, can bear bidirectional load, do not need on-the-spot formwork, and cost is low, lifting, transportation are easily.This prefabricated units with ribbing comprise strip base plate, strip longitudinal rib, and longitudinal rib and base plate connect into integral body.The longitudinal rib length of common this prefabricated units is consistent with floor length, when bearing the floor of bidirectional load with this splicing prefabricated components formation, Cast-in-place concrete can't pass through at the longitudinal rib position, the Cast-in-place concrete rib that intersects with longitudinal rib that can not form connection, simultaneously, in the direction vertical with longitudinal rib, various pipe line arrangement need the scene threading that burrows, and have both wasted concrete material, waste man-hour again, therefore, develop a kind of novel precast member for reinforcing bar concrete for being badly in need of.
(3) summary of the invention
The object of the present invention is to provide a kind of precast member for reinforcing bar concrete, have that mechanical property is good, easy construction, simple in structure, save characteristics such as material, cost are low.
Solution of the present invention is on the basis of existing technology, comprise reinforced concrete floor, at least one steel concrete longitudinal rib, base plate and longitudinal rib are linked to be integral body, it is characterized in that described steel concrete longitudinal rib has the rear pouring concrete cross rib and wears die cavity in the rib of longitudinal rib, form the right-angled intersection node of concrete rib in length and breadth, the vertical die cavity top rib that plays interconnect function in the rib in the longitudinal rib on the die cavity is the connection rib of putting more energy into.Like this, because the steel concrete longitudinal rib has the rear pouring concrete cross rib and wears die cavity in the rib of longitudinal rib, form the right-angled intersection node of concrete rib in length and breadth, thereby prefabricated units are when being used to construct, die cavity position in the rib of longitudinal rib, smooth and easy the passing through of Cast-in-place concrete energy, the Cast-in-place concrete rib that intersects with longitudinal rib that form to be communicated with, with the cast-in-place and prefabricated two-way rib structure that combines of the common formation of longitudinal rib, simultaneously, in the direction vertical with longitudinal rib, can lay various pipelines very swimmingly by die cavity in the rib of longitudinal rib, no longer need the scene to burrow, and, because the vertical die cavity top rib that plays interconnect function on the die cavity is the connection rib of putting more energy in the rib in the longitudinal rib, thereby, the intensity height of prefabricated units, rigidity is big, good integrity; Therefore, this prefabricated units have that mechanical property is good, easy construction, simple in structure, save characteristics such as material, cost are low, thereby reached purpose of the present invention; Simultaneously, prefabricated units also have characteristics such as intensity height, rigidity is big, making is easy, the hollowcore slab, hollow building cover, roof system, sole plate, body of wall and the hollow bridges that are applicable to cast-in-situ reinforced concrete or prestressed reinforced concrete are used, and are specially adapted to hollow arch without beam and use.
Feature of the present invention is that also the described connection rib of putting more energy into has reinforcing bar or steel strand to pass.Like this, when having reinforcing bar or steel strand to pass in the connection rib of putting more energy into, the strength and stiffness of connection rib of putting more energy into have all obtained significantly improving, make it in transportation, installation and work progress, not fragile, fracture, after described prefabricated units are applied in the Cast-in-place concrete floor, but the connection rib participation structure of putting more energy into is stressed jointly, improves the performance of floor.
Feature of the present invention also is the width of the width of the described connection rib of putting more energy into greater than longitudinal rib.Like this, when the width of the connection rib of putting more energy into during greater than the width of longitudinal rib, the strength and stiffness of the connection rib of putting more energy into are corresponding to have obtained reinforcement, makes it survivable, can reduce the proportion of goods damageds of prefabricated units effectively, saves cost.
Feature of the present invention is that also the concrete of the described connection rib of putting more energy into is a High Strength Concrete.Like this, when the concrete of the connection rib of putting more energy into is High Strength Concrete, the intensity height of the connection rib of putting more energy into, rigidity is big, make its pile up, transport, not fragile in installation and the work progress, can reduce the proportion of goods damageds of prefabricated units effectively, save cost.
Feature of the present invention is that also gauze wire cloth is arranged in the described connection rib of putting more energy into, thin band reinforce.Like this, when gauze wire cloth, thin band reinforce are arranged in the connection rib of putting more energy into, improve the strength and stiffness of the connection rib of putting more energy into, resistance to tension is greatly improved, can improve the stress performance of prefabricated units.
Feature of the present invention also is in the described connection rib of putting more energy into shaped steel is arranged.Like this, when in the connection rib of putting more energy into shaped steel being arranged, the intensity of connection rib of putting more energy into has obtained significantly strengthening, make the structure base plate can bear bigger load, after described prefabricated units are applied in the Cast-in-place concrete floor, but the connection rib participation structure of putting more energy into is stressed jointly, improves the performance of floor, fully satisfies the demand.
Feature of the present invention also is on the described shaped steel hole is arranged.Like this, when also having hole on the shaped steel, can reduce the weight of shaped steel, save steel, reduce cost, simultaneously, can improve the mutual wedge action between Cast-in-place concrete and the shaped steel greatly.
Feature of the present invention also is to be compounded with steel plate in the described connection rib of putting more energy into.Like this, in the connection rib of putting more energy into, be compounded with steel plate, the strength and stiffness of connection rib of putting more energy into have all obtained significantly improving, make that it is not fragile in transportation, installation and work progress, fracture, after described prefabricated units are applied in the Cast-in-place concrete floor, the connection rib of putting more energy into is can participation structure stressed jointly, improves the performance of floor.
Feature of the present invention is that also die cavity periphery longitudinal rib is a stiffening rib in the described rib.Like this, when die cavity periphery longitudinal rib was stiffening rib in the rib, the intensity of die cavity periphery longitudinal rib can be greatly improved in the rib, make its pile up, transport, not easy fracture, damage in installation and the work progress, can reduce the loss of prefabricated units, save cost.
Feature of the present invention is that also the base plate under the die cavity is the base plate of putting more energy in the described rib.Like this, when the base plate under the die cavity in the rib when putting more energy into base plate, the intensity of die cavity periphery longitudinal rib can be greatly improved in the rib, make its pile up, transport, not easy fracture, damage in installation and the work progress, can reduce the loss of prefabricated units, save cost.
Feature of the present invention is that also elongated vertical top reinforcing bar or steel strand are arranged at described longitudinal rib top.Like this, after the longitudinal rib top is provided with elongated vertical top reinforcing bar or steel strand, can improve the strength and stiffness of longitudinal rib greatly, improve its force structure, make its force structure more good, reasonable, after described prefabricated units are applied in the Cast-in-place concrete floor, but the longitudinal rib participation structure is stressed jointly, improves the performance of floor.
Feature of the present invention also is in the base plate of described longitudinal rib and base plate intersection area longitudinal reinforcement or steel strand are arranged.Like this, after in the base plate of longitudinal rib and base plate intersection area, being provided with longitudinal reinforcement or steel strand, can improve the strength and stiffness of base plate greatly, improve its force structure, make its force structure more good, reasonable, after described prefabricated units are applied in the Cast-in-place concrete floor, but the base plate participation structure is stressed jointly, improves the performance of floor.
Feature of the present invention also is to have on the described base plate at least a in reinforcing rib, bracing piece or the stiffener.Like this, when base plate is provided with reinforcing rib, bracing piece or stiffener, can strengthen the supporting capacity of prefabricated units greatly, reduce the proportion of goods damageds of prefabricated units in transportation, installation, work progress, save material, reduce the cost of hollowcore slab, after described prefabricated units are applied in the Cast-in-place concrete floor, but the base plate participation structure is stressed jointly, improves the performance of floor.
Feature of the present invention is that also described base plate is extended with toss.Like this, when base plate was extended with toss, toss can replace template, reduced the template loss, reduced material cost, can save the template installation procedure simultaneously, accelerated speed of application, improved efficiency of construction.
Feature of the present invention is that also described prefabricated units are provided with the carrying suspender member.The carrying suspender member can be handle, suspension hook, suspension ring or other device.Like this, can very easily member be piled up, transport, lift and construct, reduce the work difficulty and the working strength of above-mentioned operation, help improving efficiency of construction, reduce construction cost.
(4) description of drawings
Fig. 1 is the structural representation of the embodiment of the invention 1.
Fig. 2 is the structural representation of the embodiment of the invention 2.
Fig. 3 is the structural representation of the embodiment of the invention 3.
Fig. 4 is the structural representation of the embodiment of the invention 4.
Fig. 5 is the structural representation of the embodiment of the invention 5.
Fig. 6 is the structural representation of the embodiment of the invention 6.
(5) specific embodiment
The present invention is further illustrated below in conjunction with drawings and Examples.
The present invention as shown in drawings, comprise reinforced concrete floor 1, at least one steel concrete longitudinal rib 2, base plate 1 is linked to be integral body with longitudinal rib 2, it is characterized in that described steel concrete longitudinal rib 2 has the rear pouring concrete cross rib and wears die cavity 3 in the rib of longitudinal rib 2, form the right-angled intersection node of concrete rib in length and breadth, the vertical die cavity top rib that plays interconnect function in the rib in the longitudinal rib 2 on the die cavity 3 is the connection rib 4 of putting more energy into.In each accompanying drawing, 1 is reinforced concrete floor, and 2 is the steel concrete longitudinal rib, and 3 is die cavity in the rib, and 4 are the connection rib of putting more energy into, below in each accompanying drawing, number identically, its explanation is identical.As shown in Figure 1, its described steel concrete longitudinal rib 2 has the rear pouring concrete cross rib and wears die cavity 3 in the rib of longitudinal rib 2, form the right-angled intersection node of concrete rib in length and breadth, the vertical die cavity top rib that plays interconnect function in the rib in the longitudinal rib 2 on the die cavity 3 is the connection rib 4 of putting more energy into.
Feature of the present invention is that also the described connection rib 4 of putting more energy into has reinforcing bar or steel strand 5 to pass.As shown in Figure 2, its described connection rib 4 of putting more energy into has reinforcing bar 5 to pass.
Feature of the present invention also is the width of the width of the described connection rib 4 of putting more energy into greater than longitudinal rib 2.As shown in Figure 2, the width of its described connection rib 4 of putting more energy into is greater than the width of longitudinal rib 2.
Feature of the present invention is that also the concrete of the described connection rib 4 of putting more energy into is a High Strength Concrete.As shown in Figure 2, the concrete of its described connection rib 4 of putting more energy into is a High Strength Concrete.
Feature of the present invention is that also gauze wire cloth is arranged in the described connection rib 4 of putting more energy into, thin band reinforce 6.As shown in Figure 3, in its described connection rib 4 of putting more energy into gauze wire cloth reinforce 6 is arranged.
Feature of the present invention also is in the described connection rib 4 of putting more energy into shaped steel 7 is arranged.As shown in Figure 4, in its described connection rib 4 of putting more energy into shaped steel 7 is arranged.
Feature of the present invention also is on the described shaped steel 7 hole 8 is arranged.As shown in Figure 4, on its described shaped steel 7 hole 8 is arranged.
Feature of the present invention also is to be compounded with steel plate 9 in the described connection rib 4 of putting more energy into.As shown in Figure 5, be compounded with steel plate 9 in its described connection rib 4 of putting more energy into.
Feature of the present invention is that also die cavity 3 peripheral longitudinal ribs 2 are stiffening rib in the described rib.As shown in Figure 6, die cavity 3 peripheral longitudinal ribs 2 are stiffening rib in its described rib.
Feature of the present invention is that also the base plate under the die cavity 31 is the base plate of putting more energy in the described rib.As shown in Figure 5, the base plate 1 under the die cavity 3 is the base plate of putting more energy in its described rib.
Feature of the present invention is that also elongated vertical top reinforcing bar or steel strand 5 are arranged at described longitudinal rib 2 tops.As shown in Figure 2, elongated vertical top reinforcing bar 5 is arranged at its described longitudinal rib 2 tops.
Feature of the present invention also is in the base plate 1 of described longitudinal rib 2 and base plate 1 intersection area longitudinal reinforcement or steel strand 5 are arranged.As shown in Figure 6, in the base plate 1 of its described longitudinal rib 2 and base plate 1 intersection area longitudinal reinforcement 5 is arranged.
Feature of the present invention also is to have on the described base plate 1 at least a in reinforcing rib 10, bracing piece 11 or the stiffener 12.As shown in Figure 6, its described base plate 1 is provided with reinforcing rib 10, bracing piece 11 and stiffener 12.
Feature of the present invention is that also described base plate 1 is extended with toss 13.As shown in Figure 4, its described base plate 1 is extended with toss 13.
Feature of the present invention is that also described prefabricated units are provided with carrying suspender member 14.As shown in Figure 4, its described prefabricated units are provided with carrying suspender member 14.
During the invention process, can adopt cement concrete in the base plate mould, to make the base plate 1 that includes reinforcing bar or reinforced mesh earlier, propped up the longitudinal rib mould then, make the longitudinal rib 2 of middle die cavity 3 with ribbing again of cement concrete, the vertical die cavity top rib that plays interconnect function in the rib on the die cavity 3 is the connection rib 4 of putting more energy into, reinforcing bar or gauze wire cloth etc. can be contained in it, after the maintenance demoulding, required precast member for reinforcing bar concrete can be made.

Claims (10)

1, a kind of precast member for reinforcing bar concrete, comprise reinforced concrete floor (1), at least one steel concrete longitudinal rib (2), base plate (1) is linked to be integral body with longitudinal rib (2), it is characterized in that described steel concrete longitudinal rib (2) has the rear pouring concrete cross rib and wears die cavity in the rib of longitudinal rib (2) (3), form the right-angled intersection node of concrete rib in length and breadth, the vertical die cavity top rib that plays interconnect function in the rib in the longitudinal rib (2) on the die cavity (3) is the connection rib of putting more energy into (4).
2, precast member for reinforcing bar concrete according to claim 1 is characterized in that the described connection rib of putting more energy into (4) has reinforcing bar or steel strand (5) to pass.
3, precast member for reinforcing bar concrete according to claim 1 is characterized in that the width of the width of the described connection rib of putting more energy into (4) greater than longitudinal rib (2).
4, precast member for reinforcing bar concrete according to claim 1, the concrete that it is characterized in that the described connection rib of putting more energy into (4) is a High Strength Concrete.
5, precast member for reinforcing bar concrete according to claim 1 is characterized in that gauze wire cloth is arranged in the described connection rib of putting more energy into (4), approaches band reinforce (6).
6, precast member for reinforcing bar concrete according to claim 1 is characterized in that shaped steel (7) is arranged in the described connection rib of putting more energy into (4).
7, precast member for reinforcing bar concrete according to claim 6 is characterized in that hole (8) is arranged on the described shaped steel (7).
8, precast member for reinforcing bar concrete according to claim 1 is characterized in that being compounded with in the described connection rib of putting more energy into (4) steel plate (9); Perhaps the peripheral longitudinal rib of die cavity (3) (2) is a stiffening rib in the rib; Perhaps the base plate (1) under the die cavity (3) is the base plate of putting more energy in the rib.
9, precast member for reinforcing bar concrete according to claim 1 is characterized in that elongated vertical top reinforcing bar or steel strand (5) are arranged at described longitudinal rib (2) top; Perhaps in the base plate (1) of longitudinal rib (2) and base plate (1) intersection area longitudinal reinforcement or steel strand (5) are arranged; At least a in reinforcing rib (10), bracing piece (11) or the stiffener (12) perhaps arranged on the base plate (1).
10, precast member for reinforcing bar concrete according to claim 1 is characterized in that described base plate (1) is extended with toss (13); Perhaps prefabricated units are provided with carrying suspender member (14).
CNB2004100972298A 2004-11-22 2004-11-22 Precast member for reinforcing bar concrete Active CN100458063C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2004100972298A CN100458063C (en) 2004-11-22 2004-11-22 Precast member for reinforcing bar concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2004100972298A CN100458063C (en) 2004-11-22 2004-11-22 Precast member for reinforcing bar concrete

Publications (2)

Publication Number Publication Date
CN1779191A true CN1779191A (en) 2006-05-31
CN100458063C CN100458063C (en) 2009-02-04

Family

ID=36769641

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004100972298A Active CN100458063C (en) 2004-11-22 2004-11-22 Precast member for reinforcing bar concrete

Country Status (1)

Country Link
CN (1) CN100458063C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625458A (en) * 2016-03-01 2016-06-01 沈阳建筑大学 Concrete-slab-poured cross-shaped foundation of separate house

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1284402A (en) * 1968-08-06 1972-08-09 Rheinbau Gmbh Improvements in and relating to building constructions
ES2161199B1 (en) * 2000-05-16 2002-07-01 Sanchez Jaime Enrique Jimenez MANUFACTURING PROCEDURE OF LIGHTWEIGHT ALVEOLAR PLATE MATERIALIZED IN WORK, PLATE AS WELL OBTAINED AND ITS APPLICATION IN HOUSING.
CN1168881C (en) * 2001-11-15 2004-09-29 邱则有 Prefabricated hollow member for roof with space structure and its application
CN2570377Y (en) * 2002-09-26 2003-09-03 姚月荣 Lock joint plastic formwork for construction
CN1226505C (en) * 2003-03-31 2005-11-09 邱则有 Light construction unit for on sito pouring reinforced concrete filling

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625458A (en) * 2016-03-01 2016-06-01 沈阳建筑大学 Concrete-slab-poured cross-shaped foundation of separate house

Also Published As

Publication number Publication date
CN100458063C (en) 2009-02-04

Similar Documents

Publication Publication Date Title
CN1779191A (en) Precast member for reinforcing bar concrete
CN1779149A (en) Cavity structural member of hollow concrete slab
CN100427711C (en) Cavity member for hollow concrete slab
CN100449078C (en) Cavity member for hollow concrete slab
CN1779188A (en) Precast cavity structural member with reinforcing bar concrete
CN100535363C (en) Precast member for concrete hollow slab
CN101408049B (en) Cavity component for concrete hollow slab
CN1779195A (en) Cavity structural member for hollow concrete slab
CN1779194A (en) Cavity structural member for hollow concrete slab
CN1779174A (en) Cavity member for hollow concrete slab
CN1779184A (en) Cavity structural member for hollow concrete slab
CN1779148A (en) Cavity structural member of hollow concrete slab
CN1779147A (en) Cavity structural member of hollow concrete slab
CN1779175A (en) Cavity member for hollow concrete slab
CN1779182A (en) Precast member for hollow concrete slab
CN1779163A (en) Precast member for lightweight board
CN1779183A (en) Precast member for hollow concrete slab
CN1779202A (en) Precast member for lightweight board
CN1779162A (en) Precast member for lightweight board
CN1779201A (en) Precast member for lightweight board
CN1779176A (en) Precast member for hollow concrete slab
CN1779196A (en) Precast member for lightweight board
CN1779173A (en) Cavity member for hollow concrete slab
CN1779203A (en) Precast member for lightweight board
CN1779186A (en) Cavity structural member for hollow concrete slab

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHANGSHA GIANT STAR LIGHT QUALITY BUILDING MATERIA

Free format text: FORMER OWNER: QIU ZEYOU

Effective date: 20150708

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150708

Address after: 410205, Hunan, Changsha Province, Yuelu District Road, 8 star road, star industry base, 4 floor

Patentee after: Changsha Juxing Light Weight Building Material Co., Ltd.

Address before: 410011 Hunan province Changsha Furong Road two section 59 Suncheon City 28 floor

Patentee before: Qiu Zeyou