CN1724825A - Processing method of concrete honeycomb floor and its used structure box - Google Patents

Processing method of concrete honeycomb floor and its used structure box Download PDF

Info

Publication number
CN1724825A
CN1724825A CN 200410024514 CN200410024514A CN1724825A CN 1724825 A CN1724825 A CN 1724825A CN 200410024514 CN200410024514 CN 200410024514 CN 200410024514 A CN200410024514 A CN 200410024514A CN 1724825 A CN1724825 A CN 1724825A
Authority
CN
China
Prior art keywords
box
structure box
concrete
stiffening rib
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200410024514
Other languages
Chinese (zh)
Inventor
李克翔
张锡增
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200410024514 priority Critical patent/CN1724825A/en
Publication of CN1724825A publication Critical patent/CN1724825A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a building cover manufacturing method and the used structural box technical method. The manufacturing method includes the steps as follows: firstly arranging structural boxes on the bottom mould of a supported building cover, where the space between the structural boxes is 70-250 mm as the width of the field-cast ribbon strips; then making a ribbon strip reinforcing steel bar cage by binding in the gap of each structural box; then connecting the reinforcing steel bars extending out of the structural boxes with the ribbon strip reinforcing steel bar cage; then casting concrete into the gaps between the structural boxes, tightly vibrating the concrete and nourishing the concrete into ribbon strips; and finally removing the bottom mould to make an integral nested building cover superposed of structural boxes and cast ribbon strips. The structural boxes used have hollow sealed concrete box bodies, and there are reinforcing steel bars intercrossing and extending out of them in their bottom and top plates, and the solution arranges reinforcing ribs on the bottom and top plates of the cavities of the box bodies, and arranges reinforcing ribs on the side walls of the cavities of the box bodies; and arranges shearing force teeth outside the side walls of the box bodies.

Description

A kind of processing method of concrete honeycomb superstructure and used structure box
Affiliated technical field:
What the present invention relates to is the processing method and the member of a kind of superstructure in the building trade, especially plants the processing method of concrete honeycomb superstructure and used structure box.
Background technology:
In the prior art, in cast-in-situ concrete beam slab-type apartment building lid and the close rib building roof system, template and primary structure member separate, and template not participation structure is stressed.The T section of close rib building roof makes that the flooring rigidity of multispan continuous floor is low, and the negative muscle of floor is too much, and span is also done not quite.The structure of beam-and-slab floor needs higher beam, and therefore, it is too many to take up room, from great, span is little, bearing capacity is little, existing in prior technology problem that Here it is.
Summary of the invention:
Purpose of the present invention is exactly at the existing in prior technology deficiency, and a kind of processing method of concrete honeycomb superstructure and used structural box technical is provided.This scheme adopts the girt strip of structure box and cast-in-place notes to be overlapped into whole honeycomb superstructure, the cross section of superstructure is become " worker " font, bearing capacity and rigidity have been strengthened, thereby can make longspan structure, the hollow rate of superstructure is improved, can reduce the quantity of the required reinforcing bar of superstructure again, and make floor construction simple more, convenient, construction costs obviously reduces.
This programme is realized by following technical measures.
The processing method of superstructure, its procedure of processing is as follows:
(1) put the structure box on a superstructure bed die of getting well, the spacing between each structure box is the 70-250 millimeter, as the width of cast-in-place girt strip;
(2) colligation girt strip reinforcing steel bar cage in the gap of each structure box;
(3) the structure box is overhanging structure box reinforcing bar is connected with the girt strip reinforcing steel bar cage;
(4) the space fluid concrete between each structure box, and concrete jolt ramming, maintenance made cast-in-place girt strip;
(5) remove bed die the girt strip of structure box and cast-in-place notes be overlapped into whole honeycomb superstructure.
The structure box that concrete honeycomb superstructure processing method is used, mainly include the concrete box body of hollow sealing, in the base plate of box body and top board right-angled intersection is arranged and stretch out structure box reinforcing bar outside the box body, the characteristics of this programme are that base plate stiffening rib and top board stiffening rib are arranged on the base plate of box body inner chamber and top board.The concrete characteristics of this programme also have, and described base plate stiffening rib and top board stiffening rib are the stiffening ribs of cross type.Described base plate stiffening rib and top board stiffening rib also can be the stiffening ribs that is parallel to each other.On the sidewall of the four sides of box body inner chamber, every sidewall also has at least two vertical sidewall stiffening ribs.On the four sides, the outside of box side wall, every also has at least two vertically outstanding sidewall shearing teeth.
The beneficial effect of this programme can be learnt according to the narration to such scheme, owing to be to adopt the girt strip that has structure box and concrete cast-in-situ to annotate to be overlapped into integral cover in the method for this scheme, this can make the cross section of superstructure become " worker " font, form the same structure of similar honeycomb cardboard, bearing capacity and rigidity have been strengthened, thereby can make long-span floor system, the hollow rate of superstructure is improved, can reduce the quantity of the required reinforcing bar of superstructure again, add this superstructure again and in construction, only need bed die, so make floor construction simple more, convenient, construction costs obviously reduces.Again owing in the box body of structure box, increased base plate stiffening rib, top board stiffening rib and sidewall stiffening rib, this just can with the structure box body long-pending do big, do height, for realize strengthening the span of superstructure and greatly hollow rate condition is provided.Lateral surface at total box box body has added protruding shearing tooth, and this obtains more reliable transmission with regard to making the shear stress on structure box and the cast-in-place girt strip superposed surfaces.Therefore, realized that the structure box is the effect that is subjected to upright member also to have template.This shows that the present invention compared with prior art has outstanding substantive distinguishing features and obvious improvement, its implementation result also is conspicuous.
Description of drawings:
Fig. 1 is the part sectional structure schematic diagram of the structure box specific embodiment of the present invention.
Fig. 2 is the A-A sectional structure schematic diagram of Fig. 1.
Fig. 3 is that the specific embodiment of the invention is by structure box and the superimposed superstructure schematic diagram of girt strip.
Fig. 4 is the B-B sectional structure schematic diagram of Fig. 3.
1 is structure box reinforcing bar among the figure, and 2 is box body, and 3 is the base plate stiffening rib, and 4 is the top board stiffening rib, and 5 is sidewall shearing tooth, and 6 is top board, and 7 is base plate, and 8 is the sidewall stiffening rib, and 9 is sidewall, and 10 is girt strip, and 11 is the girt strip reinforcing steel bar cage.
The specific embodiment:
For clearly demonstrating the technical characterstic of this programme, this programme is illustrated below by a specific embodiment.
By accompanying drawing 1 and accompanying drawing 2 as can be seen, the used structure box of superstructure in this programme, be one and make the box body (2) of hollow sealing in the base plate (7) of box body (2) and top board (6), right-angled intersection is arranged and stretch out structure box reinforcing bar (1) outside the box body (2) by concrete.On the base plate (7) of box body (2) inner chamber and top board (6), base plate stiffening rib (3) and top board stiffening rib (4) are arranged, this base plate stiffening rib (3) and top board stiffening rib (4) are the stiffening ribs of cross type, it also can be the stiffening rib that is parallel to each other, this can be under the situation that does not increase base plate (7) and top board (6) thickness, just can make large-sized box body (2), thereby can obtain the superstructure of big hollow rate, and can alleviate the deadweight of structure.On the four sides sidewall (9) of box body (2) inner chamber, every sidewall (9) also has at least two vertical sidewall stiffening ribs (8), drag and anti-unstability ability in order to reinforced sidewall (9), the height of box body (2) is done greatly, thereby the span of superstructure is done more, and this specific embodiment adopts two sidewall stiffening ribs (8) exactly.In addition, on the four sides, the outside of box side wall (9), every also has at least two vertical sidewall shearing teeth (5), this sidewall shearing tooth (5) can make the shear stress on box body (2) and girt strip (10) superposed surfaces obtain more reliable transmission, make box body (2) and girt strip (10) connect into as a whole primary structure member, this specific embodiment is to adopt every face that three sidewall shearing teeth (5) are arranged.Step with the structure box fabrication of concrete honeycomb superstructure of this programme is, at first, puts the structure box on a good superstructure bed die, and the spacing between each structure box is the 70-250 millimeter, preferably adopts 150 millimeters, as the width of cast-in-place girt strip (10).Then, colligation girt strip reinforcing steel bar cage (11) in the gap of each structure box.And the structure box is stretched out the outer structure box reinforcing bar (1) of box body (2) be connected with girt strip reinforcing steel bar cage (11) in being placed on each structure box gap.Space fluid concrete between each structure box again, and concrete jolt ramming, maintenance made girt strip (10).At last, remove bed die the girt strip (10) of structure box and cast be overlapped into whole honeycomb superstructure, shown in accompanying drawing 3 and accompanying drawing 4.Because superstructure only needs bed die in construction, so make floor construction simple more, convenient, construction costs also obviously reduces.

Claims (6)

1. the processing method of a concrete honeycomb superstructure is characterized in that procedure of processing is as follows:
(1) put the structure box on a superstructure bed die of getting well, the spacing between each structure box is the 70-250 millimeter, as the width of cast-in-place girt strip;
(2) colligation girt strip reinforcing steel bar cage in the gap of each structure box;
(3) the structure box is overhanging structure box reinforcing bar is connected with the girt strip reinforcing steel bar cage;
(4) the space fluid concrete between each structure box, and concrete jolt ramming, maintenance made cast-in-place girt strip;
(5) remove bed die the girt strip of structure box and cast-in-place notes be overlapped into whole honeycomb superstructure.
2. structure box of using according to the described processing method of claim 1, mainly include the concrete box body of hollow sealing, in the base plate of box body and top board, right-angled intersection is arranged and stretch out structure box reinforcing bar outside the box body, it is characterized in that: on the base plate of box body inner chamber and top board, base plate stiffening rib and top board stiffening rib are arranged.
3. structure box according to claim 2 is characterized in that: described base plate stiffening rib and top board stiffening rib are the stiffening ribs of cross type.
4. structure box according to claim 2 is characterized in that: described base plate stiffening rib and top board stiffening rib also can be the stiffening ribs that is parallel to each other.
5. according to claim 2 or 3 or 4 described structure boxes, it is characterized in that: on the sidewall of the four sides of box body inner chamber, every sidewall also has at least two vertical sidewall stiffening ribs.
6. structure box according to claim 5 is characterized in that: on the four sides, the outside of box side wall, every also has at least two vertically outstanding sidewall shearing teeth.
CN 200410024514 2004-07-21 2004-07-21 Processing method of concrete honeycomb floor and its used structure box Pending CN1724825A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200410024514 CN1724825A (en) 2004-07-21 2004-07-21 Processing method of concrete honeycomb floor and its used structure box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200410024514 CN1724825A (en) 2004-07-21 2004-07-21 Processing method of concrete honeycomb floor and its used structure box

Publications (1)

Publication Number Publication Date
CN1724825A true CN1724825A (en) 2006-01-25

Family

ID=35924437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200410024514 Pending CN1724825A (en) 2004-07-21 2004-07-21 Processing method of concrete honeycomb floor and its used structure box

Country Status (1)

Country Link
CN (1) CN1724825A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764557A (en) * 2020-07-21 2020-10-13 江苏智信达建筑科技有限公司 Assembly type floor with decorative surface layer and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764557A (en) * 2020-07-21 2020-10-13 江苏智信达建筑科技有限公司 Assembly type floor with decorative surface layer and construction method thereof

Similar Documents

Publication Publication Date Title
CN107245934A (en) A kind of assembled steel profiled sheet concrete combined board small box girder
CN1814930A (en) Constrction method and templet of rc floor
CN1724825A (en) Processing method of concrete honeycomb floor and its used structure box
CN211775065U (en) Steel beam-prestressed concrete combined composite slab
CN2804222Y (en) R.C. ribbed floor slab
CN110055874B (en) Corrugated steel web box girder bridge lining concrete structure
CN101117835A (en) Reinforcement built-in anti-shear steel plate concrete combination beam
CN2714707Y (en) Structural case for concrete honeycomb slab
CN207553448U (en) A kind of detachable reinforcing steel truss floor support plate of connection fastener and the application fastener
CN101137537A (en) Method for obtaining a box frame for construction and resulting box frame
CN105350460B (en) Corrugated steel web temporary fixation structure independent of template
CN211949027U (en) Shear wall structure for improving lateral stiffness resistance
CN210032274U (en) Building flat slab structure
CN101260712A (en) Prefabricated element for floor
CN210976179U (en) Keel system rammed earth wall
KR102136025B1 (en) Laminated Composite Beam System Using Precast Concrete Panels
CN208038999U (en) A kind of assembled simple supported box beam end floor beam construction
CN112376434A (en) Assembled steel-concrete cap beam and construction method thereof
CN220225868U (en) Prefabricated reinforced concrete substrate assembled floor
CN208263095U (en) A kind of manufacturing equipment of precast rib cavity plate
CN201771112U (en) Multipurpose reinforcement mat frame
CN2851390Y (en) High-strength prefabricated thin-walled box
CN219987955U (en) Prefabricated long line platform concrete superimposed sheet mould baffle
CN210238897U (en) Integral type Chevron barrel waffle slab structure of disassembly-free template of industrial factory building
CN220580297U (en) Prefabricated module double-deck floor connection structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication