CN1724825A - Processing method of concrete honeycomb floor and its used structure box - Google Patents
Processing method of concrete honeycomb floor and its used structure box Download PDFInfo
- Publication number
- CN1724825A CN1724825A CN 200410024514 CN200410024514A CN1724825A CN 1724825 A CN1724825 A CN 1724825A CN 200410024514 CN200410024514 CN 200410024514 CN 200410024514 A CN200410024514 A CN 200410024514A CN 1724825 A CN1724825 A CN 1724825A
- Authority
- CN
- China
- Prior art keywords
- box
- structure box
- concrete
- stiffening rib
- base plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention provides a building cover manufacturing method and the used structural box technical method. The manufacturing method includes the steps as follows: firstly arranging structural boxes on the bottom mould of a supported building cover, where the space between the structural boxes is 70-250 mm as the width of the field-cast ribbon strips; then making a ribbon strip reinforcing steel bar cage by binding in the gap of each structural box; then connecting the reinforcing steel bars extending out of the structural boxes with the ribbon strip reinforcing steel bar cage; then casting concrete into the gaps between the structural boxes, tightly vibrating the concrete and nourishing the concrete into ribbon strips; and finally removing the bottom mould to make an integral nested building cover superposed of structural boxes and cast ribbon strips. The structural boxes used have hollow sealed concrete box bodies, and there are reinforcing steel bars intercrossing and extending out of them in their bottom and top plates, and the solution arranges reinforcing ribs on the bottom and top plates of the cavities of the box bodies, and arranges reinforcing ribs on the side walls of the cavities of the box bodies; and arranges shearing force teeth outside the side walls of the box bodies.
Description
Affiliated technical field:
What the present invention relates to is the processing method and the member of a kind of superstructure in the building trade, especially plants the processing method of concrete honeycomb superstructure and used structure box.
Background technology:
In the prior art, in cast-in-situ concrete beam slab-type apartment building lid and the close rib building roof system, template and primary structure member separate, and template not participation structure is stressed.The T section of close rib building roof makes that the flooring rigidity of multispan continuous floor is low, and the negative muscle of floor is too much, and span is also done not quite.The structure of beam-and-slab floor needs higher beam, and therefore, it is too many to take up room, from great, span is little, bearing capacity is little, existing in prior technology problem that Here it is.
Summary of the invention:
Purpose of the present invention is exactly at the existing in prior technology deficiency, and a kind of processing method of concrete honeycomb superstructure and used structural box technical is provided.This scheme adopts the girt strip of structure box and cast-in-place notes to be overlapped into whole honeycomb superstructure, the cross section of superstructure is become " worker " font, bearing capacity and rigidity have been strengthened, thereby can make longspan structure, the hollow rate of superstructure is improved, can reduce the quantity of the required reinforcing bar of superstructure again, and make floor construction simple more, convenient, construction costs obviously reduces.
This programme is realized by following technical measures.
The processing method of superstructure, its procedure of processing is as follows:
(1) put the structure box on a superstructure bed die of getting well, the spacing between each structure box is the 70-250 millimeter, as the width of cast-in-place girt strip;
(2) colligation girt strip reinforcing steel bar cage in the gap of each structure box;
(3) the structure box is overhanging structure box reinforcing bar is connected with the girt strip reinforcing steel bar cage;
(4) the space fluid concrete between each structure box, and concrete jolt ramming, maintenance made cast-in-place girt strip;
(5) remove bed die the girt strip of structure box and cast-in-place notes be overlapped into whole honeycomb superstructure.
The structure box that concrete honeycomb superstructure processing method is used, mainly include the concrete box body of hollow sealing, in the base plate of box body and top board right-angled intersection is arranged and stretch out structure box reinforcing bar outside the box body, the characteristics of this programme are that base plate stiffening rib and top board stiffening rib are arranged on the base plate of box body inner chamber and top board.The concrete characteristics of this programme also have, and described base plate stiffening rib and top board stiffening rib are the stiffening ribs of cross type.Described base plate stiffening rib and top board stiffening rib also can be the stiffening ribs that is parallel to each other.On the sidewall of the four sides of box body inner chamber, every sidewall also has at least two vertical sidewall stiffening ribs.On the four sides, the outside of box side wall, every also has at least two vertically outstanding sidewall shearing teeth.
The beneficial effect of this programme can be learnt according to the narration to such scheme, owing to be to adopt the girt strip that has structure box and concrete cast-in-situ to annotate to be overlapped into integral cover in the method for this scheme, this can make the cross section of superstructure become " worker " font, form the same structure of similar honeycomb cardboard, bearing capacity and rigidity have been strengthened, thereby can make long-span floor system, the hollow rate of superstructure is improved, can reduce the quantity of the required reinforcing bar of superstructure again, add this superstructure again and in construction, only need bed die, so make floor construction simple more, convenient, construction costs obviously reduces.Again owing in the box body of structure box, increased base plate stiffening rib, top board stiffening rib and sidewall stiffening rib, this just can with the structure box body long-pending do big, do height, for realize strengthening the span of superstructure and greatly hollow rate condition is provided.Lateral surface at total box box body has added protruding shearing tooth, and this obtains more reliable transmission with regard to making the shear stress on structure box and the cast-in-place girt strip superposed surfaces.Therefore, realized that the structure box is the effect that is subjected to upright member also to have template.This shows that the present invention compared with prior art has outstanding substantive distinguishing features and obvious improvement, its implementation result also is conspicuous.
Description of drawings:
Fig. 1 is the part sectional structure schematic diagram of the structure box specific embodiment of the present invention.
Fig. 2 is the A-A sectional structure schematic diagram of Fig. 1.
Fig. 3 is that the specific embodiment of the invention is by structure box and the superimposed superstructure schematic diagram of girt strip.
Fig. 4 is the B-B sectional structure schematic diagram of Fig. 3.
1 is structure box reinforcing bar among the figure, and 2 is box body, and 3 is the base plate stiffening rib, and 4 is the top board stiffening rib, and 5 is sidewall shearing tooth, and 6 is top board, and 7 is base plate, and 8 is the sidewall stiffening rib, and 9 is sidewall, and 10 is girt strip, and 11 is the girt strip reinforcing steel bar cage.
The specific embodiment:
For clearly demonstrating the technical characterstic of this programme, this programme is illustrated below by a specific embodiment.
By accompanying drawing 1 and accompanying drawing 2 as can be seen, the used structure box of superstructure in this programme, be one and make the box body (2) of hollow sealing in the base plate (7) of box body (2) and top board (6), right-angled intersection is arranged and stretch out structure box reinforcing bar (1) outside the box body (2) by concrete.On the base plate (7) of box body (2) inner chamber and top board (6), base plate stiffening rib (3) and top board stiffening rib (4) are arranged, this base plate stiffening rib (3) and top board stiffening rib (4) are the stiffening ribs of cross type, it also can be the stiffening rib that is parallel to each other, this can be under the situation that does not increase base plate (7) and top board (6) thickness, just can make large-sized box body (2), thereby can obtain the superstructure of big hollow rate, and can alleviate the deadweight of structure.On the four sides sidewall (9) of box body (2) inner chamber, every sidewall (9) also has at least two vertical sidewall stiffening ribs (8), drag and anti-unstability ability in order to reinforced sidewall (9), the height of box body (2) is done greatly, thereby the span of superstructure is done more, and this specific embodiment adopts two sidewall stiffening ribs (8) exactly.In addition, on the four sides, the outside of box side wall (9), every also has at least two vertical sidewall shearing teeth (5), this sidewall shearing tooth (5) can make the shear stress on box body (2) and girt strip (10) superposed surfaces obtain more reliable transmission, make box body (2) and girt strip (10) connect into as a whole primary structure member, this specific embodiment is to adopt every face that three sidewall shearing teeth (5) are arranged.Step with the structure box fabrication of concrete honeycomb superstructure of this programme is, at first, puts the structure box on a good superstructure bed die, and the spacing between each structure box is the 70-250 millimeter, preferably adopts 150 millimeters, as the width of cast-in-place girt strip (10).Then, colligation girt strip reinforcing steel bar cage (11) in the gap of each structure box.And the structure box is stretched out the outer structure box reinforcing bar (1) of box body (2) be connected with girt strip reinforcing steel bar cage (11) in being placed on each structure box gap.Space fluid concrete between each structure box again, and concrete jolt ramming, maintenance made girt strip (10).At last, remove bed die the girt strip (10) of structure box and cast be overlapped into whole honeycomb superstructure, shown in accompanying drawing 3 and accompanying drawing 4.Because superstructure only needs bed die in construction, so make floor construction simple more, convenient, construction costs also obviously reduces.
Claims (6)
1. the processing method of a concrete honeycomb superstructure is characterized in that procedure of processing is as follows:
(1) put the structure box on a superstructure bed die of getting well, the spacing between each structure box is the 70-250 millimeter, as the width of cast-in-place girt strip;
(2) colligation girt strip reinforcing steel bar cage in the gap of each structure box;
(3) the structure box is overhanging structure box reinforcing bar is connected with the girt strip reinforcing steel bar cage;
(4) the space fluid concrete between each structure box, and concrete jolt ramming, maintenance made cast-in-place girt strip;
(5) remove bed die the girt strip of structure box and cast-in-place notes be overlapped into whole honeycomb superstructure.
2. structure box of using according to the described processing method of claim 1, mainly include the concrete box body of hollow sealing, in the base plate of box body and top board, right-angled intersection is arranged and stretch out structure box reinforcing bar outside the box body, it is characterized in that: on the base plate of box body inner chamber and top board, base plate stiffening rib and top board stiffening rib are arranged.
3. structure box according to claim 2 is characterized in that: described base plate stiffening rib and top board stiffening rib are the stiffening ribs of cross type.
4. structure box according to claim 2 is characterized in that: described base plate stiffening rib and top board stiffening rib also can be the stiffening ribs that is parallel to each other.
5. according to claim 2 or 3 or 4 described structure boxes, it is characterized in that: on the sidewall of the four sides of box body inner chamber, every sidewall also has at least two vertical sidewall stiffening ribs.
6. structure box according to claim 5 is characterized in that: on the four sides, the outside of box side wall, every also has at least two vertically outstanding sidewall shearing teeth.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200410024514 CN1724825A (en) | 2004-07-21 | 2004-07-21 | Processing method of concrete honeycomb floor and its used structure box |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200410024514 CN1724825A (en) | 2004-07-21 | 2004-07-21 | Processing method of concrete honeycomb floor and its used structure box |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1724825A true CN1724825A (en) | 2006-01-25 |
Family
ID=35924437
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200410024514 Pending CN1724825A (en) | 2004-07-21 | 2004-07-21 | Processing method of concrete honeycomb floor and its used structure box |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1724825A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111764557A (en) * | 2020-07-21 | 2020-10-13 | 江苏智信达建筑科技有限公司 | Assembly type floor with decorative surface layer and construction method thereof |
-
2004
- 2004-07-21 CN CN 200410024514 patent/CN1724825A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111764557A (en) * | 2020-07-21 | 2020-10-13 | 江苏智信达建筑科技有限公司 | Assembly type floor with decorative surface layer and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107245934A (en) | A kind of assembled steel profiled sheet concrete combined board small box girder | |
CN1814930A (en) | Constrction method and templet of rc floor | |
CN1724825A (en) | Processing method of concrete honeycomb floor and its used structure box | |
CN211775065U (en) | Steel beam-prestressed concrete combined composite slab | |
CN2804222Y (en) | R.C. ribbed floor slab | |
CN110055874B (en) | Corrugated steel web box girder bridge lining concrete structure | |
CN101117835A (en) | Reinforcement built-in anti-shear steel plate concrete combination beam | |
CN2714707Y (en) | Structural case for concrete honeycomb slab | |
CN207553448U (en) | A kind of detachable reinforcing steel truss floor support plate of connection fastener and the application fastener | |
CN101137537A (en) | Method for obtaining a box frame for construction and resulting box frame | |
CN105350460B (en) | Corrugated steel web temporary fixation structure independent of template | |
CN211949027U (en) | Shear wall structure for improving lateral stiffness resistance | |
CN210032274U (en) | Building flat slab structure | |
CN101260712A (en) | Prefabricated element for floor | |
CN210976179U (en) | Keel system rammed earth wall | |
KR102136025B1 (en) | Laminated Composite Beam System Using Precast Concrete Panels | |
CN208038999U (en) | A kind of assembled simple supported box beam end floor beam construction | |
CN112376434A (en) | Assembled steel-concrete cap beam and construction method thereof | |
CN220225868U (en) | Prefabricated reinforced concrete substrate assembled floor | |
CN208263095U (en) | A kind of manufacturing equipment of precast rib cavity plate | |
CN201771112U (en) | Multipurpose reinforcement mat frame | |
CN2851390Y (en) | High-strength prefabricated thin-walled box | |
CN219987955U (en) | Prefabricated long line platform concrete superimposed sheet mould baffle | |
CN210238897U (en) | Integral type Chevron barrel waffle slab structure of disassembly-free template of industrial factory building | |
CN220580297U (en) | Prefabricated module double-deck floor connection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |