CN1704539A - Construction method for one-time pouring molding of light solid wall - Google Patents

Construction method for one-time pouring molding of light solid wall Download PDF

Info

Publication number
CN1704539A
CN1704539A CN 200410022674 CN200410022674A CN1704539A CN 1704539 A CN1704539 A CN 1704539A CN 200410022674 CN200410022674 CN 200410022674 CN 200410022674 A CN200410022674 A CN 200410022674A CN 1704539 A CN1704539 A CN 1704539A
Authority
CN
China
Prior art keywords
grouting
template
wall
slurry
front template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200410022674
Other languages
Chinese (zh)
Inventor
陈田平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200410022674 priority Critical patent/CN1704539A/en
Publication of CN1704539A publication Critical patent/CN1704539A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

A construction method for one-time pouring and forming of a light solid wall comprises the following steps: erecting framework materials such as reinforcing mesh at the position of a corresponding partition wall of the house frame main body; erecting a front template and a rear template of the wall; adding water into the lightweight filler and the cement to prepare cement slurry; two grouting modes are adopted, wherein one grouting mode is a manual mode or a semi-mechanical mode: reserving a 10-30 cm grouting seam at the top position of the front template, conveying a hopper to the height position of the grouting seam, putting slurry between the two templates, and vibrating by using a vibrating rod to finish grouting operation; the second mode is a full mechanical mode: the grouting pump is used for feeding the slurry between the front template and the rear template from a grouting opening, the grouting openings are basically arranged in rows on the front template, and grouting is carried out from the grouting opening with a low position from bottom to top; and after the cement slurry is basically cured, removing the mold and completing the whole operation. The invention changes the traditional mode of wallboard prefabrication and field installation, and has the advantages of good wall integrity, high mechanical strength and no crack on the board surface.

Description

The job practices of the disposable material filling moulding of light solid wall
One, technical field
The present invention relates to construction techniques, relate in particular to the job practices of the disposable material filling moulding of lightweight body of wall.
Two, background technology
In the building trade, light cellular partition board has formed an industry.Chinese patent literature discloses multiple structure, the light cellular partition board that material is different, as, ZL87204680X, it is to make inserts by alkaline cement and gypsum, makes as framework material with glass fiber mesh or glass silk, a plurality of through holes are arranged in the plate body,, be called for short the gypsum lightweight wallboard to reduce proportion; And for example, to be called " composite lightweight wall plate " Patent publish (ZL932353789) as follows for name: this wallboard is to be framework material by galvanized steel wire netting, and filling concrete mortar and perlite added a small amount of additive in the rack is through the foaming wallboard that is made; For another example, name is called " porous reinforcing bar Light trabs ", and it is a framework material with the steel mesh reinforcement, has a plurality of through holes in the wallboard.In addition, also have " not crack Light trabs is installed " (ZL022453687), it makes the skeleton of plate with the reinforcing bar welding, do inserts with expanded perlite, adding a small amount of additive is made, be characterized in, the vertical two sides of wallboard are provided with interconnective box pin joint, in the wallboard monolithic reinforced skeleton on, down, a left side, the right side is equipped with built-in fitting, when installing at the scene, can pass through expansion bolt or welding manner, built-in fitting is fixed on the main body frame, like this, on the wallboard, down, a left side, the right side all is fixed together with main body frame, stressed balanced, solved the wallboard unbalance stress to a certain extent and problem of cracks.
From above-mentioned existing various light cellular partition boards, its something in common is, all belongs to precast plate, and promptly the processing and fabricating in advance in special place is transported to the scene with wallboard again and installs.Its major defect is: 1, the globality of construction back partition wall body is relatively poor, is that whole partition wall body is to be spliced by polylith wallboard scene on the one hand, has the problem of piece; In a plurality of wallboards of body of wall, a plurality of framework materials are to disperse as a plurality of steel mesh reinforcements on the other hand, do not constitute an integral body, Gu and, can not organically combine with main body frame, form integrated.In the use, under the discontinuity equalization situation, the wallboard problem of cracks can appear; 2, need the special precast place, floor space is bigger; 3, prefabricated panel belongs to the small profits industry, because of the cost problem is not suitable for long-distance transport, Gu and, the topped scope of the product of wallboard processing factory is very limited, conversely, also limits and restricted wallboard process plants ability to maximization, scale, the development of standardization aspect; Existing wallboard processing factory point miniaturization, decentralized, the mechanization level is low, and the present situation of process units backwardness also fully reflects and has confirmed above-mentioned viewpoint.
The technician of existing Light trabs industry is prefabricated to wallboard, the on-the-spot installation, and this fact for a long time is accustomed to, forms a fixed pattern, and seeing of poring.
Three, summary of the invention
The objective of the invention is to provide the job practices of the disposable material filling moulding of a kind of light solid wall at the existing prefabricated problem of Light trabs, be intended to abandon the existing traditional approach that wallboard processing, installation are separately carried out, disposable at the construction field (site) material filling moulding, itself and main body frame are combined together, improve the overall performance of wallboard.
The object of the present invention is achieved like this: the job practices of the disposable material filling moulding of a kind of light solid wall, it is characterized in that, and may further comprise the steps:
A) fixedly install crisscross steel mesh reinforcement or galvanized steel wire netting or glass fiber mesh on the partition wall position answering of house frame main body, as the wall skeleton material;
B) set up the forward and backward template of body of wall respectively on the two sides of above-mentioned mesh skeleton material, the mesh skeleton material is positioned at about medium position of two templates;
C) with light filler and cement allotment, add water and make cement slurry;
D) grouting operation adopts artificial, half mechanical or full mechanical system:
Manually, half mechanical system: the grouting seam of reserving 10-30cm at the tip position of front template, by artificial or electri forklift hopper is delivered to grouting seam height and position, again cement slurry is put into from hopper between two templates, used vibrating head to vibrate simultaneously, finish grouting operation at last;
Full mechanical system: use the flange plate type grouting of grout pump from the front template mouthful that slurry is sent among the formed inner chamber of forward and backward template, grouting mouth on the front template is basic in a row to be provided with by row, its column pitch 2-4 rice, row's spacing 1-2 rice, about 2 meters of the height on the irrigation and drainage slurry mouthful distance construction ground that the position is minimum, the irrigation and drainage slurry mouthful contiguous front template top that the position is the highest; Grouting order is carried out from bottom to top according to the grouting mouth minimum from the position, after the grouting mouth of having finished this position grouting operation adopts plug with its shutoff, continues the grouting operation of back again;
E) treat that cement slurry solidifies substantially after, pull down forward and backward template, finish whole operation.
Described wall skeleton material be reserved with door opening and/or window opening on the net, have door opening and/or window opening accordingly on the described forward and backward template, and adopt lath that institute's clip space of forward and backward template is sealed at door opening and/or window opening position.
Above-mentioned job practices has been abandoned the prefabricated of existing light cellular partition board fully, field erected conventional construction method, and it is directly at the scene, answer the real size (comprising any special size) of partition wall body according to chassis body, netting (wall skeleton such as steel mesh reinforcement etc.), cope match-plate pattern, grouting are once finished.
The present invention has following characteristics and advantage:
1, need not use prefabricated production site, directly in engineering site clamping, disposable material filling moulding; The transportation problem of prefabricated panel has not existed, and construction enterprises can give no thought to the problem of distance, can be in any place far away, and local procurement construction raw material carries out site operation.The present invention enlarges the professional coverage of construction enterprises and no longer is subjected to any limitation.
2, the framework material of disposable material filling moulding lightweight body of wall, as steel mesh reinforcement itself is an integral body, and be fixedly installed on the chassis body (in the reality, can squeeze into swell fixture, fixing through welding again, also the reinforcing bar of burying underground in itself and the chassis body can be welded together), wallboard integration degree height (steel mesh reinforcement of the present invention, be fixedly connected with chassis body, and existing prefabricated panel is a plurality of wallboard assembly units, a plurality of gauze wire cloths, discontinuity equalization, can produce the crack), good stability, shock resistance improves.After testing, the single-point suspension force of lightweight body of wall of the present invention reaches 1800N above (existing Light trabs standard JC/T3029-1995, the single-point suspension force is 800N); The bending resistance rupture load reaches 8 times of plates heavy above (standard is heavy for 〉=0.75 times of plate, existing prefabricated wallboards is measured reach 5 times of plates heavy); Weighted transmission loss (by " Standard for assessment of building sound insulation " the GBJ121-88 comparison method is carried out) Rw is 40dB, surpasses 5 times of existing prefabricated panels; Because body of wall good integrity of the present invention, stressed balanced more, body of wall can not produce the crack in the use.
3, body of wall material filling moulding rear surface is smooth bright and clean, does not need to do leveling layer and surface layer, and directly facing further reduces construction sequence on the one-shot forming basis, has accelerated construction speed, has reduced construction cost.
4, the disposable material filling moulding of the present invention can be satisfied any special-shaped dimensional requirement, especially can solve the partition body of wall problem of door, window, and this is that existing prefabricated panel is indeterminable.
Four, description of drawings
Fig. 1 Fig. 2 is respectively the front view of steel mesh reinforcement set on the chassis body of the different standard widths of a room in an old-style house;
Fig. 3 is the schematic diagram that presets the steel mesh reinforcement of door opening and window opening;
Fig. 4 Fig. 5 is respectively the front view and the left view of the used a kind of steel form of the present invention;
Fig. 6 is the schematic diagram that flange plate type grouting mouth and vibrator are provided with on steel form;
Fig. 7 is the generalized section of flange plate type grouting mouth;
Five, the specific embodiment
Fig. 1 illustrates, the standard width of a room in an old-style house of chassis body 1 is 3800mm, highly be 3000mm, the main muscle 2a diameter 4.5mm of its steel mesh reinforcement, secondary muscle 2b diameter 3.5mm, main muscle is provided with along whole chassis body interior periphery, and comprise muscle bottom, promptly constitute an integral body master muscle frame, middle is secondary muscle, and crisscross reinforcing bar can adopt welding or colligation to fix at infall.Adopt swell fixture to squeeze into chassis body, steel mesh reinforcement is welded on the swell fixture is fixed again, can be fixed on the chassis body along whole reinforcing bar periphery.
Fig. 2 illustrates, the standard width of a room in an old-style house of chassis body is 21000mm (7 * 3000mm), highly be 4000mm, the diameter that decides reinforcing bar according to the height and the width of body of wall, in the steel mesh reinforcement as Fig. 2, as main muscle, all the other adopt the reinforcing bar of 3.5-4.5 as secondary muscle every 3 meters vertical reinforcements that to adopt a diameter be 8mm (among Fig. 2 than thick lines) at laterally (on the length direction).Its mode that is fixedly connected is identical with aforementioned manner.
Fig. 3 illustrates, and in the time of need door and window being set on body of wall, can reserve door opening 7 and window opening 8 on steel mesh reinforcement.
Above-mentioned steel mesh reinforcement (diameter of reinforcing bar is between 1.5-20mm) can be used galvanized steel wire netting (steel wire diameter≤1mm) or glass fiber mesh instead according to requirement of strength.When using glass fiber mesh, should adopt alkaline cement.
Fig. 4 Fig. 5 illustrates, and (size 1m * 1m) by thin plate 5f and angle steel 5a, 5b, band steel 5c, 5d, 5e etc. are welded to form steel form, in the reality, have multiple dimensions.Except that steel form, also can adopt wooden form, or Bamboo form board etc.During use, according to thickness of wall body clamping moulding.
During construction, fixedly install steel mesh reinforcement or zinc-plated silk screen or glass fiber on the partition wall position as the wall skeleton material answering of chassis body, fixing can the employing of framework material beaten swell fixture on chassis body, more above-mentioned framework material welding or colligation are fixed, and combines as a whole with chassis body; Set up forward and backward template 5,6 (referring to Fig. 7) respectively on the two sides of above-mentioned mesh skeleton material, the mesh skeleton material is positioned at about medium position of two templates; Referring to Fig. 3, as required, can reserve door opening, window opening on the net, during cope match-plate pattern, can adopt lath institute's clip space of forward and backward template to be sealed in door opening and/or window opening position, the diameter of reinforcing bar is between 1.5-20mm in the steel mesh reinforcement.One or more inserts that will be selected from expanded perlite, flyash, industrial slag, plastic foam pellet (as: are selected expanded perlite for use, or select flyash, industrial slag and plastic foam pellet for use or choose usefulness expanded perlite and flyash etc.) allocate with cement, add water and make cement slurry, this step of sizing mixing should comprise existing all prescriptions of Light trabs slurry.In addition, the blowing agent of inventor's exploitation can add in the perlite and foam, as light filler.Grouting operation can adopt manually, half mechanical system or full mechanical system; Manually, half mechanical system: the grouting seam of reserving 10-30cm at the tip position of front template, by artificial or electri forklift hopper is delivered to grouting seam height and position, again cement slurry is put into from hopper between two templates, use vibrating head to vibrate simultaneously, finish grouting operation, full mechanical system: before using grout pump slurry to be sent into from flange plate type grouting mouthful 3 (referring to the Fig. 7) on the front template, among the formed inner chamber of rear pattern plate, referring to Fig. 6, grouting mouth on the front template is basic in a row to be provided with by row, its column pitch 2-4 rice, row's spacing 1-2 rice, the minimum irrigation and drainage in position slurry mouthful, as grouting mouthfuls 3 apart from about 2 meters of the height on construction ground, a highest irrigation and drainage slurry in position mouthful as the contiguous front template of a grouting mouthful 3a top, according to the body of wall height, grouting mouthful can be set between grouting mouthful 3a and grouting mouthfuls 3 also; The grouting order is according to the grouting mouth minimum from the position, carry out from bottom to top, preferably, grouting operation on a height and position carries out simultaneously, in filling process, start simultaneously attached to the vibrator 4 (as 1.1 kilowatts small vibrating device) on the front template external surface (rear pattern plate also can) and vibrate, after the grouting mouth of having finished this position grouting operation adopts plug with its shutoff, continue the grouting operation of back again.Treat that cement slurry solidifies back (24 hours summers, 48 hours winters) substantially, pull down forward and backward template, finish whole operation.

Claims (6)

1, the job practices of the disposable material filling moulding of a kind of light solid wall is characterized in that, may further comprise the steps:
A) fixedly install crisscross steel mesh reinforcement or galvanized steel wire netting or glass fiber mesh on the partition wall position answering of house frame main body, as the wall skeleton material;
B) set up the forward and backward template of body of wall respectively on the two sides of above-mentioned mesh skeleton material, the mesh skeleton material is positioned at about medium position of two templates;
C) with light filler and cement allotment, add water and make cement slurry;
D) grouting operation adopts artificial, half mechanical or full mechanical system:
Manually, half mechanical system: the grouting seam of reserving 10-30cm at the tip position of front template, by artificial or electri forklift hopper is delivered to grouting seam height and position, again cement slurry is put into from hopper between two templates, used vibrating head to vibrate simultaneously, finish grouting operation at last;
Full mechanical system: use the flange plate type grouting of grout pump from the front template mouthful that slurry is sent among the formed inner chamber of forward and backward template, grouting mouth on the front template is basic in a row to be provided with by row, its column pitch 2-4 rice, row's spacing 1-2 rice, about 2 meters of the height on the irrigation and drainage slurry mouthful distance construction ground that the position is minimum, the irrigation and drainage slurry mouthful contiguous front template top that the position is the highest; Grouting order is carried out from bottom to top according to the grouting mouth minimum from the position, after the grouting mouth of having finished this position grouting operation adopts plug with its shutoff, continues the grouting operation of back again;
E) treat that cement slurry solidifies substantially after, pull down forward and backward template, finish whole operation.
2, job practices according to claim 1, it is characterized in that, described wall skeleton material be reserved with door opening and/or window opening on the net, have door opening and/or window opening accordingly on the described forward and backward template, and adopt lath that institute's clip space of forward and backward template is sealed at door opening and/or window opening position.
3, job practices according to claim 1 and 2 is characterized in that, in the described full mechanical system filling process, starts simultaneously attached to the vibrator on the front template external surface and vibrates.
4, job practices according to claim 3 is characterized in that, when described full mechanical system is in the milk, carries out simultaneously at the locational grouting mouth of sustained height.
5, job practices according to claim 4 is characterized in that, the diameter of reinforcing bar is between 1.5-20mm in the described steel mesh reinforcement.
6, job practices according to claim 5 is characterized in that, described light filler is selected from expanded perlite, flyash, industrial slag, one or more of plastic foam pellet.
CN 200410022674 2004-06-02 2004-06-02 Construction method for one-time pouring molding of light solid wall Pending CN1704539A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200410022674 CN1704539A (en) 2004-06-02 2004-06-02 Construction method for one-time pouring molding of light solid wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200410022674 CN1704539A (en) 2004-06-02 2004-06-02 Construction method for one-time pouring molding of light solid wall

Publications (1)

Publication Number Publication Date
CN1704539A true CN1704539A (en) 2005-12-07

Family

ID=35576559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200410022674 Pending CN1704539A (en) 2004-06-02 2004-06-02 Construction method for one-time pouring molding of light solid wall

Country Status (1)

Country Link
CN (1) CN1704539A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102287052A (en) * 2011-05-26 2011-12-21 昆明二建建设(集团)有限公司 Construction method of ecological wall
CN101269516B (en) * 2007-03-23 2012-03-21 上海亿航工贸发展有限公司 Vibrating method for producing concrete building block by using pipe pile wastewater slurry
CN108863186A (en) * 2018-07-31 2018-11-23 广西易筑装配式建材科技有限公司 A kind of fire prevention solid light partition plate and its production technology
CN108947345A (en) * 2018-07-31 2018-12-07 广西易筑装配式建材科技有限公司 A kind of solid light partition plate and its production technology

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101269516B (en) * 2007-03-23 2012-03-21 上海亿航工贸发展有限公司 Vibrating method for producing concrete building block by using pipe pile wastewater slurry
CN102287052A (en) * 2011-05-26 2011-12-21 昆明二建建设(集团)有限公司 Construction method of ecological wall
CN108863186A (en) * 2018-07-31 2018-11-23 广西易筑装配式建材科技有限公司 A kind of fire prevention solid light partition plate and its production technology
CN108947345A (en) * 2018-07-31 2018-12-07 广西易筑装配式建材科技有限公司 A kind of solid light partition plate and its production technology

Similar Documents

Publication Publication Date Title
US20070044426A1 (en) Lightweight Wall Structure For Building Construction
PL194292B1 (en) Wall segment and method of erecting same
CN101858114A (en) Construction method for cast-in-place integral light-weight partition wall
CN1356441A (en) Reinforced concrete floor slab with space structure
CN104032888A (en) Integrally prefabricated multifunctional composite external wall panel and industrial building external wall
CN1796706A (en) Box shaped house model of construction and fabricating method
CN201202189Y (en) Light concrete keel light board wall
CN113719008A (en) Steel mesh truss hollow nest core plate and construction process
CN206289832U (en) A kind of hollow light precast body
CN112538915A (en) Precast concrete wallboard and manufacturing method thereof
CN1210471C (en) Cast-in-situ reinforced concrete combined wall
CN1704539A (en) Construction method for one-time pouring molding of light solid wall
CN2761757Y (en) Box type building mould
CN1237244C (en) Building wall body board and building wall body
CN2526382Y (en) Shear wall module
CN213390660U (en) One shot forming's secret close rib structure light weight wallboard
CN203947671U (en) Integral prefabricated multi-functional compound external wall panel and industrialized building exterior wall
CN111395575A (en) One-step formed light wallboard with hidden rib structure and manufacturing method
CN1092838A (en) Building board and use the building of this kind sheet material
CN221298320U (en) Sandwich wallboard and connection structure thereof
CN1208525C (en) Shear wall module
CN213014664U (en) Assembled window apron that wafts of taking heat preservation
CN209837461U (en) Light-duty partition plate of assembled
CN2660001Y (en) Composite concrete plates and building structure thereof
CN216239245U (en) Hollow nest core plate of steel mesh truss

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned
C20 Patent right or utility model deemed to be abandoned or is abandoned