CN1512011A - Layered net type steel bar stone cage barricade for reinforcing slope - Google Patents

Layered net type steel bar stone cage barricade for reinforcing slope Download PDF

Info

Publication number
CN1512011A
CN1512011A CNA021597049A CN02159704A CN1512011A CN 1512011 A CN1512011 A CN 1512011A CN A021597049 A CNA021597049 A CN A021597049A CN 02159704 A CN02159704 A CN 02159704A CN 1512011 A CN1512011 A CN 1512011A
Authority
CN
China
Prior art keywords
gabion
reinforced
slope
stone
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA021597049A
Other languages
Chinese (zh)
Other versions
CN1198990C (en
Inventor
张路青
杨志法
祝介旺
刘�英
尚彦军
许兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Geology and Geophysics of CAS
Original Assignee
Institute of Geology and Geophysics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Geology and Geophysics of CAS filed Critical Institute of Geology and Geophysics of CAS
Priority to CN 02159704 priority Critical patent/CN1198990C/en
Publication of CN1512011A publication Critical patent/CN1512011A/en
Application granted granted Critical
Publication of CN1198990C publication Critical patent/CN1198990C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Revetment (AREA)

Abstract

The layered and netted steel bar stone cage retaining wall for reinforcing slope includes steel bar stone cages laid in layers and rows with concrete deposited in between. The steel bar stone cage has vertical steel bars in the length greater than the height of the cage and with end inserted into the concrete layer. The side interval of the steel bar stone cages is deposited with mortar and provided with water draining system. The steel bar stone cage retaining wall has high overall strength, high rust resistance, effective water drainage, easy greening, easy monitoring and other advantages.

Description

The stratified net-mesh reinforced stone-gabion that is used for slope reinforcement
Technical field
The present invention relates to a kind of barricade that is used for slope reinforcement, relate in particular to a kind of stratified net-mesh reinforced stone-gabion that is used for medium and small slope reinforcement.
Background technology
At present, the domestic structure that is used for the supporting slope of highway is the plain edition steel bar stone cage retaining wall.Also plain edition steel bar stone cage retaining wall structure is used for aspects such as anti-erosion or scour protection abroad.In view of many advantages of this wall-retaining structure, some country in the U.S. and Europe is used for it supporting of medium and small side slope under the difficult area (as the mountain area) more at large, and has developed corresponding design manual and professional production merchant.
Plain edition reinforced gabion as shown in Figure 3, its construction mainly was divided into for two steps: make one with reinforcing bar and steel wire by certain specification earlier and be rectangular-shaped reinforcing cage, fill the rubble (or gravel) of gathering materials on the spot again in cage.Then, each reinforced gabion is in a row piled up to stratification on demand be barricade.For gabion is closely contacted with treating reinforcing side slope, between barricade and side slope face, fill up rubble (or gravel).In specific design and work progress, strengthen the shearing resistance and the anti-upset ability of barricade sometimes according to actual needs at barricade bottom pouring concrete pedestal.Although the construction of plain edition steel bar stone cage retaining wall has advantages such as can gathering materials on the spot, be easy to construct, be beneficial to draining, yet still there are many weak points in existing design and construction:
Bulk strength is lower.Because the plain edition steel bar stone cage retaining wall is to be formed by simply piling up of a plurality of reinforced gabions, its integrality is to keep by the frictional force between the gabion.Be easy to produce relative to slip under external force between each gabion, relative displacement such as rotate, severe patient can make reinforced gabion disintegrate.
Resistant tarnishing is poor.Because the reinforcing bar of plain edition reinforced gabion and steel wire directly touch the sky G﹠W, very easily by corrosion.If reinforcing bar and steel wire corrosion are serious, the plain edition reinforced gabion then will face the danger of disintegration, thereby reduce the intensity of this barricade greatly and be reinforced the stability of side slope.
Drainage performance is limited.Because the drainability of plain edition steel bar stone cage retaining wall can not satisfy the drainage requirement of side slope, the underground water of side slope inside is in from oozing state, and this might threaten the stability of side slope.
In addition, the plain edition steel bar stone cage retaining wall is difficult to realize that the state to side slope and barricade monitors.And be reinforced original vegetation on the side slope surface because remove or covered in the work progress, the plain edition steel bar stone cage retaining wall again can't restore vegetation, is unfavorable for environmental protection.
Summary of the invention
The objective of the invention is at above-mentioned problems of the prior art, proposed a kind of steel bar stone cage retaining wall that has high bulk strength, strong anti-corrosion, effectively draining, is easy to afforest, be easy to monitoring and other advantages.
For achieving the above object, a kind of stratified net-mesh reinforced stone-gabion that is used for slope reinforcement of the present invention, be piled into step-like reinforced gabion with comprising stratification in a row, be cast with layer of concrete at transverse reinforcement gabion interlayer, the vertical reinforcement of described reinforced gabion framework is longer than the height of cage body, its terminal layer of concrete inside of inserting described reinforced gabion interlayer; Between the reinforced gabion side gap, be cast with screed; And also include drainage system.
The vertical reinforcement two ends of described reinforced gabion framework are the hook shape.
Described layer of concrete is formed by steel mesh reinforcement and concrete pouring.
Described drainage system comprises:
Below, described reinforced gabion side has along the longitudinal drainage pipe of side slope tendency direction;
Be provided with along side slope every layer of described reinforced gabion side and move towards the transverse drain that direction is communicated with two adjacent reinforced gabions; And
In side slope, be provided with the drain hole that communicates with the rubble of described reinforced gabion inside.
On each step of described steel bar stone cage retaining wall, be provided with the catch basin that moves towards direction along side slope, and weep pipe is set.
On each step of described steel bar stone cage retaining wall, also be provided with soil box, be used for serike, in the hope of reaching the purpose that barricade is afforested.Can utilize catch basin, aqueduct and weep pipe to water.
In reinforced concrete floor, be embedded with and extend to extensometer in the side slope boring, the monitoring slope deforming, corresponding deformation data can use the dial gage of handheld tape side holder to obtain.Burying load that sensor bears barricade or inner stress, strain etc. in reinforced concrete floor or screed underground monitors.
Thus, the present invention has following tangible advantage with respect to other slope reinforcement measures:
(1) construction is simple and convenient, cheap, and the braiding of reinforcing cage can be concentrated making near the barricade of waiting to construct, the interior stone of the reinforced gabion steel of can gathering materials on the spot.The rule of reinforced gabion is piled up, between gabion the construction of the steps such as laying, the slurry placement between the gabion side, the layout of gabion interlayer steel mesh reinforcement and the cast of layer of concrete of communicating pipe very easy and do not need the workload of high-tech.
(2) bulk strength height, between each layer reinforced gabion and interstitial reinforced concrete floor in reinforced gabion both sides or screed, the built-in fitting at the vertical reinforcement two ends of each reinforced gabion framework all inserts up and down in the reinforced concrete floor, filling mortar between space, reinforced gabion both sides, make this wall-retaining structure that very high bulk strength and certain deformability be arranged, reduce the possibility that reinforced gabion disintegrates, thereby help the stable of side slope.
(3) resistant tarnishing is excellent, can also prevent effectively that with interstitial reinforced concrete floor in reinforced gabion both sides or screed reinforcing bar and steel wire are owing to being exposed to water and air and by corrosion between each layer reinforced gabion.
(4) drainage performance is strong, fill rubble or gravel in the reinforced gabion with height water permeability, the reinforced gabion side is provided with to be communicated with in the transverse drain of adjacent reinforced gabion and every layer of reinforced gabion along side slope tendency direction and is provided with the longitudinal drainage pipe that moves towards direction along side slope.According to the needs of design, also can be at the inner drain hole that communicates with piece stone gap in the gabion of laying of side slope.Said structure makes many drainage channels that have of steel bar stone cage retaining wall, realizes efficient draining.
(5) be easy to monitoring, in reinforced concrete floor, be embedded with and extend to extensometer monitoring slope deforming in the side slope boring, in reinforced concrete floor or screed, bury the stress, strain etc. of load that sensor bears barricade or inside underground and monitor.
(6) be beneficial to environmental protection, whole steel bar stone cage retaining wall is without any need for timber, free from environmental pollution and can plant in the soil box on the barricade step and be fit to growing plants.
Description of drawings
Fig. 1 is structure and the reinforcing principle schematic that is used for the stratified net-mesh reinforced stone-gabion of slope reinforcement of the present invention;
Fig. 2 is the structural representation that is used for the stratified net-mesh reinforced stone-gabion reinforcing cage of slope reinforcement of the present invention;
Fig. 3 is the structure of plain edition steel bar stone cage retaining wall and reinforces principle schematic.
The specific embodiment
A kind of steel bar stone cage retaining wall as shown in Figure 1 is a specific embodiment of the present invention, and Fig. 2 is the structural scheme of mechanism of reinforcing cage.The loose top layer of at first excavating position, barricade pedestal place is to projected depth, and fluid concrete makes up pedestal layer of concrete 13.Pedestal layer of concrete 13 sectionals or laminated pouring, the size of its segmentation unlikely concrete of just having poured into a mould of stepping on of personnel when putting reinforcing cage is advisable.In case of necessity, can in concrete, add retarding agent and delay concrete initial set, so as for reinforcing cage put and the reinforcing cage bottom surface can be immersed concrete grout exercisable condition is provided.After pouring every section concrete; unsealed reinforcing cage in a row can be put the position of design; bottom layer of the reinforcing steel gabion vertical reinforcement terminal 5 is inserted concrete grout, and guarantee that reinforcing bar and steel wire on the reinforcing cage bottom surface are wrapped up to form the topping of anti-corrosion by concrete grout.Reinforcing bar end 5 is the hook shape, and the vertical reinforcement lower end built-in fitting length of bottom layer of the reinforcing steel gabion framework is greater than the length of the vertical reinforcement two ends built-in fitting of built-in fitting and other layers reinforced gabion framework on the vertical reinforcement of bottom layer of the reinforcing steel gabion framework.When putting reinforcing cage, should stay space, the 4cm left and right sides to be used for the filling mortar between two adjacent reinforcing cages and form screed 6.The mesh 18 that longitudinal drainage pipe 10 is passed through bottom, reinforced gabion side is communicated with adjacent reinforced gabion along side slope tendency direction, and longitudinal drainage pipe 10 should insert the interior certain distance of reinforcing cage to prevent the mortar plugging.In side slope 1, be provided with the drain hole 16 that communicates with the rubble of described reinforced gabion inside.Establish the transverse drain 7 that moves towards direction along side slope in the reinforced gabion side.It is fixed that the diameter of longitudinal drainage pipe 10 and transverse drain 7 should be come by the size of the mesh 18 of the hydrologic condition of locality and reinforced gabion side, is not advisable not weave special preformed hole as far as possible for this reason.After the layer of concrete of cast reaches certain intensity, the rubble (or gravel) that filling is gathered materials on the spot in unsealed reinforcing cage.All spaces near side slope 1 one sides that are reinforced all are filled with rubble (or gravel).The stone that is loaded should have certain grating so that the stone in the cage is closely contacted, near the remaining space of side slope one side do not put because the space is less reinforcing cage will with grating preferably rubble come filling.Be woven into the end face of reinforced gabion with steel wire 17, all reinforcing cages of filling stone are sealed.With the filling mortar of the space between the reinforced gabion side, and make mortar closely knit as far as possible, protect the reinforcing bar of reinforced gabion side and steel wire not by corrosion to form screed 6.In screed 6, bury the sensor 15 that is used to monitor barricade load and internal stress or strain underground.So far, finished the laying work of bottom layer of the reinforcing steel gabion.Outside the bottom layer of the reinforcing steel gabion, be provided with along the catch basin 11 of side slope tendency direction and the soil box 12 at the bottom of the serike.The longitudinal drainage pipe 10 that effluxes the reinforced gabion side leads to catch basin 11.Soil box 12 certain distances are provided with gutter 14 outside distance bottom layer of the reinforcing steel gabion.
On one deck reinforced gabion of having constructed, lay steel mesh reinforcement 4, and will reserve certain clearance between steel mesh reinforcement 4 and lower floor's reinforced gabion end face.Subsequently, pour into a mould the concrete of 4cm~6cm on steel mesh reinforcement 4, corresponding section construction should help putting of last layer reinforcing cage.After every section concrete construction finishes, the upper end built-in fitting 5 of lower floor's reinforced gabion vertical reinforcement will be embedded in the concrete grout.The concrete tamping so that forming reinforced concrete floor 3 with steel mesh reinforcement 4 wraps up reinforcing bar and steel wire on lower floor's reinforced gabion end face, is formed the topping of anti-corrosion.In reinforced concrete floor 3, bury the sensor 15 that is used to monitor barricade load and internal stress or strain underground, in reinforced concrete floor 3, be embedded with the extensometer 2 that extends in the side slope 1 that is fixed, the monitoring slope deforming.When putting reinforcing cage, except that being undertaken by above-mentioned requirements, the interlaced arrangement of also the adjacent two layers reinforced gabion should should being tried one's best, the upper strata effluxes reinforcing cage and lower floor and effluxes reinforced gabion and have certain distance to form step.Add on the barricade step surface and smear surperficial screed 9, prevent the corrosion of barricade free face, fixing soil box 12 simultaneously is used for serike.In addition, on the barricade step surface, also be provided with, the gutter of weep pipe 8 and corresponding connected set tank 11 and weep pipe 8 is set at interval in the step surface extension along the catch basin 11 of side slope tendency direction.
Adopt above-mentioned way, make up each reinforced gabion layer until the engineering design height.Top layer reinforced gabion upper surface is laid steel mesh reinforcement 4, fluid concrete, form reinforced concrete floor 3, in reinforced concrete floor 3 or screed 6, bury the sensor 15 that is used to monitor barricade load and internal stress or strain underground, bury the extensometer 2 that extends in the side slope 1 that is fixed underground, the monitoring slope deforming.In reinforced concrete floor 3 extensions weep pipe 8 is set at interval.
Steel bar stone cage retaining wall of the present invention is gathered materials on the spot except having, the easy construction, with low cost, advantage such as adaptive is strong, compare also with the plain edition steel bar stone cage retaining wall and to have the following advantages:
1, stronger slope reinforcement function
The reinforced concrete floor of reinforced gabion interlayer, the built-in fitting that inserts the reinforced gabion vertical reinforcement in the reinforced concrete floor and the mortar between gabion etc. can closely connect to each gabion an integral body, cause corresponding bulk strength very high.And this steel bar stone cage retaining wall still belongs to a kind of flexible structure.Because there is certain deformability in this flexible structure, so can suitably reduce that slope deforming causes and act directly on load on the barricade.This have certain deformability and the bigger wall-retaining structure of bulk strength and can significantly reduce the possibility that reinforced gabion disintegrates, thereby help the stable of side slope.
2, anti-corrosion ability efficiently
The reinforcing bar of all gabions and steel wire are all wrapped up by concrete or mortar cover, cause this new reinforcing steel bar gabion baffling to have anti-corrosion ability efficiently.Only in this way, reinforcing bar and the steel wire of forming barricade could keep its due intensity for a long time, and can satisfy the basic demand of slope reinforcement.
3, can realize efficient draining
Though itself has had good drain function the plain edition steel bar stone cage retaining wall, on drainage condition after all also less than the former side slope that does not have barricade.When the discharging of slope underground water became the key factor that influences stability of slope, it obviously was very important improving corresponding drainage condition.At this situation, when design new reinforcing steel bar gabion baffling, can in side slope, beat special drain hole according to actual needs, rubble (or gravel) communicates in its aperture gabion.Like this, the gutter that is communicated with reinforced gabion by the space between the rubble (or gravel) in slope drainage hole, the cage, along side slope tendency direction, and the catch basin on the barricade step surface, gutter and weep pipe, the common drainage system that constitutes barricade can make this wall-retaining structure have drain function efficiently.
4, be easy to realize greening to barricade
Soil box replanting kind fixing on the barricade step surface is fit to the local environment growing plants, has destroyed original vegetation in the time of can recovering the barricade construction.The efficient reinforcing function that this barricade had is enough to guarantee the long-term stability of soil box, can avoid the harmful effect of plant growing to barricade when utilizing soil box to afforest.The required water of soil box implants growth is mainly rainwater, and from side slope inside ooze out and flow through slope drainage hole, reinforced gabion rubble, gutter, catch basin and the water that flows out by weep pipe.
5, be easy to realize monitoring to side slope or barricade
In work progress, can in side slope, play special boring, so that extensometer is embedded in the layer of concrete of boring and gabion interlayer.Like this, can help to judge the stability of side slope or barricade by the deformation measurement data that obtains.Obtain load that barricade bore and monitored data such as inner stress or strain thereof by being embedded in sensor in the reinforced concrete floor or in the screed.

Claims (8)

1, a kind of stratified net-mesh reinforced stone-gabion that is used for slope reinforcement is piled into step-like reinforced gabion with comprising stratification in a row, it is characterized in that:
Be cast with layer of concrete at transverse reinforcement gabion interlayer, the vertical reinforcement of described reinforced gabion framework is longer than the height of cage body, its terminal layer of concrete inside of inserting described reinforced gabion interlayer;
Between the reinforced gabion side gap, be cast with screed; And
Also include drainage system.
2, the stratified net-mesh reinforced stone-gabion that is used for slope reinforcement as claimed in claim 1 is characterized in that: the vertical reinforcement two ends of described reinforced gabion framework are the hook shape.
3, the stratified net-mesh reinforced stone-gabion that is used for slope reinforcement as claimed in claim 1, it is characterized in that: described layer of concrete is formed by steel mesh reinforcement and concrete pouring.
4, the stratified net-mesh reinforced stone-gabion that is used for slope reinforcement as claimed in claim 1, it is characterized in that: described drainage system comprises:
Below, described reinforced gabion side has along the longitudinal drainage pipe of side slope tendency direction;
Be provided with along side slope every layer of described reinforced gabion side and move towards the transverse drain that direction is communicated with two adjacent reinforced gabions; And
In side slope, be provided with the drain hole that communicates with the rubble of described reinforced gabion inside.
5, the stratified net-mesh reinforced stone-gabion that is used for slope reinforcement as claimed in claim 1 is characterized in that: be provided with the catch basin that moves towards direction along side slope on each step of described steel bar stone cage retaining wall, and weep pipe is set.
6, the stratified net-mesh reinforced stone-gabion that is used for slope reinforcement as claimed in claim 1 is characterized in that: also be provided with the soil box that is used for serike on each step of described steel bar stone cage retaining wall.
7, the stratified net-mesh reinforced stone-gabion that is used for slope reinforcement as claimed in claim 1 is characterized in that: the extensometer that is embedded with the monitoring slope deforming in described layer of concrete.
8, the stratified net-mesh reinforced stone-gabion that is used for slope reinforcement as claimed in claim 1 is characterized in that: be embedded with monitoring barricade load sensor at described layer of concrete or described screed.
CN 02159704 2002-12-30 2002-12-30 Layered net type steel bar stone cage barricade for reinforcing slope Expired - Fee Related CN1198990C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02159704 CN1198990C (en) 2002-12-30 2002-12-30 Layered net type steel bar stone cage barricade for reinforcing slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02159704 CN1198990C (en) 2002-12-30 2002-12-30 Layered net type steel bar stone cage barricade for reinforcing slope

Publications (2)

Publication Number Publication Date
CN1512011A true CN1512011A (en) 2004-07-14
CN1198990C CN1198990C (en) 2005-04-27

Family

ID=34237601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02159704 Expired - Fee Related CN1198990C (en) 2002-12-30 2002-12-30 Layered net type steel bar stone cage barricade for reinforcing slope

Country Status (1)

Country Link
CN (1) CN1198990C (en)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967830A (en) * 2010-09-21 2011-02-09 张宇顺 Ecological net cages and side slope retaining wall using same
CN101984192A (en) * 2009-12-25 2011-03-09 北京东霖广环保材料有限公司 Ecological engineering method of flexible strong structure
CN101412605B (en) * 2008-11-21 2011-11-16 中冶宝钢技术服务有限公司 Steel slag movable retaining wall and manufacturing method thereof
CN102296580A (en) * 2011-04-21 2011-12-28 长沙理工大学 Slope shallow drainage system
CN104328766A (en) * 2014-10-31 2015-02-04 杭州市市政工程集团有限公司 Ecological stone cage net box retaining wall and construction method
CN104358203A (en) * 2014-11-14 2015-02-18 铁道第三勘察设计院集团有限公司 Reinforced concrete floor type lateral drainage ditch structure utilizing gabion waste stones
CN105484199A (en) * 2015-12-28 2016-04-13 陈桂腾 Dam structure and construction method thereof
CN105544563A (en) * 2015-12-16 2016-05-04 大连久鼎祥瑞特种工程技术研究院有限公司 Large unconsolidated soil and stone body slope protection structure and method
CN105569071A (en) * 2015-12-29 2016-05-11 吉林省银河水利水电新技术设计有限公司 Cement-based material underwater grouting or mud-jack rock block foundation construction method
CN106337394A (en) * 2016-09-22 2017-01-18 水利部中国科学院水工程生态研究所 River bank ecological restoration device and method suitable for mountain river characteristics
CN106759397A (en) * 2017-01-06 2017-05-31 苏州工业园区园林绿化工程有限公司 Ecological lattice guest method to set up
CN107313445A (en) * 2017-05-23 2017-11-03 西北矿冶研究院 Composite retaining wall structure of refuse dump
CN107354954A (en) * 2017-07-27 2017-11-17 中钢集团马鞍山矿山研究院有限公司 A kind of Gravity Retaining Wall administered for slope and land slide
CN107975138A (en) * 2017-12-29 2018-05-01 内蒙古蒙草生态环境(集团)股份有限公司 A kind of gabion structure and preparation method thereof
CN108157077A (en) * 2015-03-11 2018-06-15 泉州泉港润美环保科技有限公司 A kind of modification method in hillside forest land
CN108374388A (en) * 2018-04-03 2018-08-07 晋泽兵 A kind of retaining wall for hydraulic engineering
CN110438943A (en) * 2019-07-31 2019-11-12 江河水利水电咨询中心 A kind of sandy soil fill construction method
CN110438857A (en) * 2019-07-12 2019-11-12 中交一公局第四工程有限公司 A kind of Freeway of Mountain Range steel reinforcement cage stalagmite stake and its construction technology
CN112144940A (en) * 2020-09-28 2020-12-29 中国电建集团贵阳勘测设计研究院有限公司 Steel reinforcement gabion bin wall structure suitable for backfilling foundation and construction method
CN113250240A (en) * 2021-05-24 2021-08-13 中国电建集团贵阳勘测设计研究院有限公司 Combined side slope protection structure and process of layered net type gabion and concrete
CN113863340A (en) * 2021-10-13 2021-12-31 中电建十一局工程有限公司 Cofferdam construction method under complex terrain condition

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101412605B (en) * 2008-11-21 2011-11-16 中冶宝钢技术服务有限公司 Steel slag movable retaining wall and manufacturing method thereof
CN101984192A (en) * 2009-12-25 2011-03-09 北京东霖广环保材料有限公司 Ecological engineering method of flexible strong structure
CN101984192B (en) * 2009-12-25 2015-02-18 北京群祥兴科技有限公司 Ecological engineering method of flexible strong structure
CN101967830A (en) * 2010-09-21 2011-02-09 张宇顺 Ecological net cages and side slope retaining wall using same
CN102296580A (en) * 2011-04-21 2011-12-28 长沙理工大学 Slope shallow drainage system
CN104328766A (en) * 2014-10-31 2015-02-04 杭州市市政工程集团有限公司 Ecological stone cage net box retaining wall and construction method
CN104358203B (en) * 2014-11-14 2016-08-24 铁道第三勘察设计院集团有限公司 The reinforced concrete floor formula gabion side's of abandoning lateral drainage groove structure
CN104358203A (en) * 2014-11-14 2015-02-18 铁道第三勘察设计院集团有限公司 Reinforced concrete floor type lateral drainage ditch structure utilizing gabion waste stones
CN108157077A (en) * 2015-03-11 2018-06-15 泉州泉港润美环保科技有限公司 A kind of modification method in hillside forest land
CN105544563A (en) * 2015-12-16 2016-05-04 大连久鼎祥瑞特种工程技术研究院有限公司 Large unconsolidated soil and stone body slope protection structure and method
CN105544563B (en) * 2015-12-16 2018-01-12 大连久鼎祥瑞特种工程技术研究院有限公司 Large-scale loose ground, stone body slope protection structure
CN105484199B (en) * 2015-12-28 2017-09-22 陈桂腾 A kind of dam configuration and its construction method
CN105484199A (en) * 2015-12-28 2016-04-13 陈桂腾 Dam structure and construction method thereof
CN105569071A (en) * 2015-12-29 2016-05-11 吉林省银河水利水电新技术设计有限公司 Cement-based material underwater grouting or mud-jack rock block foundation construction method
CN106337394A (en) * 2016-09-22 2017-01-18 水利部中国科学院水工程生态研究所 River bank ecological restoration device and method suitable for mountain river characteristics
CN106759397A (en) * 2017-01-06 2017-05-31 苏州工业园区园林绿化工程有限公司 Ecological lattice guest method to set up
CN107313445B (en) * 2017-05-23 2019-05-17 西北矿冶研究院 Composite retaining wall structure of refuse dump
CN107313445A (en) * 2017-05-23 2017-11-03 西北矿冶研究院 Composite retaining wall structure of refuse dump
CN107354954A (en) * 2017-07-27 2017-11-17 中钢集团马鞍山矿山研究院有限公司 A kind of Gravity Retaining Wall administered for slope and land slide
CN107975138A (en) * 2017-12-29 2018-05-01 内蒙古蒙草生态环境(集团)股份有限公司 A kind of gabion structure and preparation method thereof
CN108374388A (en) * 2018-04-03 2018-08-07 晋泽兵 A kind of retaining wall for hydraulic engineering
CN110438857A (en) * 2019-07-12 2019-11-12 中交一公局第四工程有限公司 A kind of Freeway of Mountain Range steel reinforcement cage stalagmite stake and its construction technology
CN110438857B (en) * 2019-07-12 2023-12-05 中交一公局第四工程有限公司 Mountain heavy-hill area reinforcement cage gabion pile and construction process thereof
CN110438943A (en) * 2019-07-31 2019-11-12 江河水利水电咨询中心 A kind of sandy soil fill construction method
CN112144940A (en) * 2020-09-28 2020-12-29 中国电建集团贵阳勘测设计研究院有限公司 Steel reinforcement gabion bin wall structure suitable for backfilling foundation and construction method
CN113250240A (en) * 2021-05-24 2021-08-13 中国电建集团贵阳勘测设计研究院有限公司 Combined side slope protection structure and process of layered net type gabion and concrete
CN113863340A (en) * 2021-10-13 2021-12-31 中电建十一局工程有限公司 Cofferdam construction method under complex terrain condition

Also Published As

Publication number Publication date
CN1198990C (en) 2005-04-27

Similar Documents

Publication Publication Date Title
CN1198990C (en) Layered net type steel bar stone cage barricade for reinforcing slope
CN109868829B (en) High-side slope soil and stone protection structure and construction method
CN111549799A (en) Comprehensive control system applied to gravel soil slope
CN110397050B (en) Beam-anchor type light drainage retaining wall and construction method thereof
CN208280161U (en) The compound retaining wall structure of antifouling type reinforcement pervious concrete
CN113250240A (en) Combined side slope protection structure and process of layered net type gabion and concrete
CN210482362U (en) Assembled rigid and flexible combined elastic anti-seismic reinforced earth retaining wall
CN112431213A (en) Ecological comprehensive treatment structure for semi-rigid support of artificial slope and construction method thereof
RU2252294C1 (en) Combined support wall with gauze anchors
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN111676989A (en) Expansive soil cutting slope reinforcing structure and construction method
CN216275714U (en) Deep foundation pit combined supporting structure suitable for deep filling
KR100939311B1 (en) Prestressed quay wall and construction method thereof
CN210216318U (en) Ecological river course side slope protective structure
CN108691317A (en) The compound retaining wall of antifouling type reinforcement pervious concrete and its construction method
CN112832288A (en) Anti-floating structure of sloping field building basement and construction method thereof
CN210031903U (en) Retaining wall structure based on mortar rubble
CN1348037A (en) Continuous wall foundation pit supporting method with short brad
CN111455931A (en) Cold region flexible integral ecological slope protection structure and construction method thereof
CN214783977U (en) Compound foundation pit supporting structure of full miscellaneous filled earth stratum
CN113982001B (en) Construction method of flexible framework slope protection structure
CN212956382U (en) Ecological gabion retaining wall
CN210712832U (en) Assembled anti-freezing ecological side slope retaining wall for climate yin-wet cold area
CN212294705U (en) Inflation dirt road moat slope reinforced structure
CN208701738U (en) A kind of solid reinforcement combination of rigidity and flexibility ecology retaining wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: China Railway Construction Engineering Bureau No.16 Group Corp., Ltd.

Assignor: Institute of Geology and Geophysics, Chinese Academy of Sciences

Contract fulfillment period: 2009.4.28 to 2014.4.30 contract change

Contract record no.: 2009990000478

Denomination of invention: Layered net type steel bar stone cage barricade for reinforcing slope

Granted publication date: 20050427

License type: Exclusive license

Record date: 2009.5.13

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.4.28 TO 2014.4.30; CHANGE OF CONTRACT

Name of requester: CHINA RAILWAY 16 BUREAU GROUP CO., LTD.

Effective date: 20090513

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050427

Termination date: 20111230