CN1485501A - Construction method for prefabricating ballast slab of channel beam partitionally - Google Patents

Construction method for prefabricating ballast slab of channel beam partitionally Download PDF

Info

Publication number
CN1485501A
CN1485501A CNA021371547A CN02137154A CN1485501A CN 1485501 A CN1485501 A CN 1485501A CN A021371547 A CNA021371547 A CN A021371547A CN 02137154 A CN02137154 A CN 02137154A CN 1485501 A CN1485501 A CN 1485501A
Authority
CN
China
Prior art keywords
bed board
road bed
girder
channel beam
mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA021371547A
Other languages
Chinese (zh)
Other versions
CN1200171C (en
Inventor
沈秀芳
陈文艳
顾民杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Original Assignee
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunnel Engineering and Rail Transit Design and Research Institute filed Critical Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Priority to CN 02137154 priority Critical patent/CN1200171C/en
Publication of CN1485501A publication Critical patent/CN1485501A/en
Application granted granted Critical
Publication of CN1200171C publication Critical patent/CN1200171C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a construction method of channel beam partitioning prefabrication, wherein the main beam and the sectionalized road bed plate are prefabricated, the hoisting die is mounted using the main beam as support, then the prefabricated road bed plate is hoisted in position to the hoisting die, welding the steel bar at the seam crossing portion of the road bed plate, finally casting all the seams in-situ. The advantages of the invention are, it causes little impacts to the city environment and the ground traffic, it can conserve construction cost and shorten the time limit for the project, and the workload of cast-in-situ is low.

Description

The job practices of prefabricating ballast slab of channel beam partitionally
Technical field
The present invention relates to bridge and viaduct build and bridge set up class, particularly a kind of job practices of prefabricating ballast slab of channel beam partitionally.
Background technology
The job practices of the bridge that domestic existing orbit traffic overhead bridge is adopted all is to adopt the cast-in-place on the spot job practices of full framing usually, and the flow process of this method is: A. sets up support on the ground of handling well, makes template then on support; B. assembling reinforcement and bellows on template are installed with prestressing tendon in the bellows; C. water and smash the beam body concrete; Reach certain intensity and after the length of time Deng the beam body concrete, the whole prestressing force of stretch-draw beam body; D. mud jacking sealing off and covering anchorage and striking and template.This job practices has following shortcoming: during (1) construction, whole bridge is all established support from ground in the plane of projection, and is very big to the influence of urban environment and traffic above-ground; (2) ground has enough deadweight of bearing capacity brace summer body and working load under when construction bridge in order to make, and needs before the construction flatten and consolidation process ground under the bridge, increases operating expenses, has delayed construction speed, and if deal with improperly, has easily caused beam body cracking; (3) owing to all adopt field fabrication, be difficult to accomplish standardization, standardization, mechanized construction, be unfavorable for total quality control, the construction period is longer.
Summary of the invention
The objective of the invention is according to above-mentioned the deficiencies in the prior art part, a kind of job practices that is applicable to channel beam is provided, be that girder prefabrication and lifting, road bed board precast block hang the job practices that mould is installed, this job practices does not need from ground support to be set, and does not need ground under the bridge is flattened and consolidation process.
The object of the invention realizes being finished by following technical scheme: a kind of job practices of channel beam is characterized in that: prefabricated girder of A. and piecemeal road bed board; B. main cable and girder is in place; C. be that mould is hung in the support installation with the girder; D. the road bed board lifting of precast block is in place to hanging on the mould; E. weld bed board seam crossing reinforcing bar, the seam crossing bellows is installed, establish cast-in-place all seams of simple and easy template at seam crossing; F. in the entrance path bed board in length and breadth to prestressing tendon, whole residue prestressing tendon in prestressing tendons and the girder in the stretch-draw road bed board; G. the prestressing tendon to stretch-draw carries out the mud jacking sealing off and covering anchorage.
Advantage of the present invention is that (1) hangs the mould form of construction work owing to having adopted, and does not need from ground support to be set, and constructs can not produce considerable influence to urban environment and traffic above-ground; (2) do not need ground under the bridge is flattened and consolidation process, saved unnecessary operating expenses and shortened the duration; (3) on-the-spot cast-in-place workload is little, and it is easy for installation simple to hang mould; (4) be convenient to carry out standardization, standardization, mechanized construction, be easy to control construction quality and duration.
Summary of drawings
Accompanying drawing 1 is a invention process texture edge schematic diagram;
Accompanying drawing 2 is a invention process structure section schematic diagram;
Concrete technical scheme
Feature of the present invention and other correlated characteristic are described in further detail by embodiment below in conjunction with accompanying drawing, so that technician's of the same trade understanding:
Shown in Fig. 1-2, always representing respectively in the accompanying drawing: the suspension ring (6) on prefabricated girder (1), precast block road bed board (2), top rail (3), suspension rod (4), seam (5), the prefabricated road bed board with reference to label 1-6.
Embodiment:
As shown in Figure 1, 2, A. be prefabricated in the factory earlier two girders (1) and several piece road bed board (2), stretch-draw girder (1) interior section or whole prestressing force." A1 " is behind formwork erection, assembling reinforcement and bellows on the factory place, water the railway roadbed board concrete of smashing girder and piecemeal, penetrate prestressing tendon again after finishing Deng casting and compacting of concrete, prestressing tendon in the girder can certainly be penetrated earlier and carry out casting and compacting of concrete in the bellows again; Main beam concretes such as " A2 " reaches certain intensity and after the length of time, whole prestressing force of stretch-draw beam body or partial prestressing; " A3 " carries out the mud jacking sealing off and covering anchorage to the prestressing tendon of stretch-draw.B. girder (1) and be divided into the prefabricated road bed board (2) of several piece and be transported to the scene after, with two girders (1) hoisted in position, and in girder (1) inboard, end two girders (1) are made laterally temporary fixedly of members such as reinforcing bar, angle steel, topple so that two girders (1) are unexpectedly outer.C. be that mould is hung in the support installation with two girders (1), hang mould and comprise top rail (3), suspension rod (4) etc., wherein top rail (3) is supported on the girder (1), and suspension rod (4) upper end is fixing with nut and top rail (3), and the lower end is gone up set suspension ring (6) with road bed board (2) and linked to each other.D. road bed board (2) lifting of several piece precast block is in place to hanging on the mould; E. weld bed board (2) seam (5) and locate reinforcing bar, seam (5) is installed locates bellows, locate to establish cast-in-place all joints of simple and easy template in seam (5).F. in the entrance path bed board (2) in length and breadth to prestressing tendon, locate that concrete reaches certain intensity and after the length of time etc. seam (5), whole residue prestressing tendon in prestressing tendons and the girder (1) in the stretch-draw road bed board (2).G. the prestressing tendon to stretch-draw carries out the mud jacking sealing off and covering anchorage.H. remove and hang mould and the temporary fixed member of girder (1) etc.

Claims (4)

1. the job practices of a prefabricating ballast slab of channel beam partitionally is characterized in that: prefabricated girder of A. and piecemeal road bed board; B. main cable and girder is in place; C. be that mould is hung in the support installation with the girder; D. the road bed board lifting of precast block is in place to hanging on the mould; E. weld bed board seam crossing reinforcing bar, the seam crossing bellows is installed, establish cast-in-place all seams of simple and easy template at seam crossing; F. in the entrance path bed board in length and breadth to prestressing tendon, whole residue prestressing tendon in prestressing tendons and the girder in the stretch-draw road bed board; G. the prestressing tendon to stretch-draw carries out the mud jacking sealing off and covering anchorage.
2. the job practices of a kind of channel beam according to claim 1 is characterized in that the described mould that hangs mainly is made up of top rail, suspension rod.
3. the job practices of a kind of channel beam according to claim 1 and 2 is characterized in that described installation of hanging mould is that top rail is bearing on the girder, and the suspension rod upper end is fixed with nut and top rail.
4. the job practices of a kind of channel beam according to claim 1 and 2, the hoisted in position that it is characterized in that described road bed board are that the lower end with suspension rod links to each other with set suspension ring on the road bed board.
CN 02137154 2002-09-26 2002-09-26 Construction method for prefabricating ballast slab of channel beam partitionally Expired - Fee Related CN1200171C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02137154 CN1200171C (en) 2002-09-26 2002-09-26 Construction method for prefabricating ballast slab of channel beam partitionally

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02137154 CN1200171C (en) 2002-09-26 2002-09-26 Construction method for prefabricating ballast slab of channel beam partitionally

Publications (2)

Publication Number Publication Date
CN1485501A true CN1485501A (en) 2004-03-31
CN1200171C CN1200171C (en) 2005-05-04

Family

ID=34146894

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02137154 Expired - Fee Related CN1200171C (en) 2002-09-26 2002-09-26 Construction method for prefabricating ballast slab of channel beam partitionally

Country Status (1)

Country Link
CN (1) CN1200171C (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1710207B (en) * 2005-07-11 2010-11-03 上海市政工程设计研究院 Steel strand back-tension prestressed channel mudjacking method
WO2011079675A1 (en) * 2009-12-30 2011-07-07 中铁八局集团有限公司 Construction method for double-block ballastless track bed on bridge
CN102704406A (en) * 2012-06-21 2012-10-03 东南大学 Roadbed slab non-tensile stress construction method based on combined channel girder
CN103321153A (en) * 2013-06-19 2013-09-25 江苏科技大学 Construction method for medium and small span trough girder bridge

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1710207B (en) * 2005-07-11 2010-11-03 上海市政工程设计研究院 Steel strand back-tension prestressed channel mudjacking method
WO2011079675A1 (en) * 2009-12-30 2011-07-07 中铁八局集团有限公司 Construction method for double-block ballastless track bed on bridge
CN102704406A (en) * 2012-06-21 2012-10-03 东南大学 Roadbed slab non-tensile stress construction method based on combined channel girder
CN103321153A (en) * 2013-06-19 2013-09-25 江苏科技大学 Construction method for medium and small span trough girder bridge
CN103321153B (en) * 2013-06-19 2016-01-20 江苏科技大学 A kind of construction method of Mid and minor spans channel girder

Also Published As

Publication number Publication date
CN1200171C (en) 2005-05-04

Similar Documents

Publication Publication Date Title
CN111254796B (en) Single-side integral hoisting long-span overbridge for multiple railway business lines and construction method
CN102154992B (en) Dislocation installation method of corrugated steel web
CN111877182B (en) Novel construction method for upper structure of multi-chamber continuous UHPC box girder bridge
CN113279324A (en) Semi-prefabricated UHPC-NC combined cover beam connecting structure and assembling method
CN110409492A (en) The combination assembled piping lane of one kind more structures containing superposed member and its construction method
KR100775053B1 (en) The original seat concrete ballast method of construction and its structure for which existence steel girder was utilized
CN112681822A (en) Double-column-support four-column assembled elevated station
CN1216207C (en) Construction method of hanging module and cast-in-situ for ballast slab of channel beam
CN1200171C (en) Construction method for prefabricating ballast slab of channel beam partitionally
CN209779683U (en) Jigsaw assembled comprehensive pipe gallery
CN107558351A (en) Abdomen bag bottom is trapezoidal(Waveform)Steel plate combination box beam and its construction method
CN115748483A (en) Pile-pier-beam integrated bridge fabrication machine construction method
CN114197303B (en) Bridge temporary expansion joint construction method
CN114561873B (en) Bridge high pier construction method
CN214882871U (en) Steel construction overpass that can build fast
WO2022083380A1 (en) Overhead cover structure system applicable in operational railway line and implementation method for system
CN214828502U (en) Prefabricated steel reinforcement cage hoist and mount construction equipment of culvert
CN1485498A (en) Construction method for longitudinally assembling prefabricated subsection of channel beam
CN214737289U (en) Mounting structure for assembled elevated road and bridge
CN114808774A (en) Method for dismantling upper-span bridge body
CN211947883U (en) Integrally-assembled large-span steel truss overbridge
CN211395312U (en) Upper structure for wide box girder and short tower cable-stayed bridge
CN210685282U (en) Prefabricated rail top air duct assembly structure
CN112281646A (en) Back-mounted cantilever top plate wet joint structure of disassembly-free template for backbone beam bridge
CN213233147U (en) Prefabricated segment beam assembling temporary quick-dismantling movable support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050504

Termination date: 20140926

EXPY Termination of patent right or utility model