CN1485501A - Construction method for prefabricating ballast slab of channel beam partitionally - Google Patents
Construction method for prefabricating ballast slab of channel beam partitionally Download PDFInfo
- Publication number
- CN1485501A CN1485501A CNA021371547A CN02137154A CN1485501A CN 1485501 A CN1485501 A CN 1485501A CN A021371547 A CNA021371547 A CN A021371547A CN 02137154 A CN02137154 A CN 02137154A CN 1485501 A CN1485501 A CN 1485501A
- Authority
- CN
- China
- Prior art keywords
- bed board
- road bed
- girder
- channel beam
- mould
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention relates to a construction method of channel beam partitioning prefabrication, wherein the main beam and the sectionalized road bed plate are prefabricated, the hoisting die is mounted using the main beam as support, then the prefabricated road bed plate is hoisted in position to the hoisting die, welding the steel bar at the seam crossing portion of the road bed plate, finally casting all the seams in-situ. The advantages of the invention are, it causes little impacts to the city environment and the ground traffic, it can conserve construction cost and shorten the time limit for the project, and the workload of cast-in-situ is low.
Description
Technical field
The present invention relates to bridge and viaduct build and bridge set up class, particularly a kind of job practices of prefabricating ballast slab of channel beam partitionally.
Background technology
The job practices of the bridge that domestic existing orbit traffic overhead bridge is adopted all is to adopt the cast-in-place on the spot job practices of full framing usually, and the flow process of this method is: A. sets up support on the ground of handling well, makes template then on support; B. assembling reinforcement and bellows on template are installed with prestressing tendon in the bellows; C. water and smash the beam body concrete; Reach certain intensity and after the length of time Deng the beam body concrete, the whole prestressing force of stretch-draw beam body; D. mud jacking sealing off and covering anchorage and striking and template.This job practices has following shortcoming: during (1) construction, whole bridge is all established support from ground in the plane of projection, and is very big to the influence of urban environment and traffic above-ground; (2) ground has enough deadweight of bearing capacity brace summer body and working load under when construction bridge in order to make, and needs before the construction flatten and consolidation process ground under the bridge, increases operating expenses, has delayed construction speed, and if deal with improperly, has easily caused beam body cracking; (3) owing to all adopt field fabrication, be difficult to accomplish standardization, standardization, mechanized construction, be unfavorable for total quality control, the construction period is longer.
Summary of the invention
The objective of the invention is according to above-mentioned the deficiencies in the prior art part, a kind of job practices that is applicable to channel beam is provided, be that girder prefabrication and lifting, road bed board precast block hang the job practices that mould is installed, this job practices does not need from ground support to be set, and does not need ground under the bridge is flattened and consolidation process.
The object of the invention realizes being finished by following technical scheme: a kind of job practices of channel beam is characterized in that: prefabricated girder of A. and piecemeal road bed board; B. main cable and girder is in place; C. be that mould is hung in the support installation with the girder; D. the road bed board lifting of precast block is in place to hanging on the mould; E. weld bed board seam crossing reinforcing bar, the seam crossing bellows is installed, establish cast-in-place all seams of simple and easy template at seam crossing; F. in the entrance path bed board in length and breadth to prestressing tendon, whole residue prestressing tendon in prestressing tendons and the girder in the stretch-draw road bed board; G. the prestressing tendon to stretch-draw carries out the mud jacking sealing off and covering anchorage.
Advantage of the present invention is that (1) hangs the mould form of construction work owing to having adopted, and does not need from ground support to be set, and constructs can not produce considerable influence to urban environment and traffic above-ground; (2) do not need ground under the bridge is flattened and consolidation process, saved unnecessary operating expenses and shortened the duration; (3) on-the-spot cast-in-place workload is little, and it is easy for installation simple to hang mould; (4) be convenient to carry out standardization, standardization, mechanized construction, be easy to control construction quality and duration.
Summary of drawings
Accompanying drawing 1 is a invention process texture edge schematic diagram;
Concrete technical scheme
Feature of the present invention and other correlated characteristic are described in further detail by embodiment below in conjunction with accompanying drawing, so that technician's of the same trade understanding:
Shown in Fig. 1-2, always representing respectively in the accompanying drawing: the suspension ring (6) on prefabricated girder (1), precast block road bed board (2), top rail (3), suspension rod (4), seam (5), the prefabricated road bed board with reference to label 1-6.
Embodiment:
As shown in Figure 1, 2, A. be prefabricated in the factory earlier two girders (1) and several piece road bed board (2), stretch-draw girder (1) interior section or whole prestressing force." A1 " is behind formwork erection, assembling reinforcement and bellows on the factory place, water the railway roadbed board concrete of smashing girder and piecemeal, penetrate prestressing tendon again after finishing Deng casting and compacting of concrete, prestressing tendon in the girder can certainly be penetrated earlier and carry out casting and compacting of concrete in the bellows again; Main beam concretes such as " A2 " reaches certain intensity and after the length of time, whole prestressing force of stretch-draw beam body or partial prestressing; " A3 " carries out the mud jacking sealing off and covering anchorage to the prestressing tendon of stretch-draw.B. girder (1) and be divided into the prefabricated road bed board (2) of several piece and be transported to the scene after, with two girders (1) hoisted in position, and in girder (1) inboard, end two girders (1) are made laterally temporary fixedly of members such as reinforcing bar, angle steel, topple so that two girders (1) are unexpectedly outer.C. be that mould is hung in the support installation with two girders (1), hang mould and comprise top rail (3), suspension rod (4) etc., wherein top rail (3) is supported on the girder (1), and suspension rod (4) upper end is fixing with nut and top rail (3), and the lower end is gone up set suspension ring (6) with road bed board (2) and linked to each other.D. road bed board (2) lifting of several piece precast block is in place to hanging on the mould; E. weld bed board (2) seam (5) and locate reinforcing bar, seam (5) is installed locates bellows, locate to establish cast-in-place all joints of simple and easy template in seam (5).F. in the entrance path bed board (2) in length and breadth to prestressing tendon, locate that concrete reaches certain intensity and after the length of time etc. seam (5), whole residue prestressing tendon in prestressing tendons and the girder (1) in the stretch-draw road bed board (2).G. the prestressing tendon to stretch-draw carries out the mud jacking sealing off and covering anchorage.H. remove and hang mould and the temporary fixed member of girder (1) etc.
Claims (4)
1. the job practices of a prefabricating ballast slab of channel beam partitionally is characterized in that: prefabricated girder of A. and piecemeal road bed board; B. main cable and girder is in place; C. be that mould is hung in the support installation with the girder; D. the road bed board lifting of precast block is in place to hanging on the mould; E. weld bed board seam crossing reinforcing bar, the seam crossing bellows is installed, establish cast-in-place all seams of simple and easy template at seam crossing; F. in the entrance path bed board in length and breadth to prestressing tendon, whole residue prestressing tendon in prestressing tendons and the girder in the stretch-draw road bed board; G. the prestressing tendon to stretch-draw carries out the mud jacking sealing off and covering anchorage.
2. the job practices of a kind of channel beam according to claim 1 is characterized in that the described mould that hangs mainly is made up of top rail, suspension rod.
3. the job practices of a kind of channel beam according to claim 1 and 2 is characterized in that described installation of hanging mould is that top rail is bearing on the girder, and the suspension rod upper end is fixed with nut and top rail.
4. the job practices of a kind of channel beam according to claim 1 and 2, the hoisted in position that it is characterized in that described road bed board are that the lower end with suspension rod links to each other with set suspension ring on the road bed board.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02137154 CN1200171C (en) | 2002-09-26 | 2002-09-26 | Construction method for prefabricating ballast slab of channel beam partitionally |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02137154 CN1200171C (en) | 2002-09-26 | 2002-09-26 | Construction method for prefabricating ballast slab of channel beam partitionally |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1485501A true CN1485501A (en) | 2004-03-31 |
CN1200171C CN1200171C (en) | 2005-05-04 |
Family
ID=34146894
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 02137154 Expired - Fee Related CN1200171C (en) | 2002-09-26 | 2002-09-26 | Construction method for prefabricating ballast slab of channel beam partitionally |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1200171C (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1710207B (en) * | 2005-07-11 | 2010-11-03 | 上海市政工程设计研究院 | Steel strand back-tension prestressed channel mudjacking method |
WO2011079675A1 (en) * | 2009-12-30 | 2011-07-07 | 中铁八局集团有限公司 | Construction method for double-block ballastless track bed on bridge |
CN102704406A (en) * | 2012-06-21 | 2012-10-03 | 东南大学 | Roadbed slab non-tensile stress construction method based on combined channel girder |
CN103321153A (en) * | 2013-06-19 | 2013-09-25 | 江苏科技大学 | Construction method for medium and small span trough girder bridge |
-
2002
- 2002-09-26 CN CN 02137154 patent/CN1200171C/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1710207B (en) * | 2005-07-11 | 2010-11-03 | 上海市政工程设计研究院 | Steel strand back-tension prestressed channel mudjacking method |
WO2011079675A1 (en) * | 2009-12-30 | 2011-07-07 | 中铁八局集团有限公司 | Construction method for double-block ballastless track bed on bridge |
CN102704406A (en) * | 2012-06-21 | 2012-10-03 | 东南大学 | Roadbed slab non-tensile stress construction method based on combined channel girder |
CN103321153A (en) * | 2013-06-19 | 2013-09-25 | 江苏科技大学 | Construction method for medium and small span trough girder bridge |
CN103321153B (en) * | 2013-06-19 | 2016-01-20 | 江苏科技大学 | A kind of construction method of Mid and minor spans channel girder |
Also Published As
Publication number | Publication date |
---|---|
CN1200171C (en) | 2005-05-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111254796B (en) | Single-side integral hoisting long-span overbridge for multiple railway business lines and construction method | |
CN102154992B (en) | Dislocation installation method of corrugated steel web | |
CN111877182B (en) | Novel construction method for upper structure of multi-chamber continuous UHPC box girder bridge | |
CN113279324A (en) | Semi-prefabricated UHPC-NC combined cover beam connecting structure and assembling method | |
CN110409492A (en) | The combination assembled piping lane of one kind more structures containing superposed member and its construction method | |
KR100775053B1 (en) | The original seat concrete ballast method of construction and its structure for which existence steel girder was utilized | |
CN112681822A (en) | Double-column-support four-column assembled elevated station | |
CN1216207C (en) | Construction method of hanging module and cast-in-situ for ballast slab of channel beam | |
CN1200171C (en) | Construction method for prefabricating ballast slab of channel beam partitionally | |
CN209779683U (en) | Jigsaw assembled comprehensive pipe gallery | |
CN107558351A (en) | Abdomen bag bottom is trapezoidal(Waveform)Steel plate combination box beam and its construction method | |
CN115748483A (en) | Pile-pier-beam integrated bridge fabrication machine construction method | |
CN114197303B (en) | Bridge temporary expansion joint construction method | |
CN114561873B (en) | Bridge high pier construction method | |
CN214882871U (en) | Steel construction overpass that can build fast | |
WO2022083380A1 (en) | Overhead cover structure system applicable in operational railway line and implementation method for system | |
CN214828502U (en) | Prefabricated steel reinforcement cage hoist and mount construction equipment of culvert | |
CN1485498A (en) | Construction method for longitudinally assembling prefabricated subsection of channel beam | |
CN214737289U (en) | Mounting structure for assembled elevated road and bridge | |
CN114808774A (en) | Method for dismantling upper-span bridge body | |
CN211947883U (en) | Integrally-assembled large-span steel truss overbridge | |
CN211395312U (en) | Upper structure for wide box girder and short tower cable-stayed bridge | |
CN210685282U (en) | Prefabricated rail top air duct assembly structure | |
CN112281646A (en) | Back-mounted cantilever top plate wet joint structure of disassembly-free template for backbone beam bridge | |
CN213233147U (en) | Prefabricated segment beam assembling temporary quick-dismantling movable support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20050504 Termination date: 20140926 |
|
EXPY | Termination of patent right or utility model |