CN1389742A - 地震炮眼井固井方法 - Google Patents
地震炮眼井固井方法 Download PDFInfo
- Publication number
- CN1389742A CN1389742A CN 01115942 CN01115942A CN1389742A CN 1389742 A CN1389742 A CN 1389742A CN 01115942 CN01115942 CN 01115942 CN 01115942 A CN01115942 A CN 01115942A CN 1389742 A CN1389742 A CN 1389742A
- Authority
- CN
- China
- Prior art keywords
- seismic
- blasthole
- cement
- well
- earthquake
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Soil Conditioners And Soil-Stabilizing Materials (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
一种地震炮眼井固井方法包括下列步骤:1.分析预测地震炮眼井孔隙压力和地层破裂压力;2.钻井后用地震炮眼井固井管将***包等下到井底;3.结合地层破裂压力和地层性质配制复合水泥浆;4.用高压泵或其它设备将复合水泥浆送到***包周围;5.起出固井管;6.水泥浆半凝固时激发地震波。应用该固井方法后激发的地震波能量强、频率高,在油气勘探开发的高分辨率地震勘探中有很好的应用前景。
Description
本发明涉及油气勘探开发中的地震勘探领域,具体地说,是属于一种地震炮眼井固井方法。
近年来地震采集的接收技术有了突破性进展,地震仪的道数高达数千道,光电技术也正应用于地震检波器中,三维地震勘探将广泛运用。能否提高地震采集的激发技术成为地震勘探的一个主要研究课题。比较而言,地震炮眼井中***激发地震波仍是主要的陆上地震波激发方法。
地震勘探钻井放炮时首先要做井深试验,选择有利激发井深。因为不同井深地层岩性不同,激发的地震波能量和频率也不同。一般来讲在给松软的岩层(如流砂、淤泥)中激发,则能量低,频率也低,而在较坚硬的岩层中激发则会产生能量高强的高频地震波。即使在日常生活中,也有相同的经验,在药量相同时,铁炮比纸炮声音响。铁炮破裂压力高,***时间短,产生的声波频率高能量强,纸炮破裂压力小,***时间长,产生的声波频率低能量弱。附图1所示为压力-时间、振幅-频率间的关系。
地震勘探中进行深井试验,选择高破裂压力的位置是很关键的,做好***包与井筒的耦合也很重要。
从目前地震炮眼井激发地震波可出两个严重不足的问题,一是***包周围的钻井水泥浆对激发有不利影响,使***包与井壁耦合不好,二是***包之上井筒中的泥浆破裂压力小,是******时最先破裂的方向。地震炮眼井下药后做好回填工作对解决上述两个问题有一定的作用,但不能从根本上解决问题。
为解决上述问题,进一步提高地震波高频成分和能量,本发明提出地震炮眼井固井方法,即下药后用水泥浆顶替***包周围的泥浆,形成局部最佳激发条件。
本发明的目的在于提供一种地震炮眼井固进方法,可以提高地震波能量和频率。
为实现上述目的,本发明提供的地震炮眼井固井方法包括下列步骤:
1、分析预测地震炮眼井孔隙压力和地层破裂压力;
2、钻井后用地震炮眼井固井管将***包等下到井底
3、结合地层破裂压力和地层性质配制复合水泥浆;
4、用高压泵或其它设备将复合水泥浆固井管送到***包下,并使其上返到***包上;
5、起出固井管;
6、水泥浆半凝固时激发地震波。
其中,地震炮眼井是指陆地上地震勘探时用钻机或吹砂筒等所建成的用***激发地震波的井。
其中,固井管是指类似于油田中的采油管,只是直径略小,直径2-5cm,壁厚2-5mm,每根长1-5m,每根间螺丝相连,其不同于目前的地震下药杆,但有地震下药杆的作用。
其中,复合水泥浆,是指由水泥、水、加重剂、填充剂等配制的水泥浆,比重在1.5-2.2,其组成比例(重量比):水25-30%,水泥65-70,加重剂1-5%,充填剂1-5%。
其中,加重剂为重晶石、赤铁矿等,充填剂为膨润土、绿泥石等,
其中,高压泵是指类似于油气井固井的高压泵,只是要求的压力要低,一般在20Mpa。
其中,使复合水泥浆上返到***包上,是指***包周围及***包上30-90cm。
其中,水泥浆半凝固时是指固井后水泥浆凝固到具较强抗压能力和较高可塑性时激发地震波。
以下列举实施例并结合附图对本发明作进一步的详细说明。
附图1所示为压力-时间、振幅-频率间的关系;
附图2所示为水泥浆抗压强度与时间的关系;
附图3所示为本发明地震炮眼井固井方法的示意图。
实施例1:
如图2所示,首先研制出固井管(2)和高压泵(3),固井管(2)直径为3cm,壁厚2mm,每根长1m,每根间螺丝相连。固井管(2)的材料为抗压强度大于40MPa的钢管,高压泵(3)压力为20Mpa左右。
其次是复合水泥浆(4)的配制,复合水泥浆的组成比例(重量比):水25%,水泥65%,加重剂5%,充填剂5%,加重剂为重晶石,充填剂为膨润土。
第三实施步骤是:1、分析预测地震炮眼井孔隙压力和地层破裂压力;2、钻井后用地震炮眼井固井管(2)将***包(1)等下到井底;3、用高压泵(3)将复合水泥浆(4)通过固井管(2)送到***包(1)下,使其上返到***包(1)上30cm,形成水泥塞;4、起出固井管(2);5、水泥浆凝固8小时后激发地震波,此时半凝固的水泥浆的固化抗压强度为100MPa(参阅附图2)。
实施例2:固井管(2)直径为5cm,壁厚3mm,每根长5m,复合水泥浆的组成比例(重量比):水28%,水泥70%,加重剂1%,充填剂1%,加重剂为赤铁矿,充填剂为绿泥石,上返到***包90cm,其余操作及条件同实施例1。
实施例3:固井管(2)直径为2cm,壁厚5mm,每根长3m,复合水泥浆的组成比例(重量比):水30%,水泥65%,加重剂2%,充填剂3%,加重剂为重晶石,充填剂为绿泥石,上返到***包60cm,其余操作及条件同实施例1。
本发明可使地震波40-140Hz高频成分的能量提高40%以上,使地震采集主频由30-50Hz提高到50-80Hz以上。
Claims (4)
1、一种地震炮眼井固井方法,包括下列步骤:
(1)分析预测地震炮眼井孔隙压力和地层破裂压力;
(2)钻井后用地震炮眼井固井管将***包等下到井底
(3)结合地层破裂压力和地层性质配制复合水泥浆;
(4)用高压泵或其它设备将复合水泥浆送到***包下,并使其上返到***包上;
(5)起出固井管;
(6)水泥浆半凝固时激发地震波。
其中,地震炮眼井是陆地上地震勘探时用钻机或吹砂筒等所建成的用***激发地震波的井。
其中,复合水泥浆是由水泥、水、加重剂、充填剂等配制而成。
其特征在于:
其中固井管的直径2-5cm,壁厚2-5mm,长1-5m,每根间螺丝相连;其中复合水泥浆的比重在1.5-2.2;
其中高压泵压力在20Mpa;
其中复合水泥浆上返到***包周围及***包上30-90cm。
2、根据权利要求1所述的地震炮眼井固井方法,其特征在于,所述的加重剂为重晶石或赤铁矿。
3、根据权利要求1所述的地震炮眼井固井方法,其特征在于,所述的充填剂为膨润土或绿泥石。
4、根据权利要求1所述的地震炮眼井固井方法,其特征在于,所述的复合水泥组成比例按重量比计为:水25-30%;水泥65-70%;加重剂1-5%;充填剂1-5%。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB011159421A CN1137391C (zh) | 2001-06-06 | 2001-06-06 | 地震炮眼井固井方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB011159421A CN1137391C (zh) | 2001-06-06 | 2001-06-06 | 地震炮眼井固井方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1389742A true CN1389742A (zh) | 2003-01-08 |
CN1137391C CN1137391C (zh) | 2004-02-04 |
Family
ID=4662290
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB011159421A Expired - Fee Related CN1137391C (zh) | 2001-06-06 | 2001-06-06 | 地震炮眼井固井方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1137391C (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101270634B (zh) * | 2008-04-25 | 2012-09-05 | 刘亚 | 一种井下固壁方法 |
CN104806197B (zh) * | 2015-04-22 | 2017-09-15 | 中国石油天然气股份有限公司 | 一种振动固井***及方法 |
CN109709266A (zh) * | 2018-12-03 | 2019-05-03 | 中国石油集团川庆钻探工程有限公司 | 一种直井多层油藏流动模拟实验装置及方法 |
-
2001
- 2001-06-06 CN CNB011159421A patent/CN1137391C/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101270634B (zh) * | 2008-04-25 | 2012-09-05 | 刘亚 | 一种井下固壁方法 |
CN104806197B (zh) * | 2015-04-22 | 2017-09-15 | 中国石油天然气股份有限公司 | 一种振动固井***及方法 |
CN109709266A (zh) * | 2018-12-03 | 2019-05-03 | 中国石油集团川庆钻探工程有限公司 | 一种直井多层油藏流动模拟实验装置及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN1137391C (zh) | 2004-02-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102803650B (zh) | 压裂致密储层中岩石的***和方法 | |
CN1080365C (zh) | 地下地层射孔和增产用的设备和方法 | |
CN104005415B (zh) | 微风化花岗岩中地下连续墙的高效成槽施工方法 | |
CN109026039A (zh) | 地铁隧道盾构掘进孤石深孔***预处理施工方法 | |
CN100434653C (zh) | 煤层气井***式洞穴完井工艺方法 | |
CN110761765A (zh) | 一种大范围激活天然裂缝的体积压裂方法 | |
CN103764940A (zh) | 使用和报废地下井的线缆兼容的无钻机可操作环状空间接合*** | |
CN1912255A (zh) | 沉管扩底灌注桩施工方法 | |
CN102878874A (zh) | 深孔预裂***注浆方法 | |
CN115749713A (zh) | 岩层变频脉冲缝网压裂方法与装备 | |
WO2014168699A2 (en) | Controlling pressure during perforating operations | |
CN112855110A (zh) | 砂岩型铀矿层的增渗方法 | |
CN105986801A (zh) | 用于侧钻井***压裂的方法和装置 | |
CN109973037B (zh) | 储层开采激励结构以及页岩气储层的开采方法 | |
CN1137391C (zh) | 地震炮眼井固井方法 | |
CN109458214B (zh) | 一种低透气性煤层静态***增透瓦斯抽采方法 | |
CN107724984A (zh) | 一种利用脉冲式冲击波提高油气采收率的方法 | |
CN102296945A (zh) | 石油采油井低渗透油气层的***压裂增产方法 | |
CN103967001A (zh) | 冲孔桩成孔施工方法 | |
CN112983258A (zh) | 一种用于松散岩层地质的潜孔锤快速成孔施工方法 | |
RU2563893C1 (ru) | Способ взрывания на открытых разработках разнопрочных слоистых массивов горных пород | |
JP2010522289A (ja) | 送電鉄塔の基礎を施工するための岩盤発破方法 | |
CN109098707B (zh) | 砂砾岩体油藏的直井缝网压裂的适应性评价方法、砂砾岩体油藏的直井缝网压裂方法 | |
Albright et al. | Road Map for a 5000-ft Microborehole | |
KR0146411B1 (ko) | 지중암반 발파공법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20040204 Termination date: 20160606 |