CN1372059A - Method for integral jacking roof of reinforced concrete pile single storey industry workshop - Google Patents

Method for integral jacking roof of reinforced concrete pile single storey industry workshop Download PDF

Info

Publication number
CN1372059A
CN1372059A CN 02113537 CN02113537A CN1372059A CN 1372059 A CN1372059 A CN 1372059A CN 02113537 CN02113537 CN 02113537 CN 02113537 A CN02113537 A CN 02113537A CN 1372059 A CN1372059 A CN 1372059A
Authority
CN
China
Prior art keywords
reinforced concrete
concrete pile
jack
roof
jacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 02113537
Other languages
Chinese (zh)
Other versions
CN1159505C (en
Inventor
卢献荣
周云祥
卢晔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aluminum Corp of China Ltd
Original Assignee
GUIZHOU ALUMINIUM PLANT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU ALUMINIUM PLANT filed Critical GUIZHOU ALUMINIUM PLANT
Priority to CNB021135371A priority Critical patent/CN1159505C/en
Publication of CN1372059A publication Critical patent/CN1372059A/en
Application granted granted Critical
Publication of CN1159505C publication Critical patent/CN1159505C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The reinforced concrete corbels are fixed on two side surfaces of upper portion of every reinforced concrete column of reinforced concrete column single-layer industrial factory building, on the top of every corbel a jack is placed, and a steel beam supported on the jack is placed on the lower chord end portion of roof trass, then the jacks can be synchronously started and the cushion blocks are added between the tops of all the reinforced concrete columns and lifted roof truss ends respectively, said operation can be repeatedly made, so that the roof can be lifted up to required height.

Description

The method of integral jacking roof of reinforced concrete pile single storey industry workshop
The present invention relates to a kind of method of integral jacking roof of reinforced concrete pile single storey industry workshop, belong to house lid integral jacking technical field.
Present existing integral jacking roof technology, general all is the column top that the lifting pin that jacking is used is fixedly connected on the house, just can carry out jacking after then the house column being cut off, as the disclosed denomination of invention of Chinese patent literature be: integrated raising method for self-supporting house roof extremely installs, application number is: 01108408.1 technical scheme, in this technical scheme, the method that is adopted is exactly the method that just can carry out jacking after the house column need being cut off.Yet, for the factory building column that adopts steel bar concrete to make, owing to be difficult to lifting pin is fixed on the reinforced concrete pile, even and lifting pin is fixed on the reinforced concrete pile, but because the fragility of steel bar concrete material, when its reinforced concrete pile is cut off, the one, greatly reduce the intensity of reinforced concrete pile, the 2nd, influence being connected of lifting pin and reinforced concrete pile easily, thereby cause that easily the danger of falling apart is become flexible in appearance in the jacking process, so existing jacking technology only is applicable to the house caping liter of steel post, and be not suitable for the house caping liter of reinforced concrete pile.
The objective of the invention is: provide a kind of simple to operate, with low cost and do not need with column method that cut off, that be applicable to integral jacking roof of reinforced concrete pile single storey industry workshop, to overcome the deficiencies in the prior art.
The present invention is achieved in that it comprises that the employing jack carries out jacking, when the roof system to reinforced concrete pile single storey industry workshop carries out jacking, elder generation's prefabricated cushion block (6), fix two steel bar concrete brackets (2) in two sides, top of the every reinforced concrete pile (1) of reinforced concrete pile single storey industry workshop then, and the end face that makes each bracket (2) is the plane, on the end face of each bracket (2), place a jack (3), lower edge end at the every roof truss (4) of factory building roof system is provided with a girder steel (5), and the two ends that make girder steel (5) are bearing in respectively on the jack (3) of reinforced concrete pile (1) both sides, the connector of all former roof truss (4) head bottom part and reinforced concrete pile (1) end face is disconnected, start the jack (3) of every reinforced concrete pile (1) both sides then synchronously, whole roof system is risen simultaneously, after lifting altitude reaches a stroke, a pad cushion block (6) between the end face of every reinforced concrete pile (1) and roof truss (4) termination, fall every jack (3) then after rise, and below every jack (3) cushion block (6) of a same thickness of pad, and then the jack (3) that starts every reinforced concrete pile (1) both sides synchronously carries out next stroke jacking, and so circulation can be with integral jacking roof to desired location; The material of cushion block (6) can adopt plain concrete, steel bar concrete, timber or metal material to make.
Owing to adopted technique scheme, the present invention compared with prior art, the present invention's operation is very easily simple, because need not cutting off the column in house when jacking, the present invention can carry out jacking, therefore can not influence the intensity of house column, so the present invention is very suitable for the roof system of reinforced concrete pile single storey industry workshop is carried out integral jacking, and because cushion block of the present invention making is very simple, cost of manufacture is also very cheap, and required instrument, material is all fewer, so the present invention has simple to operate, with low cost, and be applicable to the advantage of integral jacking roof of reinforced concrete pile single storey industry workshop.
Accompanying drawing 1 is a construction schematic diagram of the present invention;
Accompanying drawing 2 is that the A of accompanying drawing 1 is to schematic diagram.
Embodiments of the invention: jack can adopt fluid pressure type or spiral jack, but preferably adopt spiral jack, when the roof system to reinforced concrete pile single storey industry workshop carries out jacking, elder generation's prefabricated cushion block (6), the material of making cushion block (6) can adopt plain concrete, steel bar concrete, timber or metal material are made, adopting plain concrete material to make under the regular situation gets final product, when making cushion block, note making smooth in two planes it up and down, highly preferably be made into the same height, fix two steel bar concrete brackets (2) in two sides, top of the every reinforced concrete pile (1) of reinforced concrete pile single storey industry workshop then, and the end face that makes each bracket (2) is the plane of equal height, on the end face of each bracket (2), place a jack (3), lower edge end at the every roof truss (4) of factory building roof system is provided with a girder steel (5), and the two ends that make girder steel (5) are bearing in respectively on the jack (3) of reinforced concrete pile (1) both sides, the connector of all former roof truss (4) head bottom part and reinforced concrete pile (1) end face is disconnected, start the jack (3) of every reinforced concrete pile (1) both sides then synchronously, whole roof system is risen simultaneously, reach the stroke of a jack when lifting altitude after, a pad cushion block (6) between the end face of every reinforced concrete pile (1) and roof truss (4) termination, then every jack (3) is fallen back to original position, and below every jack (3) cushion block (6) of a same thickness of pad, and then the jack (3) that starts every reinforced concrete pile (1) both sides synchronously carries out next stroke jacking, and so circulation can be with integral jacking roof to desired location.

Claims (2)

1, a kind of method of integral jacking roof of reinforced concrete pile single storey industry workshop, it comprises adopts jack to carry out jacking, it is characterized in that: elder generation's prefabricated cushion block (6), fix two steel bar concrete brackets (2) in two sides, top of the every reinforced concrete pile (1) of reinforced concrete pile single storey industry workshop then, and the end face that makes each bracket (2) is the plane, on the end face of each bracket (2), place a jack (3), lower edge end at the every roof truss (4) of factory building roof system is provided with a girder steel (5), and the two ends that make girder steel (5) are bearing in respectively on the jack (3) of reinforced concrete pile (1) both sides, the connector of all former roof truss (4) head bottom part and reinforced concrete pile (1) end face is disconnected, start the jack (3) of every reinforced concrete pile (1) both sides then synchronously, whole roof system is risen simultaneously, after lifting altitude reaches a stroke, a pad cushion block (6) between the end face of every reinforced concrete pile (1) and roof truss (4) termination, fall every jack (3) then after rise, and below every jack (3) cushion block (6) of a same thickness of pad, and then the jack (3) that starts every reinforced concrete pile (1) both sides synchronously carries out next stroke jacking, and so circulation can be with integral jacking roof to desired location.
2, the method for integral jacking roof of reinforced concrete pile single storey industry workshop according to claim 1 is characterized in that: the material of cushion block (6) can adopt plain concrete, steel bar concrete, timber or metal material to make.
CNB021135371A 2002-03-26 2002-03-26 Method for integral jacking roof of reinforced concrete pile single storey industry workshop Expired - Lifetime CN1159505C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB021135371A CN1159505C (en) 2002-03-26 2002-03-26 Method for integral jacking roof of reinforced concrete pile single storey industry workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB021135371A CN1159505C (en) 2002-03-26 2002-03-26 Method for integral jacking roof of reinforced concrete pile single storey industry workshop

Publications (2)

Publication Number Publication Date
CN1372059A true CN1372059A (en) 2002-10-02
CN1159505C CN1159505C (en) 2004-07-28

Family

ID=4742668

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB021135371A Expired - Lifetime CN1159505C (en) 2002-03-26 2002-03-26 Method for integral jacking roof of reinforced concrete pile single storey industry workshop

Country Status (1)

Country Link
CN (1) CN1159505C (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1327036C (en) * 2004-11-05 2007-07-18 贵阳铝镁设计研究院 Aluminium electrolyzing tank integral error correcting and position restoring method
CN102101629A (en) * 2009-12-18 2011-06-22 中国海洋石油总公司 Hierarchical synchronous hydraulic jacking process for large-tonnage ocean engineering structure
CN102277980A (en) * 2011-05-06 2011-12-14 河海大学 Device for integrally jacking roof of single-layer industrial factory building and construction method thereof
CN102518317A (en) * 2011-12-15 2012-06-27 攀钢集团工程技术有限公司 Method for increasing heights of roof truss beams of large-span workshops in online manner
CN103572837A (en) * 2012-07-30 2014-02-12 上海天演建筑物移位工程有限公司 Building jacking system and jacking method
CN103669576A (en) * 2013-11-18 2014-03-26 中色十二冶金建设有限公司 Integral jacking construction device and method for steel structure workshop
CN105064717A (en) * 2015-07-24 2015-11-18 武大巨成结构股份有限公司 Method for constructing added storey of building in jack-up manner through steel slide ways
CN107476597A (en) * 2017-07-12 2017-12-15 杭州圣基建筑特种工程有限公司 Integral roof synchronization of jacking up method
CN107628567A (en) * 2017-09-30 2018-01-26 中国二十冶集团有限公司 The lifting method of overhead crane orbit beam
CN110080318A (en) * 2019-04-29 2019-08-02 兰州理工大学 A kind of method for correcting error that pile foundation building locally settles
CN110616913A (en) * 2019-09-28 2019-12-27 山东建固特种专业工程有限公司 Method for synchronously jacking frame structure building
CN111877790A (en) * 2020-07-01 2020-11-03 上海建工集团股份有限公司 Construction method for integrally jacking and replacing new and old steel roof
CN112459516A (en) * 2020-10-23 2021-03-09 上海建工二建集团有限公司 Construction method for increasing net height of existing building
CN112942590A (en) * 2021-01-27 2021-06-11 关国荣 Whole lifting structure of large-span steel structure roof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101476397B (en) * 2009-01-15 2010-09-29 二十三冶建设集团有限公司 Integral jacking method for steel roof frame and concrete column articulated factory house cover

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1327036C (en) * 2004-11-05 2007-07-18 贵阳铝镁设计研究院 Aluminium electrolyzing tank integral error correcting and position restoring method
CN102101629A (en) * 2009-12-18 2011-06-22 中国海洋石油总公司 Hierarchical synchronous hydraulic jacking process for large-tonnage ocean engineering structure
CN102277980A (en) * 2011-05-06 2011-12-14 河海大学 Device for integrally jacking roof of single-layer industrial factory building and construction method thereof
CN102518317B (en) * 2011-12-15 2014-05-28 攀钢集团工程技术有限公司 Method for increasing heights of roof truss beams of large-span workshops in online manner
CN102518317A (en) * 2011-12-15 2012-06-27 攀钢集团工程技术有限公司 Method for increasing heights of roof truss beams of large-span workshops in online manner
CN103572837B (en) * 2012-07-30 2016-08-10 上海天演建筑物移位工程有限公司 A kind of building jacking method
CN103572837A (en) * 2012-07-30 2014-02-12 上海天演建筑物移位工程有限公司 Building jacking system and jacking method
CN103669576A (en) * 2013-11-18 2014-03-26 中色十二冶金建设有限公司 Integral jacking construction device and method for steel structure workshop
CN105064717A (en) * 2015-07-24 2015-11-18 武大巨成结构股份有限公司 Method for constructing added storey of building in jack-up manner through steel slide ways
CN107476597A (en) * 2017-07-12 2017-12-15 杭州圣基建筑特种工程有限公司 Integral roof synchronization of jacking up method
CN107628567A (en) * 2017-09-30 2018-01-26 中国二十冶集团有限公司 The lifting method of overhead crane orbit beam
CN110080318A (en) * 2019-04-29 2019-08-02 兰州理工大学 A kind of method for correcting error that pile foundation building locally settles
CN110616913A (en) * 2019-09-28 2019-12-27 山东建固特种专业工程有限公司 Method for synchronously jacking frame structure building
CN111877790A (en) * 2020-07-01 2020-11-03 上海建工集团股份有限公司 Construction method for integrally jacking and replacing new and old steel roof
CN111877790B (en) * 2020-07-01 2021-11-09 上海建工集团股份有限公司 Construction method for integrally jacking and replacing new and old steel roof
CN112459516A (en) * 2020-10-23 2021-03-09 上海建工二建集团有限公司 Construction method for increasing net height of existing building
CN112942590A (en) * 2021-01-27 2021-06-11 关国荣 Whole lifting structure of large-span steel structure roof

Also Published As

Publication number Publication date
CN1159505C (en) 2004-07-28

Similar Documents

Publication Publication Date Title
CN1159505C (en) Method for integral jacking roof of reinforced concrete pile single storey industry workshop
CN201152040Y (en) Workshop single layer mixing bent structure
CN113323216A (en) Support-free laminated slab and construction method thereof
CN205907812U (en) Take steel frame structure that encorbelments greatly of pull rod
CN1190578C (en) Integrated raising method for self-supporting house roof and its equipment
CN1078524A (en) Brick-and-concrete buildings constructional column, collar tie beam cast-in-situ construction method and device
CN208577944U (en) A kind of bridge curve type side web constructing device
CN112482193A (en) Method for applying compressive stress to concrete slab in hogging moment area of combination beam, main beam and cable-stayed bridge
CN203097331U (en) Wood-plastic hexagonal pavilion
CN202220438U (en) Diving platform steel formwork support system
CN202388183U (en) Lifting equipment for H-shaped steel numerical control cutting machine
CN2748568Y (en) Repeatedly usable special-shaped formwork for engineering casing with rotary curved surface
CN215629404U (en) Steel case roof beam mobile location rack
CN212954041U (en) Glass net rack lifting device
JP2001207689A (en) Relay elevation engineering method for steel tower and elevation guide mechanism
CN2476611Y (en) Self-supporting roof lift-up device
CN203393843U (en) Roof truss and column rigid connection jacking structure
CN216949471U (en) Building floor height difference template support system
CN212552486U (en) Camber steel beam processing platform
CN113216288B (en) Jacking construction method for wood structure house
CN212358039U (en) Counter-force pre-pressing system of ultrahigh suspension casting beam 0# block support
CN216276405U (en) Liftable overhaul furred ceiling structure
CN220504665U (en) Ectopic assembled H-shaped steel tower
CN220952982U (en) Jack lifting device for steel truss girder falling
CN219280520U (en) High pier large cantilever bent cap support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINESE ALUMINIUM CO., LTD.

Free format text: FORMER OWNER: GUIZHOU ALUMINUM FACTORY

Effective date: 20030228

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20030228

Address after: 100814, Fuxing Road, Beijing, No. 12, No. 10

Applicant after: Aluminum Corporation of China Limited

Address before: 550008 Baiyun District, Guizhou, Guiyang

Applicant before: Guizhou Aluminium Plant

C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20040728

CX01 Expiry of patent term