CN1319700A - Technological equipment for airprot runway foundation cement mortar filling consolidation - Google Patents

Technological equipment for airprot runway foundation cement mortar filling consolidation Download PDF

Info

Publication number
CN1319700A
CN1319700A CN 01100550 CN01100550A CN1319700A CN 1319700 A CN1319700 A CN 1319700A CN 01100550 CN01100550 CN 01100550 CN 01100550 A CN01100550 A CN 01100550A CN 1319700 A CN1319700 A CN 1319700A
Authority
CN
China
Prior art keywords
grouting
slip casting
basic unit
airfield runway
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 01100550
Other languages
Chinese (zh)
Other versions
CN1126841C (en
Inventor
陈文玮
曹峰
吕广荣
王杰
杨金钟
赵宝春
李正全
肖专文
鲁晓华
吴聚元
杨长岭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING UNIV CONSTRUCTION SUBWAY AND FOUNDATION MUNICIPAL ENGINEERING Co Ltd
Original Assignee
BEIJING UNIV CONSTRUCTION SUBWAY AND FOUNDATION MUNICIPAL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING UNIV CONSTRUCTION SUBWAY AND FOUNDATION MUNICIPAL ENGINEERING Co Ltd filed Critical BEIJING UNIV CONSTRUCTION SUBWAY AND FOUNDATION MUNICIPAL ENGINEERING Co Ltd
Priority to CN 01100550 priority Critical patent/CN1126841C/en
Publication of CN1319700A publication Critical patent/CN1319700A/en
Application granted granted Critical
Publication of CN1126841C publication Critical patent/CN1126841C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The grouting construction process for strengthening base course of airport runway includes the following steps: distributing holes, drilling holes, cleaning holes, installing grouting equipment and grout compressing tightly sealing equipment, pressure gauge and flow meter, grouting, plugging grouting holes and cleaning runway surface. The slurry pump of said equipment is connected with grout divider, said grout divider at least possesses two grout outlets, said grout outlet are connected with grout-conveying pipe by means of flow sensor and switch, and said grout conveying pipe is connected with grouting performated pipe, around it there is compressing sealing equipment, including rubber plug, rubber plug washer, sealing ring, compression base seat and positioning bolt, etc.

Description

Airfield runway basic unit grouting and reinforcing construction technology and equipment
The present invention relates to a kind of ground stabilization Processes and apparatus.
After the use of airfield runway through many years, the road face occurs damaged, and the phenomenon of coming to nothing appears in the sand pebble layer of basic unit and surface layer part, need carry out runway strengthening, to guarantee aircraft flight safety.Existing foundation grouting reinforcement process equipment takes up an area of big, dismounting inconvenience, and the construction period is long, is not suitable for airfield runway and uses, and needs placing of material place, and power supply, water supply all need backguy to take over, the not only normal navigation of influence, and can move to aircraft and bring potential safety hazard.Existing basic unit grouting and reinforcing construction equipment does not have branch slurry device, no vehicular, seal around the grouting tube bad, spillage easily, the job site face that paves is big, mechanization degree is not high, does not regain round the clock.Adopt existing construction technology to reinforce an airfield runway and need suspend about 15 days,, will cause about 5.4 hundred million yuans of the loss of suspending if per day navigation amount was 450 sortie/days.
The purpose of this invention is to provide a kind of airfield runway basic unit's grouting and reinforcing construction technology and equipment, improve mechanization degree, equipment construction flexible for installation, rapid reduces the economic loss of suspending.
Technical scheme of the present invention: comprise construction technology and equipment, wherein construction sequence:
(1). cloth hole, slip casting diffusion radius 1-3 rice;
(2). boring, with core-drill(ing) machine boring, submersible creeps into 10~15cm earlier;
(3). clear hole, in high pressure draught purge hole;
(4). grouting equipment is installed;
(5). the slip casting pressed sealing device is installed, pressure meter and flowmeter;
(6). slip casting, its grouting sequence are both sides, the elder generation outside, and the middle part, back should be mentioned to send after the single hole slip casting slip casting for the first time and be starched pipe, treats to carry out the slip casting second time after the face grouting pressure dissipates, and grouting pressure is not more than 2.5MPa;
(7). the shutoff injected hole;
(8). the cleaning of road face.
In above-mentioned its (5) injecting paste material be cement paste and antifreeze morning strong composite water-reducing agent.
A complete set of equipment all is automobile-carried formula, comprises boring a complete set of equipment and slip casting a complete set of equipment.
The boring a complete set of equipment mainly comprises core-drill(ing) machine, air pressure gun, portable electric hammer, clear hole device, pneumatics unit, generating set, waterwheel and lighting etc.
The slip casting a complete set of equipment mainly comprises airfield runway basic unit grouting and reinforcing construction equipment, the automatic collection of grouting parameter and analysis process system, cleaning equipment, settlement observation instrument.
Airfield runway basic unit grouting and reinforcing construction equipment comprises again stirring starches part, circulating tank, slush pump, grouting tube, generator, it is characterized in that: slush pump links to each other with a minute slurry device, divide the slurry device that at least two slip casting outlets are arranged, be connected with sending the slurry pipe with switch through flow transmitter, send the slurry pipe to connect grouting tube, pressed sealing device is arranged on every side.
The slip casting exit of above-mentioned branch slurry device is provided with pressure meter and safety relief valve.
Above-mentioned branch slurry device connects test of vehicular grouting parameter and analysis process system.
Above-mentioned pressed sealing device comprises and is with plug, plug packing ring and O-ring seal around the grouting tube, on O-ring seal and 2 on ground compress pedestal, its middle part perforation is provided with the positioning bolt that inserts ground.
Above-mentioned positioning bolt and compress and be lined with the balance cushion block between the pedestal.
On the above-mentioned positioning bolt crank of stepping up is arranged.
Advantage of the present invention: this technology makes and to carry on construction work at night, the navigation on daytime becomes possibility, and construction and is not stayed any vestige flexibly, rapidly, reduces the economic loss of suspending, and has guaranteed that the airport normally opens the navigation or air flight.Be applicable to Large Square, large tracts of land sandy gravel basic unit terrace.
Below in conjunction with drawings and Examples the present invention is further described:
Fig. 1 is the on-the-spot schematic diagram of arranging of technology of the present invention;
Fig. 2 is the structural representation of airfield runway of the present invention basic unit grouting and reinforcing construction equipment;
Fig. 3 is the structural representation of pressed sealing device in the airfield runway of the present invention basic unit grouting and reinforcing construction equipment;
Fig. 4 divides the slurry device and send slurry pipe connection diagram in the airfield runway of the present invention basic unit grouting and reinforcing construction equipment.
Embodiment: processing step: (1). cloth hole, slip casting diffusion radius 1-3 rice, every plate 5 holes;
(2). boring, earlier with core-drill(ing) machine boring, submersible creeps into 10~15cm, withdraw from drilling rod and take out core, simultaneously with instrument during operation trickling ground and hole in water clean out.Be drilled into below the panel with the air pressure gun operation afterwards, should verify following cable of pavement slab and pipeline situation before the pore-forming;
(3). clear hole, with the clear hole of device, clear hole, clear hole device is connected with air compressor machine, with spare and the residue in the high pressure draught purge hole, for avoiding the hole of collapsing;
(4). grouting equipment is installed, slurries are after stirring, send in the branch slurry device through slush pump pressure, divide the slurry device to be divided into five slip casting outlets, slurries all will pass through the flow directions such as flow transmitter, valve switch and send in the slurry pipe, send the slurry pipe to connect grouting tube, are respectively equipped with pressure meter and safety relief valve simultaneously near the slip casting outlet, with convenient slurries pressure is monitored at any time, guarantee construction and device security.Slurries are when flowing through flow transmitter, and the inductor of flow transmitter is responded to the mobile generation of slurries, and it is changed into the mainboard that the signal of telecommunication transfers to corresponding flow meter, and mainboard transfers to display screen after handling through data, and it is right that display screen shows
(5). the slip casting pressed sealing device is installed, pressure meter and flowmeter;
After hole depth adheres to specification, can insert grouting tube, seal plug-hole,, pressed sealing device is installed then in plugging device loam cake one annular iron plate with plugging device.Slurries must be with the grouting tube sealing and fixing in injected hole before injection, and cover top cement plug packing ring in grouting tube puts O-ring seal afterwards earlier, overlaps top cement plug again, inserts in the injected hole then.One location bolt is set at the position of the about 200mm of distance injected hole, to compress base sleeve then behind positioning bolt, the horizontal base head is buckled on the plug packing ring, the balance cushion block is pressed on one's body the pedestal by positioning bolt, step up crank and positioning bolt and be pressed on the balance cushion block, screw crank, just be pressed on the plug packing ring by the horizontal base head by screwed connection, plug is contacted, to reach enough slips casing by pressure with the sealing of slip casting aperture.
(6). slip casting.Allowing under the pressure of slip casting that adopt the mode of flow-control to give slip casting, grouting mode is a cycling element with every panel, every cycling element is by the slip casting simultaneously of 5 holes, and slip casting is operation from bottom to top, at twice slip casting, insert floral tube slip casting for the first time earlier, for the second time slip casting once more behind the tube drawing 5-10cm.Twice slip casting is not less than 5-10 minute blanking time.Make slurries filling widely in the hole or space of rubble and aggregate chips basic unit, and continue, produce a desired effect with gelling.In the time of slip casting, utilize special flow Acquisition Instrument reading, write down each hole grouting amount of every block of plate and printing.Every plate slip casting time should be controlled according to grouting pressure, pavement slab lifting amount and the excessive slurry situation of plate seam, and when grouting pressure remained on certain numerical value, grouting amount no longer increased, and can stop slip casting.For avoiding slurries to run off, grouting sequence should be during construction: earlier runway centerline outside pavement slab is carried out slip casting, seal both sides, do not exosmose in the time of can guaranteeing the slip casting of runway middle part like this, the extruding that helps slurries is with closely knit, and then to middle part slip casting.
Injection slurry be the straight cement slurries and antifreeze morning strong composite water-reducing agent, water/binder ratio is 0.8.Grouting pressure is not more than 2.5MPa, when pressure surpasses, stop 5-10 minute after, continue slip casting.
(7). the shutoff injected hole.After grouting with plunger finishes, should in time give the sealing of hole operation, promptly cram boring to the aperture with super-early strength cement 525R, aperture palpus levelling, and than the low 3-5mm of original ground.
(8). the cleaning of road face.In the time of panel slip casting, foreign material such as rubble that will go out cement core, clear Kong Qing and aggregate chips, excessive cement grout thoroughly clean, and the preceding road face that guarantees to accomplish to hand over to the next shift does not stay more any hidden danger that jeopardizes aircraft flight.In the grouting and reinforcing construction of Capital Airport airfield runway basic unit, normally open the navigation or air flight daytime, the construction of marching into the arena night.Compare about 2.36 hundred million yuan of minimizing economic loss with the construction of suspending fully.
A complete set of equipment all is automobile-carried formula, comprises boring a complete set of equipment and slip casting a complete set of equipment.
The boring a complete set of equipment mainly comprises core-drill(ing) machine, air pressure gun, portable electric hammer, clear hole device, pneumatics locomotive
1, generating locomotive 2, water tender 3 and lighting etc.
The slip casting a complete set of equipment mainly comprises airfield runway basic unit grouting and reinforcing construction equipment, vehicular grouting parameter test and analysis process system 4, cleaning equipment, settlement observation instrument automatically.
Wherein airfield runway basic unit grouting and reinforcing construction equipment comprises again and stirs slurry car 5, circulating tank 6, slush pump 7, grouting vehicle 8, generating locomotive 9, slush pump 7 is starched device 10 with the branch on the grouting vehicle 8 and is linked to each other, divide slurry device 10 that at least two slip casting outlets 11 are arranged, be connected with sending slurry pipe 14 with switch 13 through flow transmitter 12, divide the slip casting of starching device 10 to export 11 places and be provided with pressure meter 16 and safety relief valve 17.Divide the slurry device to connect test of vehicular grouting parameter and analysis process system 4.Send slurry pipe 14 to connect grouting tube 15, pressed sealing device is arranged on every side by connecting bolt 24.
Pressed sealing device is to be with plug 18, plug packing ring 19 and O-ring seal 25 around grouting tube 15, on O- ring seal 25 and 2 on ground compress pedestal 20, its middle part perforation is provided with the positioning bolt 21 that inserts ground.Positioning bolt 21 and compress and be lined with balance cushion block 22 between the pedestal 20.The crank of stepping up 23 is arranged on the positioning bolt 21.Grouting tube stretches in the graded sand boulder bed 27 through concrete cushion 26, carries out slip casting near cushion lime 28.

Claims (8)

1, a kind of airfield runway basic unit grouting and reinforcing construction technology, it is characterized in that: its processing step is:
(1). cloth hole, slip casting diffusion radius 1-3 rice;
(2). boring, with core-drill(ing) machine boring, submersible creeps into 10~15cm earlier;
(3). clear hole, in high pressure draught purge hole;
(4). grouting equipment is installed;
(5). the slip casting pressed sealing device is installed, pressure meter and flowmeter;
(6). slip casting, its grouting sequence are both sides, the elder generation outside, and the middle part, back should be mentioned to send after the single hole slip casting slip casting for the first time and be starched pipe, treats to carry out the slip casting second time after the face grouting pressure dissipates, and grouting pressure is not more than 2.5MPa;
(7). the shutoff injected hole;
(8). the cleaning of road face.
2, airfield runway according to claim 1 basic unit grouting and reinforcing construction technology is characterized in that: in its (5) injecting paste material be cement paste and antifreeze morning strong composite water-reducing agent.
3, a kind of airfield runway basic unit grouting and reinforcing construction equipment comprises and stirs slurry part, circulating tank, slush pump, grouting tube, generator, it is characterized in that: slush pump links to each other with a minute slurry device, divide the slurry device that at least two slip casting outlets are arranged, be connected with sending the slurry pipe with switch through flow transmitter, send the slurry pipe to connect grouting tube, pressed sealing device is arranged on every side.
4, airfield runway according to claim 3 basic unit grouting and reinforcing construction equipment is characterized in that: the slip casting exit of described branch slurry device is provided with pressure meter and safety relief valve.
5, airfield runway according to claim 3 basic unit grouting and reinforcing construction equipment is characterized in that: described branch slurry device connects test of vehicular grouting parameter and analysis process system.
6, airfield runway according to claim 3 basic unit grouting and reinforcing construction equipment, it is characterized in that: described pressed sealing device is with plug, plug packing ring and O-ring seal around comprising grouting tube, on O-ring seal and 2 on ground compress pedestal, its middle part perforation is provided with the positioning bolt that inserts ground.
7, airfield runway according to claim 3 basic unit grouting and reinforcing construction equipment is characterized in that: described positioning bolt and compress and be lined with the balance cushion block between the pedestal.
8, airfield runway according to claim 3 basic unit grouting and reinforcing construction equipment is characterized in that: on the described positioning bolt crank of stepping up is arranged.
CN 01100550 2001-01-12 2001-01-12 Technological equipment for airprot runway foundation cement mortar filling consolidation Expired - Fee Related CN1126841C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01100550 CN1126841C (en) 2001-01-12 2001-01-12 Technological equipment for airprot runway foundation cement mortar filling consolidation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01100550 CN1126841C (en) 2001-01-12 2001-01-12 Technological equipment for airprot runway foundation cement mortar filling consolidation

Publications (2)

Publication Number Publication Date
CN1319700A true CN1319700A (en) 2001-10-31
CN1126841C CN1126841C (en) 2003-11-05

Family

ID=4651683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01100550 Expired - Fee Related CN1126841C (en) 2001-01-12 2001-01-12 Technological equipment for airprot runway foundation cement mortar filling consolidation

Country Status (1)

Country Link
CN (1) CN1126841C (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019826A (en) * 2015-05-28 2015-11-04 中铁第四勘察设计院集团有限公司 Drilling construction method for existing airport ground
CN105442425A (en) * 2015-12-18 2016-03-30 安徽优特公路养护科技有限公司 Rapid repairing device and method for diseases of roadbase
CN105544368A (en) * 2015-12-07 2016-05-04 江美娣 Method and system for pre-repairing road before road damage
CN105625153A (en) * 2015-12-18 2016-06-01 安徽优特公路养护科技有限公司 High-polymer repair method for road base damages
CN106013836A (en) * 2016-07-02 2016-10-12 杭州固特建筑加固技术工程有限公司 Pressure injection device for reinforcement industry
CN108457163A (en) * 2016-04-04 2018-08-28 吴振彪 A kind of road maintenance device and reinforcement
CN108951338A (en) * 2018-08-23 2018-12-07 山东承坤信息科技有限公司 A kind of anticracking method for building up plastic race track
CN109555526A (en) * 2018-11-16 2019-04-02 中铁二十三局集团有限公司 Grouting strengthening method for underground cavity
CN112853851A (en) * 2021-01-15 2021-05-28 中铁北京工程局集团有限公司 Rapid integral plate replacement construction process for damaged road panel in civil aviation non-navigation construction

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019826A (en) * 2015-05-28 2015-11-04 中铁第四勘察设计院集团有限公司 Drilling construction method for existing airport ground
CN105019826B (en) * 2015-05-28 2017-08-29 中铁第四勘察设计院集团有限公司 existing airport ground drilling construction method
CN105544368A (en) * 2015-12-07 2016-05-04 江美娣 Method and system for pre-repairing road before road damage
CN105442425A (en) * 2015-12-18 2016-03-30 安徽优特公路养护科技有限公司 Rapid repairing device and method for diseases of roadbase
CN105625153A (en) * 2015-12-18 2016-06-01 安徽优特公路养护科技有限公司 High-polymer repair method for road base damages
CN108457163A (en) * 2016-04-04 2018-08-28 吴振彪 A kind of road maintenance device and reinforcement
CN108457163B (en) * 2016-04-04 2020-07-10 广州北环高速公路有限公司 Road maintenance device and reinforcing method
CN106013836A (en) * 2016-07-02 2016-10-12 杭州固特建筑加固技术工程有限公司 Pressure injection device for reinforcement industry
CN108951338A (en) * 2018-08-23 2018-12-07 山东承坤信息科技有限公司 A kind of anticracking method for building up plastic race track
CN108951338B (en) * 2018-08-23 2020-08-14 广东弘道体教科技产业有限公司 Anti-cracking plastic track construction method
CN109555526A (en) * 2018-11-16 2019-04-02 中铁二十三局集团有限公司 Grouting strengthening method for underground cavity
CN112853851A (en) * 2021-01-15 2021-05-28 中铁北京工程局集团有限公司 Rapid integral plate replacement construction process for damaged road panel in civil aviation non-navigation construction

Also Published As

Publication number Publication date
CN1126841C (en) 2003-11-05

Similar Documents

Publication Publication Date Title
CN104846810B (en) Self-circulating posterior grouting bored pile construction method
CN110185844B (en) Shallow-earthing large-diameter pipe jacking construction method
CN1126841C (en) Technological equipment for airprot runway foundation cement mortar filling consolidation
CN102061938A (en) Filling process for recovering coal pillars by filling goaf with paste
CN101806059A (en) Drilling, grouting and sand-throwing process of ground surface of mined-out region under highway
CN104533449A (en) Rack for tunnel excavation and adit construction method applying rack
CN110284901A (en) Water proof type single shell lining structure and its construction technology
CN107059920A (en) Loess formation piping lane construction technology
CN108487297A (en) The construction method that bracing members are set up in a kind of half lid excavation construction of subway station
CN111927548A (en) Method for plugging abandoned coal mine well mouth
JP3418069B2 (en) Injection method and injection equipment
CN111676987A (en) Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method
CN103276736B (en) Trailer-type high polymer grouting system
CN2520346Y (en) Base course grouting reinforcing construction apparatus for airport runway
CN101275393A (en) Method for controlling running sand in underground engineering and grouting system therefor
CN205637048U (en) Drainage pipe spraying restoration construction car
CN208748461U (en) It is a kind of for protecting the environmental type road of shallow embedding pipeline
Kaneshiro et al. Controlled Low Strength Material for Pipeline Backfill— Specifications, Case Histories and Lessons Learned
CN205347997U (en) Bridge
CN109826176B (en) Pipe trench engineering construction process for coastal special silt geology
CN107130627A (en) A kind of construction method of the observation pier based on GNSS system for monitoring displacement
JPH08296205A (en) Method for filling underground cavity
CN111455970B (en) Reinforcing treatment method for backfilled weak miscellaneous soil area containing fertilizer groove
CN113846695B (en) Reverse construction method basement construction method
CN114910282B (en) High-water-pressure shield tunnel wall back grouting and duct piece floating model test device and method

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
AR01 Abandonment of patent right to avoid double patenting

According to article 9 of the patent law and article 13 of the detailed rules for the implementation of the patent law: 1100550.5 of the invention patents in this issue as a notice of authorization, and at the same time corresponding to the 1201102.9 utility model patent to be given up, and in the 19 volume of the 45 issue of the new type of communique on the patent right to abandon the announcement.

C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee