CN1298050A - High-pressure rotating spraying bottom-spreading technology for pre-buried pipe - Google Patents

High-pressure rotating spraying bottom-spreading technology for pre-buried pipe Download PDF

Info

Publication number
CN1298050A
CN1298050A CN 00123357 CN00123357A CN1298050A CN 1298050 A CN1298050 A CN 1298050A CN 00123357 CN00123357 CN 00123357 CN 00123357 A CN00123357 A CN 00123357A CN 1298050 A CN1298050 A CN 1298050A
Authority
CN
China
Prior art keywords
pipe
pile
pressure rotary
pipe laying
buried pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 00123357
Other languages
Chinese (zh)
Inventor
罗明
邹玉平
陈日宏
张利军
王宏祥
杨得力
Original Assignee
罗明
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 罗明 filed Critical 罗明
Priority to CN 00123357 priority Critical patent/CN1298050A/en
Publication of CN1298050A publication Critical patent/CN1298050A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

After a pile hole is formed manually or mechanically, one pre-buried pipe is set vertically in the center of the hole, a reinforcing cage is laid, and concrete is deposited to form pile with pre-buried pipe after coagulation in 2-3 days. Then, one high pressure rotary spraying mortar depositing pipe is inserted inside the pre-buried pipe to the bottom of the pile and settled to set depth by a small vibrator, and a spread pile bottom with 1.2-2.5 m diameter is formed through high pressure rotary spraying. Mortar is replenished to form the integral pile bottom-pile body structure. The present invention has fast construction speed and low pile construction cost and the constructed pile foundation has great bearing capacity.

Description

High-pressure rotary spray technique for enlarging base of preburied pipe
The invention belongs to a kind of building pile foundation construction technology.
Enlarged footing is one of effective ways that improve bearing capacity of pile foundation, has all brought into play certain effect as ramming expansion method, explosive expansion method, multi-branch bearing disk technology, spiral bottom-spreading technology etc.But shortcoming such as existing base-enlarging method exists construction is complicated, efficient is low, cost height and not being widely used.
Purpose of the present invention is to propose a kind of easy to operate, efficient is high, cost is low, widely applicable enlarged footing formation technology at the problems referred to above.Simultaneously, be easy to solve hand excavated pile because of meeting the difficulty that underground water produces.
The objective of the invention is to realize, that is: by following technical proposals
High-pressure rotary spray technique for enlarging base of preburied pipe comprises:
One, pile.In all kinds of filling pile constructions, mechanical pore-creating or manpower pore-creating vertically are provided with the pre-pipe laying of Φ 100-120mm along the center, hole behind the pore-forming, and pre-pipe laying lower end is at the bottom of the hole.Then, descending reinforcing cage pours into concrete again, treats that concrete solidified after 2-3 days can expand at the end.
Two, expand at the end.Base-enlarging method is that the high pressure jet grouting pipe is lowered to the pipe end along pre-pipe laying, with the small vibrating device Grouting Pipe is sink to set depth, carries out high-pressure rotary-spray simultaneously and expands the end, and the churning diameter is determined by adjusting pressure according to designing requirement.The high-pressure rotary-spray bellout diameter can reach 1.2~2.5m by triple pipe method (cohesive soil, sandy soil, gravel), and the compressive strength of enlarged footing induration adopts 425 #Can reach C during above label cement 20More than.
Three, mend slurry.Mend slurry to pre-pipe laying upper end along pre-pipe laying after expanding the bottom application worker, combine closely, prevent broken pile to guarantee pile body and enlarged footing.
High-pressure rotary spray technique for enlarging base of preburied pipe of the present invention has following advantage:
1, carries out step by step at the bottom of pile and the expansion, do not disturb mutually, thereby improved integral construction efficient.
2, operate easily at the high-pressure rotary-spray expansion end, and speed is fast, and the Grouting Pipe hoisting velocity is generally 1m/10min.
3, because bellout diameter is big, thereby increase substantially bearing capacity of pile foundation, reduce the quantity that lays out pile.
4, generally the stake footpath of large-section in-situ concrete pile can be locked in 800mm-1000mm.
5, cost is low, can reduce the pile foundation total cost significantly.
Fig. 1 is a kind of exemplary construction schematic diagram of the present invention.The invention will be further described below in conjunction with accompanying drawing.
High-pressure rotary spray technique for enlarging base of preburied pipe is included in the sandy soil layer with manually digging out hole 1, and 1 center vertically is provided with pre-pipe laying 2 along the hole, and pre-pipe laying 2 is the iron pipe of Φ 110mm.Descending reinforcing cage 3 then, pour into concrete again, concrete solidifies the pile body 4 that forms after 3 days with pre-pipe laying 2, the high pressure jet grouting pipe is lowered to the pipe end along pre-pipe laying 2, with the small vibrating device Grouting Pipe is sink to set depth, carry out high-pressure rotary-spray simultaneously and expand the end, the high-pressure rotary-spray bellout diameter is 1.4m, and the compressive strength of the enlarged footing 5 that its induration forms reaches C 20, mend slurry along pre-pipe laying 2 at last, mend extremely pre-pipe laying 2 upper ends of slurry, enlarged footing 5 and pile body 4 structures in aggregates.Pre-pipe laying 2 also can adopt tubing such as plastic pipe.

Claims (2)

1, high-pressure rotary spray technique for enlarging base of preburied pipe, comprise with artificial or mechanical hole building (1), it is characterized in that (1) center vertically is provided with pre-pipe laying (2) along the hole, descending reinforcing cage (3) then, pour into concrete again, after concrete solidifies 2-3 days, formation is with the pile body (4) of pre-pipe laying (2), the high pressure jet grouting pipe is lowered to the pipe end along pre-pipe laying (2), Grouting Pipe is sink to set depth, carry out high-pressure rotary-spray simultaneously and expand the end with the small vibrating device, its induration forms enlarged footing (5), mend slurry along pre-pipe laying (2) again, mend slurry to pre-pipe laying (2) upper end, enlarged footing (5) and pile body (4) structure in aggregates.
2, high-pressure rotary spray technique for enlarging base of preburied pipe according to claim 1 is characterized in that described pre-pipe laying (2) is an iron pipe, also can be plastic pipe, and its diameter is 100-120mm; Described high-pressure rotary-spray bellout diameter is 1.2-2.5m.
CN 00123357 2000-12-04 2000-12-04 High-pressure rotating spraying bottom-spreading technology for pre-buried pipe Pending CN1298050A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 00123357 CN1298050A (en) 2000-12-04 2000-12-04 High-pressure rotating spraying bottom-spreading technology for pre-buried pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 00123357 CN1298050A (en) 2000-12-04 2000-12-04 High-pressure rotating spraying bottom-spreading technology for pre-buried pipe

Publications (1)

Publication Number Publication Date
CN1298050A true CN1298050A (en) 2001-06-06

Family

ID=4589808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 00123357 Pending CN1298050A (en) 2000-12-04 2000-12-04 High-pressure rotating spraying bottom-spreading technology for pre-buried pipe

Country Status (1)

Country Link
CN (1) CN1298050A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669337A (en) * 2013-11-22 2014-03-26 宁波鸿晨建设有限公司 Head-expansion long spiral drilling pressure irrigation pile and construction method and construction device thereof
CN105714770A (en) * 2016-02-05 2016-06-29 云南建工基础工程有限责任公司 Reinforced type cast-in-situ bored pile structure and construction method thereof
CN109083143A (en) * 2018-09-27 2018-12-25 上海勘察设计研究院(集团)有限公司 A kind of preexisting hole burried pipe grouting aperture slurry seal construction method and constructing device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669337A (en) * 2013-11-22 2014-03-26 宁波鸿晨建设有限公司 Head-expansion long spiral drilling pressure irrigation pile and construction method and construction device thereof
CN105714770A (en) * 2016-02-05 2016-06-29 云南建工基础工程有限责任公司 Reinforced type cast-in-situ bored pile structure and construction method thereof
CN109083143A (en) * 2018-09-27 2018-12-25 上海勘察设计研究院(集团)有限公司 A kind of preexisting hole burried pipe grouting aperture slurry seal construction method and constructing device

Similar Documents

Publication Publication Date Title
CN103184734B (en) A kind of construction method implanting slip casting compound pile
CN106759473B (en) The constructing structure and its construction method of underground pipe gallery and road
CN103993598B (en) One is drawn hole and is implanted cloth bag crushed stone grouting pile and construction method
CN107503257A (en) One kind is close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN105464074B (en) A kind of artificial digging pile high polymer grouting safeguard structure and its construction method
CN103603369A (en) Construction method of anchor pile counterfort retaining wall
CN107513994A (en) One kind segmentation becomes supporting rotary digging stake and its construction method without leave
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN108560536A (en) The continuous piling wall construction method of Soil-cement
CN206070508U (en) Device for reinforcing foundation
CN113174958A (en) Construction method for foundation pit of adjacent road under poor ground condition
CN203213101U (en) Embedding grouting combined pile
CN104480956B (en) A kind of minor diameter mold-bagged concrete pile composite foundation
CN104762957B (en) A kind of spiral pore-forming rams the construction method that expands CFG stake
CN111676987A (en) Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method
CN204252164U (en) A kind of Submersed type active well
CN109898556A (en) A kind of underground pipe gallery structure and sunk type construction method
CN106869153A (en) A kind of method of the quick soft soil foundation treatment of well-points dewatering
CN2716340Y (en) Immersed tube for filling pile
CN1298990A (en) High-pressure rotary spray technique for enlarging base of preburied pipe
CN1298050A (en) High-pressure rotating spraying bottom-spreading technology for pre-buried pipe
CN205776209U (en) The construction equipment of concrete-pile
CN108570979A (en) A kind of construction method for building antiseepage composite foundation on dolomite stratigraph
CN1514073A (en) Supporitng structure of breast wall
CN1137088A (en) Construction method for soil bulkhead structure

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication