CN1278572A - New method of changing arch bridge into beam-arch bridge - Google Patents

New method of changing arch bridge into beam-arch bridge Download PDF

Info

Publication number
CN1278572A
CN1278572A CN 00114698 CN00114698A CN1278572A CN 1278572 A CN1278572 A CN 1278572A CN 00114698 CN00114698 CN 00114698 CN 00114698 A CN00114698 A CN 00114698A CN 1278572 A CN1278572 A CN 1278572A
Authority
CN
China
Prior art keywords
arch
bridge
arch bridge
changing
new method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 00114698
Other languages
Chinese (zh)
Other versions
CN1120268C (en
Inventor
王国鼎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huazhong University of Science and Technology
Original Assignee
Huazhong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huazhong University of Science and Technology filed Critical Huazhong University of Science and Technology
Priority to CN 00114698 priority Critical patent/CN1120268C/en
Publication of CN1278572A publication Critical patent/CN1278572A/en
Application granted granted Critical
Publication of CN1120268C publication Critical patent/CN1120268C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The present invention includes the following steps: removing protective arch of arcuated on-arch construction and filling, then changing arched bridge into beam-arched on-arch construction bridge. The old bridge has no need of reinforcement, only has need of reducing self-weight, and its load-bearing capacity also can be raised naturally.

Description

Arch bridge is changed into the new method of beam-arch bridge
The present invention relates to a kind of method that a kind of arch building on extrados bridge in the arch bridge is changed into the beam-arch bridge.
The arch building on extrados bridge is a modal bridge type (as shown in Figure 1) in the arch bridge, and this type of arch bridge of China is ten hundreds of.Its arch top of most arch bridges protect arch and filler weight very big, the deadweight that has increased the bed rearrangement bridge.Along with the increase of the carrying capacity of vehicle in the communications and transportation, some arch bridges that built up do not satisfy the demand that load-carrying increases, and transformation needs reinforcement.
Reinforce old arch bridge now and adopt following several method usually:
1. below main arch, thicken main arch, increase the arch ring cross section;
2. eliminate abutment displacement with incremental launching method;
3. use the external prestressing strengthening bridge.
These methods all are the methods that strengthens, and its shortcoming is that difficulty of construction is big, and have increased deadweight again when reinforcing old bridge, also are difficult for the effect that reaches satisfied with higher cost.
Guiding theory of the present invention is Reduction of Students' Study Load, promptly alleviates the arch bridge deadweight to greatest extent, need not strengthen just to reach the purpose that improves weight bearing power naturally.
Below in conjunction with accompanying drawing, specify implementation method of the present invention.
Fig. 1 is the schematic diagram of arch building on extrados bridge.
Fig. 2 is for removing the bridge floor beam slab, protecting the arch building on extrados bridge schematic diagram behind arch and the filler.
Fig. 3 is for becoming the schematic diagram of beam-arch bridge after reconstructing.
Referring to Fig. 1, Fig. 2, at first open bridge floor beam slab 6, remove above the protecting of main arch 1 and spandrel arch 2 hogbacks and encircle and filler 4, keep spandrel arch pier 3, Spandrel arch 2 can keep in the ordinary course of things, also can remove if necessary; On spandrel arch pier 3, build then column 7; At last at each column 7 With vault 8 upper cover with bridge floor beam slab 6, the beam-arch bridge. Vault 8 can form entity section 5 with bridge floor beam slab 6, and vault 8 like this Effective cross-section obviously increase. Entity section 5 can be regarded the synthetic of column 7 and beam slab 6 as.

Claims (1)

1, a kind of method that the arch building on extrados bridge is changed into the beam-arch bridge, it is characterized in that: open bridge floor beam slab (6), removing above the protecting of main arch (1) and spandrel arch (2) hogback encircles and filler (4), on spandrel arch pier (3), build column (7), appoint each column (7) and vault (8) upper cover with bridge floor beam slab (6).
CN 00114698 2000-07-13 2000-07-13 New method of changing arch bridge into beam-arch bridge Expired - Fee Related CN1120268C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 00114698 CN1120268C (en) 2000-07-13 2000-07-13 New method of changing arch bridge into beam-arch bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 00114698 CN1120268C (en) 2000-07-13 2000-07-13 New method of changing arch bridge into beam-arch bridge

Publications (2)

Publication Number Publication Date
CN1278572A true CN1278572A (en) 2001-01-03
CN1120268C CN1120268C (en) 2003-09-03

Family

ID=4584339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 00114698 Expired - Fee Related CN1120268C (en) 2000-07-13 2000-07-13 New method of changing arch bridge into beam-arch bridge

Country Status (1)

Country Link
CN (1) CN1120268C (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100447338C (en) * 2007-09-06 2008-12-31 长业建设集团有限公司 Soft-ground multi-cell twin-cantilever arched bridge structure and its construction method
CN103184723A (en) * 2012-05-09 2013-07-03 金辉 Method for reinforcing arch bridge with EPS Expandable Polystyrene light concrete
CN106087695A (en) * 2016-06-07 2016-11-09 朱传培 Fill-type concrete-shell slab arch bridge
CN106284106A (en) * 2016-08-30 2017-01-04 武汉二航路桥特种工程有限责任公司 A kind of double curvature arch bridge arch compound sleeve arch reinforcement means
CN108677757A (en) * 2018-04-27 2018-10-19 广西翔路建设有限责任公司 The arch bridge reinforcing structure and method of lift structure drag
CN109137762A (en) * 2018-10-24 2019-01-04 重庆交通大学 A kind of waveform arch bar Strengthening Method of Two-way Curved Arch Bridges
CN110130233A (en) * 2019-05-06 2019-08-16 中铁大桥(南京)桥隧诊治有限公司 A kind of remodeling method suitable for double curvature arched bridge spandrel construction
CN110804959A (en) * 2019-11-26 2020-02-18 山西省交通规划勘察设计院有限公司 Beam-arch cooperative stone arch bridge reinforcing and load shedding method
CN111734419A (en) * 2020-05-23 2020-10-02 中交路桥建设有限公司 Construction method for reversely making tunnel entrance by special-shaped arch protection on slope body tunnel

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100447338C (en) * 2007-09-06 2008-12-31 长业建设集团有限公司 Soft-ground multi-cell twin-cantilever arched bridge structure and its construction method
CN103184723A (en) * 2012-05-09 2013-07-03 金辉 Method for reinforcing arch bridge with EPS Expandable Polystyrene light concrete
CN106087695A (en) * 2016-06-07 2016-11-09 朱传培 Fill-type concrete-shell slab arch bridge
CN106087695B (en) * 2016-06-07 2018-07-13 朱传培 Fill-type concrete-shell slab arch bridge
CN106284106A (en) * 2016-08-30 2017-01-04 武汉二航路桥特种工程有限责任公司 A kind of double curvature arch bridge arch compound sleeve arch reinforcement means
CN106284106B (en) * 2016-08-30 2019-01-01 武汉二航路桥特种工程有限责任公司 A kind of double curvature arch bridge arch compound sleeve arch reinforcement means
CN108677757A (en) * 2018-04-27 2018-10-19 广西翔路建设有限责任公司 The arch bridge reinforcing structure and method of lift structure drag
CN109137762A (en) * 2018-10-24 2019-01-04 重庆交通大学 A kind of waveform arch bar Strengthening Method of Two-way Curved Arch Bridges
CN110130233A (en) * 2019-05-06 2019-08-16 中铁大桥(南京)桥隧诊治有限公司 A kind of remodeling method suitable for double curvature arched bridge spandrel construction
CN110804959A (en) * 2019-11-26 2020-02-18 山西省交通规划勘察设计院有限公司 Beam-arch cooperative stone arch bridge reinforcing and load shedding method
CN110804959B (en) * 2019-11-26 2021-01-26 山西省交通规划勘察设计院有限公司 Beam-arch cooperative stone arch bridge reinforcing and load shedding method
CN111734419A (en) * 2020-05-23 2020-10-02 中交路桥建设有限公司 Construction method for reversely making tunnel entrance by special-shaped arch protection on slope body tunnel

Also Published As

Publication number Publication date
CN1120268C (en) 2003-09-03

Similar Documents

Publication Publication Date Title
CN106958206B (en) Hybrid structure of arch and beam formula continuous rigid frame bridge bilayer bottom basket bilayer button hangs constructing device and method
CN1278572A (en) New method of changing arch bridge into beam-arch bridge
CN105803916B (en) Light-duty combined box-type bent cap of steel and ultra-high performance concrete and preparation method thereof
CN106835926A (en) A kind of small side main span is than prestressed concrete continuous beam and its construction method
CN102021889A (en) Bridge erection method
CN101289835A (en) Process for rebuilding double arch bridge by replacing arch style construction on arch with continuous slabs
CN106906733A (en) One kind is without the small side main span of end bay closure section than continuous rigid frame bridge and its construction method
CN101555680B (en) Large-span Pi type socle beam construction process in non-rope area of cable stayed bridge
CN106976157A (en) A kind of post stretching precast beam pedestal for being applicable different length and cross sectional shape
EP3455412A1 (en) An improved reinforcement apparatus for reinforcing a structure comprising a pier and a cross- beam
CN1740448A (en) Composite reinforcing structure for main arch circle
CN108978478A (en) Bridge cast-in-situ box-beam deck-type bearing frame system and its construction method
CN206828906U (en) A kind of temporary pavement bedding structure for Metro Deep Excavation
CN212294301U (en) Railway cable-stayed bridge with concrete main beam and steel main beam in mixed matching
CN104294752A (en) Hollow slab bridge structure with end floor beams and construction method thereof
CN214882879U (en) Tie bar replacing structure of swallow-type tie bar arch bridge
CN214271705U (en) Bent cap reinforcing bar ligature bed-jig
CN2232455Y (en) Prestressed sewer shaft cover
CN112069584B (en) Design method of ductile structural pier for railway
CN211342931U (en) Underground factory roof arch surrounding rock reinforcing and supporting structure under adverse geological conditions
CN214168779U (en) Large-cantilever pier structure with force storage type reverse-jacking double-limb vertical arch
Tveit An introduction to the optimal network arch
CN111502119A (en) Prefabricated concrete pi-shaped beam for railway passenger station fabricated concrete canopy
CN109468945A (en) Whole warpage space structure bridge
CN201043261Y (en) Bridge tower of single-tower non-dorsal cord stayed-cable bridge

Legal Events

Date Code Title Description
C06 Publication
C10 Entry into substantive examination
PB01 Publication
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee