CN1277023C - Method for treating depression watertight in hydraulic engineering by employing yellow mud grout - Google Patents

Method for treating depression watertight in hydraulic engineering by employing yellow mud grout Download PDF

Info

Publication number
CN1277023C
CN1277023C CN 200410085824 CN200410085824A CN1277023C CN 1277023 C CN1277023 C CN 1277023C CN 200410085824 CN200410085824 CN 200410085824 CN 200410085824 A CN200410085824 A CN 200410085824A CN 1277023 C CN1277023 C CN 1277023C
Authority
CN
China
Prior art keywords
grouting
yellow mud
grout
grout hole
slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200410085824
Other languages
Chinese (zh)
Other versions
CN1629406A (en
Inventor
葛扬安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200410085824 priority Critical patent/CN1277023C/en
Publication of CN1629406A publication Critical patent/CN1629406A/en
Application granted granted Critical
Publication of CN1277023C publication Critical patent/CN1277023C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention relates to a method for treating depression and water leakage in hydraulic engineering by employing yellow mud grout, particularly to the treating method for depression and water leakage in hydraulic engineering. The present invention is characterized in that the method comprises the following four steps: the arrangement of grout holes and hole manufacture, the preparation of yellow mud grout liquid, grout devices and the arrangement and grouting. After the yellow mud grout is used for treatment, a layer of hard yellow mud is generated between a grouted stone bottom board and a foundation; the yellow mud is also filled in gaps of silty soil and sandy soil with the thickness of 5 meters from shallow parts to deep parts with gradual reduction. The present invention enhances the compactness and the bearing capacity of the soil, reduces the infiltration coefficient of the soil, and achieves the purposes of reinforcing the foundation and preventing depression and water leakage.

Description

Handle the depression of hydraulic engineering and the method for leaking with thick loess grouting
Technical field:
A kind of processing method that the present invention relates to the depression of hydraulic engineering and leak.
Background technology:
The hydraulic engineering particularly soil under the embankment canal dike is mainly silt and sandy loam, the compressibilty height, and water permeability is strong, is easy to take place depression and causes canal end liner course by drawing crack, causes the crack to leak.Existing two alternatives: the one, the reinforced concrete floor of overlay 40 cm thicks needs cement, steel on barrier sheet at the bottom of the canal, invests very big.The 2nd, subsidize with glass wool cloth and epoxy resin.But large tracts of land is subsidized difficulty, and the glass wool cloth long term exposure that posts is easily aging in atmosphere, also must handle after aging again.
Summary of the invention:
The objective of the invention is to overcome above deficiency and provide a kind of cost near low, the yellow mud consolidated subsoil utilizing, the processing method of preventing depression and leaking.
The present invention is achieved by the following technical solution: handle the depression of hydraulic engineering and the method for leaking with thick loess grouting, its major technique feature is that this method may further comprise the steps: one, the layout of grout hole and pore-creating: grout hole is arranged to quincunx, first, second and third round all is positioned on the crack, and array pitch and pitch-row all are 4~5 meters; Grout hole is to pass the lining cutting base plate with the 2.54cm iron pipe, gos deep into 20 centimetres on ground again, exposes 10 centimetres, is connected with grout pipe; Two, the preparation of yellow mud slurries: the preparation slurries to select the yellow mud that clay is many, coarse grain is little, its grating is: particle diameter less than 0.005 millimeter account for 42%, 0.005~0.05 millimeter account for 34%, 0.05~2 millimeters account for 24%, organic content is less than 1%; The yellow mud of preparation divides two kinds: the concentration of slurry 1.15 that gravitational grouting is used, the proportioning of water, yellow mud, cement are 70: 28: 2; Concentration of slurry with the grouting machine perfusion is 1.2, and the proportioning of water, yellow mud, cement is 70: 27: 3; Three, grouting equipment and layout thereof: the equipment that irritating yellow mud needs is water pump, reservoir, beater, pulp storage tank, join stock tank, grouting machine, pressure meter, mesh are 1 * 1,2 * 2 millimeter iron wire cloth, diameter is rubber tube and several valve of 5.08cm, reservoir, beater, pulp storage tank, join stock tank, grouting machine from high to low order arrange, the outlet mounted valve of beater and pulp storage tank and filtration iron wire cloth, join the stock tank outlet threeway is installed, one is connected with the gravitational grouting rubber tube, be communicated with grout hole again, as gravitational grouting; The other end is communicated with grouting machine, the grouting of can pressurizeing; Four, grouting: use earlier gravitational grouting, gravitational grouting pipe and grout hole are connected, pressure is controlled at below 0.6 kg/cm, pours into; After grout hole does not advance slurry, use the grouting machine enhancing perfusion again, pressure is controlled at below 1.2 kg/cm; When pressure during in 1.2 kg/cm, grout hole no longer advances slurry, and slurry promptly comes to an end; Before grouting, be with the crack cutter wash clean of canal end liner course, crack is mended the jail with No. 80 mortars, big seams with No. 150 concrete.
After handling through thick loess grouting, between cemented rock base plate and ground, tied the hard yellow mud of one deck, in the space that reaches 5 meters thick silts and sandy loam deeply also filling yellow mud, from shallow to deep, reduce gradually.Improved the compactness and the bearing capacity of soil, reduced the soil permeability coefficient, the purpose of reached consolidated subsoil, preventing depression and leak.
Description of drawings:
Fig. 1 is the grout hole arrangement diagram;
Fig. 2 arranges schematic diagram for grouting equipment.
The specific embodiment:
As shown in Figure 1, the layout of first step grout hole and pore-creating: grout hole 13 is arranged to quincunx, and first, second and third round all is positioned on the crack 14, and array pitch and pitch-row all are 4~5 meters.Grout hole is to pass the lining cutting base plate with the 2.54cm iron pipe, gos deep into 20 centimetres on ground again, exposes 10 centimetres, so that be connected with grout pipe.Before being grouting, be with the crack cutter wash clean of canal end liner course, crack is mended the jail with No. 80 mortars, big seams with No. 150 concrete.
Second the step be the preparation of yellow mud slurries: the preparation slurries to select the yellow mud that clay is many, coarse grain is little, its grating is: particle diameter less than 0.005 millimeter account for 42%, 0.005~0.05 millimeter account for 34%, 0.05~2 millimeters account for 24%, organic content is less than 1%; The yellow mud of preparation divides two kinds: the concentration of slurry 1.15 that gravitational grouting is used, the proportioning of water, yellow mud, cement are 70: 28: 2; Concentration of slurry with the grouting machine perfusion is 1.2, and the proportioning of water, yellow mud, cement is 70: 27: 3.The step of preparation slurries is by proportioning quantitative water and yellow mud to be dropped into beater tub earlier, makes a call to 10 minutes just pulpings approximately, and the process mesh is after 2 * 2 millimeters iron wire cloth filters, and flows in the pulp storage tank to store.When using slurry, stir with six tooth harrows earlier and spare, open valve, the process mesh is that 1 * 1 millimeter iron wire cloth filters, and flows into and joins stock tank, adds No. 400 quantitative cement by proportioning again and mixes thoroughly, promptly is made into the slurries of perfusion.Yellow mud wants matter pure, must filter impurity in the yellow mud and coarse granule, and concentration is measured with hydrometer.
As shown in Figure 2, the 3rd step grouting equipment and layout thereof: the equipment that irritating yellow mud needs is water pump, reservoir, beater, pulp storage tank, join stock tank, grouting machine, pressure meter, mesh are iron wire cloth 5 and 2 * 2 millimeters iron wire cloths 3 of 1 * 1 millimeter, and diameter is rubber tube and several valve of 5.08cm.Beater is homemade in the building site, the circular wood tube that high 1.2 meters, diameter is 1.1 meters, and interior dress vertical shaft is equipped with four iron blades on the axle, uses motor drives.Grouting machine is common grouting machine, is communicated with machinery grouting rubber tube 10.Pulp storage tank with join stock tank and become with brick, barnacle.The grouting place is chosen on the hillside, joins stock tank and is higher than that 7 distances are 7 meters at the bottom of the canal, enables gravitational grouting.Reservoir 1, beater 2, pulp storage tank 4, join stock tank 6, grouting machine 8 from high to low order arrange, the outlet mounted valve of beater and pulp storage tank and filter iron wire cloth is joined the stock tank outlet threeway is installed, and one is connected with gravitational grouting rubber tube 11, be communicated with grout hole again, as gravitational grouting; The other end is communicated with grouting machine, the grouting of can pressurizeing.Also have piece stone and concrete lining course 12 among the figure.
The 4th step was grouting: use earlier gravitational grouting, gravitational grouting pipe and grout hole are connected, pressure is controlled at below 0.6 kg/cm with pressure meter 9, pours into; After grout hole does not advance slurry, use the grouting machine enhancing perfusion again, pressure is controlled at below 1.2 kg/cm; When pressure during in 1.2 kg/cm, grout hole no longer advances slurry, and slurry promptly comes to an end;
This handles the depression of channel with thick loess grouting and the method for leaking is equally applicable to handle the depression and the seepy question of other all hydraulic engineerings.

Claims (2)

1, a kind of with the depression of thick loess grouting processing hydraulic engineering and the method for leaking, it is characterized in that this method may further comprise the steps: one, the layout of grout hole and pore-creating: grout hole is arranged to quincunx, first, second and third round all is positioned on the crack, and array pitch and pitch-row all are 4~5 meters; Grout hole is to pass the lining cutting base plate with the 2.54cm iron pipe, gos deep into 20 centimetres on ground again, exposes 10 centimetres, is connected with grout pipe; Two, the preparation of yellow mud slurries: the preparation slurries to select the yellow mud that clay is many, coarse grain is little, its grating is: particle diameter less than 0.005 millimeter account for 42%, 0.005~0.05 millimeter account for 34%, 0.05~2 millimeters account for 24%, organic content is less than 1%; The yellow mud of preparation divides two kinds: the concentration of slurry 1.15 that gravitational grouting is used, the proportioning of water, yellow mud, cement are 70: 28: 2; Concentration of slurry with the grouting machine perfusion is 1.2, and the proportioning of water, yellow mud, cement is 70: 27: 3; Three, grouting equipment and layout thereof: the equipment that irritating yellow mud needs is water pump, reservoir, beater, pulp storage tank, join stock tank, grouting machine, pressure meter, mesh are 1 * 1,2 * 2 millimeter iron wire cloth, diameter is rubber tube and several valve of 5.08cm, reservoir, beater, pulp storage tank, join stock tank, grouting machine from high to low order arrange, the outlet mounted valve of beater and pulp storage tank and filtration iron wire cloth, join the stock tank outlet threeway is installed, one is connected with the gravitational grouting rubber tube, be communicated with grout hole again, as gravitational grouting; The other end is communicated with grouting machine, the grouting of can pressurizeing; Four, grouting: use earlier gravitational grouting, gravitational grouting pipe and grout hole are connected, pressure is controlled at below 0.6 kg/cm, pours into; After grout hole does not advance slurry, use the grouting machine enhancing perfusion again, pressure is controlled at below 1.2 kg/cm; When pressure during in 1.2 kg/cm, grout hole no longer advances slurry, and slurry promptly comes to an end.
2, as claimed in claim 1ly a kind ofly handle the depression of hydraulic engineering and the method for leaking with thick loess grouting, it is characterized in that grouting before, be with the crack cutter wash clean of canal end liner course, crack is firm with No. 150 concrete benefits with No. 80 mortars, big seam.
CN 200410085824 2004-10-20 2004-10-20 Method for treating depression watertight in hydraulic engineering by employing yellow mud grout Expired - Fee Related CN1277023C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200410085824 CN1277023C (en) 2004-10-20 2004-10-20 Method for treating depression watertight in hydraulic engineering by employing yellow mud grout

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200410085824 CN1277023C (en) 2004-10-20 2004-10-20 Method for treating depression watertight in hydraulic engineering by employing yellow mud grout

Publications (2)

Publication Number Publication Date
CN1629406A CN1629406A (en) 2005-06-22
CN1277023C true CN1277023C (en) 2006-09-27

Family

ID=34847407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200410085824 Expired - Fee Related CN1277023C (en) 2004-10-20 2004-10-20 Method for treating depression watertight in hydraulic engineering by employing yellow mud grout

Country Status (1)

Country Link
CN (1) CN1277023C (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101235632B (en) * 2007-12-28 2010-06-02 中国水电顾问集团中南勘测设计研究院 Grouting leak-stopping technique
CN101503915B (en) * 2009-03-09 2010-11-17 中国建筑第六工程局有限公司 Construction method for ultra-large area, ultra-thin non-agglutination pre-stress integral pond baseboard
CN102108701B (en) * 2009-12-29 2013-07-24 贵阳铝镁设计研究院有限公司 Method for reinforcing soil at periphery of column by non-pressure grouting
CN103215922A (en) * 2013-04-09 2013-07-24 长江勘测规划设计研究有限责任公司 High-pressure high-flow centralized leakage grouting leaking stoppage method
CN103255762B (en) * 2013-05-10 2015-04-08 中国矿业大学(北京) Method of leading Yellow River silt to fill reclamation coal mining subsidence land
CN104846848B (en) * 2015-03-23 2016-08-24 安徽理工大学 A kind of method controlling the earth's surface soil erosion of stratiform exploitation of mineral resources Subsidence Area, underground

Also Published As

Publication number Publication date
CN1629406A (en) 2005-06-22

Similar Documents

Publication Publication Date Title
CN103590425B (en) A kind of Peaty soft soil stratum subway station construction technology
CN101591904B (en) Method for strengthening composite pile foundation by prepressing drainage and following grouting for drainage body
CN110397057B (en) Self-sinking type steel open caisson supporting system and method for soft soil area
CN106337413A (en) Water-draining stiff geo-textile bag cement-soil composite pile and construction method thereof
CN112195924A (en) Method for reinforcing foundation pit base of silt silty clay layer
CN113957913A (en) Construction method of film bag sand filling combined steel sheet pile cofferdam
CN101560760B (en) Construction method for fast concreting and dredging and filling ultra-fine earth foundation
CN110080169A (en) A kind of construction method reclaimed fields from the sea utilized based on basement
CN205171496U (en) Foundation stabilization high pressure jet slip casting device
CN207003421U (en) A kind of steel plate pilework for being seated hard rock top surface
CN1277023C (en) Method for treating depression watertight in hydraulic engineering by employing yellow mud grout
CN107916663B (en) Construction method for soft soil foundation
CN104695455B (en) High-flow and high-head antiscour and anti-seepage overflow cofferdam structure and construction method thereof
CN100355991C (en) Method for constructing composite foundation of piles and ground interactive slurry bonded dispersed body material
CN110144871A (en) A kind of dark creek processing construction method
CN216339559U (en) Advanced integral curing structure of ultra-soft site foundation pit
CN110670613A (en) Anti-seepage structure of foundation pit elevator shaft and construction method thereof
JP4313070B2 (en) Sludge treatment method in ready-made pile construction and ground reinforcement structure obtained by the treatment method
CN210946854U (en) Anti-seepage structure of foundation pit elevator shaft
CN211143046U (en) Water-blocking and draining anti-floating construction structure
JP2001123438A (en) Construction method for preventing liquefaction in earthquake of soil within city or the like by injecting air-dissolved water or compressed air into ground, device used therefor, and construction method therefor
CN210049908U (en) Earth surface gully paving structure and shallow-buried section tunnel structure
CN207013441U (en) Comprehensive restoration system for polluted site
CN111364488A (en) Drainage hole structure of bottom plate of hydraulic building
CN205421157U (en) Reinforced earth quaywall structure based on soft base of mud flat

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20060927

Termination date: 20091120