CN1234940C - Energy dissipation method for enhancing bearing capacity of arch bridge - Google Patents

Energy dissipation method for enhancing bearing capacity of arch bridge Download PDF

Info

Publication number
CN1234940C
CN1234940C CN 03157112 CN03157112A CN1234940C CN 1234940 C CN1234940 C CN 1234940C CN 03157112 CN03157112 CN 03157112 CN 03157112 A CN03157112 A CN 03157112A CN 1234940 C CN1234940 C CN 1234940C
Authority
CN
China
Prior art keywords
arch
bridge
bearing capacity
arch ring
internal force
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 03157112
Other languages
Chinese (zh)
Other versions
CN1525011A (en
Inventor
蒙云
于秀荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Qing Song Meng Building Structure Strengthening Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 03157112 priority Critical patent/CN1234940C/en
Publication of CN1525011A publication Critical patent/CN1525011A/en
Application granted granted Critical
Publication of CN1234940C publication Critical patent/CN1234940C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to an energy dissipation method for enhancing the bearing capacity of an arch bridge. The connection form of a main arch ring and an arch seat of an original bridge is changed into partial (compression zone) consolidation from whole consolidation, so a tensile zone can be separated and can slightly rotate, the internal force of an arch foot is released, and the hogging moment is reduced; an arch shaft line and a pressure line are adjusted, the internal force of the whole arch ring is distributed again, the stress situation of the main arch ring of the original bridge is improved, and the bearing capacity is increased. Compared with a traditional technology, the present invention does not need the steps of fur picking, grinding, cleaning and hole drilling to the arch ring of the original bridge, anchor rod, steel bar and support mould addition, concrete pouring, steel plate, carbon cloth and glass steel gluing, etc. and only need to processing the connection point of the arch ring and the arch seat of the original bridge; therefore, the present invention has the advantages of great reduction of strengthening expenses, small construction difficulty, small workload, great shortening of construction periods, no influence to traffic and no traffic interruption in a construction period, and no pollution to environment.

Description

Improve the energy dissipating method of arch bridge bearing capacity
Technical field the present invention relates to the method that old bridge is reinforced, improved the arch bridge bearing capacity, is specifically related to improve the energy dissipating method of arch bridge bearing capacity.
Background technology is in order to adapt to the needs of transport development, and the large quantities of arch type bridges that built up are suddenly treated reinforcement and strengthening because former design load grade is low, improve bearing capacity.The existing method that improves the arch bridge bearing capacity has two big classes: the first improves its moment of inertia and resistance to compression, resistance to tension by increasing the main arch ring cross-section, reaches the purpose that improves former bridge bearing ability.As shown in Figure 1, usually the approach of taking is earlier former bridge main arch circle 1 to be cut a hole hair, clean, holed, anchor pole and steel mesh reinforcement are set, thicken one deck reinforced concrete floor or wrap one deck steel concrete cuff 2 all around at former bridge main arch circle hogback, soffit by the mode of cast-in-situ concrete or sprayed mortar then, working procedure is many, and technical difficulty is big, and material usage is big, reinforcing expense height accounts for and rebuilds new bridge 20~40%; Long in time limit, construction adds about 2 months phases of concrete curing at least; Traffic there is certain interference, even will suspends traffic.Its two be adopt as shown in Figure 2 " mounting method " by on former bridge main arch circle 1 with high-strength materials 3 such as epoxy rubber cement affixing carbon fabric, steel plate, glass fiber reinforced plastic or reinforcing bars, to improve the intensity of main arch circle, reach the purpose that improves bearing capacity.This method difficulty of construction is big, and technical sophistication, material expensive, reinforcing expense are higher than preceding a kind of method, account for build again 30~50%, particularly the carbon cloth cost is the highest.Duration is than pouring concrete short approximately (mainly be that curing time is short, but engineering time and technical difficulty being greater than pouring concrete).
The deficiency that summary of the invention exists at above-mentioned prior art, it is little to the purpose of this invention is to provide a kind of difficulty of construction, and the duration is short, does not influence or suspends traffic, and free from environmental pollution, the energy dissipating method of arch bridge bearing capacity is reinforced, improved to the old bridge that the reinforcing expense significantly reduces.
The object of the present invention is achieved like this: the energy dissipating method that improves the arch bridge bearing capacity, affixed at the main arch pressure zone, crack in promptly former bridge main arch circle and abut junction, and the perfusion flexible material, the tensile region is separated, can fine rotation, discharge the internal force of arch springing, reduce hogging moment, adjust arch axis line and pressure line, carry out full arch circle internal force and heavily distribute, improve the force-bearing situation of former bridge main arch circle, improve supporting capacity.Described flexible material is polyurethane foam resin or composite asphalt.
The present invention is for by changing the form that connects of former bridge main arch circle and abut, by original whole affixed, can not rotate that to be converted to the pressure zone part affixed, adjust arch axis line and pressure line, carry out full arch circle internal force and heavily distribute, improve the force-bearing situation of former bridge main arch circle, reach the purpose that improves supporting capacity.
The present invention has following advantage:
(1) compares traditional reinforcement means engineering cost and reduce cost saving 60~70% significantly;
(2) do not need original bridge arch ring cutter hair, polishing, clean and boring, add anchor pole, reinforcing bar, formwork, pouring concrete or affixing steel plate, carbon cloth, glass fiber reinforced plastic etc., only need original bridge arch ring and abut junction are handled, difficulty of construction is little, workload is little, duration shortens greatly, and reinforcement material is saved more than 90%;
(3) single span arch bridge and the not high bridge of abut are not needed to set up scaffold, only the higher bridge of arch springing is taken a small amount of scaffold or workbench, need full-bridge or large tracts of land spanning zone need take full hall formula scaffold than traditional reinforcing technique and can save built time and scaffold expense;
(4) construction period does not influence traffic and uninterrupted traffic;
(5) environment is not polluted.
The invention will be further described below in conjunction with the drawings and specific embodiments for description of drawings.
Fig. 1 reinforces the method schematic diagram that improves bearing capacity with steel concrete or sprayed mortar
Fig. 2 is that affixing steel plate or glass fiber reinforced plastic are reinforced the method schematic diagram that arch ring improves bearing capacity
Fig. 3 is the method schematic diagram that the present invention improves the arch bridge bearing capacity
Preferred forms
Referring to Fig. 3, step of the present invention is:
1, sets up a little scaffold (the not high arch of single span or abut is scaffolding not) at the arch springing position;
2, crack with abut 4 junctions at former bridge main arch circle 1, form flat hinge;
3, with the hinge seam of flexible material 5, get final product as polyurethane foam resin or composite asphalt perfusion main arch circle and abut junction.
4, reduce and discharge former bridge arch pin hogging moment 30~40%, improve 1~2 grade of class of loading of former bridge bearing ability.
The open web type arch bridge that least significant end spandrel arch cross wall is had certain distance or pillar spandrel construction apart from springing line, tensile region (more than the neutral axis) opens a finedraw at main arch circle hogback springing line place, and opposite joint perfusion flexible material, main arch circle tensile region and abut kept apart getting final product.
Real abdomen formula arch bridge or least significant end spandrel arch cross wall are needed, all to separate with tensile region, abut springing line place until the main arch circle with its pressure zone of Materials with High Strength cementation from down and upper edge springing line section gap is cracked to the arch ring end face near the open web type arch bridge of springing line; The isolation of perfusion flexible material gets final product.

Claims (2)

1, improves the energy dissipating method of arch bridge bearing capacity, it is characterized in that at the main arch pressure zone affixedly, cracks in promptly former bridge main arch circle and abut junction, and the perfusion flexible material, the tensile region is separated, can fine rotation, discharge the internal force of arch springing, reduce hogging moment, adjust arch axis line and pressure line, carry out full arch circle internal force and heavily distribute, improve the force-bearing situation of former bridge main arch circle, improve supporting capacity.
2, the energy dissipating method of raising arch bridge bearing capacity according to claim 1 is characterized in that described flexible material is polyurethane foam resin or composite asphalt.
CN 03157112 2003-09-15 2003-09-15 Energy dissipation method for enhancing bearing capacity of arch bridge Expired - Fee Related CN1234940C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03157112 CN1234940C (en) 2003-09-15 2003-09-15 Energy dissipation method for enhancing bearing capacity of arch bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03157112 CN1234940C (en) 2003-09-15 2003-09-15 Energy dissipation method for enhancing bearing capacity of arch bridge

Publications (2)

Publication Number Publication Date
CN1525011A CN1525011A (en) 2004-09-01
CN1234940C true CN1234940C (en) 2006-01-04

Family

ID=34287144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03157112 Expired - Fee Related CN1234940C (en) 2003-09-15 2003-09-15 Energy dissipation method for enhancing bearing capacity of arch bridge

Country Status (1)

Country Link
CN (1) CN1234940C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100503975C (en) * 2006-04-03 2009-06-24 同济大学 Arch bridge vortex vibration control building membrane structure for arch bridge

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102032957A (en) * 2010-11-25 2011-04-27 中铁六局集团有限公司 Abutment node stress monitoring method of steel tube concrete arch bridge
CN102966048B (en) * 2012-11-28 2014-10-08 华南理工大学 Reinforcing method for increasing bearing force of spandrel-filled arch bridge
CN107841933B (en) * 2017-12-08 2019-02-22 中水北方勘测设计研究有限责任公司 A kind of Arch Bridges Strengthening method
CN110424245B (en) * 2019-08-08 2021-08-27 中铁二十局集团第一工程有限公司 Large-span tied arch bridge reconstruction method based on bridge hydraulic jacking system
CN112284934B (en) * 2020-10-23 2023-11-14 陕西省建筑科学研究院有限公司 Method for evaluating vertical bearing capacity of existing loess cave dwelling arch coupon

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100503975C (en) * 2006-04-03 2009-06-24 同济大学 Arch bridge vortex vibration control building membrane structure for arch bridge

Also Published As

Publication number Publication date
CN1525011A (en) 2004-09-01

Similar Documents

Publication Publication Date Title
CN105064208B (en) A kind of deck structrue combined with steel bridge deck by prefabricated U HPC plate and construction method thereof
CN107165272A (en) Prestressing force assembly concrete frame joint attachment structure and its construction method
CN2784490Y (en) Prestress connection node for beam column of assembled concrete frame structure
CN207194146U (en) Prestressing force assembly concrete frame joint attachment structure
CN204185755U (en) A kind of Wavelike steel webplate post-stressed concrete T beam
CN106284045A (en) A kind of secondary overlapping concrete slab girder steel combined bridge structure and construction method thereof
CN103233421B (en) Pre-stressed concrete variable cross-section box girder bridge and construction method thereof
CN208151833U (en) A kind of construction of novel RC-masonry combination arch bridge
CN108978434A (en) A kind of Novel steel-is mixed to be combined Continuous Box Girder Bridge and its industrializes construction method without bracket
CN1234940C (en) Energy dissipation method for enhancing bearing capacity of arch bridge
CN106087711A (en) Antinode work beam-steel concrete top board-external prestressing combines T-shaped simply supported beam
CN208933811U (en) A kind of novel steel-concrete combination Continuous Box Girder Bridge of erection without scaffolding
CN108316164A (en) It is a kind of to reinforce old assembled Hollow Slab Beam Bridge construction and construction method using new beam
CN2918523Y (en) Bamboo wood bridge
CN112796198A (en) Hollow arch bridge system connected by UHPC wet joints and construction method
CN102808375B (en) Hinge structure of steel pier column of portal frame platform bridge and bearing platform and construction method thereof
CN209397518U (en) A kind of Hollow Slab Beam Bridge transverse prestress friction plate ruggedized construction
CN111851323A (en) Novel concrete joint structure and construction process
CN216920894U (en) Prefabricated floor panel with removable stiffening member
CN103669193B (en) A kind of laterally assembled Wavelike steel webplate combination T beam and construction method
CN217204610U (en) Low multilayer does not need to support assembled ultra high performance concrete frame structure and building
CN110055905A (en) A kind of reinforcement means of novel fabricated bricklaying donor
CN1186509C (en) Post-stretching prestressed concrete arch bar roof and its construction method
CN214737289U (en) Mounting structure for assembled elevated road and bridge
CN208266706U (en) It is a kind of to reinforce old assembled Hollow Slab Beam Bridge construction using new beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHONGQING QINGLEMENG BUILDING STRUCTURE REINFORCE

Free format text: FORMER OWNER: MENG YUN

Effective date: 20070406

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20070406

Address after: 400074 No. 35, Jiaotong University, 66 Jiaotong University Avenue, Chongqing, 1, unit 3-1

Patentee after: Chongqing Qing song Meng building structure strengthening Co., Ltd.

Address before: 400074 Chongqing Jiaotong University, No. 66 Jiaotong University Road, 35, 1-3-1

Patentee before: Meng Yun

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee