CN1215792A - Sand pressure release double arch semi-enclosed support technology for soft break rock mining roadway - Google Patents

Sand pressure release double arch semi-enclosed support technology for soft break rock mining roadway Download PDF

Info

Publication number
CN1215792A
CN1215792A CN 97115978 CN97115978A CN1215792A CN 1215792 A CN1215792 A CN 1215792A CN 97115978 CN97115978 CN 97115978 CN 97115978 A CN97115978 A CN 97115978A CN 1215792 A CN1215792 A CN 1215792A
Authority
CN
China
Prior art keywords
arch
support
release
enclosed
semi
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 97115978
Other languages
Chinese (zh)
Other versions
CN1133795C (en
Inventor
刘照朗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB971159785A priority Critical patent/CN1133795C/en
Publication of CN1215792A publication Critical patent/CN1215792A/en
Application granted granted Critical
Publication of CN1133795C publication Critical patent/CN1133795C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A semi-enclosure support technology for the mining gallery in soft and fracture rock features that drift sand pressure-relief unit and steel arch constitute a quickly installed flexible arch frame, which is then used as a bearing and moulding structure of the second layer of sprayed reinforced concrete arch to form an enclosed dual-arch support band. Only metallic net is hung between the enclosed arches to support fracture rock and allow the surrounding rock's rheid and roof fall for relieving pressure. The bands are alternatively arranged at same intervals. Before actual mining, the quickly installed arch and metallic net are detached. Its advantages are reliable support, easy operation and lowering cost by 50%.

Description

The sand pressure release double arch semi-enclosed support technology in soft break rock mining tunnel
The invention belongs to the mining technique field.
It is to press according to the ground of mining tunnel in the soft broken rock under the high stress to manifest rule, to traditional anchor net spray, build arch, hydraulic prop, the steel bow member, support forms such as log hut are reformed and a kind of novel support process founded, in Shandong Province's rock mechanics annual meeting of holding in August, 1997, the ground of introducing the soft broken rock stope of paper " of this technology press manifest improve " and deliver with support process after, the participant expert is consistent to be thought: the technology mode of this technology and supporting mechanism demonstration belong to domestic initiation, also do not see the similar techniques report abroad.
The purpose of this invention is the stable of mining tunnel supporting in the rock of realization weak broken ore deposit, safety, easy and consumption reduction.
The supporting pattern is shown in Fig. 1, Figure 1A, and main contents are as follows:
1,10~15 on 3~5+M12 of 4+quicksand of steel arch release son 2+headblock sheet bolt is formed the fast-assembling bow member, and the steel arch is made and seen Fig. 2, Fig. 2 A, Fig. 2 B; Quicksand release is made and is seen Fig. 4, Fig. 4 A, and Fig. 4 B, Fig. 4 C,
2, bamboo (bar) basketry is many, and wide 300 ~ 400MM ties up and is affixed on the steel arch outside; 12 of timber wedges (40MM*600MM*120 ~ 200MM, on-the-spot fixed) are tightly filled in arch and crag gap, are used for steel arch location, protect the top temporarily and serve as the concrete arch flexible layer: 10 ~ 12 pairs of reinforcing cages, make as Fig. 3, and install between timber wedge; With bamboo (bar) basketry is that loose tool is constructed sprayed mortar arch, clad " O " type reinforcing cage, expose " W " type link and be full of basketry and crag between number, the thickness of arch is not less than 120MM.
3, prefabricated metal net multi-disc, wide 250 ~ 300MM, length is made by oneself, and grid 80MM*80MM hang on the link that concrete arch exposes, the semi-enclosed support band of meaning (protecting band is propped up in the sealing of two arch meaning), confining zone and semiclosed band roughly wait width to arrange at interval.
4, the requirement of construction and management is: with propping up, fast-assembling spring base work plane is not more than 2.0 meters with pick, sprays the spring base work plane and is not more than 6.0 meters; To locate with backstay when the fast-assembling bow member is installed, and lift (figure slightly) with vertical loading board; Quicksand release prepackage quartz sand (0.5mm, 1.0mm, each 1/3 grating of 1.5 2.5mm) is most probably full, can put sand during the supporting as one feels fit and make bow member sinking release, removes for the release of steel arch but must keep three one-tenth above sand amounts; Wire lath is loaded and can manually be dredged dribbling when excessive with release and repair damaged; During stability of the roadway fast-assembling arch can remove in advance or before back production progressively apart from removing (wire lath also should reclaim), the reinforced concrete arch back production avalanche of then sacrificing one's life for; Parts such as steel arch, release, wire lath should be listed fixed capital management in, are coated with the antiseized cement paste of butter during use, and mopping is antirust during placement.
Supporting mechanism is: flexible two arches can be reinforced sealing zone circle rock, its compressive strength under two-way constraint is increased be the several times of single shaft intensity; Semiclosed band makes water-swellable rock and soft broken rock be able to the rheology release of pressure; Quicksand release+steel arch is formed fast-assembling arch replacement hydraulic support and has been realized that manufacturing and easy and simple to handle and cost reduce.
For the soft break rock mining tunnel, this technology is compared with conventional bolting and shotcreting with wire mesh, and sharpest edges have three: one, the Acceptable life of bolting and shotcreting with wire mesh only 3--6 month, and this technology can reach more than 15 months; Its two, be easy to rebuild maintenance because semiclosed band allows the country rock inbreak with release, confining zone then keeps the use section in tunnel and moulding constant substantially; They are three years old, owing to finally have only the back production avalanche of sacrificing one's life for of a reinforced concrete arch, so support cost is cheap, a scrap cost of the every joint supporting of this technology length (confining zone+semiclosed band=0.8 meter) is a 300--350 unit, depreciable cost is a 100--150 unit, is about the 50--60% of anchor net spray support cost.
Fig. 1 is among Figure 1A: 1--timber wedge, 2--steel concrete, 3--headblock sheet, 4--steel arch, 5--quicksand release, 6--wire lath.Fig. 2, Fig. 2 A, Fig. 2 B are steel arch shop drawings, among Fig. 3: 1--8# reinforcing bar " W " type link, 2--6# reinforcing bar " O " type reinforcing cage.Fig. 4, Fig. 4 A, Fig. 4 B, among Fig. 4 C: coupling (1) and sand piston (3) welding, (2) are the location semi-ring, (4) are joint ring, sand cylinder (5) and base (9) welding, sand valve seat (7) is adaptive with sand cock (8), and (6) are quartz sand.

Claims (1)

  1. The sand pressure release double arch semi-enclosed support technology in soft break rock mining tunnel.The invention belongs to the mining technique field.Its major technique characteristics are: quicksand release+steel arch is formed flexible fast-assembling bow member and is constructed second layer steel concrete injection arch as supporting and moulding loose tool, the synthetic sealing protecting band of two arches.Only hang wire lath support rubble and allow country rock rheology, inbreak with release between the sealing arch, width such as two bands are arranged at interval.Remove fast-assembling arch and wire lath before the back production, only stay the concrete arch back production avalanche of sacrificing one's life for.
CNB971159785A 1997-10-25 1997-10-25 Sand pressure release double arch semi-enclosed support technology for soft break rock mining roadway Expired - Fee Related CN1133795C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB971159785A CN1133795C (en) 1997-10-25 1997-10-25 Sand pressure release double arch semi-enclosed support technology for soft break rock mining roadway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB971159785A CN1133795C (en) 1997-10-25 1997-10-25 Sand pressure release double arch semi-enclosed support technology for soft break rock mining roadway

Publications (2)

Publication Number Publication Date
CN1215792A true CN1215792A (en) 1999-05-05
CN1133795C CN1133795C (en) 2004-01-07

Family

ID=5173589

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB971159785A Expired - Fee Related CN1133795C (en) 1997-10-25 1997-10-25 Sand pressure release double arch semi-enclosed support technology for soft break rock mining roadway

Country Status (1)

Country Link
CN (1) CN1133795C (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101749034A (en) * 2010-02-10 2010-06-23 辽宁工程技术大学 Shoring method for prolonging service cycle of soft rock laneway
CN103032080A (en) * 2012-12-21 2013-04-10 江苏建筑职业技术学院 Support method of weak and broken surrounding rock tunnel
CN105019928A (en) * 2015-08-05 2015-11-04 中国十九冶集团有限公司 Construction method for tunnel arch bar planting and wall protection
CN105422140A (en) * 2015-12-30 2016-03-23 马钢(集团)控股有限公司 Template supporting device for concrete supporting construction of shaft and lane engineering
CN110397455A (en) * 2019-08-06 2019-11-01 樊建昆 Highway soft rock tunnel bilayer arch supporting construction system and its construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101749034A (en) * 2010-02-10 2010-06-23 辽宁工程技术大学 Shoring method for prolonging service cycle of soft rock laneway
CN103032080A (en) * 2012-12-21 2013-04-10 江苏建筑职业技术学院 Support method of weak and broken surrounding rock tunnel
CN105019928A (en) * 2015-08-05 2015-11-04 中国十九冶集团有限公司 Construction method for tunnel arch bar planting and wall protection
CN105422140A (en) * 2015-12-30 2016-03-23 马钢(集团)控股有限公司 Template supporting device for concrete supporting construction of shaft and lane engineering
CN110397455A (en) * 2019-08-06 2019-11-01 樊建昆 Highway soft rock tunnel bilayer arch supporting construction system and its construction method

Also Published As

Publication number Publication date
CN1133795C (en) 2004-01-07

Similar Documents

Publication Publication Date Title
CN1163660C (en) Steel bar reticulated shell support and reticulated shell anchor-shotcrete support method
CN102562093B (en) Full-length anchoring supporting method with intensive resin anchor rod and anchor-shotcrete net
CN101539021B (en) Road tunnel excavation method
CN106702914B (en) A kind of hardened system and its construction method promoting concrete structure bearing capacity
CN108775252A (en) The supporting construction and method for protecting support in Deep Soft Rock tunnel
CN110566249A (en) Temporary support for coal mine tunnel
CN1215792A (en) Sand pressure release double arch semi-enclosed support technology for soft break rock mining roadway
CN206668276U (en) Arch device is changed in the movement that a kind of tunnel initial support invades limit section
CN111980707A (en) Method for reinforcing fault broken zone bottom column by natural caving method
CN105952459B (en) A kind of tunnel pin-connected panel preliminary bracing method
CN111411978A (en) Clamping plate type supporting structure for adjacent ore removal roadways and construction process thereof
CN109751062A (en) One kind facing sky fender Floor Heave in Roadway control method
CN117307214A (en) Underground mine safety support device
CN219119272U (en) Tunnel primary support structure with hydraulic pressure lets pressure function
CN208252138U (en) A kind of natural caving method bottom structure two-ended cables and combining anchor support system
CN112901226A (en) Ultra-thin roof roadway supporting method under goaf
CN103850259A (en) Horizontal inner support at capping beam elevation of foundation pit supporting and protecting system and construction method thereof
CN2758486Y (en) Fast supporter moving device of 'three soft' coal layer composite mining top coal supporter series
CN214062999U (en) Mine supporting device
CN210483763U (en) Mine tunnel roof supporting device
CN110656784A (en) Ore bin repairing method
CN219033253U (en) Spraying anchor support device for weak rock slope construction
CN217055207U (en) Tunnel is first a steel bow member connecting plate protection device
CN221195081U (en) Underground mine safety support device
CN216342312U (en) Novel underground water retaining wall for filling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee